ML20011E699

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1990 for Crystal River Unit 3.W/900212 Ltr
ML20011E699
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/31/1990
From: Binkowski J, Boldt G, John Lane
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0290-06, 3F290-6, NUDOCS 9002220232
Download: ML20011E699 (5)


Text

_ _ _ _ _ _ - _ _ _ ._ _ _ - . _ _ _ _ - - _ _ . _.

t i

i S.

J@

C O R P O R AliO N February 12, 1990 3F0290-06 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 J Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached is the Crl'stal River Unit 3 January 1990 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, 1'

Gary Boldt, Vice President Nuclear Productions

/wla Attachment xc: Regional Administrator, Region II Senior Resident Inspector hgg22{$$$k $

. . - . - -~

g2 [ ;

POST OFFICE BOX 219 e CRYSTAL RIVER, FLORIDA 32629-0219 * (904) 7954486 A Florida Progress Company

(N'M ~ .

7 OPERATING DATA REPORT i DOCK [T NO.50-30P 041[ OP-5-90 [~

COMPLE1[D BY J. t. tane TELEPMDNE (9041795-6486 atLB&ligGSTATUS l

1. - UNIT NAME: CRYST AL RIVER UNIT 3 2, REPORTING P[RIDD:- January 1-31. 1990 jL 3. LICENS[D THERMAL POW [R (HWt): 2544
4. NAM [PLAl[RA11h6(GROSSMWe): 890
5. . DESIGN [LECTRICAL RATING (Net MWe): B?$
6. MAXIMUMDEPENDABLECAPACITY(GROSSMWe): 000
7. MAXIMUM DIP [NDABL[ CAPAC11Y (NET MWe): 821
8. IF CHANGES OCCUR IN CAPAtl1Y RATINGS (11[MS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE RIASONS:

N/A 9 POWER LtV[L 10 WHICH R[STRICl[D, IF ANY (NET MWe): N/A

10. REASONS FOR R[$1RIC110NS, IF ANY: N/A THisfl0 NTH VR,10 D.at COMULAllV[
11. HOURS IN p[ PORTING PiR100. . ,.ILLL L4( 1 , 112.99 Q {

12, NUMBid CF HOURS RCACTOR tit.S CRITICAL m,jfL2, 09U . 71J,121

- 18. R[At10R RISt#VE SHUTDOW HOUR $ . Om0, d),,,, , , . 1.!e Q l

14. ' HOURS ut4[RATOR Oh41NC .. 630. P5 , 68f . B_ ,, ,,,,,,,J),4]A I f 35. D.0 UNIT k[$fRVE SHUTDnWN NOU:ts , _. ,0 0 01  ;

16, GROS $ THIMAL [F((GY GEN [3Ai[0 (MVH) Lffl,,ij$,, , J 1 ?l9 .)ff,JM.355

17. GR051[LiCTRICAL[NERGYU[N[RATXD(MV4) M8.701 JJ) , ,,,,, JJMg_,,,,

'18. h[7 ((fC7RICAL [NikM MNERA!(0 (H./H) $30.770 _ hEJ)p_ M Q fp L ,

~19 UNIT $[hVICI FACTDR t),,3 43, ,,,,,,,,,, , _,,,,,,Q),4

29. UNIT AVAILADIU TY FACTOR ,,, 91 5% 91 5% ,____ 67 4 21.- UNITCAPAClffFAC10R(UsingMDCnet) BS.9% B6Ry, 56.5%
22. UNIT CAPACliY FACTOR (Using DER net) 86 5% 86 M 55.1%
23. UNIT FORCCD OUT73[ RAi[ B3% 8.5% Pl.4%
24. SHUTD0VNS SCHEDUL[D OVER NtXT 6 MONTHS (Type. Date, and Duratton of [ach):

_Refucitnn Outaae VII: start 9/14/90. duration of 77 days.

25. IF SHU1DOWN AT [ND OF R[ PORT P[RIOD, [STIMAT[D DAT[ OF STARTUPr
26. UNITS IK 1[ST STATUS (PRIOR TO COMMERCIAL OPERATION): FOR[ CAST ACHl[VCD INITIAL CRITICALITY INITIAL [LECTRICITY COMM[RCIAL OPERAtl0N f

{.

. 4 *.

I ,

j AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 tali FlCRP-3 DATE 02-5-90 CO WL[i[D BY J. Binkowski T[L[ PHONE (904) 553-44B5 i NONTH JANUARY DAY-- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net) (MWe-Net)

-1 ___ 827 17 818 2 ._ 809 . 18 814 3 802 19 818 i

. 4 _._ 815 20 815 _

5 . 814 . _, 21 834 _

6' , _ , _ _ - 804 ,. __ . _ _ ___ _ 22 _ 4 59_.,

f' 7 . _ . . _!!D_.__ 23 _0 ___

k 8 589- __ . _ _ _ . . /4 0 . _ _

.9 757 25 260 10 804 _ 26 747 792 s 11 27 805 12 818 28 813 13 811 29 823 14 819 30 817 15 812 31 815 16 817 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

. . - - , , . , ~

unit sanDOWNS MS PCWEP REDUCTIONS - *k 9*

BOMET NO. 50-302 . ,

15 BIT supe FLCRP-3 REPORT NONTH JANUARY BATE' 2/5/90  ?*

CtpFLETED ST J. E. UK TELEPfG E (904) 195-6486 Ilo. Date Type' Duration Reason

  • kethod of - L8cswesee System, r 7. Cause & Corrective Hours $hett nq ,. Event Code
  • Cod. Action to Prevent Dnam Reactor
  • Report #

90-01 900106 F O.0 A C N/A HF MOTORX The *T Circulating Water Pury tripped.

Reduced ;:ower to approximately 72% for condenser delta-T limits and then replaced the ptana motor.

90-02 900122 F 63.2 0 1 90-001 CJ VALVEK The plant was taken off-line to identify the source of Reactor Coolant System unidentified leakage which exceeded Technical Specifications. RCV-11 (the PORV Block Valve) had a packing leak. The leekage was isolated when RCV-11 was closed.

1 2 3 e $

F: Forced Reason: Method Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure ' 1-Manual f p Peeparation of Data B-Maintenance or Test 2-Manual Scrax Entry 3 hec *s for Licansee C-Refueling 3-Auto Scren: Event ce port (LER) File D-Regulatory Restriction 4-Continued  !,NL9EG-2161)

E-Operator Training & 5-Reduced Load License Examination F-A&rinistrative 9-Other 6-Operational Error (Explain)

H-Other (Explain)

.- - - , - - - .. . -- ., .,.~.:... . -. - . - . .,, . - . . - - - . . . ~ . _ . - w

, y. .ee

.- NONTHLY OPERATIONAL SUNNARY STATEMENT l DOCKET 100. 10-30?

Utili FLCRP-3 DATE 02-05-90 +

TEiLPHDIlE (904) 796-0486 i

NONTH: JANUARY >

t >

t-SUNNARY STATEMENT:

During the month of January, Crystal River 3 experienced one significant power reduction to replace a Circulating Water Pump motor and one outage to identify the i source of Reactor Coolant S/ stem leakage. RCV-Il (PORV Block Valve) had a packing leak which was isolated when RCV-Il was closed,  ;