Department of Energy Washington, D.C. 20545 Docket No. 50-537 HQ:S:83:265 007 2 4 1983 Dr. J. Nelson Grace, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Dr. Grace:
MEETING
SUMMARY
FOR THE CLINCH RIVER BREEDER REACTOR PLANT PROBABILISTIC RISK ASSESSMENT (PRA) PROGRAM On October 4,1983, Project Office (P0) representatives met with the Nuclear Regulatory Commission (NRC) to review the management of the PRA program.
During the course of the meeting the following agreements were reached.
(1) The P0 will formally submit the PRA subtask reports for NRC review.
The subject reports will have had a project-wide review with resolution / incorporation of all project comments prior to submittal to NRC.
(2) The NRC will review the subject reports and provide the project with comments on the effectiveness of communications exhibited by the reports. is a copy of the viewgraphs provided during the meeting. A PRA Review Distribution list is provided (enclosure 2) as suggested by NRC.
The list of meeting attendees is also provided as enclosure 3.
If there are any questions, please call P. J. Gross of the Project Office (FTS 626-6005).
Sincerely, hp Francis X. G f an
- Director, f e of reeder Demonstra on Projects Office of Nuclear Energy 3 Enclosures 0k cc: Service List 0
Standard Distribution M Ig Licensing Distribution B310310059 831024 PDR ADOCK 05000537 A
i c\\
ENCLOSURE I Viewgraphs f rom the PRA Management Meeting on October 4,1983 i
L
1 l
CLINCH RIVER BREEDER REACTOR PLANT PROJECT BRIEFING TO:
i NUCLEAR REGULATORY COMMISSION i
! ON:
I l PRA STATUS PRESENTED BY:
i P.J. GROSS ASSISTANT DIRECTOR, l
I PUBLIC SAFETY I
CRBRP PROJECT OFFICE OAK RIDGE, TN.
Q, L
Trn u,.m, J' W b a L
- OCTOBER 4,1983 l
\\
AGENDA PROGRAM GOALS RESPONSIBILITIES OF PARTICIPANTS I
RELIABILITY OF PRODUCTS REVIEW CYCLE AND SCHEDULE i
i i
\\
l i'
I i
~
l
.l
}
GOALS OF PRA PROGRAM ENHANCE SAFE DESIGN AND OPERATION OF THE PLANT IMPROVE UNDERSTANDING OF PLANT BEHAVIOR l
UNDER DEGRADED CONDITIONS i.
IMPROVE OPERATOR'S ABILITY TO MANAGE I
ACCIDENTS ASSESS SAFETY SIGNIFICANCE OF DESIGN ALTERNATIVES ENHANCE EMERGENCY PLANNING EFFECTIVENESS I
- ASSIST IN PREPARATION OF LCOs, TEST I
INTERVALS, AND TECH SPECS CHECK DESIGN BASIS ACCIDENT SELECTION l
CHARACTERIZE RELATIVE RISK i
f
'N
~
PROJECT OFFICE ORGANIZATIONAL CHART P. BREWINGTON PROJECT l
DIRECTOR I
I I
I l
l l
1
!l C. FOX P. GROSS D. KEETON OTHER ENGINEERING PUBLIC SAFETY OPERATIONS DIVISIONS DIVISION DIVISION DIVISION I
1 l
?
RISK l
MANAGEMENT OTHERS j
i BRANCH l
j
.l t
/
7
PRA PROGRAMMATIC RESPONSIBILITIES i
i i
TECHNICAL REVIEW P. GROSS NRC i
COMMITTEE I
I t
I RISK MANAGEMENT l
BRANCH 4
I I
i ENGINEERING OPERATIONS i
CONTRACTOR DIVISION DIVISION (TEC)
I I
]
E BR TVA 1
i I
O
l TECHNICAL REVIEW COMMil I EE (TRC' i
PROVIDES PROGRAMMATIC RECOMMENDATIONS REVIEWS METHODOLOGY AND BASIC TECHNICAL l
APPROACH i
(
l REVIEWS OVERALL MODEL AND SPECIFIC l
PRODUCTS REVIEWS EFFECTIVENESS OF TECHNOLOGY i
TRANSFER l
i REVIEWS EFFECTIVENESS OF FEEDBACK l
TO DESIGN I.
i
~
I i
i
~
l 1
TECHNICAL REVIEW COMMil IEE COMPOSED OF PROJECT OFFICE PERSONNEL (PUBLIC i
l-SAFETY, ENGINEERING)
DESIGN ORGANIZATIONS
[
INDEPENDENT PRA CONSULTANTS
- TVA PERSONNEL l
i I
i i
i i
L 4
/
FLOW CHART FOR FEEDBACK TO DESIGN PUBLIC RECOM. -
EN/OP TEC MADE SAFETY TRANSMI n
a n y
j NO NG YES 1
EQUIRED u
FILE RESOLUTION u
T
'N RECOMMEND.
ORG OR FORMAL ECP FINAL PROCESS DISPOSITION I
OF RECOMMENDATION P
YES NO i
,g CCEPT 1
RELIABILITY ASSURED BY INTERNAL TEC REVIEW CY.CLE AND QA PROGRAM PROJECT REVIEW CYCLE (PO, DESIGNERS) l
- TECHNICAL REVIEW COMMITTEE SCRUTINY i
PRA/SIA REVIEW AND EXCHANGE NRC REVIEW CYCLE i
l
i
\\
OVERVIEW OF TEC REVIEW CYCLE DRAF i CHANGES M < INA""3
<ANALYSISJ
"" ""3 I
M I
< J a
u u
TASK TASK QA REVIEW j
MGMNT.
MANAGER REVIEW I COMMENT i
OVERVIEW REVIEW PONSE/
LINE MANAGER REVIEW u
p _ _v _ _ j lEXTE8NALl TASK MANAGER 1
REVIEW l
REVIEW L _ __ _ _ J
)
l-TEC QA ACTIVITIES l
ANALYSIS OVERSIGHT DOCUMENTATION i
- TASK LEADER
- TEC ADVISOR FILE I
REVIEW GROUP MAINTENANCE AUDIT L
DOCUMENTATION j
- QA TEST CASE
- R&D ACTIVITY i
AND PRODUCT MONITOR CONTROL REVIEW SYSTEM i
i u
i i
i FINDINGS i
i u
MONTHLY QA i
i REPORT t
)
1 l
I L.
PROJECT REVIEW OF PRA PRODUCTS i
l (ISSUE t
TEC DRAFT) u t
j.
t i
i B&R PO W
l.
b,'
t I
RESOLVE COMMENTS WITH TEC j
t (I
TEC FINAL)
-l t
u t
i i.
B&R
=
PO W
I I
a
.t NRC y
.,hUjEC I
^S
~
RESOLVE COMMENTS j
O WITH TEC DOCUMENT" I
1
PROJECT REVIEW CYCLE j-BEGINNING OF TASK-REVIEW PLANS AND APPROACHES e
i I
ASSURES AGREEMENT ON APPROACH AT FRONT l
j END
[
HELPS IDENTIFY INFORMATION REQUIREMENTS
~ !
REVIEW TEC DESIGN UNDERSTANDING BEFORE i
I ANALYSIS i
p ASSURES CORRECT UNDERSTANDING l
j ASSURES CORRECT ASSUMPTIONS l
MINIMlZES REWORK i
REVIEW OF DRAFT PRODUCT APPROPRIATE DESIGN ORGANIZATIONS
~
i ASSURES TECHNICAL ACCURACY i-
.l
1984 1985 O]NIDlJIFIM]AIMlJIJ]A]S OINIDlJ1F]M] AIM]J
.CEvie.T m es
.---o- - - e 2C PAULT TREES
- MOoetS
-.-.--.e-------e
- OAT A c.
- MOOUL AMTATION 3C OUAN saf sC 4TeON
- F AULT TREd
- SEOutseCE SOLUTO881
---e i
- StouthCE SOLUTIOft 2
-- --e 4C HUMAN A4LIAtellTY
- -- -% - - se.---e SC 3EOuf NCE litms TION & REVIEW 0 - -m---e GC CORE PHf NOMEkOLOOV e Evf NT TREE e --M--se---.e
- OUA8eIetICATr380 2---3
-e-- W 7C CONT A18eMe NI *tef fe04E.
l
- EVtNT TRf E
- - -W. ---le---e
- OUANTNICATION
---m- -e---c - e 2A RADIO 8eUCteOE AELE ASE I
- TRANSPORT ANAL 7Sl4 -
- - -m- -e -- -r
- PTLE ASE CAf tGO#eES
---m-e---:
O me 3A HE ALTH COseSEOutNCES
- MODELS & DAT A 2 -.e- -G- - -A.--e
- COceDtTIONAL AtSE CURVSS
_ - -w.--o- - -#--e 4A 8btSR ANALYSIS
- -.e- =e- - -#---e S A MOOf L UPO AT E I
- -@. - --e e
SA E3R Cone SOURCES
- SEOutNCE ANAiVSIS I
I
- --% -.u-e e CONSEQUENCE A8eALYS48
- 2 - -m- - -- e i
i TA UpeCERTAaleTT
-r 0 -.e-.--g j
SA 1 FIAE l
- LIQUIO METAL O -W 3
- CONVENilOfeAL 3-e- - -n.-.-e SA 2 INvtRO8eNIENTAL (TEEEPERAT.AK)
- --m- - e--.-e 84 3 MtSSItf S
-- -se-- e-- -e.g I
S A 4 IW *T RN AL f L 0004800
- -.e- -e g
SA S OthtR IfetERNAL CCF A 0 -M 1
BA 8 '3EISM*C
- F R AGitiiy i
g
- ---m --e--.e e
- SitSainCITY
- - - - m
- e...e-.--e j
- MOOGLS 0 -.e-.- e
- RE SUL T S
__4-~
0 -M j
{
--W - --We j
84 S StiE SPECNIC
- - - % 4 - -p--J l
i e
.e..% --e g
10A DOCUMtNT ATIOfe' g
18 OrtRA704 ACTIOas ANALTSd 0
-.g e
28 EMERGINCY PLAN IIePUT
- -.3-=--@. - - p---e JB 18ePUT TO LCDs
- w,...s_
-g t
48 ACClotMT Detteet ATIN
-.m e-- w SR nlSEL MANAGEMtNT PL AN 1
%-.e - e l
- DOLUMENT AtaON IS INDeCATED Si a j
MattSIOpet FOR 4 ACH INoeV. RISR [
j t
4 af wie w Dn Af t Pnovenf D to t nepF PO w S&M A IIc efelf f" eat IIIstitiofeE teeOf f U8stESS IfeOICAllD
~ if C DtyttoriseO Oct nivtSINO PRODUCis i
9 e weAt omar i Pnoviot D 1O onenP PC W. 344. feltC esattamat asettsloset 85 AS$uutD Osse WEER PRooft
- ** lac AWAllIIeQ ftEWIEW COMutNIS l
6 e sweat pnoACI DOCueelmt ISSUED to f Atle E nitesseAt InstEstoset TO AttOW FOft M COnceed 4iS At tummtD fO fIC IpeTE Rf4AL_ RE vie w I f
)
'1 I
m
l-SUGGESTED NRC MEETING DATES EARLY NOVEMBER,1983
- MID JANUARY,1984
- EARLY APRIL,1984 i
I
- MID JULY,1984
)
- EARLY OCTOBER,1984 i
L
- EARLY JANUARY,1985
- EARLY APRIL,1985 l
- EARLY JULY,1985 l
I i
i i
l l
9
..v
~
ENCLOSURE II PRA REVIEW DISTRIBUTION LIST Dr. J.
Nelson Grace, NRC (6)
A. Spano, NRC (1)
P. Boehnert, ACRS (1)
E.
Rumble, SAI (2)
R. Liner, SAI (1) i I
L
.. _... = - - - - -
ENCLOSURE III j
MEETING ATTENDEES j
PRA MANAGEMENT MEETING October 4, 1983 S. Asselin TEC P. Gross CRB RP-PO F. Gavigan DOE, HQ R.
Emmett CRB RP-PO A.
Spano NRC-RRAB T.
King NRC-CRBRPO J. Swift NRC-CRBRPO N. Grace NRC-CRBRPO R. Sta rk NRC-CRBRPO R.
Rothman NRC GSB L. Reiter NRC GSB L. N. Ribb LNR Assoc.
H. Holz NRC-CRBRPO S. Additon W-Bethesda G.
Sherwood DOE, HQ P.
Boehne rt ACRS Staff