Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
1
. l
.~ l l
/$f Duquesne LkJ1t m.- . m . _
t e m,aroup I' O 6ea 4
%tppn.gpat A isocf qgxit Boaver Valley Power Station Unit 1 - Docket No. S' 334, Licenso No. DIR 66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatitujkport U. S. Nuclear Regulatory Cammission Doctunent Conttul Desk Washin3 ton, D.C. 20555 Gentlemon:
In acconbnce with Appendix A, Technical Spect.fications, the Monthly Operatirq Report is subnitted for Unit 1 and Unit 2 for the ronth of September, 1991.
Very truly yotum, f
N --
h E. D. Sieber v ice President Nuclear Group DI!T/smJ Ehclosurca cc: NRO PaJ i xial Office King of Prussia, PA 9110110057 910930 V, PDR ADOCK 05000334 l a en g\
v 1
NARPATIVE SLM%RY OF MOlmILY OPERATDIG EXPERIDiCE LWIT 1 SEPTEMBER 1991 Septaber 1 'Ihe Unit operated at a nam.iml value of 100% uutput.
September 2 At 0045 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> the unit's output was reduced to 94% to load follcM. At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> the unit's output was escalated to a naminal value of 100%.
Sept eber 3 'Ihe unit operated at a nantinal value of 100% output.
throx3h Septmber 16 September 17 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the unit commnced load reduction to shutdown for "B" Pacirculation Spray Heat Exchanger tube plugging.
September 18
~
At 0441 hours0.0051 days <br />0.123 hours <br />7.291667e-4 weeks <br />1.678005e-4 months <br /> the Main Unit Generator was taken off line. At 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br /> the turbine was mnually tripped and the unit entered Mode 2. At 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br /> the reactor was shutdown and the L unit entarrd Mcxde 3. At 1719 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.540795e-4 months <br /> the unit entered Mode 4.
Septet er 19 At 0605 hours the unit entered Mode 5 to parfom "B" Pacirculation Spray Heat Exchanger tube pluggirq.
September 20 '1he unit Irenained in Mode 5 to perform "B" Recirc.tlation Spray through Heat Excharger tube plugging.
September-22 September 23- At 1103 hours0.0128 days <br />0.306 hours <br />0.00182 weeks <br />4.196915e-4 months <br /> the unit entered Mode 4. At 2202 hours0.0255 days <br />0.612 hours <br />0.00364 weeks <br />8.37861e-4 months <br /> the unit entered Mode 3.
September'24 At 2101 hours0.0243 days <br />0.584 hours <br />0.00347 weeks <br />7.994305e-4 months <br /> the unit entered Mode 2. At 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br /> the reactor was taPan critical.
Septer:ber 25 At 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> the Main Unit Generator output breaker was closed and the unit began power ascension to ?OO% output.
September 26 'Ihe C.11t achieved a nantinal value of 100% output at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />.
Septeder 27 'I* 'Jnit operated at a naminal value of 100% output.
through Septenber 30 i
~ . . . - . . . . _ - . _ .. ~ -.
AVERAGE DAILY UllIT PohTR IE'EL DOChTP No. 50-334 UNIT _J.fdQ.llnLt 1 DATE October 3, 1991 COMP 11TED BY D Wid T d QDes_
TEIII)(O!;E _L412L. 393-7612_
FLtII11 Sentett>2E 10_9J DAY AVERIE DAILY FObTR IL'EL - DAY AVERN3E DAILY TOG IE'EL (FMe-Net) (!@le-tiet) 1 821 17 792 2 804 18 31
.3 804 19 0
~4 813 20 0 5- 817 21 0 .
6 813 22 0 1 804 , _ , _ _
23 0 8- __
813 24 0 _
9- 808 25 129 10 800 _ 26- 708 11- 813 ,
27 829 _
- 12 ' 82?- 28 817 13 817 29 _ . .
829 808' 30 813
-14 15' 792 31 -
- 16. -800
(
. Il&ITUCI' IONS:
On this format, list the average daily unit power level !@le-Net for each day in
> the reporting month. Campute to the nearest v, tole megavatt.
, , - ,w, ,
l l
OPERATINC DATA REPORT DOCKET No., 50-334 REPORT DATE: 10/03/91 COMPLETED BY: DAVID T. JONES TELEP)(ONE: (412) 393-7621 QfERATING STATUS
.. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 hore,
- 2. REPORTINO PERIOD: SEPTEMLER 1991
- 3. LICENSED THERMAL POWER (MWt): 2652 4 NAMEPLATE RATING (Cross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 850
- 7. MAX DEPENDABLE CAPACITY (Net MWe): 810
- 8. IF CilANCES OCCUR IN CAPACITY RATINCF SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS. IF ANY: _
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 6551.0 13310 .0
- 12. NO. OF HRS. REACTOR WAS ORIT! CAL: 559.1 3716.2 84010.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 4482.8
- 14. Il0URS CENERATOR WAS ON LINE 551.3 3577.9 82122.9
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0,0 0.0 16.-CROSS THERMAL ENERGY GEN. ( M' H ) : 1406382.0 8847137.0 195135584 5
- 17. CROSS ELECT. ENERGY GEN. (MWH)- 456850.0 2851038.C 62683767 0
- 18. NET ELECTRICAL ENERGY GEN. (MVH): 426750.0 2662920.0 58527120.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 76.6 54.6 52.9
- 20. UNIT AVAI1 ABILITY FACTOP:(PERCENT) 76.6 54.6 62.9
- 21. UNIT CaF* C"'Y FACTOR (!!DC) : PCT 73.2 50.2 56.2
- 22. UNIT CA1 FACTOR (DER): PCT 71.0 48.7 54.5
' 23. UNIT FORCEL HAGE RATE: (PERCENT) 0.0 13.4 16 2
- 24. SHUTDOVNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACil):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTlMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A U/A l
i ,i1ll!I
. !;I;
- l ,1 ,ygiI m.g f ! l ( I Ily* liil( :,k<!
- ci n _.
e t s ag l
? l ;r _ t 9 < 2 ot _ I 7 w ? ti a
? ' r ^ e c r p r '
e T v c. i e*
. J - n ce eE t 3 3 _itc or e eb p (L
. 3 R u m e 4 1 - et r t r 4 u e f u _ c yt c
- "5 r oc ec 3
r ?
e 3 5 e
'v 2
C e s "g e _
snp
- t 0 e a t en _
cE + e b C D & ct eo a
5 t _
r A + .
e e c t r t s * , = _. c a c N
.eey e a e sE _
uJ e. 1 eet a r c r eaB etc m f p ot t f e nO t e ._. s 'e s t . ue n e .
oe) et t i cn G* k t e
y
_ i cm7 f i c L-N oU cT t a _ t eT C a r _ t ecO t o smp _ i r s G C Ls _ b ALE 46 Hc S e
, i} j ! ! } fI,; l 1' ' t,!' , +
!iIL_ _
s r e E EF
9 E
s t: _
r 4 5 e a _
- r. 5e t s
od pc f _.
mC i _
o w _
C a y ,iij}!!;I!,;4!ii h! t I,&_ -.
t c
m =
et s t e w soy o
$ e
) Sc ic
. v
'C .
e mr 4
2 ,!<itiaf! ! tI- -
ap Q e
5 1 e aS c 9 st t r e e
C 9 r nr t
A cct a c I 1 eeo t vp
/ Si t .i T t C P iEe ! t adt a ea u u c 't cr U E L s O E d,.
ae T w - b an anuet et coh E E 7 1 ,I .!.!. )a ;jii.h.4 l 5 T t m*ACsO R & 3 e - -
I T r M123459 S f e W ogt 3 n-F 3 T da a 0 4 ot e 1 s ; ht s A
$ 7 wS e s s 4 c a C o s
% P E Il,;,t1 1l C
5 7 3 ) e J s w 2r n. i r io S a e +
c i c
)p Y s 6 c ni =
a s ot e E i f iM t t ( t t& (
s
,4 'I, e? ic g r r! r*r c n u t t rd o) t r i o sner ei wEi r
is 7 t r a a oi a au 3 f c yf eap rt t t r o 6 c.
D(
uW 1 t csr nat ort ot r na enit osi(
oel at i t pt u- eAri ar sr t 1Il s et r r e c uif ep:2 soa6 se s ep *t l
ep af = 8E oACO y
S Ee- 4SC0Ef - - - - - - Ga-T 2
fI
- 8 1
e 9 d e
t 0 a 1 t D 9 du et
, ,l j,' re rh ec o 9 f S N 2 _ - -
F S y < l+It
_ 1 tl,i ,, ,llilll l llll l f1Illfi I {
, ifARRATIVE SUFfRRY OF
!CtlIIILY OPEPATDh3 EXPERIDJCU UtTIT 2 SEPIDiBER 1991 September 1 'Ihe Unit' operated at a namimi value of 100% output.
Septernber 2 At 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> the Unit's output waa reduced to 73% to load follow.
September 3 .At 0403 hours0.00466 days <br />0.112 hours <br />6.66336e-4 weeks <br />1.533415e-4 months <br /> the Unit's output was escalated to a nominal value of 100% outpat.
September 4 Tne Unit operated at a ncminal value of 100% output.
through September 15 September 16- At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> the Unit's output was re uced to 95% to improve coniitions in the hotwell. At 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> the Unit's output was returned to a namimi value of 100%.
September 17 Ihe Unit operated at a runinal value of 100% outy.it.
through Septeter 30 w w,-m e ' e- * , r
_ , . . . _ . _- . -..~ - .-.. . _ . _ - . _ _ _ .. . . - . _ . . . _ . - . - _ -- -
AV12V4E LAILY UNIT. IOG IJNEL i
DOCIET 110. 50-412 i UNIT _Lf{PS Unit 2 t%TE l OctoEI_),_1921 CCMPIRED BY .,jMvid T. JoIps_
TELEI110NE _{il2)JE7312_
l
! W Ill_fspictgr_1991 IWY - AVEIVCE CAILY IOG ILVEL S\Y AVEIVCE DAILY IGER LEVEL (MWe-Net) (MWo-Not) 1 811 17 804
.2 ' J28 16 806 3' 752 19 DJ7 4 803 20 819 _
U 5' 811- 21 817 6 ~812- 22 814 7 _ __,,
810 23 E3 8 807- 24 817
- 9. 803 25 817 10 802 _,
26 817 all 811 27 819 12 814' 28 82Q 13 80% 29 - 817
.34 802 30 812 15- .a 72.0 31 - -
16 _ 784 REITUCTIONS:
On this format, list the average daily unit power level Kde-Not for each day in the reportirq nonth. - Campute to the nearest whole megawatt.
h -
s , -<a\ m- - - n ,w, . , - - , - ,..s , n , , * - -w
t OPERATING DATA REPORT DOCKET NO., 50 412 REPORT DATE: 10/03/91 COMPLETED BY; DAVID T. JONES TELEPHONE: (412) 393-7621 QEERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: SEPTEMBER 1991 3, LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MVe): 870
- 7. MAX. DEPENDABLE CAPACITY (Net MVe): 820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): None 10, REASONS FOR RESTRICTIONS, IF ANY; . N/A THIS MONTH YEAk TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 6551.0 33926.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL- 720.0 6551.0 28898 3
- 13. REACTOR RESERVE-SHUTDOWN HOURS- 0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE: 720.0 6551.0 28712.8
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MVH): 1881952.0 17060187.0 70187803.4
- 17. ~ CROSS ELECT ENERGY GEN. (MVH): 608886.0 5470838.0 22507638.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH): 577490.0 187193.0 21230517,0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 84.6
- 20! UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 84.6
- 21. UNIT CAP.\ CITY FACTOR (MDC): PCT 97.8 96.6 75.5 95.9 74.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 94.7
- 23. UNIT FORCED OUTAGE RAIE: (PERCENT) 0.0 0.0 4.1
- 24. SHUTDOWNS JCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO SHUTDOWN FOR IT'S THIRD REFUELING OUTAGE ON MARCH 13. 1992. . THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 70 DAYS .
'25-. IF SHUT DOW AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY M /A N/A COMMERCIAL OPERATION ___N/A N/A
l Unit Sittt1DC%4S Ah0 FCraE 9 REOUCTIC%S Q20%) Oxhet so, 50-412 LM i t Ease B vo 5 Um t e2 Date Oct etwr 3, 1991 Ccgieted By' Da
1 2 3 4 f - f orced Reascn: 88e t noo: E n n s ta a t F-instrwttons for S-Scneduled A-Equipment Tsiture (Emptain) 1 - p ar.ua l Freparation of Cata Entry Sheets B-Maintenance or Test 2-Manual Scras *cr L icensee E vent ; epo.- I (LER) fate C-Refuelins 3-Autcgaric scras (nuttc0161).
D-Regulatcry Restriction 4-Cont c. frce Frevious month E-operat er T rainiwa & ticeese E xas 5-seduction 5 T-Aasinistrativa 9-Other fa5ibit e - s ame s our c e ,
G-Cperational Errce (Emplain)
W-Other (Esplatn)
. . - . ._