PLA-1712, Monthly Operating Rept for May 1983

From kanterella
(Redirected from ML20077A112)
Jump to navigation Jump to search
Monthly Operating Rept for May 1983
ML20077A112
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/09/1983
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-1712, NUDOCS 8307220176
Download: ML20077A112 (5)


Text

ANN 4

. l 1 3@

D ][ v l \ 7 W / _ _ _ _ .

\ 3 L

I M hh OPERATING DATA REPORT

  1. g..

hO DOCKET NO. 50-387 DATE 6/9/83 NIC s@N COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-2181 OPERATING STATUS Unit 1 Notes

1. Unit Name: Susquehanna Steam Electric Station
2. Reporting Period: May, 1983 3293
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 1280 x 0.9 = 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1090
7. Maximum Dependable Capacity (Net MWe): 1050
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

Items 5,6, and 7 have been redetermined based upon best available data of actual turbine canacirv nnd mentinn innde.

9. Power Level To Which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions,If Any: None l
This Month Yr.-to.Date Cumulative 744 3,623 4.715.5
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 199 1,907.7 2,837.7
13. Reactor Reserve Shutdown Hours 0 133 197.6 14 9 1,705.1 2,557.7
14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 321,265 4.088.994 5,383,459
17. Gross Electrical Energy Genersted (MWH) 113.610 1,366,780 1,711,200
18. Net Electrical Energy Generated (MWH) 108.613 1,301,274 1.621,579 l

l 19. Unit Service Factor N/A

20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor 8Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):

Unit 1/ Unit 2 Tie-in' Outage to Commence November 7, 1983. Scheduled to last 29 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 09-07-82 09-10-82 INITIAL ELECTRICITY 11-19-82 11-16-82 COMMERCIAL OPERATION 06-08-83 8307220176 830609 (Y7)

PDR ADOCK 05000387 R pyg

AVERAGE DAILY UNIT POWER LEVEL rf)

@@ 4%3

, , , , , , DOCKETNO. 50-387 L "% UNIT One O DATE 6/9/83

+Op g yh# COMPLETED BY L.A. Kuczvnski TELEPff0NE (717)S42-2181 MOPrni Ma v . 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-liet) (MWe-Net) 1 0 37 0 2 0 18 0 3 0 g9 0 4 0 0 20 5 0 0 21 0 0 6 n 1 0 D 0 8 0 3 0 9 0 25 17 10 0 26 403 0 493 11 27 12 0 28 764 13 0 853 29 14 0 30 958 15 0 33 1038 16 0 INSTRUCDONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

gANN4 a hs-]rrh5 fel k P^ -

MdkJ DOCKET NO. 50-387 UNIT SHUTDOWNS AND POWER REDUCTIONS E UNIT NAME One k+ o DATE 6/9/83 M L.A. Kuzcynski NIC N REPORT MONTH May. 1983 COMPLETED BY TELEPHONE (717)542-2181 "i -

c e ce 3 ea =

. 2? 8 g .c 'A Licensee Ev. c ". Cause & Corrective

, No. Date o- gg  ;; ,cgy Event  :; ? 83 Action to

  • $3 5 j 15 y Report # N0 0 Prevent Recuirence S

11 052583 S 595 B 3 N/A ZZ ZZZZZZ Completion of pre-commercial operation outage.

i 4

4 I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161) i E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I- Same Source (9/77) Il-Other (Explain)

p.: ,

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 6/6/83 Completed by L. A. Kuczynski Telephone (717)542-2181 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Water Treatment Syste_ms None L \

I h

3 1 -s

< g '

t, i w ,

% w g a d es

\s 2 .* s s .- ' Y

'N

,  %. ss. \s' ..%

-4' o s

% w .

s Y<

.'.A

t *

.\

PPal. Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 1 770 5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 JUN 151983 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORT - MAY 1983 ER 100450 FILE 841 PLA-1712 Docket No. 50-387

Dear Mr. Beebe:

The May 1983 monthly operating report for Susquehanna SES Unit 1 is attached.

The Unit was declared commercial at 0001 on June 8, 1983.

Ver truly ours, C {

. . Kenyo Vice President-Nuclear Operations Attachment cc: Mr. James M. Allan INPO Records Center Acting Regional Administrator Suite 1500 Region I 1100 circle 75 Parkway U.S. Nuclear Regulatory Commission Atlanta, Georgia 30339 631 Park Avenue King of Prussia, PA 19406 Director Mr. Thomas E. Pollog Office of Inspection and Enforcement Department of Environmental U.S. Nuclear Regulatory Commission Resources Washington, D.C. 20555 Bureau of Radiation Protection Attn: Document Control Desk (12 copies) P.O. Box 2063 Harrisburg, PA 17120

+ Mr. G. Rhoads - NRC Mr. R. Perch - NRC 1

I

) 3 1