ML20023C582

From kanterella
Jump to navigation Jump to search
Submits Supplemental Info to Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways
ML20023C582
Person / Time
Site: Clinch River
Issue date: 05/16/1983
From: Longenecker J
ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT
To: Grace J
Office of Nuclear Reactor Regulation
References
HQ:S:83:251, NUDOCS 8305170449
Download: ML20023C582 (1)


Text

-

O Department of Energy Washington, D.C. 20545 Docket No. 50-537 HQ:S:83:251 MAY l G 1333 Dr. J. Nelson Grace, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Dr. Grace:

SUPPLEMENTAL INFORMATION ON CLINCH RIVER BREEDER REACTOR PLANT (CRBRP)

CABLE SEPARATION

Reference:

Letter HQ:S:83:238, J. R. Longenecker to J. N. Grace, Additional Information on the Clinch River Breeder Reactor (CRBRP) Instrumentation and Controls, dated April 1,1983 The purpose of this letter is to supplement the information contained in the referenced letter by confirming that the approximately 75 feet of decay heat removal service and steam generator auxiliary heat removal system cable. routing from the control room into the steam generator building will be run in separate conduits or enclosed raceways.

'If there are any questions on this matter, please call Peter J. Gross of the CRBRP Project Office (FTS 626-6005).

Sincerely, J n R. Longene er Acting Director, Office of Breeder Demonstration Projects Office of Nuclear Energy cc: Service List Standard Distribution

/

Licensing Distribution Ofo$$$$Q, PDR