Monthly Operating Repts for Jan 1995 for Beaver Valley Power Station Units 1 & 2
ML20078N425
Person / Time
Site: Beaver Valley
Issue date: 01/31/1995
From: David Jones, Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9502150316
Download: ML20078N425 (9)


Text

_.

'gy I Ap%

~7 Telephone (412) 393-6000 0Bx4 Shippifigport PA 15077-0004 February 8,1995 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooeratine Reoort U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

the Monthly In accordance with Appendix A, Technical Specifications,2 for the month of Operating Report is submitted for Unit I and Unit January,1995.

Respectfully,

/W T. P. Noonan Division Vice President, Nuclear Operations /

Plant Manager DTJ/mmg Enclosures .

cc: NRC Regional Office King of Prussia, PA 0

t w The Nuclear Professionals 9502150316 950131 PDR ADOCK 05000334 PDP

____-~

R -_

r

~

  • . NARRATIVE SW99RY OF PENIHLY OPERATING EXPERIINCE INIT 1 JANUARY 1995 January 1 The Unit continued to operate at approximately 59% output for the planned end-of-cycle fuel coastdown prior to the tenth refueling outage.

January 2 The Unit continued to operate at approximately 59% output for the planned end-of-cycle fuel coastdown. At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the Unit cannenced to shutdown for the tenth refueling outage.

January 3 At 0043 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> the Unit was taken off-line when the Main Unit Generator output bresers were opened beginning the tenth refueling outage. Mode 2 was entered at 0159 hours0.00184 days <br />0.0442 hours <br />2.628968e-4 weeks <br />6.04995e-5 months <br />. Mode 3 was entered at 0233 hours0.0027 days <br />0.0647 hours <br />3.852513e-4 weeks <br />8.86565e-5 months <br />. Mode 4 was entered at 1329 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.056845e-4 months <br />.

January 4 Mode 5 was erfared at 0255 hours0.00295 days <br />0.0708 hours <br />4.21627e-4 weeks <br />9.70275e-5 months <br />.

January 5 The Unit remained shutdown in Mode 5 for the tenth refueling through outage.

January 10 January 11 Mode 6 was entered at 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br />.

January 12 The Unit remained shutdown in Mode 6 for the tenth refueling through outage for the remainder of the re:ru.t period.

January 31

AVEM'E DAILY LNIT POWIR LEVEL DOOTT NO. 50-334 LNIT BVPS Unit 1 DATE Feb. 1, 1995 CIMPLEITD BY David T. Jones TELEPHONE (412) 393-7553 10tml Jarumrv 1995 DAY AVDE'E DAILY POWER LEVEL DAY AVEME DAILY IVWER LEVEL i- (We-Net) (We-Net) 1 458 17 0 2 428 18 0 3 0 _ 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 1

11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 (

i l

l 15 0 31 0 16 0 INSIRUCTICNS on this fann, list the average daily unit power level m e-Net for each day in the reporting nonth. Ctmpute to the nearest whole megawatt.

1 l

(,,--- .- . - - - - - _ _

E l

. OPERATING DATA REPORT DOCKET NO.- 50-334 REPORT DATE: 02/06/95 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7553 l

l OPERATING STATUS )

i

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: JANUARY 1995 1
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923 .
5. DESIGN ELECTRICAL RATING (Net MWe): 835  !
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860  ! '
7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A f THIS MONTH YEAR TO DATE CUMUIATIVE
11. HOURS IN REPORTING PERIOD: 744.0 744.0 164400.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 48.7 48.7 106605.5
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 48.7 48.7 104586.4
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 72153.0 72153.0 251399219.5
17. GROSS ELECT. ENERGY GEN. (MWH): 23230.0 23230.0 81049197.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 17240.0 17240.0 75741144.0
19. UNIT SERVICE FACTOR: (PERCENT) 6.5 6.5 65.5
20. UNIT AVAILABILITY FACTOR:(PERCENT) 6.5 6.5 65.5
21. UNIT CAPACITY FACTOR (MDC): PCT 2.9 2.9 59.3
22. UNIT CAPACITY FACTOR (DER): PCT 2.8 2.8 57.5
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.1
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):

THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS. THE TENTH REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS. t

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 03/03/95
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

UNIT SMUTDOWNS AND POWER REDUCTIONS (t201) Docket No. 50-334 Unit Name BVPS Unit #1 -

Date February 1. 1995 Completed By _ David T. Jones -

REPORT MONTH January 1995 Telephone (4121 393-T553 Method of Licensee Cause & Corrective

  • Duration Shutting Event System Component Action to No. Date Typel (Nours) Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence ,

1 950101 S O N 4 N/A RC FUELXX The Unit continued with the planned end-of-cycle fuel coastdown prior to the tenth refueling outage.

2 950103 5 695.3 C 1 N/A RC FUELXX The Unit shutdown for its tenth refueling outage.

1 2 3 4 F-Forced Reason: Method: Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit H-Same Source.

G-Operational Error (Explain)

H-Other (Explain)

l NARRATIVE SGMARY OF

~

MNIHLY OPERATING EXPERIENCE LNIT 2 I JANUARY 1995 Jarmary 1 The Unit operated at a nominal value of 100% output.

through Jarmary 19 Jarmary 20 The Unit continued to operate at a ncaninal value of 100%

output. At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit ocramen d a reduction in output to approxiInately 78% to investigate a possible leak in the "B" Waterbox of the Main Cumisa rer.

January 21 The Unit operated at approx 12nately 78% output while thrux3h investigation of a possible leak in the "B" Waterbox of the January 22 Main Condenser continued, January 23 No leaks were identified and the Unit u.-. arcs 3 a return to full power at 0115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br />. A nominal value of 100% output was achieved at 0559 hours0.00647 days <br />0.155 hours <br />9.242725e-4 weeks <br />2.126995e-4 months <br />.

January 24 The Unit operated at a nominal value of 100% output for the through remainder of the report period. '

January 31 1

1

AVERAGE DAILY LNIT POWER IE/EL DO G ET NO. 50-412 LNIT BVPS Unit 2 '

DATE Feb. 1, 1995 CCMPIEfED BY David T. Jones TELEIHEE (412) 393-7553 IOffIH Jan m W 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net) (We-Net) 1 833 17 836 2 837 18 833 3 832 19 831 4 835 20 831 5 834 21 663 6 832 22 658 7 832 23 810 8 833 24 830 9 834 25 834  ;

10 835 26 833 l l

11 829 27 832 l 12 814' 28 831 13 826 29 833 14 827 30 833 15 830 31 832 16 837 l

l INSTRUCTICES On this form, list the average daily unit power level We-Net for eact1 day in the reporting month. Campute to the nearest whole megawatt.

. OPERATING DATA REPORT DOCKET NO.: 50-412 REPORT DATE: 02/06/95 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: JANUARY 1995
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 744.0 63183.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 744,0 744.0 54568.5
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 744.0 744.0 54221.6
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. CROSS THERMAL ENERGY GEN. (MWH): 1929527.0 1929527.0 134450849.0
17. GROSS ELECT. ENERGY GEN. (MWH): 642126.0 642126.0 43693919.0
13. NET ELECTRICAL ENERGY GEN. (MWH): 610052.0 610052.0 41285057.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 85.8
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 85.8
21. UNIT CAPACITY FACTOR (MDC): PCT 100.0 100.0 79.2
22. UNIT CAPACITY FACTOR (DER): PCT 98.1 98.1 78.2 l
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 3.0 1

\

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

_IHE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS.

25. IF SHUT DOWN AT END OF PEPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

]

UNIT SMUTDOWNS ANO POWER REDUCTIONS (120%) Docket No. 50-412 Unit Name svPS Unit 82 '

Date February 1. 1995 Completed By David T. Jones REPORT MONTH Jenuerv 1995 Tetophone t412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typet 'nours) Reeson2 Doun Reactor 3 Report # Code 4 Code 5 Prevent Recurrence ,

1 950120 S O N 5 N/A NC NTEXCN The Unit reduced output from 100%

to approximately 78% to investisete a possible leek in the "B" Waterben of the Main Condenser. No leaks were identifled.

1 2 3 4 F-Forced Reason: Method: Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Emptein) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manuel Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Screm (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E-operator Training & License Enem 5-Reduction 5 F-Administrative 9-Other Exhibit N-Same source.

G-operational Error (Emplain)

M-Other (Explain)