LER 80-036/01T-0:on 800806,found Hourly Fire Check of Auxiliary Offgas Bldg Not Performed on Continuous Basis Since 800707 While Fire Detection Units Were Inoperable. Caused by Communications Lapse Between Personnel
ML19344D939
Person / Time
Site: Pilgrim
Issue date: 08/14/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19344D938 List:
References
LER-80-036-01T, LER-80-36-1T, NUDOCS 8008260405
Download: ML19344D939 (2)


Text

.. . . - . - - . . _ . _.

w. a. awwa.epen nsuwe.m a un t summeasavn NRC PoRM 356 (7 1-

. LICENSEE EVENT REPORT CONTROL SLOCK: I I

I l l l l lh 8

(PLEAsE PRINT OR TYPE ALL REQUIRED INFORMATION) lo l1l 7 8 9 lM l LICENSEE A lP lP CODE lS l1 l@l 0l 0l- l0 LICENSE 14 15 l0 !ONUMBERl Ol 0l -l 0l 0 @l28 4 l LICENSE 21i 1l 1l TYPE 1l 1l@l JO l

57 CAT 58 l@

CON'T .

lolil 7 8 EuE IL h l0 15 lDOCKET 80 81 01 -lNUMsER 0l 21 91 3 @ l0 18 l0l6l810@l018lIl4l8lOl@

68 89 EV ENT 0 A rg 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PRO 8ABLE CONSEQUENCES h FTil I Contrary to Technical Specification 3.12.A.a an hourly fire check of the Auxiliary I ry75"l l Off-gas Building (A0G) was not performed on a continuous basis from July 7,1980 to l lo i4 i l present while the fire detection units of this system were inoperable. A communi- 1 Io Isl l cations lapse between Operations and Security personnel resulted in'this oversight.I l o 16 l l However, twice hourly, security personnel check the exterior of the A0G Building l and would have detected smoke or fire emitting from it.

lo l7l l I 1

I o Ia 1 I .,

80 7 8 9 0E SC E COMPON1NT CODE 8 ode SU lol9l 7 8 l ZI Zl 9 to 11 h I X lh l Z l Zl ZI ZI Zl Zlh 12 13 18 19 h l ZIh 20

,,, SEQUENTIAL OCCURRENCE REPORT REVISION LER EVENT YEAR REPORT No. CODE TYPE No.

@ ,aeg/Rov 18l01 l-! 1013161 1/1 10111 1 Tl I-l I 0l 21 22 23 24 28 27 28 29 30 31 32 T N AC N O P T METH HOURS S8 i POR 8. SU La ~ MAN RER Ial@lZl@ l35Z l@ lzl@

38 l0101010l 31 40 l Y l@

el

(,H,j@

42

[Lj@ ',t l 9 l 9 ld@

43 4 47 33 at CAUSE DESC'RIPTION.AND CORRECTIVE ACTIONS h _

l liioll To prevent occurrences of this type in the future, operations personnel wi_ note I gl I che W.E. Log Book the time equipment fails, the time security is no'1fied. and I i i i 21 I name of the security individual contacted. The fire protection engdaeer will also I i1 i3i l be notified. I I

u.j,4,,) l 7 8 9 80 STA  % POWER OTHER STATUS I Y DISCOVERY DESCRIPTION g l El@ l 1 l 0 l 0 l@l N.A. l l Zl@l Management Review l A TIVITY CkTENT RELEASEo OFRELEASE LOCATION OF RELEASE @

l116l[_Z_j @ lZl@l AMOUNT N.A. OF ACTIVITY 44 l

46 hl N.A.

80 l

7 8 9 10 11 PERSONNEL EXPOSURES NUM8tR TYPE DESCRtPTION I,1[2]l0l0l0l@lZl@l '

N.A.

80 l

' _ ' ' 13 PERSONNEt'iNau' dies NUM8ER DESCRIPTION l1 l a l , 0l 0 l 0 l@l N.A. l 7 f 9 11 12 So

'#5E " fr^CT#l '" @

N.A.

l1lfillZl@l 7 8 9 10 80 l

NRC USE ONLY ,

12lol iSSufo@lDE

[N,J CRIPTION 8 008260 N5' N.A. l lllllllllllllj 7 8 9 10 68 69 80 g Mr. M. Tnomas MCLoughlin 617-746-7900 0 RAQ WPJppMDF4f-1 PHONE: }

.S s ~

SUPPLENENT TO LER 80-036/01T-0 Description On July 7,1980 smoke detectors in the A0G Building were found inoperable as reported in LER 80-035/C3L-0. Review of the subsequent corrective measures revealed that a continuous hourly fire check was not performed as required by T.S. 3.12.A.a. Station records indicata that a communications lapse between operations and security personnel occurred on July 7,1980 and as a result a fire watch was not sesrted on this date. On July 24, 1980, however, this hourly fire watch was initiated following notification from the control room that the fire detectors were out of service.

Security techniques for scheduling, tracking and logging the performance of the hourly fire check were altered on July 24, 1980. This revision apparently resulted in the surveillance interval being lengthened from i hour to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at sometime between July 24, 1980 and July 29, 1980 and continuing at this inte rval.

The hourly fire check of the A0G building, which is not a Vital Area, should have included a check of the inside of the building. This was not done; however, twice each hour security patrols the A0G building and entrance for security reasons and would have detected any smoke or fire emitting from the building.

Additionally, a fire sprinkler system protects the equipment in the A0G building.

For this system the melting of a fusible link initiates water flow which in turn causes an alarm in the control room. This system was operable throughout the period in question.

Immediately upon appraisal of this omission the hourly fire check was re-initiated. Surveillance testing of the A0G fire detection units was completed, the fire check terminated, and the system returned to service at approximately 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on August 7,1980. .

To prevent recurrence of this type of event the following action has been taken:

1. Security personnel have instituted a new control mechanism for continu-ation of requested patrols whereby the duty security police supervisor will log this activity each hour into the " Daily Security Activity Log".
2. Operations personnel have been instructed via the W.E. Instruction Log Book and a memo, issued to the Watch Engineers, that following a de-terminatior of inoperable fire equipment they will do the following:

A. Enter into the W.E. Log Book the faulty equipment and the time of failure.

w,

! .r, .p._i 3 ? . '. m Refsr-to spplicable Technical Specifications B.

C. If a fire watch is required the W.E. Log Book will indicate the time of security notification and the person notified.

D. Notify the Fire Protection Engineer.

, , .,- n i U -