ML20087A211
| ML20087A211 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 11/08/1968 |
| From: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20086U000 | List:
|
| References | |
| FOIA-95-36 NUDOCS 9508040225 | |
| Download: ML20087A211 (1) | |
Text
-.
4\\
_n >
- ~
y 4
g;c4 c
g o
T U'.4TED STAT OS l
Ciw iC ENERGY COMMISSION
$[14v A-(
)
j hl
- -;#)%
awwfCywJ W ASHINGTON. D.C. 20545 j
NOV 8 1968
'i I
R. E sayd, Assistant Director for Reactor Projects pi- [ph-)
'f
!f.
Division of Rec..or Licensing (2)
>y f'f.
JEPS Y CENTRAL POWER AND LIGHT CGGANY (0YSTER CREEK) f DOL.dT No. 50-219 l
)
V Is The enclosed inspection report on the subject facility, which is
'f forwarded for information, provides supplementary information i
{
obtained during the period from May 7, 1968 through September 20 l
1968. This report supplements the information contained in t,
CO Reports Nos. 219/68-5 and 219/68-6.
The results of recent inspection activities in the areas of out-l standing plant quality issues, electrical separation of cables, f
cable-tray loading, outstanding preoperational testing issues, y
and startup and power ascension testing will be forwarded to you I
by November 15, 1968. A draft report, covering our recent in-i.
spection on electrical systems and cable tray loading, was hand
(
delivered to cognizant DRL personnel on November 7,1968.
\\
f..
Origtnal signed by J. P. O'Rellty
(.,'
{[
J. P. O'Reilly, Chief Reactor Inspection and I
i-Enforcement Branch Division.of Compliance I
h i
,4 i
Enclosure:
i S
CO Report No. 50-219/68-7
~
f cc w/ enclosure:
{
r f
E. G. Case, DRS f
S. Levine, DRL (6)
D. J. Skovholt, DRL (3) q h
L. Kornblith, Jr., CO o
J. G.
Da'._s, CO:II g,h gg t
j B. H. Gru, C0:111
)
i D. I. Walker, CO:IV R. W. Smith, CO:V g
i QL.T. G t son, CO:I w/o enc 1 REG Cent..A File j
l s
9508040225 950227 PDR FOIA DEKOK95-36 PDR
"" -" "~ ' ~ "~ ' " '" ~ ~" ~""m Wr;~ N
_