Revised Monthly Operating Rept for Sept 1983
ML20082S918
Person / Time
Site: Beaver Valley
Issue date: 10/04/1983
From: Holtz J
DUQUESNE LIGHT CO.
To:
Shared Package
ML20082S900 List:
References
NUDOCS 8312150057
Download: ML20082S918 (1)


Text

- -

OPERATISG DATA REPORT DOCKET NO. 50-334 DATE 10-4-83 COMPLETED BY L L Holtz TELEPHONE. 67' 4 0-1369 OPERATING STATUS

g. Unit Name: Beaver Valley Pcwcr 5t:nion. Unit #1 Notes
2. Reporting Period: September, 1983
3. Licensed Thermal Power (MWt): ?AAn
4. Nameplate Rating (Gross MWe): 923
5. Design Electrien! Rating (Net MWe): 835
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Thruugh 7) Since 1.ast Report. Give Reasons:
9. Power Level To Which Restricted.!f Any (Net MWe): None
10. Reasons For Restrictions.lf Any: N/A

' Itis Month Yr to-Date ' Cumulative II. Hours In Reporting Period 720 6,551 65,015 ,

12. Number Of Hours Reactor Was Critical 193.7 3,912.6 28,730.1

)

13. Reactor Reserve Shutdown Hours 0 0 4,482.8
14. Hours Generator On Line 153.5 3.861.7 27,661.9
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal EnerFy Generated (MWH) 233,976 9,710,624.8 62,220,806.2
17. Gross Electrical Energy Generated (MWH) 71.900 3,163,300 19,675,940
18. Net Electrical Energy Generated (MWH) 61,872 3,003,189 _ _18,215,306
19. Unit Service Factor 21.3 58.9 44.4
20. Unit Asailability Factor 21.3 58.9 44.4
21. Unit Capacity Factor (Using MDC Net) 10.6 56.6 37.8
22. Unit Capacity Factor (Using DER Net) 10.3 54.9 36.7
23. Unit Forced Outage Rate 0 3.8 32.7
24. Shutdowns Scheduled Over Next 6 Months ! Type.Daee and Duration of Each1:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Ststu> dir~r to Commercial Operationn Forecast . Achieved INITIAL CRITICA LITY "/A -

N4 INITIAL ELECTRICITY -

/,. N/A COMMERCIAL OPERATION N/A N/A O

.- --