Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program 1986-03-13
[Table view] Category:STATE/LOCAL GOVERNMENT TO NRC
MONTHYEARML20028A3461982-11-12012 November 1982 Forwards Statement Re Socioeconomic Impact of Crbr ML20027E7091982-11-10010 November 1982 Forwards Position Paper of State of Tn Atty General on Socioeconomic Impact Matters.Certificate of Svc Encl ML20065U0151982-10-27027 October 1982 Confirms 821027 Telcon Re Procedural Matters Not Expressly Covered by ASLB 820831 Scheduling Order.Matl from State of Tn,As Interested State,Need Not Be Filed by 821101 But Should Be Filed by 821112.Certificate of Svc Encl ML20058F3331982-07-22022 July 1982 Package of 19 Ltrs Supporting DOE Request for Limited Site Preparation Work Authorization Permit ML20058B9641982-07-21021 July 1982 Opposes Applicant Request for Exemption to Conduct Site Preparation Activities.New Application Presents No New Factors or Circumstances Warranting Change in Commission Denial of Earlier Request.Certificate of Svc Encl ML20058E5011982-07-21021 July 1982 Forwards Governor of Tn Supporting Applicant Request for Exemption to Allow Limited Site Preparation Activities ML20071L3201982-07-20020 July 1982 Forwards 820224 & s to NRC in Support of Crbr. NRC Should Act W/Speed to Approve Request for Accelerated Site Preparation ML20058E5081982-07-11011 July 1982 Supports DOE Request for Exemption to Commence Site Preparation ML20063D5501982-07-0909 July 1982 Requests Temporary Delay to Schedule Set for Licensing of Crbr.Delay Necessary to Update 1977 EIS ML20054G0311982-06-21021 June 1982 Urges NRC to Issue Supplemental Des to 1977 Fes.New Info Developed Since 1977 Which Affects Crbr.Comments on Adequacy of Fes Encl ML20054E5981982-06-13013 June 1982 Requests That NRC Issue Updated EIS & Provide Organizations & Private Citizens Opportunity for Comment ML20052B5611982-04-0808 April 1982 Senate Joint Resolution 205 Supporting Expeditious Completion of Plant & Immediate Commencement of Site Preparation ML20071L3291982-02-24024 February 1982 Expresses Dissatisfaction That Governor Alexander & Senator Baker Ltrs Supporting Crbr Were Omitted from NRC Rept on Project.Ltrs Should Be Included in Suppl to Rept ML20039F8001982-01-0808 January 1982 Advises That Oak Ridge City Council Voted to Support DOE Request to Expedite Process for Granting Limited Site Preparation Work Authorization Permit ML20039F8061982-01-0505 January 1982 Expresses Town of Clinton,Tn Support for Facility & for DOE 811201 Request for Authorization to Commence Site Preparation ML20039C3361981-12-17017 December 1981 Submits Resolution Passed by Town of Oliver Springs on 811217 Supporting Facility ML20039B0691981-12-11011 December 1981 Expresses Lake City,Tn Support for Facility & DOE 811201 Request for NRC Authorization to Commence Site Preparation ML20071L3321981-12-11011 December 1981 Supports DOE Request to Expeditiously Authorize Site Preparation for Crbr ML20039B7221981-12-11011 December 1981 Expresses City of Harriman,Tn Support for Facility & DOE 811201 Request for NRC Authorization to Commence Site Preparation Activities by Mar 1982 ML20062M6421981-12-10010 December 1981 Supports Facility & DOE 811201 Request to Commence Site Preparation Activities by Mar 1982 ML20062M7221981-12-0909 December 1981 Expresses Support for DOE Request to Commence Site Preparation Activities.Jc Cotham Appointed to Coordinate All Activities Re Facility for State ML19340B1721980-10-0909 October 1980 Notifies That Amend 56 to PSAR Is Acceptable 1982-07-09
[Table view] |
Text
b1 AIE hEPxtshS1 in E
. (ONSLR\ ATION ASD ENVIHONMENT M88 M E Q ESERGY SUliCOMMIT1LE ELDGET blisCOMMITTEE 7 r,y 4 11 MONA LASE '*s* ~.g- ;
OAK RIDCE.TN 37830 h) ,c a -S.' LABOR ANIS CON 50 MEN AFFAIRM (616) 453 8544 I
QM.. . $ LABON St BCOMM111EE
%.!'3E 0)FICE JOIST 1101 SE-SEN ATE REPUBLIC Ah CALC 05 bECHL"f AR)
"'*^*
s = "#N a', [fottse of %eprescittatibes i.m m =
$ late of Ecititessec NASHVILLE December 11, 1981 The Honorable Munzio J. Palladino United States Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Chairman:
As an American concerned about the nation's energy future and as a Legislator representing the interests of taxpayers, I strongly urge you to approve the request by the Department of Energy (D.O.E.)'
and act expeditiously to authorize site preparation for the Clinch River project.
The Department of Energy's petition filed on December 1st would save the taxpayers from $120 to $240 million in additional costs and avoid delays of one to two years. This cost and time savings approach is certainly in the national interest. Moreover, under the proposed licensure schedule, the N.R.C. would conduct all necessary review and hearings required in the public interest. Should the N.R.C. decide subsequently that construction should not proceed further, the site could easily be restored to pristine condition.
By allowing site activity to proceed this spring and ending the ,
unconscionable delays imposed on this vital energy project by the pre-vious administration, the N.R.C. would send a signal to Americans that government is indeed responsible to the wishes of taxpayers wary of hearings and overly restricted regulations. From my personal exper-icnce as a Legislator dealing with people from all walks of life, I can attest without hesitation that those who suffer the most from the indecision and stop-and-start policy of many government programs are the underprivileged, the eldarly and minorities.
Electric rates throughout the country are being irresistibly forced up year after year. Those that are least able to afford higher utility bills are the most victimized by these unyielding increases. I whole-heartedly support you in your statement that taxpayers and consumers would benefit from a streamlining of the regulatory process and an approach that simplifics regulations and rules when we can preserve the public interest, the environment and our concerns for safety while bene-fiting Americans by efficiently and effectly managing government pro-8208020425 820720 PDR ADOCK 05000537 33rd LEGISLATIVE DISTRICT U PDR ANDERSON AND ROANE COUNTIES
.-~
Jb. M. J. Palladino '
U.S. Nuclear Regulatory Comm1ssion 12/14/81 ,
grams and assisting utilities in providing cost effective services to ratepayers.
The federal government, electric utilities throughout the country, and contractors have invested $1.2 billion in the Clinch River project.
More than $630 million worth of components have been delivered or are on order and the project is ready to begin site preparation. Congress has steadfastly supported the project and its expeditious completion.
Over the past several years, the project has undergone extensive safety and environmental review.
As you know, the breeder can tap an energy source larger than the estimated energy supply of the entire world's coal, gas and oil. In fact, the uranium already mined and stored as tails in the government's enrichment plants is equivalent to the entire world's reserve of oil in a breeder. These tails would produce an equivalent amount of elec-tricity -- compared to oil at $36 a barrel -- exceeded $60 trillion.
The consensus of expert opinion not only in the U.S. but worldwide is that we would be foolish to turn our backs on such a vast resource.
Recently, scientists and engineers for "SEZ" declared that the Clinch River plant "may become the only realistic technological undertaking of its kind in the free world" ("SEZ" members include seven Nobel Prize Laureates and imminent scientists from the nations most respectable universities and research centers).
This kind of support indicates clearly that the Clinch River project is indeed a national project of value to all Americans. Over 3,500 people in 30 states and the District of Columbia are under contract to build hardware and provide services for the Clinch River Breeder Reactor proj ect plant in Oak Ridge, Tennessee. I respectfully urge you to immediately consider the request of D.O.E. and authorize site preparation activities under Section 50.12 of Title 10 of the Code of Federal Regu-lations. Such an action would enable this important project to comply with both the letter and the intent of the law. It would provide for .
the most productive use of available funding of taxpayer dollars---
something we as government officials sometimes forget---it just makes common sense.
The beneficiaries of such favorable action on the part of N.R.C.
would undoubtedly be the nation and the American taxpayer.
Sincerely, 6td NW Randy cNally State Representative RMcN:ml cc: Governor.Lamar Alexander All Members -- Tennessee Congressional Delegation Mr. Ron Getz Department of Energy P. O. Box U Oak Ridge, TN 37830
[ . , . . ,.
SENATE JOINT RESOLUTION NO. 205 By Elkins, Ashe A RESOLUTION Relative to the adoption of the official policy of the State of Tennessee concerning the Clinch River Breeder Reactor Project.
WHEREAS, The Department of Energy and other project sponsors are prepared to begin construction and site preparation for the Clinch River Breeder Reactor Project; and WHEREAS, The pooject, which has been in the planning stage for over ten years, has already been unnecessarily delayed and has cost taxpayers one billion dollars; and WHEREAS, During the period that site selection and preparation has been discussed, the public and all interested parties have been given ample opportunity for comment; and WHEREAS, The breeder reactor licensing process has been interrupt'ed more than once, and preliminary public hearingr would delay the project even longer; and .
WHEREAS, Funds for research and development and to purchase major components of the project have already been appropriated by Congress and should be used to begin site preparation with no further delay; now, therefore, BE IT RESOLVED BY THE SENATE OF THE NINETY-SECOND GENERAL ASSE31BLY OF THE STATE OF TENNESSEE, THE HOUSE OF REPRESENTATIVES CONCURRING, That we adopt as the official policy of -
the State of Tennessee that the Clinch River Breeder Reactor Project should be completed as expeditiously as possible and toward this end that site preparation should commence without any further delay or hearings.
BE IT FURTHER RESOLVED, That a copy of this resolution be forwarded to the Honorable Lamar Alexander, Governor, the Honorable William Leech, Attorney General and Reporter, the Tennessee Congressional Delegation and to the members of the Nuclear Regulatory Commission, Washington, D.C.