ML20087A242
| ML20087A242 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 12/04/1968 |
| From: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20086U000 | List:
|
| References | |
| FOIA-95-36 NUDOCS 9508040241 | |
| Download: ML20087A242 (1) | |
Text
-
i 1
.c ___
JP JI~'.
g
't
[4
~
UNITED STATES
'b W
4 ATOMIC ENERGY COMMISSION I
"~
4My' WASHINGTON. D.C. 20545 l
ac4 se
'..~
.R.
S.-Boyd,' Assistant Director
)
for Reactor Projects
_7
' Division of Reactor Licensing (2)
JERSEY CENTRAL POWER AND LIGHT CQ4PANY (0YSTER CREEK)
DOCKET No. 50-219 1
i /-
The enclosed report of a special inspection of the subject facility
- w]
on October:15-18, 1968, is forwarded for informccion. The report I
'1 provides detailed information on deficiencies identified by Compliance l
during special audits of the isolation condenser system and selected aspects of the plant electrical installation. The report, describes the results of two significant meetings held at the, site'on October 1 and 10, 1968.
+
Resolution of identified deficiencies is being pursued by GE/JC and by Compliance. Based on the results of a Compliance meeting with GE/JC i
at the site on Nove:r.ber 21, 1968, it appears'that' responsible actions
.I have been initiated to satisfy our concerns.- We plan to conduct an additional inspection of the electrical area during the week of Decem-
+:
ber 9-13.
We will keep you informed of significant developman'es.
Odiksi M
' F.1. NNang(
J. P. O'Reilly, Chief I
Reactor Inspection and
[
' Enforcement Branch Division of Compliance
Enclosure:
CO Report No. 50-219/68-8 cc w/ enclosure:
E. G. Case, DRS S. Levine DRL (6)
D. J. Skovholt, LaL (3) j L. Kornblith, Jr., CO.
}
R. W. Kirkman, CO:I l
J. G. Davis, CO:II B. H. Grier, CO:III D. I. Walker, CO:IV j
R. U. Smith, CO:V
'j LR. T. Carlson, CO:I REG Central File j
9509040241 950227 PDR FOIA DEKOK95-36 PDR
,,, -.