/ .s TENNESSEE '/ ALLEY AUTHORITY CH ATTANOOGA TENNESSEE 374o1 400 Chestnut Street Tower II July 18, 1980 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Light Water Reactors Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Schwencer:

In the Matter of the Application of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 In your letter to TVA dated March 24, 1980, L. S. Rubenstein requested additional information on the Process Control Program for the Sequoyah Nuclear Plant. On April 22, 1980, I responded to Mr. Rubenstein and provided a copy of TVA's ECOPAC Solidification System, Process Control Program (PCP). Enclosed for your review are five copies of Revision 4 of the PCP.

As requested by your staff reviewer, J. Boegli, TVA conducted a demon-stration of the solidification system today. The solidification system successfully met all NRC and TVA criteria for readiness to process radioactive wastes. The solidifying agent was urea-formaldehyde resin with phosphoric acid as the catalyst. The demonstration of transport-ability is anticipated to be conducted today.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, ager Nuclear Regulation and Safety Enclosure (5)

THIS DOCUMENT CONTAINS P00R QUALITY PAGES i.

An Equal Opportunity Employer 8007230ff8 )