Forwards Procedure to Be Used to Conduct Water Hammer Test on Auxiliary Feedwater Sys at Facility
ML19323A072
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/15/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML19323A073 List:
References
NUDOCS 8004170134
Download: ML19323A072 (1)


Text

~

_ _I 400 Chestnut Street Tower II April 15, 1980 Director of Nuclear Reactor Regulation Attention: Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nucl' ear Regulatory Commission Washington, DC 20555

Dear Mr. Rubenstein:

In the Matter of the Application of ) Docket No. 50-327 Tennessee Valley Authority )

Enclosed for your review are ten copies of the procedure to be used to conduct the water hammer test on the Auxiliary Feedwater System of Sequoyah Nuclear Plant unit 1. As specified in technical specification 7.2.3, your review cad approval is required before commencement of the tests. NRC Resident Inspector W. T. Cottle will be given 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notice of the schedule test date.

If you have any questions, please get in touch with M. J. Burzynski at FTS 854-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure (10)

AoD s

/l 8 004170 l3f