Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML20024J2481994-10-0707 October 1994 LER 94-012-00:on 940907,discovered Failure to Perform TS Surveillance Requirements.Caused by Misunderstanding & Inadequate Technical Reviews.Ts Bases for 3/4.8.1 Will Be revised.W/941007 Ltr ML20029E5581994-05-13013 May 1994 LER 94-005-00:on 940415,dicovered That Several Valves Were Not Being Tested Per Requirements of ASME Section Xi.Caused by Inappropriate Action.Corrective Action:Pump & Valve Team Has Been Formed to Perform in Depth reviews.W/940513 Ltr ML20029D9941994-05-11011 May 1994 LER 94-006-00:on 940415,determined That on 921103, Unidentified RCS Leak Rate of Greater than 1 Gpm Occurred. Caused by Error in RCS Mass Balance Equation.Approved Temporary Change to Procedure OP-903-024.W/940511 Ltr ML20045H4731993-07-15015 July 1993 LER 93-002-00:on 930615,reactor Tripped Due to High SG Level Caused by Failure of Feedwater Control Sys.Caused by Failure of Square Root Extractor in Feedwater Flow Circuit.Failed Components Replaced & Alarm Setpoints reviewed.W/930715 Ltr ML20029B6381991-03-0808 March 1991 LER 89-007-01:on 890331,inadequate Design of Air Accumulators Due to Inadequate Review of Design Requirements Implemented as Part of post-TMI Action Plan.Design Change 3195 Phase I implemented.W/910308 Ltr ML20029A8471991-02-28028 February 1991 LER 90-019-01:on 901212,both Trains of Control Room Heating Ventilation & Air Conditioning Sys Inoperable Due to Breach in Control Room Envelope.Caused by Air Flow Past Retaining Angle.Leakage Paths repaired.W/910228 Ltr ML20028G9631990-10-0202 October 1990 LER 90-013-00:on 900903,unsampled Gas Released from Gaseous Waste Mgt Sys.Caused by Internal Leakage Past Discharge Isolation Valves.Administrative Controls in Place to Ensure That Gas Decay Tanks Sampled Prior to release.W/901002 Ltr ML20028G9211990-09-24024 September 1990 LER 90-012-00:on 900825,reactor Tripped Due to Lightning Strike.Station Mod Request Issued to Provide Uninterruptable Power Source for Steam Bypass Control sys.W/900924 Ltr ML20044A6661990-06-27027 June 1990 LER 90-006-00:on 841218.determined That Shutdown Cooling Sys Relief Valve Setpoint Not Set,Per Tech Spec Requirement. Caused by Procedural Inadequacy.Procedure MM-007-006 revised.W/900627 Ltr ML20043G1961990-06-15015 June 1990 LER 90-001-01:on 900223,discovered Controlled Ventilation Area Sys Airlock Doors D-170 & D-171 Open.Caused by Inadequate Administrative Controls.Procedural Instructions Developed to Govern Control of Air Lock doors.W/900615 Ltr ML20043G2041990-06-14014 June 1990 LER 89-006-01:on 870105,safety Class Break Requirements Not Met.Caused by Programmatic Breakdown in Administrative Controls.Valves Closed & Design Drawings & Procedures revised.W/900614 Ltr ML20043B1121990-05-21021 May 1990 LER 90-005-00:on 900420,condenser Vacuum Pump Discharge Wide Range Gas Monitor Setpoint Discovered to Be Incorrect.Caused by Inadequate Change Procedure for Data Base Manual. Administrative Procedures revised.W/900521 Ltr ML20042F7501990-05-0707 May 1990 LER 90-004-00:on 900408,partial Actuation of Emergency Feedwater Sys Occurred During Scheduled Test of Plant Protection Sys.Caused by Test Circuit Malfunction.Relay Hold Pushbutton Assembly replaced.W/900507 Ltr ML20012D6671990-03-23023 March 1990 LER 90-001-00:on 900223,discovered Controlled Ventilation Area Sys Airlock Doors D-170 & D-171 Open.Caused by Inadequate Administrative Controls.Procedural Instructions Will Be developed.W/900323 Ltr ML19354E0181990-01-22022 January 1990 LER 89-024-00:on 891223,manual Trip of Plant Initiated in Response to Decreasing Level in Steam Generator.Caused Probably by Anomaly in Main Feed Regulating Valve Pneumatic Control Sys.Tent Erected Around valve.W/900122 Ltr ML19354E0171990-01-19019 January 1990 LER 89-023-00:on 890927,MSIV 2MS-124B,determined to Have Broken Stem.Caused by MSIV Hydraulic Control Unit Thermal Valve Leakage.Replacement MSIV Stems W/Increased Blend Radius Designed to Decrease Stress installed.W/900119 Ltr ML20005E0971989-12-29029 December 1989 LER 89-017-01:on 890819,automatic Reactor Trip Initiated by Plant Protection Sys Response to Variations in Core Axial Shape Index.Caused by Failure of Pulldown & Lower Gripper Coil Current Sensors.Equipment replaced.W/891229 Ltr ML20011D2541989-12-20020 December 1989 LER 89-022-00:on 891128,plant Operated in Condition Prohibited by Tech Specs When Emergency Diesel Generator a Inoperable More than 24 H.Caused by Personnel Error.Ltr Issued to All Shift supervisors.W/891220 Ltr ML20011F4591989-12-18018 December 1989 LER 89-021-00:on 891116,emergency Diesel Generator a Declared Inoperable When Essential Svcs Chiller a Declared Inoperable W/O Verifying Availability of Offsite Ac Power. Caused by Personnel Error.Supervisor counseled.W/891218 Ltr ML19332C5781989-11-20020 November 1989 LER 89-020-00:on 891031,containment Fan Cooler C Motor Ran in Reverse Direction Reducing Air Flow & Cooling Capacity. Caused by Personnel Not Performing Surveillance Testing. Motor Rewired for Correct Slow Speed operation.W/891120 Ltr ML19327C1111989-11-13013 November 1989 LER 89-002-01:on 890125,discovered That Safety Classification of Instrument Air Tubing That Supplies Outlet Isolation Valves Installed as non-nuclear Safety.Caused by Use of Weld Filler Matl.Tech Spec Change Sent ML19324C4611989-11-13013 November 1989 LER 89-019-00:on 891012,4.16-kV Bus 3A2 Metering Potential Transformer Fuse Door Inadvertently Opened,Causing Feeder Breaker & Supply Breaker to Open & Load Sequencer to Reset. Caused by Personnel Error.Drawers relabeled.W/891113 Ltr ML19327B3511989-10-23023 October 1989 LER 89-018-00:on 890921,while Testing Main Steam Safety Valve,Lift Pressure Found to Be Below Tech Spec Allowable Value.Caused by Error in Judgement by Plant Supervisors. Event Will Be Discussed by superintendent.W/891023 Ltr 1994-05-13
[Table view] Category:RO)
MONTHYEARML20024J2481994-10-0707 October 1994 LER 94-012-00:on 940907,discovered Failure to Perform TS Surveillance Requirements.Caused by Misunderstanding & Inadequate Technical Reviews.Ts Bases for 3/4.8.1 Will Be revised.W/941007 Ltr ML20029E5581994-05-13013 May 1994 LER 94-005-00:on 940415,dicovered That Several Valves Were Not Being Tested Per Requirements of ASME Section Xi.Caused by Inappropriate Action.Corrective Action:Pump & Valve Team Has Been Formed to Perform in Depth reviews.W/940513 Ltr ML20029D9941994-05-11011 May 1994 LER 94-006-00:on 940415,determined That on 921103, Unidentified RCS Leak Rate of Greater than 1 Gpm Occurred. Caused by Error in RCS Mass Balance Equation.Approved Temporary Change to Procedure OP-903-024.W/940511 Ltr ML20045H4731993-07-15015 July 1993 LER 93-002-00:on 930615,reactor Tripped Due to High SG Level Caused by Failure of Feedwater Control Sys.Caused by Failure of Square Root Extractor in Feedwater Flow Circuit.Failed Components Replaced & Alarm Setpoints reviewed.W/930715 Ltr ML20029B6381991-03-0808 March 1991 LER 89-007-01:on 890331,inadequate Design of Air Accumulators Due to Inadequate Review of Design Requirements Implemented as Part of post-TMI Action Plan.Design Change 3195 Phase I implemented.W/910308 Ltr ML20029A8471991-02-28028 February 1991 LER 90-019-01:on 901212,both Trains of Control Room Heating Ventilation & Air Conditioning Sys Inoperable Due to Breach in Control Room Envelope.Caused by Air Flow Past Retaining Angle.Leakage Paths repaired.W/910228 Ltr ML20028G9631990-10-0202 October 1990 LER 90-013-00:on 900903,unsampled Gas Released from Gaseous Waste Mgt Sys.Caused by Internal Leakage Past Discharge Isolation Valves.Administrative Controls in Place to Ensure That Gas Decay Tanks Sampled Prior to release.W/901002 Ltr ML20028G9211990-09-24024 September 1990 LER 90-012-00:on 900825,reactor Tripped Due to Lightning Strike.Station Mod Request Issued to Provide Uninterruptable Power Source for Steam Bypass Control sys.W/900924 Ltr ML20044A6661990-06-27027 June 1990 LER 90-006-00:on 841218.determined That Shutdown Cooling Sys Relief Valve Setpoint Not Set,Per Tech Spec Requirement. Caused by Procedural Inadequacy.Procedure MM-007-006 revised.W/900627 Ltr ML20043G1961990-06-15015 June 1990 LER 90-001-01:on 900223,discovered Controlled Ventilation Area Sys Airlock Doors D-170 & D-171 Open.Caused by Inadequate Administrative Controls.Procedural Instructions Developed to Govern Control of Air Lock doors.W/900615 Ltr ML20043G2041990-06-14014 June 1990 LER 89-006-01:on 870105,safety Class Break Requirements Not Met.Caused by Programmatic Breakdown in Administrative Controls.Valves Closed & Design Drawings & Procedures revised.W/900614 Ltr ML20043B1121990-05-21021 May 1990 LER 90-005-00:on 900420,condenser Vacuum Pump Discharge Wide Range Gas Monitor Setpoint Discovered to Be Incorrect.Caused by Inadequate Change Procedure for Data Base Manual. Administrative Procedures revised.W/900521 Ltr ML20042F7501990-05-0707 May 1990 LER 90-004-00:on 900408,partial Actuation of Emergency Feedwater Sys Occurred During Scheduled Test of Plant Protection Sys.Caused by Test Circuit Malfunction.Relay Hold Pushbutton Assembly replaced.W/900507 Ltr ML20012D6671990-03-23023 March 1990 LER 90-001-00:on 900223,discovered Controlled Ventilation Area Sys Airlock Doors D-170 & D-171 Open.Caused by Inadequate Administrative Controls.Procedural Instructions Will Be developed.W/900323 Ltr ML19354E0181990-01-22022 January 1990 LER 89-024-00:on 891223,manual Trip of Plant Initiated in Response to Decreasing Level in Steam Generator.Caused Probably by Anomaly in Main Feed Regulating Valve Pneumatic Control Sys.Tent Erected Around valve.W/900122 Ltr ML19354E0171990-01-19019 January 1990 LER 89-023-00:on 890927,MSIV 2MS-124B,determined to Have Broken Stem.Caused by MSIV Hydraulic Control Unit Thermal Valve Leakage.Replacement MSIV Stems W/Increased Blend Radius Designed to Decrease Stress installed.W/900119 Ltr ML20005E0971989-12-29029 December 1989 LER 89-017-01:on 890819,automatic Reactor Trip Initiated by Plant Protection Sys Response to Variations in Core Axial Shape Index.Caused by Failure of Pulldown & Lower Gripper Coil Current Sensors.Equipment replaced.W/891229 Ltr ML20011D2541989-12-20020 December 1989 LER 89-022-00:on 891128,plant Operated in Condition Prohibited by Tech Specs When Emergency Diesel Generator a Inoperable More than 24 H.Caused by Personnel Error.Ltr Issued to All Shift supervisors.W/891220 Ltr ML20011F4591989-12-18018 December 1989 LER 89-021-00:on 891116,emergency Diesel Generator a Declared Inoperable When Essential Svcs Chiller a Declared Inoperable W/O Verifying Availability of Offsite Ac Power. Caused by Personnel Error.Supervisor counseled.W/891218 Ltr ML19332C5781989-11-20020 November 1989 LER 89-020-00:on 891031,containment Fan Cooler C Motor Ran in Reverse Direction Reducing Air Flow & Cooling Capacity. Caused by Personnel Not Performing Surveillance Testing. Motor Rewired for Correct Slow Speed operation.W/891120 Ltr ML19327C1111989-11-13013 November 1989 LER 89-002-01:on 890125,discovered That Safety Classification of Instrument Air Tubing That Supplies Outlet Isolation Valves Installed as non-nuclear Safety.Caused by Use of Weld Filler Matl.Tech Spec Change Sent ML19324C4611989-11-13013 November 1989 LER 89-019-00:on 891012,4.16-kV Bus 3A2 Metering Potential Transformer Fuse Door Inadvertently Opened,Causing Feeder Breaker & Supply Breaker to Open & Load Sequencer to Reset. Caused by Personnel Error.Drawers relabeled.W/891113 Ltr ML19327B3511989-10-23023 October 1989 LER 89-018-00:on 890921,while Testing Main Steam Safety Valve,Lift Pressure Found to Be Below Tech Spec Allowable Value.Caused by Error in Judgement by Plant Supervisors. Event Will Be Discussed by superintendent.W/891023 Ltr 1994-05-13
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F2891999-10-13013 October 1999 Drill 99-08 Emergency Preparedness Exercise on 991013 ML20217G7211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with ML20211Q2141999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With ML20210Q6361999-07-31031 July 1999 Corrected Monthly Operating Rept for July 1999 for Waterford 3 ML20210S0581999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Waterford 3.With ML20210D8951999-07-23023 July 1999 Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 ML20209H3781999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Waterford 3 Ses. with ML20195J8951999-06-17017 June 1999 Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) ML20207E8631999-06-0303 June 1999 Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 ML20195K3391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Waterford 3 Ses.With ML20195C3041999-05-28028 May 1999 Annual Rept on Abb CE ECCS Performance Evaluation Models ML20206S7401999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Waterford 3.With ML20205T2621999-04-22022 April 1999 LER 99-S02-00:on 990216,contract Employee Inappropriately Granted Unescorted Access to Plant Protected Area.Caused by Personnel Error.Security Personnel Performed Review of Work & Work Area That Individual Was Involved with ML20205N9671999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Waterford 3 Ses.With ML20205E8531999-03-30030 March 1999 Corrected Pages COLR 3/4 1-4 & COLR 3/4 2-6 to Rev 1, Cycle 10, Colr ML20205A6331999-03-25025 March 1999 SER Accepting Request to Use Mechanical Nozzle Seal Assemblies as an Alternative Repair Method,Per 10CFR50.55a(a)(3)(i) for Reactor Coolant Sys Applications at Plant,Unit 3 ML20204H1401999-03-23023 March 1999 Rev 1 to Engineering Rept C-NOME-ER-0120, Design Evaluation of Various Applications at Waterford Unit 3 ML20204H1231999-03-22022 March 1999 Rev 1 to Design Rept C-PENG-DR-006, Addendum to Cenc Rept 1444 Analytical Rept for Waterford Unit 3 Piping ML20204H2451999-03-22022 March 1999 Rev 2 to C-NOME-SP-0067, Design Specification for Mechanical Nozzle Seal Assembly (Mnsa) Waterford Unit 3 ML20204F0791999-03-17017 March 1999 Rev 1 to Waterford 3 COLR for Cycle 10 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207F3491999-03-0505 March 1999 LER 99-S01-00:on 990203,contraband Was Discovered in Plant Protected Area.Bottle Was Determined to Have Been There Since Original Plant Construction.Bottle Was Removed & Security Personnel Performed Search of Area.With ML20204B5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Waterford 3.With ML20203H8591999-02-17017 February 1999 Safety Evaluation Accepting Licensee Second Ten Year ISI Program & Associated Relief Requests for Plant,Unit 3 ML20199H6261999-01-21021 January 1999 Safety Evaluation Accepting Classification of Instrument Air Tubing & Components for Safety Related Valve Top Works.Staff Recommends That EOI Revise Licensing Basis to Permit Incorporation of Change ML20199C9101998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Waterford 3.With ML20196F4911998-12-0101 December 1998 SER Accepting Request for Relief ISI2-09 for Waterford Steam Electric Station,Unit 3 & Arkansas Nuclear One,Unit 2 ML20206N4131998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Waterford 3.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20195E5161998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Waterford 3.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20154K0801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Waterford 3 Ses. with ML20151W8331998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Waterford,Unit 3. with ML20237B6831998-08-17017 August 1998 LER 98-S01-00:on 980723,discovered That Waterford 3 Physical Security Plan,Safeguards Document Was Not Under Positive Control of Authorized Person at All Times.Caused by Human Error/Inappropriate Action.Counseled Employee Involved ML20237C5661998-08-17017 August 1998 Safety Evaluation Accepting Licensee Request for Exemption from Section Iii.O of Appendix R to 10CFR50 ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B5261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Waterford 3 ML20236S9031998-07-22022 July 1998 SER Accepting Rev 19 to Quality Assurance Program for Waterford Steam Electric Station,Unit 3 ML20198H3911998-07-14014 July 1998 Non-proprietary Rev 5 to HI-961586, Thermal-Hydraulic Analysis of Waterford-3 Spent Fuel Pool ML20236N4181998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Waterford,Unit 3 ML20248E7781998-06-0101 June 1998 Annual Rept on Abb CE ECCS Performance Evaluation Models ML20249A4711998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Waterford 3 Ses ML20196A4051998-05-31031 May 1998 Rept of Facility Changes,Tests & Experiments,Per 10CFR50.59 for 970601-980531. with ML20198H4681998-05-20020 May 1998 Non-proprietary Rev 1 to HI-981942, Independent Review of Waterford Unit 3 Spent Fuel Pool Cfd Model ML20247A3891998-05-0101 May 1998 SG Eddy Current Examination (8th Refueling Outage) ML20247F6761998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Waterford,Unit 3.W/ ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20216B1751998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Waterford 3 Ses ML20217M1411998-03-0303 March 1998 Rev 2 of Waterford 3 Cycle 9 Colr 1999-09-30
[Table view] |
Text
z -.
p .,
1
, ,m s.
- ';, i F LOUISIANA P O W E R ' & L i G H T! 'WATERFORD 3 SES
- KILLONA, L.A 70066-0751 2 N 8 0 SYSV -
1 W3A90-0104 j
'A4.05 QA
. January. 19. 1990
'i U.S. Nuclear Regulatory Commission ,)
ATTENTION: Document Control Desk
-Washington, D.C. '20555
-)'
J SUBJECT - Waterford 3'SES- ;
Docket'No.'50-382 License No. NPF-38 Reporting of Licensee Event : Report -
Attached.is Licensee Event Report, Number LER-89-023-00 for Waterford- h4 Steam Electric-Station Unit 3. This Licensee Event' Report in submitted voluntarily as-an item of potential interest to the NRC Staff.
1 Very truly yours,
\- ) T
. J.R. McGaha Plant Manager - Nuclear '!
JRM/JEF/rk Attachment cci Messrs. R.D. Martin J.T. Wheelock - INPO Records Center
, E.L. Blake .
'W.M. Stevensen D.L. Wigginton NRC Resident Inspectors PDR S
[62.2-Ij(
t F
NRC fore 308
- U $. EzUCLE AA a t (ULATORY COMMIS$ ION APPROVED DMS NO 31to010s
'""'8'~8''
LICENSEE EVENT REPORT (LER)
'.CatlTY NkM4 Hi DOCEtt NuMSER 121 PAGE (3i Wtterford Steam Electric Station Unit 3 o 16 ; 0 l o l o l 31812 1 loFl 014 I fiTLE 141 Fatigue Failure of The Main Steam Isolation Valve Stem Due To Cyclic Stress EVENT DAf t (S) Lim NUnsetR ist REPORT Daf t 171 OTHER S ACILITits INVOLVED tel MONT H DAY YEAR YlAR IIjj ','b . y,y upNTH day ygAR 9 ACILITV NAwas DOCKET NUM0tfql81 N/A o16tojojol l l
~ ~
0l 9 2l7 8 9 8l 9 0l2l3 0l0 0l1 1l9 9l 0 N/A o l 610 0 , 0 g j l r
,,,,,,,,,, Tuis REPORT is sWeMiTTEo PURSUANT TO TMt REQUIREMENTS OF 10 Cf R l' IChwa m e< mew e' fae fenowmpi Hu
"*
- 6 a m2i i n moi.i i0naimi i n> uni gg _
a me=in Ha so.maHu noni.imi.i nnai ,
noi 01010 m aswHum _
e0 mi.im _
30 vaaH2H.ni _L gu8gsgvgey,.<r, , ,
20 4084aH1 Hell 90.13tsit2Hil 50.73talt2Hud6Hal Js6Al n 408teH1Hevt 80.73 eH21m 50.73teH2 HvisiHS) 20 408teH1 Hel to 736sH2Hiu) 60.73teH2Hz)
LICENsti CONT ACT FOR THIS Lin (12)
NJ.Mt TELEPMONE NUMBER
, Akt A CODE John B. Houghtaling - MSIV Project Manager 5l0 l4 71319 l- 16141815 COMPLETE ONE LINE FOR tach COMPONENT F Altunt DESCRitto IN THit REPORT 113) 0RTA B " ~' '
CAust systiu COMPONENT M'[N'g AC. R{0 pn CAult Sv8T E M COMPONENT "')$g AC- R 0 PR B St B 11 SI VI WI 21515 Y I t I f f 1 I B C, B I ; S, V; W,2 ; 5,5 Y j , , , ; ; ;
$UPPLEMENT AL REPORT EXPECTED Oh MONTH DAY VBAR SUOM!5SiON Yt8 tit res. compe. EXPECTIO SUOntI55tOnt OA Til NO l l l ant R ACT ro ,, ,. , .mo , . .., , <, .-, u,..m.. ,-., n ei On September 27, 1989, with Waterford Steam Electric Station Unit 3 shutdown for a refueling outage, Main Steam Isolation Valve 2 (MSIV) MS-124B, was determined to have a broken stem. MSIV 1, MS-124A, was disassembled and a crack was identified at the same location ac that found in MSIV 2. The root cause of this event is fatigue failure of the stem. The MSIVs have been subsequently repaired. MSIV 1 and 2 previously experienced guide rail failures in April of 1988.
Other design problems have been noted on V-K-M POW-R-SEAL gate valves at Waterford 3. An evaluation of similar valves manuf actured by W-K-M is being conducted to determine the need for further replacement. Although these events appeared to be individual isolated cases and do not meet the reporting criteria of 10CFR50.73(a), the combined problems are being reported as a voluntary LER which may be of generic interest to the nuclear industry.
The MSIVs would have closed in less than three seconds on a Main Steam Isolation Signal, for both failures, thus the nuclear safety function of this valve was not impacted and no threat to the health and safety of the public or plant staff existed.
y,. . m.
effic Perm SIGA U.S. NUCLEL"I f.60VL". Tony COMMIW10N
' * ' ' LICENSEE EVENT REPORT (LER) TEXT C!NTINUATION .
~ Arezoveo ove No. sinobiu EMPinES: t/31/M
. ACICITV NAMS li) - Dockti NUMS$4 (3) . ggg gygggg ggg . PA06 (31 Waterford Steam "^" "0$Ua" '
YYe#
Electric Station Unit 3 o l6 j o l0 l0 l 3l 8l2 ftKT M mese ausse 4 #sensest asse sidstepast WRC Form WW (17) 8l9 -
0l2 l 3 -
0 l0 0l2 0F., O l4 On September 27, 1989, while shutdown for refueling outage 3, Main Steam Isolation Valve 2 (MSlV) MS124B (EIIS Identifier SB-ISV) stem was found to have broken at the stem / stem head connection.- Subsequent inspection of MSIV 1 revealed a crack in the same location as the failure in MSIV 2. The.MSIVs.are thirty inch POW-R-SEAL parallel expanding gate valves manuf actured by.W-K-M Product Division of Cooper Industries.
The root cause for the MSIV etem failure was MSIV hydraulic' control unit (HCU)
(EIIS Identifier HCU) thermal relief valve (EIIS Identifier RV) leakage. This leakage led to excessive HCU pump cycling and degradation of the hydraulic system components over the-last year. These frequent hydraulic pressure fluctuations caused eccentric loading of the HSIV stem head and subsequent fatigue failure of the MSIV stem. A contributing cause was the small radius area of the stem / stem head connection which-increased the nominal stress at the fracture location.
The following actions have been or will be taken:
l -
Replacement MSIV stems with increased' blend radius designed to
- decrease peak stress in the failure region have been installed.
l i
The MSIV HCUs were overhauled to minimize cycling of the MSIV stem.
Cumulative cycle meters to record HCU pump cycles were installed to provide indication of gradual system degradation.
A new MSIV stem designed to increase the fatigue lifetime of the valve stem is under evaluation. This will include a long term inspection program to ensure valve-stem integrity. The new stem design should be completed by March 30, 1990.
g,0- . .....-,a......s.,,-.
NRC term asGA - U.S. NUCLE A2 iMULATORY COMul0840N
- " j UCENSEE EVENT REPORT (LER) TEXT CLNTINUATION'- uenovio oue No. mo-oio4
, EXPtM6: 0/31/9B P ACl[lTV NAME lip DOCelli ,,0.SER Q)
(gn ugugga (g) PAog (3)
Waterford Steam v5aa "S!M. 4Tw*e# 'j E1cetric Station Unit-3 TEXT (# more apose a reew.ed se, asheseant NAC Fenn 324W (IM 0l6l0l0l0l3l8l2 8l9 -
Ol2 l3 -
0l0 0 l3 OF 0b
/ 1 The MSIV surveillance procedure fs being evaluated to decrease the loads applied to the stem during non-emergency valve actuations and should be revised by' April 30, 1991. (completion of refuel 4)
A detailed evaluation is being completed and should be provided to the NRC resident inspector by February 28, 1990. ;
NOTE: Preliminary calculations indicate the MSIV stems are acceptable-through the next two fuel cycles.
Separation of the stem from the gate end of the stem would not impact closing of the valve because these two separated parts remain aligned. The MSIV would have closed in less than three seconds on a Main Steam Isolation Signal thus the- nuclear safety function of this valve was not impacted; therefore, no threat -
to the health and safety of the public or plant staff existed.
In April 1988, the gate guide rails for MSIV'1 and 2. failed. The. root cause was material galling resulting in excessive friction and eventual failure of the guide rail bolts. A number of design enhancements were implemented to correct this problem.
Design inadequacies have been noted on other POW-R-SEAL gate valves manufactured
.by W-K-M but none required reporting per 10CFR50.73 or 10CFR21. The letdown system containment inside isolation valve, CVC-103 (EIIS Identifier - CB-ISV) failed to close on February 21, 1985, March 25, 1985, and June 1, 1985. The outside isolation valve, CVC-109, failed to close on April 14, 1988, and ,
October 23, 1988. These problems were noted during routine system testing.
Both of these were W-K-M 2 inch POW-R-SEAL air opened spring closed reverse seated gate valves. The root cause of four of the failures was thermal binding.
between the valve body and the segment / gate. When directed to close, there was '
insufficient force by the spring actuator to move the segment / gate assembly.
One failure was attributed to a manufacturing defect in the operator spring.
CVC-103 and CVC-109 vere replaced with Masoneilan Model 48-20761 globe valves in July 1985 and October 1988 respectively. System Engineering is evaluating j
W-K-M valves and other plant system valves with the same service characteristics '
as the MSIVs. 'This evaluation is planned to be completed by June 30, 1990.
_ ge roa. = .,,,,c,o,i,...,,,.3,,,,,,,,
,s NRCForm sesa U.S. NUCLE A3 l'.ETUL.1 TORY COMMt95404
- ' [ _ , , , ' LICENSEE EVENT REPORT (LER) TEXT CONTINUATION inaovro oMe No mo4io4
- e. ,
EXPIRES: 8/31/W f ACILITY 8eAME 01 DOCKET NUMBER (2p LIM NUMBER (G) PA05 (3) h terford Steam vtAa .- " g= ',' 'm : %*,0 l q
Electric Station Unit 3 ;
o l5 l0 l0 [0 l 3l 8l 2 8l 9 -
0l2l3 -
0 l0 0l4 OF 0 l4 l TEXT & more apose is reewed. use asuntoner NAC hem W 1J (17)
Each component failure identified in this report was documented and evaluated:
under the Waterford 3 Potentially Reportable Event'(PRE) Program. Each of
.these events were single' independent component _ failures and.a redundant component was available to fulfill the system safety function; therefore, no-l t
threat to the' health and safety of the public or plant staff existed. Because ;
of~the number of problems experienced with W-K-M POW-R-SEAL type valves at Waterford 3, this voluntary LER is being issued for general tuterest, SIMILAR EVENTS No similar events of this nature have been reported by Waterford 3. -The specific details of each of the events described in this LER are available.in the following files at Waterford 3.
o MSIV 2 Stem Failure PRE 89-103 o MSIV Guide Rail Failure- PRE 88-038 ,
o CVC.109 Failure PRE 88-051 and 88-102 '
o CVC 103 Failure PRE 85-054,85-073 and 85-113 PLANT CONTACT John B. Iloughtaling, MSIV Project Manager. 504-739-6485.