ML20087A813
Text
. -- _ _ _ - - -
-., -.-.., ~
..,.w.._.....
. gt'
~
UNITED STATES ATOMIC ENERGY COMMISSION j/ Q,
3 gg WASHINGTON. D.C. 20545
///<4L
=<#
q ur14 m 4g y_/
R. T. Carlson, Senior Reactor Inspector Division of Compliance, Region I j
t' ASSIST INSIECTION AT OYSTER CREEK UNIT 1 - DOCKET NO. 50-219 Enclosed is a report of an assist inspection conducted at the subject facility by D. L. Pomeroy to obtain information on the performance of the control rod drive system.
Based on the observe.d marked deterioration of the drive system, gr g '
we have raised a number of questions and identified several safety e-concerns, as indicated in our, proposed agenda for the forthcoming DHL m ting with the licenseeM and as discussed with the ACRS on May Two items in particular that warrant Compliance follow-up action l
with the licensee are:
I a.
The missing drive exercise data for April 15 b.
The details of the quality assurance and requalification programs for the drive system.
After the forthcoming DRL meeting, we vill discuss with you our proposed plans for further assist inspections.
H. R. Denton, Chief Technical Support Branch, CO
Enclosure:
JC Assist Inspection apt J.P.O'Reilly,COv/ enc 1 cc:
1
- @ i is y
9 Memo, Dentcn to O'Reilly, dtd 4/27/70 lj/ Memo,DentontoSeniorReactorInspectors,dtd5/11/70 2
i 9508070170 950227 PDR FOIA DEKOK95-36 PDR
/
. _ _ _ _ _ _ _ _ _.. _ _ _ _. _