Summarizes 671018-19 Site Visit to Obtain Info on Final Preoperational Insp Program
ML20087A033
Person / Time
Site: Oyster Creek
Issue date: 10/23/1967
From: Nolan F
US ATOMIC ENERGY COMMISSION (AEC)
To: Moseley N
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086U000 List: ... further results
References
FOIA-95-36 NUDOCS 9508040155
Download: ML20087A033 (2)


Text

[j yp 1

H' 7~P'~'F#Trha o

EN 7 6:a ~

l f fem-

3.w

= = = = = -,

f..

~

e m c.. w b

.. s

. UNITED STATES GOVERNMENT 4

Memoraridum.

~

OTO. g : N. C.,Moseley, Acting Senior Reactor DATE: October 23, 1967 M

'Inspeg, tor' Re on I',

Division of Compliance

~.f

-4 5

Ab<-

FaoM :

.J.

an, spection Specialist (Reactors)

g,

Division of Compliance, HQ

~

SUBJEcr: INITIAL COMMENTS CONCERNING THE JERSEY CENTRAL POWER

& LIGHT COMPANY, OYSTER CREEK, INSPECTION PROGRAM

...r?

A f ~ jl4 I visited the Oyster Creek facility on October 18 and 19, i

4 1967, in conjunction with the final preoperational in-spection program.

During the visit, Carlson and I re-j quested specific information concerning various aspects of tie program.

The following is a list of the informa-

}

4 tion requested and its status:

d 1.

Information Requested

(

a.

Detailed initial loading and startup testing program.

4 b.

List of outstanding work.

c.

List of all testing to be done.

2.

Information Provided i

a.

List of preoperational tests to be performed, in-dicating those required for initial fuel loading and those, in GE's opinion, that.:an be deferred.

However, a cursory review revealed that a number of

]

necessary testa such as:

(1) primary and secondary b

containment leak rate test and (2) absolute and f -)

1 charcoal filter testing, were missing.

General discussions revealed that many of the tests will be performed in two stages,

i.e., cold and hot.

The cold.

testing will be performed prior to initial fuel loading g*

and the hot testing will be performed during the initial 4

loading and startup testing program.

The hot testing J

7 3

Y 9508040155 950227 PDR FOIA l

}

,DEKOK95-36 PDR 7,.

Buy U.S. Saving Bonds Regularl.1 on the Payroll Saving Plan

..k i.

_~

__a...

. ap; es: m.

t

.Jf

.g h

t,

i i

includes hot control rod testing and a number of other vital f

j items.

This program is only described'in this.initia1 loading

.~

and startup testing program that is being prepared at San 1

Jose and unavailable for review. In my view, it is impossible

{

~t to make a finding concerning the accelerated GE startup program i

until all testing information is available for review.

jp, i

r 3.

Meeting with Site Personnel l

?

We spent part of the first day with Jersey Central and GE personnel.

At the completion of this visit we had an informal agreement with both organizations in which we i

would meet with them again the following morning.

However, 1

both groups were attending meetings and unavailable for a maj or portion of the morning.

?

cc:

R. T. Carlson, CO:I 1

I

?

i i

i

~

r b

L i

I 7 4 i

i i

I N

Y T

/L

-