%!I A.BC+89f" UNITED STATES ATOMIC ENERGY COM' MISSION DMSION OF COMPLIANCE
- 1. LICENSEE
- 3. REClONAL OFF8CE JERSEY CENTRAL POWER AND LIGHI Co.
U. S. ATOMIC ENERGY COMMISSION Madison Avenue at Punchbowl Road Region I, Division of Compliance Morristown, New Jersey 970 Broad Street Newark, New Jersey 07102
*'"Y1T'1T" October 13-16, 1970
- 5. The following activities under your license (identined in Item No. 3 above) appear to be in noncompliance with AEC regulations ce license requirements, as indicated.
a.
Contrary to the requirements of Technical Specification 3.1, Table 3.1.1, item H.2, the trip setting for the "high flow" instrument in the condensate line (input into the isolation condenser isolation circuitry) was set at 59 inches d P H O from December 9, 1969 through July 1, 1970.
2 Technical Specification 3.1, Table 3.1.1, item H.2, requires the trip setting for the high flow instrument in the condensate line to be dE27 inches A P H 0.
2 b.
Contrary to the requieements of Technical Specification 4.7.A.3, the diesel generators have not been given a thorough inspection since the issuance of the provisional operating license on April 9, 1969.
Technical Specification 4.7.A.3 states that, "Each diesel generator shall be given c. thorough inspection at least annually."
c.
Contrary to the requirements of Technical Specification 4.7.A.5, the cell temperature measurements and the height of electrolyte measurements have not been performed quarterly on the diesel generator starting batteries.
Technical Specification 4.7.A.5 states that, "The diesel generators' starting
. batteries shall be tested and monitored the same as the station batteries, Specification 4.7.B."
Technical Specification 4.7.B.3 states in part that,
"... the temperature reading of every fifth cell Gn@ the height of electrolyte... shall be measured every 3 months."
d.
Contrary to the requirements of Technical Specification 4.7.B.3, the cell g
temperature measurements and the height of electrolyte measurements have not rv been performed quarterly on the 125 volt station batteries.
8 Technical Specification 4.7.B refers to station batteries. Technical specifica-oo tion 4.7.B.3 states in part that, ".
. the temperature reading of every fifth Q
cell OtnO the height of electrolyte... shall be measured every 3 months."
h O
g g e.
Contrary to the requirements of Technical Specifications 4.5.K and 4.5.L, the standby gas treatment charcoal and particulate filters were not tested for y
removal efficiency within the required six-month interval. The charcoal i
filters were tested on January 31, 1970 and August 20, 1970. The particulate i
filters were tested on January 19, 1970 and on August 18, 1970.
Supplementary page 2
attached. 1a 3. McDermott. Reactor Inspector g
AsC Complien.e la.p.eter Date
t
.+
m i
i (He UNITED STATES ATOMIC ENERGY COMMISSION DIVISION OF COMPLIANCE i
SUPPLEMENTARY SHEET 2
2
' Jersey Central Power & Light Co.
Page or p.,,,,
tic u,,
- 5. (Continuediroen Form AEC-592) i Technical Specification 4.5.K states in part that, "The charcoal filters of the standby gas treatment system shall be tested to demonstrate a halogen removal afficiency of not less than 99%. These tests shall be conducted
... at intervals not to exceed six months between refueling outages."
Technical Specification 4.5.L states in part that, "The particulate filter shall be tested to demonstrate a particulate removal efficiency of not less than 99% for particulate matter. which is greater than 0.3 micron in size.
i These tests shall be conducted... at intervals not to exceed six months between refueling ottages."
f.
Contrary to the requirements of Technical Specification 3.5.A.6 the 02 l'V*l within containment exceeded 5.0% for a period of at least 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> during operation on June 4,1970.. The plant had been in operation in excess of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to this period.
Technical Specification 3.5.A.6 requires that, with the exception of a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ptfor to a scheduled shutdown and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after placing the reactor mode selector switch in the run mode, the containment atmosphere be <'. 5% 02-and that if this specification cannot be met, the reactor shall be placed in the cold shutdown condition.
t r
O co a io~ O co *cio u arca. O L.= weaoou artas.
OsHEIN.La LICENGER.