ML19305E805

From kanterella
Jump to navigation Jump to search
Forwards LER 80-033/03L-0
ML19305E805
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/15/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19305E806 List:
References
NUDOCS 8005200458
Download: ML19305E805 (1)


Text

__ _ _ ._ - __ _ _ __

l 0 .

8005200 Y l l

$ l l

1750 Chestnut Street Tower II Hay 15, 1980 lir. James P. O'Reilly, Director U.S. Nuclear Ragulatory Commission ,

Office of Inspection and Enforcement l Region II l l

101 Marietta Street, Suite 3100 Atlanta, Coorgia 30303

Dear lir. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PIANT UNIT 1 - DOCKET NO. 50-327 - FACILITY OPERATING LICENSE DPR REPORTABLE OCdJRRENCE j REPORT SQRO-50-327/8033 The enclosed report provides details concerning centrifugal charging pump 1B being placed in service with diesel generator 1B being out of service. This report is submitted in accordance with Sequoyah unit 1 Techaie=1 Specification 6.9.i.13.c. ,

Very truly yours, TENNESSEE VALLEY IJJTHORITY J. R. Calhoun Director of Nuclear Power t Enclosure (3)

cc (Enclosure)

Director (3)

! Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 f l Director (40)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Connaission Washington, DC 20555 l Mr. Bill Lavallee Nuclear Safety Analysis Center Palo Alto, California 94303 Mr. W. T. Cottle, NRC Inspector, Sequoyah l

\

__