ML19261B589

From kanterella
Jump to navigation Jump to search
Forwards Attachments Detailing Reasons for Delays in Implementing 10CFR73.55 Requirements & Compensatory Measures.Encl Withheld (Ref 10CFR2.790)
ML19261B589
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/20/1979
From: Clayton F
ALABAMA POWER CO.
To: Case E
Office of Nuclear Reactor Regulation
References
NUDOCS 7902280244
Download: ML19261B589 (1)


Text

A;acama Power Company

/ 600 Nonn 18:n S;reet Pcs:C*ce Scx 2641 Birma'gnam A:atama 35291 Te;eoncne 205 323-5341 L

F. L CLAYTON JR.

Semor Vice Pres. cert Alabama Power The SCLft'em 9eC*"C SySfem February 20, 1979 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20535 Attn: Mr. Edson G. Case, Acting Director

Dear Sir:

Re: '

..oseph M. Farley Nuclear Plant Units No. 1 and No. 2 Docket Nos. 50-348 and 50-364 Enclosed are two attachments which detail reasons for delays on implementing 10CFR73.55 requirements and compensatory measures.

Yours very truly, Af

b. C a 'k tor r.

FLCJr:bhj Attachments cc: Mr. G. F. Trowbridge Mr. R. A. Thomas P

%*O%'

79022802Y s i