Monthly Operating Repts for Dec 1991 for Beaver Valley Power Station,Units 1 & 2
ML20087B334
Person / Time
Site: Beaver Valley
Issue date: 12/31/1991
From: David Jones, Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9201130091
Download: ML20087B334 (9)


Text

l 1

l 4 , hk Duquesne Lifit _ , _ - , -

uw:,ea,o.oup P O Bom 4 S* opp ngport P A t$C 7 7-OC.'J4 Januat'f 8, 1992 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, Licenso No. NPF-73 Monthly Operatim Rennrt U. S. Nuclear Regulatory Cammission Document Control Desk Washirgton, D.C. 20555 Gentlemen:

In accordance with Apperdix A, Technical Specifications, the Monthly Operating Report is subnitted for Unit 1 ard Unit 2 for the nonth of Decettber, 1991.

Very truly yours, k

J. D. Sieber Vice President Nuclear Group DTJ/Img Enclosures cc: NRC Regional Office King of Prussia, PA

.- ,,, - ~

6 ,Vla- lkbCV ?.0 005=~ '

_a run i

- . =w 1

l NARRATIVE SU HARY OF

}OtIIHLY OPERATDG EXPERIDE UNIT 1 DFrTeiBER 1991 Dx der 1 'Ihe Unit crntinuM power ascension to 100% outpit following shutdown for repairs to the River Water Pumps aM "C" Reactor Coolant Iuip lictor. 100% output kus achieved at 1236 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.70298e-4 months <br />.

C+r*' er 2 'Ibe Unit operated at a ncminal value of 100% output, thrur3h Dxsiw 31

N."JVGE DAILY UNIT IWER IEVEL DOChT.T NO. 50-334 UNIT E .llnit 1

[ ATE _Jmi, .L 1992 CDG'IEI'ED BY _ Ebvid T. Joneg_

TEIEEUQNE (412) 393-7Ga_

imIH December 1991 DAY AVERAGE DAILY FOWER IEVEL [AY AVERAGE EAILY PChTR IE'EL

(!Ue-Net) (!&e-Net) 1 793 17 833 2 825 18 833 3 813 19 833 4 829 20 _

829 5 821 21 829 6 825 22 833 7 821 23 825 8 838 24 833 9 825 25 833 10 842 26 833

'll 829 27 838 12 833 28 829 13 825 29 829 14 825 30 833 15 838 31 833 16 825 DETRUCTIOS:

-On this format, list the average daily unit y level !Ge-Net for each day in j_ the reportiny conth. Canpute to the nearest whole regawatt.

OPERATING DATA REPORT DOCKET NO.: 50 334 REPORT DATE: 01/03/92 COMPLETED BY: DAVID T. JONES .

l 4- TELEPHONE: (412) 393 7612 l OPERATING STATUS 11 UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes

2. REPORTING PERIOD: DECEMBER 1991
3. LICENSED THERMAL POWER (MWt): 2652

' 4. NAMEPIATE RATING- (Gross MWe): . 923

5. DESIGN ELECTRICAL RATING (Net MWe): 835

.6.. MAX. DEPENDABLE CAPACITY (Gross MWe): 860

7. MAX. DEPENDABLE CAPACITY (Net MWe): -810 8.- IF CHANGES OCCUR IN. CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
9. POWER LEVEL =TO WHICH RESTRICTED, IF ANY (Net.MWe): None 10; REASONS FOR RESTRICTIONS, IF ANY: ___ N/A THIS MONTH YEAR TO DATE CUMULATIVE ,

112 HOURS IN REFORTING PERIOD: - 744.0 8760,0 ~137352.0 4

.12, NO. OF HRS. F ' TOR WAS CRITICAL: 744;0 5029.2 85323.6-

-13. REACTOR RESEnvE SHUTDOWN HOURS: 0.0 0.0 4482.8

-la, EOURS GENERATOR'WAS ON.LINE: 744.0 4886.2 83431.2  ;

15.. UNIT RESERVE SHUTDOWN HOURS:

- 0.0 0.0. 0.0

-16; CROSS THERMAL' ENERGY CEN. (MWH):

1967980.0 12223729.0 198512176.5 ,

17, CROSS ELECT. ENERGY GEN. (MWH): 652030.0 3965674'.0 63798403.0 3703350.0

.18.; NET ELECTRICAL ENERGY GEN.-(MWH): 616450.0 59567550.0 19.' UNIT.. SERVICE FACTOR: (PERCENT) 100.0= 55.8 - 62.8

' 20 ' .-UNIT AVAIIABILITY FACTOR:(PERCENT) - 100.0' 5 5 .- 8 _ 62,8 21;. UNIT' CAPACITY' FACTOR (MDC): PCT --102.3

- 52.2 - 56,3'

22. UNIT CAPACITY FACTORc(DER): PCT 99.2 50.6 54'. 6 -

23.= UNIT-FORCED.0UTAGE RATE:"(PERCENT) 0.0 22.9- - 16.7 24.DSHUTDOWNS. SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

~

=25. IF SHUT DOWN AT END'OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

J26.. UNITS-IN TEST' STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

-W w.i.#y pr.- -o--g-p

. g-y .,M.

-- .r vi mg =m-w us-gw T'My--

l' Docket N3. 5D-334 .

{

UWlf SHUIDOWNS AND POWER EEDUCTIONS (>20%) 8vPS Unit #1 Unit Name Date January 5. 1992 Completed By David T. Jones T elephone (411) 393-7612 REPORT MCMtM DECEMBER 1991 Method of Licensee Cause & Corrective Event System Component Action to Duration Shutting Report # Code 4 Code 5 Prevent Recurrence No. Date Typet (Nours) Reason 2 Down Reactor 3 NCNE l

i l

l l 3 4 1 2 Method: Eshibit F-Instructions for I F-Forced Reason:

1-Manus t Preparation of Data Entry Sheets S-Scheduled A-Equipment f ailure (Emptain) for Licensee Event Report (LER) File 8-Maintenance or Test 2-Manuel Scram l 3-Automatic Sc*am (suRECD161).

C-Refueling 4-Cont'd. from Previous Month D-Regulatory Restriction 5 E-Operator Training & License Esam 5-Reduction 9-Other Enhibit M-Same Source.

F-Administrative G-Operational Error (Esptair.s N-Other (Emplain) l l ,

l l

M

}

NARPATIVE SUN %RY OF

- i

)DTIHLY OPERATING EXPERIDfCE ,

UNIT 2 i DE:CINBER 1991 he Unit continued to operate ar. amroxinately 46% output to r+Mer 1 load follow.

LWWr 2  % e Unit was returned to 100% output at 1155 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.394775e-4 months <br />.

_%r 3 S e Unit operated at a n minal value of 100% output..

through.

rw=nha" 5 y

C+  ; +r 6 At 2100 hours the . Unit m.a aed . load reduction to aproximately 45% output to load follow.

rw=nhar 7 = 2e ' Unit continued to operate at approximately.45% output to~

- load follw.

Decentx 2 8 .We Unit was returned to 100% output at'1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />. '

NWr '9 2 e Unit operatadlat a'naminal value'of 100% output. -

through

-. rw W r 24 December 25 At ~ 0001_ hours the Unit w.w.=d load ' reduction to approximately 28% cutput to load follow, r* =nhar 26- ' We Unit continued to operate at approximately:28% output to through _ load follow.

nanmhar 29.

rwwnhar ' 30 .At '0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit began swalation to a ncaninal value of 100%. output.

Decenbar 31' - 2e Unit operated'at a ncaninal value' of 100% output.

L i

i-l ^

[i I

. _ . . . _ -= ~. . _ ._._.,_.-. -. _ . . _ . __. _, ..

e 4

-* AVERME DAILY UNIT F0WER IEVEL DOCKET No. 50-412 .

UNIT BVPS Unit 2 DATE Jan. 3,1992 CCMPILTED BY David T. Jones TELEIHONE (412) 393-7612_

i PON1H M ahar 1991

' DAY AVERME DAIIX POWER LEVEL DPX AVERAGE DAILY KMER LEVEL G"% Itt) ()Me-Net) 1 339 17 814

'2- 690 18 816 ,

~

= 3 .. 811 19 815 4- 813 20 812

5: 816 _ 21- 809-

-6L 798 22 810 ,.

7 U5- 23 807

'8 631 24 812

.9 817 25 ._ 243

~

10- 819 26 1~10 11 817 27 17 5

- 12 814 28 165 13 812 29- 171

. 14 816 30 638

- 15 817 :31 817

. 16 'c16 INS'IRUCI'ICNS:

- On this_ format, list the averags daily unit power level )We-Net for. each day in

- the reporting month. Ctrrpute to the nearest whole megawatt.

j i

l OPERATING DATA REPORT j DUCKET NO.: S0 412  !

i REPORT DATE: 01/03/92 COMPLETED BY: DAVID T. JONES l TELEPl10NE: (412) 393 7612 l t

OPERATING RI M E  ;

1-

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERICD: DECEKBFR 1991
3. LICENSED TalERMAL POLPA (MWt): 2652 t
4. NAMEP! ATE EATING (Gross MWe)
923 ,
5. DESIGN ELECTRICAL RATING (Net MVe): 836 l
6. MAX. DEPENDABLE CAPACITY-(Cross MV(). 870 i
7. tiAX. DEPENDABLE CAPACITY (Net MWe)
  • 820 -

.8 IF CHANGES OCCUR-IN CAPACITY P.ATINGS SINCE IAST REPORT CIVE REASONS:

9; POWER Ls. VEL TO VilICH RESTRICTED IF ANY (Not MWe): None ,,,, _ l 10, REASONS IVR RESTRICTIONS IF ANY: N/A , _

m

. .- l TitIS MONTH YEAR TO DATE CUMUIATIVE 1 t

. 11. HOURS IN REPORTING PERIOD: 744.0 8760,0 36135.0

12. NO. OF HRS. REACTOR VAS ' CRITICAL:: 744.0 8732.9 31080,2
13. REACTOR RESERVE SHUTDOWN 110URS: 0.0 0.0 9.0 'r
14. HOURf CENERATOR WAS ON LINE. 744.0 8720.2 30882.0  !
15. l' NIT RESERVE SilUTDOWN 110URS: 0.0 0.0 0,0
16. CROSS THERMAL ENERGY CEN. (MWH): 1636067.0 2223213140 73359747.4 .

17.-GROSS EI.ECT. ENERGY GEN.-(MWH): $25760 0 7137781.0 24174581.0 ..

o. 18. NET ELECTRICAL ENERGY CEif. - (MVH): 495344.0 6762161.0 22805485.0 r

.19. UNIT SERVICE FACTOR:-(PERCENT) 100.0 99.5 85.5- *

20. UNIT AVAIIABILITY TACTOR:(PERCEFT) 100.0 99.5 85.5 '
21. UNIT CAPACITY FACTOR (MDC): PCT 81.2 94.1- 76,2  ;
22. UNIT CAPACITY FACTOR (DER): PCT 79.6 92.3 75.5

. 23.-UNIT FORCED OUTAGE RATE '(PERCENT) 0.0' O.5 3.9- '

24. SHUfDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACll):

THE ' PIT IS SCHP.DU1 Fn TO SHUTDOWN FOR IT* S THIRD MEFUILING OUTME ON ,,,,,,

MARCH 13. 1992. THE REFUE1.ING OUTAGE IS SCHEDUt Fn TO 1AST FOR 70 D,i"

-'.5. IF SHUT'DOWN AT'END'0F REPORT PERIOD.-ESTIMATED DATE OF STARTUP:

26. UNITS-IN TEST STATUS ~(PRIOR TO COMMERCIAL OP RATION):

FORECAST ACHIEVED  !

INITIAL CRITICALITY N/A N/A-

-INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 3 u

, w n - , -,-m w., --++,,,,n,,,-n,- -r,~,,.--n,--ss-vr~ av,, ,,-:a n e,-w'v w,,, ,-- r , , ,, ., w ,w ww wv m ,mm, -,,.r-,,--,,-wwww ,-r,,er,nm.,.,,,,,,w, ,m,,

UNIT EMUIDOW45 AND POWER REDUCTIOuS Q20%) Becket so. 50-412 .

tinit some gyrs ts it e2 Catt JeNery 3. W Co=pleted By _Devid T. Jone _

REPoti MouTN CYCE88Et 1991 Telephone (4121 't93-7612 k Method of Lisensee Cause & Corrective f Ouratien Shutting Event 5ystem Component Act f oct ta po, Date Typel ,j (sours) Reason 2 Loun teactor3 Report # Code 4 Code 5 Prevent seeverence 15 911201 5 0 a 4 m/A Z2 IZZZZZ Unit continued to operate at 44%

wtput to toed f ollow.

16 9112D6 5 0 N 5 m/A , ZZ ZZZZZZ tmit opersted et 45% eu pus to g load fottew.

17 911Z25 S 0 4 5 m/A ZZ ZZZZZZ Unit operated at 23% output to Jood follow, j

l

^

l

?

t i

. I I-i l 1 i

! 2 5 &

F-Forced Reason: Method- Eshibit F-Instructions var S-$cheduled A-Equipeent tellure (Explain) 1-Manu.1 Preparation of Cata Entry Sheets s-meintenance or Test 2-manual Scram f or Licensee Event 8eport (LEs) File C-tefueling 3-Autoestic seres (wJaEG0161).

3-Regulatory aestriction 4-Cont'd. free Previous month E-operater Training & License Emme 5-teduction 5 T-Admi*ilstrative 9-Other Eshtbit e-Sese source.

G-Opetstionel Error (Esplein)

M-Othee (Emplain)