ML20024C162

From kanterella
Jump to navigation Jump to search
Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985
ML20024C162
Person / Time
Site: Clinch River
Issue date: 07/08/1983
From: Longenecker J
ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT
To: Grace J
Office of Nuclear Reactor Regulation
References
HQ:S:83:260, NUDOCS 8307120345
Download: ML20024C162 (1)


Text

-

E0-S3}

Department of Energy Washington, D.C. 20545 Docket No. 50-537 HQ:S:83:260 JUL 0 81983 Dr. J. Nelson Grace, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Dr. Grace:

AUXILIARY FEEDWATER SYSTEM (AFWS) EVALUATION The purpose of this letter is to provide additional information regarding the schedule for the AFWS evaluation discussed in Preliminary Safety Analysis Report (PSAR) appendix C, section C.6.4.,

Steam Generator Auxiliary Heat Removal System and PSAR appendix H, section II.E.1.1., Auxiliary Feedwater System Evaluation. The AFWS evaluation is scheduled for completion by mid-1985.

If additional information on this subject is desired, please contact Mr. Al Meller (FTS 626-6355) of the Project Office Oak Ridge staff.

Sincercly, JMin R. Longene er Director, Office of Breeder Demonstration Projects Office of Nuclear Energy cc: Service List Standard Distribution Licensing Distribution 8307120345 830708 PDR ADOCK 05000537 I 0 i

A PDR u