Forwards Executed Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Cessar - Final Design Approval, Westinghouse Std Plant - Final Design Approval. Project Identification Summary Also Encl.W/O Std Order
ML20127L754
Person / Time
Site: 05000000, 05000470
Issue date: 05/03/1983
From: Ogeka G
ENERGY, DEPT. OF
To: Dandois D
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-3705, FOIA-84-243 NUDOCS 8505230075
Download: ML20127L754 (3)


Text

e

/

c

_,. s 9

v.,.

E r. cr* ment Of En-3 g" 2 :c.:na:e:'..,.rea Oi: ice r

...,... o 3,. v. t.....t

ay 3, 19t:3

.c t..

m 11.1. f.'ucl<2ar /' evulatory Corn-ission C~*1:

Mane 3. Dvir!<21s M'1ce si Venos.ree not. c. ent r*.,sien nc,,. erg,., t, p, re*fn :an, '...-. 2 '.t M t

e.t 1: ?s 1.s.

T.r c l ue.d i t an eT:ecuted ecpy of ITC Forra 173, Stanstard Crder for DCY.

  • .ork 7%. 70-M-400, FI'l A-17fM for *wr' to he performad by Brookhaven

..atir.an! I- !bora tort 4 e r :m : e.

~,: 'd'.

6 weed t.pon "inennsters t' te date

>it' Carol Patric, P."C, tne M1 :Junb-r han 1eeti chenred freur 20-19-40-41-1 to 70-19-40-44-3.

tiraarn1*,

0

  • 4 ' S ^

. o >.., r v...

5 1,t.n t en t f ro 3rnn&

f ncioneret en rt-ten oc v/encia 2 t Pe r.t ev. TS U, "-415. m' W ',

4 C. Cro

  • ti, R 't.
f. /. Parber, EP-34, CTN, HO S

8505230075 841002 PDR FDIA SHOLLYB4-243 PDR

y.

jQ-l }/ lc/

l lV $

s

' ' ~ ',

m

.. OFFICE OF NUCLEAR REACTOR RE6._ATION d

PROJECTIDENTIFICATION

SUMMARY

(PIDS)

/ \\>J 6ff8[,:

/OMl b d2 w_gA_

"' BER h?hb5:"i?f13:ahbFam%s :aessu-reR"" ^ ' '

CONTRACT UMBER (Non-DOE):

B&R NUMBER.

3RR E TI G

~

20-19-40-44-3

'INDEX NO.:

DIVISION: DSI BRANCH:RSB PROJECT MANAGER: J. Meyer CONTRACTOR: ENL CONTRACT METHOD: DOE Work Order i

CITY, STATE (Non-DOE):e SHAll. BUSINESS / MINORITY CONTRACT (Non-DOE):

SUB-CONTRACTOR (S):

.M-YES / /

NO.. /. /

AMOUNT $

PROJECTED PERIOD OF PERFORMANCE.

  • START: li,i/pA(est) END: 9/30/85 f,

i ~,,

PROJECTED FINANCIAL DATA (000's)

%/kbD PROJECT FY 1983

~~

TOTAL TOTAL TOTAL CARRY FY 83 FY 84 FY 85 VALUE OBLIG COSTED

'0VER BUDG

~

BUDG BUDG 00 M (0 l&

m-4 om

~

/

M A \\1/ 1 If a f I J t /

APPLICATION (RELATE THE PROJECT TO A SPECIFIC PLANNED ACCOMkISHI5NYI Review of PRA studies for:

1.

CESSAR System 80 FDA review l

2.

Westinghouse Standard Plant FDA review

  • e og l

~

i l

G m

u

s.,.,.i.

3 J -

~ WORK REQUIREMENTS (DESCRIBE WHAT IS TO BE PERFORMED)

Tha followin'g analyses and asse'ssmerits will belerformd by this project: core-melt accident progressions with emphasis on containment loadings (pressure and temperature) x and containment failure characteristic; evolution and release of radiological source term during core-melt accidents from fuel, primary system, and containment system; radiological consequences to the public from core-melt accidents; and safety benefit from features to mitigate the consequences of core melt accidents. To support these analyses, the contractor will be required to maintain and modify the MARCH, CORRAL, MATADOR'and CPAC-Ccdes as required in 1:;ht of the current RES MARCH-2 and MELCOR development assimilate results of pnenomenological studies (RES, ID00R, foreign, and DOE) program and and engineering research programs.

In addition, an overall integrated assessment which considers '

all of these factors will b'e prepared for design. Products: miscellaneous letter reports for ir.put to SERs, input to hearing testimony, if required.

Major Product:

(2) NUREG/CRs - FY 1985.

t

1. :

MODIFICATIONS (DESCRIBE MAJOR CHANGES TO THE PROJECT) e COMPLETE AS APPLICABLE -

Reconsnended:

Endorsed:

Endorsed:

Endorsed:

Approved:

PROJECT MANAGER SECTION LDR BRANCll CHF ASST DIR.

DIV. DIR (Initials)

(Date)