ML20105B955
| ML20105B955 | |
| Person / Time | |
|---|---|
| Site: | Clinch River |
| Issue date: | 07/06/1983 |
| From: | Longenecker J ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT |
| To: | Grace J Office of Nuclear Reactor Regulation |
| References | |
| HQ:S:83:258, NUDOCS 8307070086 | |
| Download: ML20105B955 (1) | |
Text
- - -
O Department of Energy Washington, D.C. 20545 Docket No. 50-537 HQ:S:83:258 l
JUL 0 01983 5
Dr. J. Nelson Grace, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Dr. Grace:
FUEL BURNUP The following is additional information that was requested at the June 10, 1983, meeting on programmatic objectives.
Per discussions between the Clinch River Breeder Reactor Plant (CRBRP)/ Project Office (PO) staff and the Fast Flux Test Facility (FFTF)/P0 staff, this letter confirms that FFTF has operated with a peak burnup of over 61,000 MWD /MT.
This burnup has occurred under temperature and power conditions similar to the CRBRP conditions.
If you have any questions, please call Wayne Pasko (FTS 626-6096) of the Public Safety Division.
Sincerely, O
J hn R. Longen ker a
Director, Office of Breeder Demonstration Projects Office of Nuclear Energy cc: Service List Standard Distribution Licensing Distribution l
Qob L
8307070086 830706 PDR ADOCK 05000537 A
P D R.._.
-..,