Forwards Co Rept 50-219/69-06 on 690527-28 & 0623-27.Mann Assigned Responsibility for Determining Satisfactory Resolution of Outstanding Issues Involving NDE of Atapco Piping within Drywell
ML20087A597
Person / Time
Site: Oyster Creek
Issue date: 08/15/1969
From: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086U000 List: ... further results
References
FOIA-95-36 NUDOCS 9508070080
Download: ML20087A597 (2)


Text

{{#Wiki_filter:gh@, ~ 13 4# m.m.

d. T. C e ls a n

~ ,mq ( h j+ - UNITED STATES ATOMIC ENERGY COMMIS510N ~ j; '. -g* 1 j WASHINGTON. D.C. 20545 { AUG 15 Slie j' ,j 1 w, R. S. Boyd, Assistant Director ~ 1 ~ for Reactor Projeets 4 '. Division of Reactor Licensing (2) JERSEY CENTRAL FOWER AND LIGHT COMPANY (0YSTER CIEEK) - DOCKBT no. 50-219 J;y: 4 The enclosed report of inspections to the subject facility on May 27-28 1@ and June 23-27, 1969, 'is forwarded for information. The May inspection vas made to review items that were not resolved at the time the limited i Provisional Operating License was issued. The inspection in June S was made to verify the substantive information contained'in Amendment j-No. 53 Preliminary findings from th!3 latter inspection were for-4i varded to DRL in our memoranda dated June 25, d6, and 30,1959 d N Following the decision to require the licensee to conduct additional ~ -Q ;i ap nondestructive examinations of ATAPCO, piping within the ciryuell, to f. require review of records of important components and to complete additional nonGentructive testing on certain valves within the pri-i mary coolant boundary, Dr. Mann was assigned the responsibility for determining satisfactory resolution of outstanding issues. In Mfj this regard, Co.mpliance assisted Dr..Mann in inspections to the Oyster c Py: Crook cite on July 17-18, 1959, end to GE-San Jose and X-Ray Engineerin5;-- ils i San Mateo on July 17-19 and July 28-29, 1959 The findings from these jt W) inspections are sumarized in Dr. Mann's memorandus dated August 1,-1969 \\ It is interesting to note that the~ plumbness of the recirculation Pimp motor, units was not measured during the preoperational primary system expansion test. A.0E reprecentative stated that one of the reasons for not requiring such measurements was that no problems d had been experienced with the pump bearin3s during preoperational 4 i checkouts. In view of the current problem Vith the "D" loop re-2l circulation pump, Compliance is closely following the JC/GE in-

v. -{

vestigation into the cause of the problem to assure that the .dk problem is not generic.

iwf, i

s 4 \\.Il / b [4-- g . P. O'Reilly, bief Reactor Inspection and Enforcement Branch A. Division of Compliance l d' 9500070000 950227 PDR FOIA PDR 2 r .,.._DEKOK95-36 s __

f* L_- 1f - O ) (- AUG 151969 R. S. Boyd -2 Enclotu re: C0 Report no. 219/69-6 ccv/ enclosure: M. M. F. ann, DR E. G. Cace, DRS S. Levine, DRL (6) D. J. Skovholt, DEL (3) L. Kornblith, Jr., CO J. G. Davis, 00:II B. H. Grder, CO:III D. I. Walker, 00:IV E V. Smith, CO:V j 7.. T. Carlcon, 00:I IEG Central File e i I t t -,,3.,ww. .}}