ML20204D428
| ML20204D428 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/16/1999 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20204D433 | List: |
| References | |
| NEL-99-0119, NEL-99-119, NUDOCS 9903240220 | |
| Download: ML20204D428 (2) | |
Text
_
--~
%.ja t
~
Dave Morey Southern Nuclear Vice ' sident Operating Compa::y i
Farley Project R0. Box 1295 Birmingham, Alabama 35201 I
Tel 205.992.5131 SOUTHERN h(
March 16, 1999 COM N Energy eo Serve hurWorld" Docket No.:
50-348 NEL-99-0119 U. S. Nuclear Regulatory Ce=iania ATTN: Docununt Control Desk Washingtm, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit 1 Steam Generator Tube Voltage-Based Alternate Repair Criteria Data Report Ladies and Gentlemen H
Generic Letter 95-05, " Voltage-Based Repair Criteria for the Repair of Weingl=se Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Crackmg," requires the submittal of an associated report within 90 days of the restart following a steam generator inspection. The required non-proprietary report for the fall 1998 Farley Unit I steam generator inspection is attached.
If there are any questions, please advise. 'Ihis submittal contains no commitments.
Respectfully submitted,,
tf blW Dave 1.
EWC/maf; 90daysg. doc I
Enclorare:
Farley Unit-1 1999 Voltage-Based Repair Criteria 90 Day Report l
)-
'!40084 9903240220 990316
~
PDR ADOCK 05000348 P
PDR 2
l:
1 Page 2 j
U. S. Nuclear Regulatory Commission
)
cc:
Southern Nuclear Operatinur Comoany Mr. L. M. Stinson, General Manager - Farley i
U. S. Nuclear Regulatory Commission. Wanhinatan_ D. C.
Mr. J. I. Zimmerman, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission. Region II Mr. L. A. Reyes, Regional Admuustrator Mr. T. P. Johnson, Senior Resident Inspector - Farley 1
l L _.