ML19309G370

From kanterella
Jump to navigation Jump to search
Forwards LER 80-009/03L-0
ML19309G370
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/30/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19309G371 List:
References
1-040-20, 1-40-20, NUDOCS 8005060225
Download: ML19309G370 (1)


Text

.

800506022$

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 3716 April 30,1980 1-040-20 Mr. K. V. Seyfrit. Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Comm.

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 .

SUBJECT:

Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Licensee Event Report No. 80-009/03L-0 (File: 0520)

Gentlemen:

In accordance with Arkansas Nuclear One Unit 1 Technical Specification 6.12.3.2.b, attached is the subject report concer. ling the lead hydrogen purge fan, VSF-30A, that tripped on overload due to the stuck check valve, HPA-5, on the suction of the fan. Due to a reailing problem this LER is being processed late. Hopefully, this delay will not occur again.

Very truly yours, bY$ Y David C. Trirble Manager, Licensing DCT:GAC:1p Attachment

/

cc: Mr. Victor Stello, Jr., Director V Office of Inspection and Enforcement U. S. Nuclear Regulatory Comm. 003 Washington, D. C. 20555 3 Mr. Norman M. Haller, Director j Office of Management and Program Analysis U.S. Nuclear Regulatcry Comm.

Washington, D. C. 20555 MEMDEA MtOOLE SOUTH UTtuTIES SYST EM