Revised Pages to Proposed Tech Specs Re Operating Limits for Cycle 4ML19312C589 |
Person / Time |
---|
Site: |
Oconee |
---|
Issue date: |
08/23/1977 |
---|
From: |
DUKE POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML19312C587 |
List: |
---|
References |
---|
NUDOCS 7912180905 |
Download: ML19312C589 (8) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20155C6391998-10-26026 October 1998 Proposed Tech Specs Tables 4.1-1 & 4.1-2,revised Surveillance Frequency of Refueling Outage to 18 Months ML20154C1021998-09-30030 September 1998 Proposed Tech Specs Changing UFSAR by Increasing Max Rod Internal Pressure in Spent Fuel Pool from 1,200 to 1,300 Psig ML20236V9611998-07-27027 July 1998 Corrected TS Bases Pages 3.5-30b of 961211 & 3.16-2 of 970205,correcting Amend Numbers ML20236T5171998-07-20020 July 1998 Proposed Tech Specs Re one-time Extension to Functional Test Frequencies for Hydraulic & Mechanical Snubbers ML20236R1901998-07-16016 July 1998 Proposed Tech Specs Extending TS Surveillances TS 4.20.2(a), Table 4.20-1,items 1,2 & 4,TS 4.1-1,Table 4.1-1,items 8,9,10 & 11 & TS 4.5.1.2.1,item b(1) ML16141A8111994-04-20020 April 1994 Proposed Tech Spec Table 4.1-2, Min Equipment Test Frequency. ML20044C9581993-05-0404 May 1993 Proposed TS 4.7.1, Control Rod Trip Time Test. ML18032A3441987-05-29029 May 1987 Proposed Tech Specs,Clarifying Trip Level Setting in Table 3.2.A for Standby Gas Treatment Sys Relative Humidity Heater ML16134A6761982-08-11011 August 1982 Proposed Tech Spec Revisions Re Reload Design Calculations for Cycle 7 ML16134A6731982-05-0303 May 1982 Proposed Tech Spec Changes Re Core Protection Safety Limits, Protective Sys Max Allowable Setpoints & Rod Position Limits ML15223A7671982-01-12012 January 1982 Proposed Revisions to Tech Spec Section 3.1.2 Re Heatup Cooldown & Inservice Test Limitations for RCS ML16148A4421981-11-13013 November 1981 Proposed Tech Spec Revision Re Core Protection Safety Limits Protective Sys Max Allowable Setpoints & Rod Position Limits ML16148A4351981-10-28028 October 1981 Proposed Revision to Tech Spec Figure 3.5.2-4B2,allowing Cycle 5 to Run at 100% Full Power W/Axial Power Shaping Rods Fully Inserted ML16148A4281981-08-19019 August 1981 Proposed Revision to Tech Spec Figures 3.5-16a,3.5.19a, 3.5-22 & 3.5-25a Re Extension of Operating Limits ML15223A7321981-05-29029 May 1981 Proposed Tech Specs 2.1-2,2.1-3,2.1-7,2.3-5,3.2-1,3.2-2, 3.3-1,3.3-2,3.3-3,3.3-4,3.3-5,3.3-6,3.5-9,3.5-10,3.5-15, 3.5-15a & b,3.5-18,3.5-18a,b,c,d & e,3.5-21,3.5-21a & B, 3.5-24,3.5-24a & b,3.8-2 & 3.8-3 Re Core Protection ML16134A6651980-08-25025 August 1980 Proposed Tech Specs Revision for Cycle 6 ML16148A3351980-07-16016 July 1980 Proposed Revision to Tech Spec 3.3.1.c Allowing Continued Operation of Unit 2 of Full Rated Power While Maint Continues on HPI Pump Until 800718 ML19318B9731980-06-24024 June 1980 Proposed Tech Spec Interpreting Term Operable as Applied to Various Tech Spec Requirements ML16148A2691979-11-16016 November 1979 Proposed Changes to Tech Spec Pages 2.1,2.3,3.2 & 3.5. Changes Affect Core Protection Limits,Reactor Protective Sys Max Allowable Setpoints & Vol Requirements for Borated Water Storage Tank ML19317D2701978-09-25025 September 1978 Proposed Tech Spec 3.5.2 Re Control Rod Group & Power Distribution Limits & Table 4.1-2 Re Min Equipment Test Frequency ML19317D2621978-09-18018 September 1978 Proposed Revisions to Tech Specs 2.1,2.3,3.2 & 3.5 Re Core Protection Safety Limits & Protective Sys Max Allowable Setpoints ML19317D2731978-09-0606 September 1978 Revised Tech Spec Page,Figure 2.3-2A,re Protective Sys Max Allowable Setpoints ML19317D2491978-08-22022 August 1978 Proposed Revision to Tech Specs 4.18 Re Hydraulic Shock Suppressors (Snubbers) ML19322B9961978-08-21021 August 1978 Proposed Revision to Tech Spec 2.3 Re Cycle 5 ML19312B7931978-07-17017 July 1978 Proposed Tech Spec 3.1.6.4,changing Steam Generator Leak Rate Limit ML19308D6271978-06-28028 June 1978 Tech Spec Change Request Re Paragraph 2.B(6),stipulating That Byproduct & SNM Associated W/Four Fuel Assemblies Acquired by Fl Power Corp from Duke Power Co Previously Irradiated in Oconee 1 May Be Possessed ML19317D2301978-06-26026 June 1978 Proposed Tech Specs 2.1,2.3,3.2,3.5 & 4.1 Required to Support Operation of Unit 1 at Full Rated Power During Cycle 5,including Core Protection Safety Limits & Protective Sys Mac Allowable Setpoint ML19316A6501978-06-22022 June 1978 Proposed Replacement Page for Tech Spec 4.1-2 Re Min Equipment Test Frequency ML19316A5381978-06-14014 June 1978 Proposed Changes to Tech Specs Re thermal-hydraulics Analysis.Revision to BAW-1486, Unit 3,Cycle 4 Reload Rept. ML19312B8161978-06-12012 June 1978 Proposed Tech Specs 3.8,4.4 & 4.6 Re Fuel Loading & Refueling,Structural Integrity & Emergency Power Periodic Testing ML19317D2341978-06-0909 June 1978 Proposed Tech Spec 3.9 Deleting Requirements Not Applicable to Liquid Effluent Monitoring Sys Due to Installation of Offline Monitor ML19317D2221978-06-0808 June 1978 Proposed Tech Spec 3.1 Allowing Max 1 Gallon Per Minute Leakage Through Steam Generator Tubes Prior to Initiation of Unit Shutdown ML19317D2121978-06-0202 June 1978 Proposed Tech Spec 4.2 Allowing re-insp of Reactor Coolant Outlet Nozzles at Future Refueling Outage ML19316A5271978-05-30030 May 1978 Proposed Revisions to Tech Specs 2.3,3.2 & 3.5.2.4 to Support Cycle 4 Operation at Full Power ML19312B7971978-04-27027 April 1978 Proposed Tech Spec 6.4,incorporating Operating Procedure Requirements Re B&W Small Break ECCS Analysis ML19312B8091978-04-20020 April 1978 Proposed Tech Spec 3.3 Incorporating New Tech Spec 3.3.8 Requiring Operability of Three HPI Pumps for Each Unit During Power Operation Above 60% Full Power ML19317D2001978-03-20020 March 1978 Proposed Tech Spec 3.5 Including 6.03% Quadrant Power Tilt Limit & Provision for Notifying NRC If Tilt Exceeds 3.5% ML19317D2131978-02-21021 February 1978 Proposed Tech Spec 3.1. Incorporating Revision to Pressurization,Heatup & Cooldown Limitations.B&W 780125 Ltr to Util Re Corrections to Errors Discovered in B&W Rept BAW-1436 Encl ML19317D2211978-02-16016 February 1978 Proposed Tech Spec 2.3 Deleting Loss of One Pump Trip Setpoint,Outdated Info & Setpoints Associated W/Single Loop Operation ML19340A2641978-02-0808 February 1978 Tech Specs 3.3.2 Through 3.3.5 for ECCS ML19316A4801978-02-0101 February 1978 Proposed Changes to Tech Spec 3.7 Re Limiting Conditions for Operation & Surveillance Requirements for 125 Volt Distribution Sys ML19317D2271978-01-23023 January 1978 Proposed Tech Spec 3.5 Incorporating Control Rod Position & Axial Imbalance Limits to Period After 100 Plus or Minus 10 Effective Full Power Days ML19312B7891978-01-0303 January 1978 Proposed Tech Spec 2.3-9 & 10 Re Computer Software Used to Process Incore Detector Signal.Includes Modified power-imbalance Trip Setpoints to Account for Bias in Positive Imbalance Measured by Incore Detector Sys ML19316A5081977-12-0202 December 1977 Amend to Tech Specs 3.9 Re Radwaste Discharge ML19312B8001977-12-0202 December 1977 Proposed Tech Spec 6.6.2.1 Providing Requirement for Prompt Written Notification of Certain ROs by Telephone,Mailgram or Facsimile Transmission ML19312B7771977-11-0909 November 1977 Proposed Tech Spec 3.5.2 Permitting Operation of Unit 1 During Cycle 4 in Unrodded Mode ML19312B8061977-10-31031 October 1977 Proposed Tech Specs 6.6-1,-2,-3 & -4 Deleting Redundant Info Currently Being Reported in Annual Operating Rept ML19312B8101977-10-26026 October 1977 Proposed Tech Specs 3.5-9 & 3.5-24a,deleting Existing Reactor Core Quadrant Power Tilt & Control Rod Position Limits & Instituting More Conservative Limits ML19312B8151977-10-0707 October 1977 Proposed Changes to Tech Specs 3.7 & 4.6 Re Auxiliary Electrical Systems & Emergency Power Periodic Testing ML19329A4011977-10-0606 October 1977 Revised Tech Specs,Table 4.1-3 Re Min Sampling Frequency 1998-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20204B4141999-03-27027 March 1999 Revised Oconee Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20155C6391998-10-26026 October 1998 Proposed Tech Specs Tables 4.1-1 & 4.1-2,revised Surveillance Frequency of Refueling Outage to 18 Months ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20154C1021998-09-30030 September 1998 Proposed Tech Specs Changing UFSAR by Increasing Max Rod Internal Pressure in Spent Fuel Pool from 1,200 to 1,300 Psig ML20236V9611998-07-27027 July 1998 Corrected TS Bases Pages 3.5-30b of 961211 & 3.16-2 of 970205,correcting Amend Numbers ML20236T5171998-07-20020 July 1998 Proposed Tech Specs Re one-time Extension to Functional Test Frequencies for Hydraulic & Mechanical Snubbers ML20236R1901998-07-16016 July 1998 Proposed Tech Specs Extending TS Surveillances TS 4.20.2(a), Table 4.20-1,items 1,2 & 4,TS 4.1-1,Table 4.1-1,items 8,9,10 & 11 & TS 4.5.1.2.1,item b(1) ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20141F1521997-06-25025 June 1997 Rev 4 to Nuclear Security Training & Qualification Plan ML20134K5401996-10-31031 October 1996 Rev 6 to Chemistry Manual 5.1, Emergency Response Guidelines ML20117J0181996-08-15015 August 1996 Revised Chapter 16 of Oconee Selected Licensee Commitments Manual ML20095H1291995-12-0505 December 1995 Rev to ONS Selected Licensee Commitments (SLC) Manual, Revising SLC 16.6.1, Containment Leakage Tests to Reflect Current Plant Configuration & Update Testing Info ML20091P2461995-08-21021 August 1995 Rev to ONS Selected Licensee Commitments Manual ML16141A8111994-04-20020 April 1994 Proposed Tech Spec Table 4.1-2, Min Equipment Test Frequency. ML15224A3521993-10-26026 October 1993 Safety Assurance Directive 6.1, Oconee Nuclear Site Safety Assurance Emergency Response Organization. ML20044C9581993-05-0404 May 1993 Proposed TS 4.7.1, Control Rod Trip Time Test. ML20045F0721993-04-0707 April 1993 Rev 9 to Corporate Process Control Program Manual. ML20097D9451992-05-28028 May 1992 Rev 11 to Training & Qualification Plan ML20096C2561992-04-30030 April 1992 Public Version of Revised Crisis Mgt Implementing Procedures (Cmip),Including Rev 46 to CMIP-1,Rev 39 to CMIP-4,Rev 45 to CMIP-5,Rev 49 to CMIP-6,Rev 48 to CMIP-7,Rev 42 to CMIP-9 & Rev 3 to CMIP-15 ML20096D5451992-04-0707 April 1992 Public Version of Revised Crisis Mgt Implementing Procedures (Cmip),Including Rev 45 to CMIP-1,Rev 27 to CMIP-13 & Notification of Deletion of CMIP-8.Procedure CMIP-8 Reserved for Future Use ML20092M5891992-02-0606 February 1992 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 43 to CMIP-1,Rev 43 to CMIP-5,Rev 33 to CMIP-8,Rev 25 to CMIP-13,Rev 6 to CMIP-18,Rev 4 to CMIP-22 & Rev 38 to CMIP-4 ML20094H2391992-01-0101 January 1992 Rev 33 to McGuire Nuclear Station Odcm ML20094H2511992-01-0101 January 1992 Rev 34 to Catawba Nuclear Station Odcm ML20087F3931991-12-11011 December 1991 Public Version of Rev 13 to Crisis Mgt Implementing Procedure CMIP-11, Emergency Classification - Mcguire. W/ 920121 Release Memo ML20086K8831991-11-18018 November 1991 Public Version of Revised Crisis Mgt Implementing Procedures (Cmips),Including Rev 42 to CMIP-1,Rev 29 to CMIP-2,Rev 42 to CMIP-5,Rev 12 to CMIP-11 & Rev 37 to CMIP-21 ML20086G7711991-10-16016 October 1991 Public Version of Revs to Crisis Mgt Implementing Procedures (Cmip),Including Rev 41 to CMIP-1,rev 37 to CMIP-4,rev 41 to CMIP-5,rev 46 to CMIP-6 & CMIP-7,rev 32 to CMIP-8,rev 40 to CMIP-9,delete CMIP-12 & Rev 24 to CMIP-13 ML20082C7441991-06-11011 June 1991 Public Version of Rev 13 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20076A7241991-06-10010 June 1991 Public Version of Crisis Mgt Implementing Procedures, Including Rev 39 to CMIP-1,rev 28a to CMIP-2,rev 44 to CMIP-7,rev 39 to CMIP-9 & Rev 10 to CMIP-11 ML20081J9841991-06-10010 June 1991 Rev 3 to EDA-1, Procedure for Estimating Food Chain Doses Under Post-Accident Conditions ML20081K0101991-06-0606 June 1991 Rev 8 to EDA-3, Offsite Dose Projections for McGuire Nuclear Station ML20072S0521991-03-15015 March 1991 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 9 to CMIP-11, Classification of Emergency for McGuire Nuclear Station & Rev 11 to CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20066G3621991-02-0101 February 1991 Public Version of Crisis Mgt Implementing Procedures, Including Rev 28 to CMIP-2,Rev 34 to CMIP-4,Rev 38 to CMIP-5,Rev 43 to CMIP-6,Rev 42 to CMIP-7,Rev 29 to CMIP-8, Rev 37 to CMIP-9 & Rev 34 to CMIP-21 ML20082P7611991-01-0101 January 1991 Rev 30 to Odcm,Catawba Nuclear Station ML20072S9621991-01-0101 January 1991 Public Version of Rev 12 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20082P7711991-01-0101 January 1991 Rev 31 to Odcm,Mcguire Nuclear Station ML20072P9621990-11-0808 November 1990 Rev 9 to Crisis Mgt Implementing Procedure CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20028H2211990-10-31031 October 1990 Public Versions of Revised Crisis Mgt Implementing Procedures,Including Rev 37 to CMIP-1,Rev 27a to CMIP-2,Rev 33 to CMIP-4,Rev 37 to CMIP-5 & Rev 42 to CMIP-6 ML20059F4301990-08-22022 August 1990 Public Version of Rev 27 to Crisis Mgt Implementing Procedure CMIP-2, News Group Plan ML20063Q2721990-08-14014 August 1990 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8,Rev 35 to CMIP-9 & Rev 7 to CMIP-11 ML20043F4841990-05-23023 May 1990 Public Version of Crisis Mgt Implementing Procedures, Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17 ML20043B2651990-05-0909 May 1990 Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7,Rev 26 to CMIP-8, Rev 33 to CMIP-9,Rev 2 to CMIP-14 & Rev 10 to CMIP-16 ML20043F4621990-04-20020 April 1990 Rev 5 to Oconee-specific Process Control manual.W/900606 Ltr ML20006C0571990-01-18018 January 1990 Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. ML16152A8951990-01-0202 January 1990 Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations. ML15264A1571990-01-0202 January 1990 Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 ML20012A3801990-01-0101 January 1990 Rev 28 to, Offsite Dose Calculation Manual,Oconee,Mcguire & Catawba Nuclear Stations. ML20012A3791990-01-0101 January 1990 Rev 27 to, Offsite Dose Calculation Manual,Oconee Nuclear Station. ML20011D2441989-12-0101 December 1989 Crisis Mgt Implementing Procedures. ML20012A3731989-11-15015 November 1989 Rev 4 to, Process Control Program Oconee Nuclear Station. 1999-08-18
[Table view] |
Text
_ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
-y 9-(158,102) o(225 9,102) 100 -
RESTRICTED
- OPERATION IN TH K POWER N % (g74,i,gg) 4 (225.9,90) 90 REGION 15 NOT CUTOFF REGION ALLOWED (169.1,80) (230.9,80) 80 -
5 SHUTOOWN MARGIN Lluti (164.1,70) (235.9,70)
(240 9 60) 60 -
RESTRICTED REGION (159.1,60)
(300,60) 50
- (126,50) 3 o
PERMIS$18LE OPERATING 40 REGION 30 20 -
(84,15) 10 -
(0.0) 1 i t i t t t I t i I 0
200 300 O 100 Roa Index, 5 fttnaraan 0 25 50 75 100 0 25 50 75 100 1 I i 1 I I I t t t Group 5 Group 7 0 25 50 75 100 l I I I I Group 6
' Rod inaen is tne percentage sum of tne witnarawal of Groups 5,6 ano 7 ROD POSITION FOR FOUR-PUMP OPERATION FROM 100 (:10) T0 rg' 235 (110) EFPD, UNIT 1 lonmwin, OCONEE NUCLEAR STATION Y Figure 3.5.2-1A2 3.5-13 7912180705'
m
)
m )
(201,102) o (251.8.102) ion _
POWER LEVEL 90 - CUTOFF >(251.8.90)
OPERATION IN THis REGION 13 NOT ALLOWE0 RESTRICTED (246.8,80) gg _
REGION 70 - (241.8.70)
E (236.8,60) 5 60 -
50 - (127.50) d 40 -
SHUTOOWN MARGIN PERMISSIBLE CPERATING REGION 30 -
Lluti 20 -
(100.15) 10 -
(0.0) 0 , i , , , i , , , , ,
100 200 300 0
Rod inces, 5 Withdrawn 0 25 50 75 100 0 25 50 75 100 I t I f f I i , , i Group 5 Group 7 0 25 50 75 100 l f I t i Group 6 Rod index is tne percentage sum of tne witnarawal of Groups 5.6 and 7 R0D POSITION LIMITS FOR FOUR-PUMP OPERATION AFTER 235 (110)
EFPD, UNIT 1 louta OCONEE NUCLEAR STATION 3.5-13a Figure 3.5.2-1A3
(188,102) (231,102) 100 - OPERATION IN THIS REGION RESTRICTED l$ NOT ALLOWED REGION FOR 3 PUNP
= 90 - (236.89)
OPERATION
_S B0 -
SHUTOOWN MARGIN LIMIT (241.76)
(300,16)
$ 70 -
i E 60 -
m 50 - (126,50)
E a
j 40 -
PERMISSIBLE OPERATING
- REGION 30 t
3 20 m
10 (84.0) 0 t I t t i i e i i t i 0 100 200 300 Rod index, 5 Witnarawn 0 25 50 75 100 0 25 50 75 100 I I I I I I i 1 i t Group 5 Group 7 0 25 50 75 100 1 I t i I Group 6 Roa index is tne percentage sum of tne estnarasal of Groups 5.6 ana 7 l
l R0D FOSITION LIMITS FOR TWO-AND THREE-PUMP OPERATION FROM l
100 (:10) TO 235 (:10), EFPD UNIT 1 g^ OCONEE NUCLEAR STATION lmtronia; 3.5-18a Figure 3.5.2-2A2 i
l l
~ , - .
(236.8.102)
,g OPERATION IN THIS REGION (201.102) (246.8.102)
IS NOT ALLOWE0 WITH 2 OR 3 . EGICN PUNPS FOR 2 & 3
=
90 - W pump (241 8.89)
S Tl PERATION E 80 -
j RESTRICTED (236.8.76) a 7g _
IN THIS REGION
[_ SHUTOOWN MARGIN Lluti M 60 -
E 50 (127.50) 3 2
2
~
40 0
PERMIS$18tE OPERATING REGION 3 20
. (100 15) 10 (0.0) 0 I I f i i 1 t i i l 0 100 200 300 Rod Indez, 5 Withdrawn 0 25 5? 75 100 0 25 50 75 100 l ! ' I 1 I I ; ; i Group 5 Group 7 0 25 50 75 100 I f f I I
~
Group 6 Roa inder is tne percentage sum of tne ettnaraeal of Groups 5.6 ana 7 R00 POSITION LIMITS FOR TWO-AND THREE-PUMP OPERATION AFTER n 235 (:10) EFPD, UNIT 1 loutrowth OCONEE NUCLEAR STATION 3.5-18b @ Figure 3.5.2-2A3 i
POWER, ", OF 2568 M t RESTRICTED REGION 110
(-18.3,102) (+3.3,102) 1 100
(-17.0,90) 90
(+3.8,90) 80 70 l
60 50 ,
1 I
40 e
30 20 l l
l l
10 I 1 ; ;
-20 -10 0 +10 +20 Core Imoalance, %
OPERATIONAL POWER IMBALANCE ENVELOPE FOR OPERATION FROM 100 (110) TO 235 (110) EFPD, rM lsuu rona.g UNIT 1 M'; OCONEE NUCLEAR STATION 3.5-21a Figure 3.5.2-3A2
?-
POWER, ", OF 2568 M t --
110 RESTRICTED ~ REGION
(-23.1,102) 100 f( *'
(-21.2,90) 90 (14.9,90)
PERMISSIBLE 80 OPERATING REGION 70 60 50 40 30 20 10 l l I I l
-30 -20 -10 0 +10 +20 Core imbalance 's OPERATIONAL POWER IMBALANCE
- ENVELOPE FOR OPERATION AFTER i 235 ( 10) EFPD, UNIT 1
.b\
,ouu rown; OCONEE NUCLEAR STATION M Figure 3.5.2-3A3 3.5-21b l
1
a l
(lq0,102) 100 -
'P RESTRICTE 1(32,102) 90 - , , (34.6,90) RESTRICTED (1 6, 0)
REGION 80 - (9.2,80) < (34.6,80) 70 -< (3.6,70) (41.6,70)
- (85.6,60)
=
[ 60 <*'(3.6,60) :
(100,60)
$ (0.60),
E 50 PERMISSIBLE j 40 OPERATING REGION
- a. :
30 I l
i 20
- l 10 0 I I I I I I I 'l i O 10 20 30 40 50 60 70 80 90 100 APSR, ", Witndrawn APSR POSITION LIMITS FOR OPERATION FROM 100 (110)
TO 235 ( 10) EFPD, UNIT 1 g
,ouu nan; OCONEE NUCLEAR STATION 3.5-23d
' W -
Figure 3.5.2-4A2 t
O '
..o i (11.0,102) (32.0,102) RESTRICTED 100 _
REGION l 90 - (8.6,90) ,(34.4,90) l f
80 - < .(6.2,80) o (34.4,80) !
(6.1,70) (34.4,70) !
70 -
- (85.4,60)
m E (100,60) !
~ (0.60) :
- 50 PERMISSIBLE
~
40 -
OPERATING f REGION 30 20 10 0 1 I I I I I I I I O 10 20 30 40 50 60 70 80 90 100 APSR, ", Witndrawn APSR POSITION LIMITS FOR OPERATION AFTER 235 (110)
EFPD, UNIT 1 lc h OCONEE NUCLEAR STATION 3.5-23e Figure 3.5.2-4A3