UNITED STATES
- yp ATOMIC ENERGY COMMISSION l
- ~~'
WASHINGTON, D.C.
2M43
- e. 3 jfjfy.' ' '
FEB 111970 n
j
-D.'J. Skovholt, Ascistent Director for Reactor Operatio'ns, Division of Reacter Licencing (3)
L.[
JERSEY CENTRI 1 IURR AND LIGET CCMPANY (0YSTER CREEK).
DOCl32 No. 50-219 X4 The enclosed report of an inspection to the. subject-facility on January 6,8, 1970, 10 forwarded for info.sation. The report providen considerable information on the results of the power accension test program at 1'ull power.
Three items of noncompliance were noted during~the inspection. Thece iteric, for which an enforcement letter is being prepared by Compliance,
~'
are ac follows:
Secondary containment integrity was not maintained as required by a.
the Technical Specifjcations while the reactor was operating.
b.
Testing of the standby gas treatment particulate filter was'not conducted at the testing interval specified in the Technical Specifications.
c.
Control rod drive scram times on December 16, 1969, vere outside the acceptable range established in DE's letter to Jersey Central, dated November 6, 1969, and were-not reported to Region I (Nevark) as required by that letter.
The significant findings from this inspection are contained in our memoranda dated January 26 and 28,1970. These memoranda' recommended that a regulatory meeting be scheduled with Jersey Central manage-ment to discuss observed weaknesses in the licensee's_ performance.
' c o.
P. O'Reilly, ief e tor Inspect 1 nd Enforcement Branch F
D vision of Compliance-
Enclosure:
.CO Report No. 219/70-1 ccw/ enclosure:
L. Kornblith, Jr., CO -
R. W. Smith, CO:V E. G. Case, DRS J. G. Davis, CO:II M T. Carlson,'CO:I
' R. S. Boyd, DE (2)
B. H. Grier, CO:III-REG Central File S. Levine, DE (6)
D. I. Walker, 00:IV g 1(I l
9500070163 950227 i
~