ML20205A153

From kanterella
Jump to navigation Jump to search
Forwards Corrected Typed & marked-up Current TS Pages for Replacing Previous Pages Submitted on 990222,re CR, Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation
ML20205A153
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/19/1999
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205A157 List:
References
NEL-99-0122, NEL-99-122, NUDOCS 9903300305
Download: ML20205A153 (4)


Text

L. -

Dave Morey Southern Nuclear '

Vice President Operating Con pany

.: . Farfey Project P.O. Box 1295 -

Birmingh in. Alabama 35201 Tel 205.992.5131 4 SOUTHERN h

March'19,1999 COMPANY Energyto Serve YourWorld" 4

Docket Nos.: 348 - NEL-99-0122 50-364 U. S. Nuclear Regulatory Commission-ATTN: Document Control Desk' Wa=hiagtaa.D.C. 20555-0001 Joseph M. Farley Nuclear Plant Request For Technical Specification Changes Control Room, Penetration Room, and Containment Purge Filtration Systems and Radiation Monitoring Instrumentation Ladies and Gentlemen-1 By letters dated June 30,1997 and February 22,1999, in accordance with the provisions of 10 CFR 50.90, Southern Nuclear Operating Company (SNC) submitted Technical Sp ecification (TS) amendments to clarify Surveillance Requirement (SR) references to ANSI N510 sections 10,12, and 13 to ASME N510-1989, "Testmg of Nuclear Air Treatment Systems," with eirata dated January 1991, and to add a footnote which references the F?iP Final Safety Analysis Report (FSAR) for relevant testing details. The FNP FSAR is being revised to include a detailed discussion of the applicability of ASME N510-1989 sections 10,11, and 15. Differences between

' ANSI N510-1980 and ASME N510-1989 hve been reviewed by SNC, and conversion to ASME N510-1989 for sections 10,11, and 15 is considered to be an cahaacament. In addition, ASME j N510-1989 is referenced by the NRC in NUREG 1431. j

'Ito Februa y 22,1999, submittal contained the following error in Current Technical Specification Table 3.3-6:- In the Applicable Modes column for the Fuel Storage Pool Area Gaseous Activity I l

Process Monitor, there is a reference to footnote "i" which no longer applies. The previous Jime i l J

30,1997, submittal contained the footnote "i but it has been determined that this footnote is no / j songer needed Footnote "i" and it's refer x:es were removed from the table by the February 22, 1999 submittal, but the reference was not removed from the Applicable Modes column in this '

location .* Ibis err r is corrected by this letter.

i

.. Enclosed are corrected typed and marked-up Current Technical Specification page.s for replacing the previous pages (on a page-for-page basis) sui., tied on February 22,1999. The Farley Improved Technical Specifi:ation pages are not aficcted by this correction The conclusions of the l no significant hazards evaluation submitted in February 22,1999 submittal are not affected by this  ;

proposed correction.  !

9903300305 990319 PDR ADOCK 05000348 i P PDH ,,

r-Page 2 {

. U.S. Nuclear Regulatory Commission j l

I Mr. D. N. Morey states that he is a Vice President of Southern Nuclear Operating Company anxi is authorized to execute this oath on behalf of Southern Nuclear Operatmg Company and that, to tim best of his knowledge and belief, the facts set forth in this letter and enclosures are true.

If you have any questions, please advise. j Respectfully submitted, l i

SOUTHERN NUCLEAR OPERATING COMPANY

$ A ?!" j Dave Morey l Sworn to and subscribed before me this dayof l YQAk_1999 0.h$(L n OW k NotMy Public  !

My Commission Erpires: Y 0-OQ.tv_ b' O= l. 50 l L

JGS/maf: filtscor. doc

Enclosures:

1. Corrected Technical Specification Pages
2. Corrected Marked-Up Technical Specification Pages i

l

\

I l

I d -- j

c 1

1

, l Page 3 U. S. Nuclear F-latary Commission l l

i I

cc: Southern Nuclear Operatina Comoany

' Mr. L. M. Stinson, General Manager - Farley U. S. Nuclear Renulatory Commission. Washinnton. D. C.

Mr. J. I. Zimmerman, Licensing Project Manager - Farley U. S. Nuclear Renulatory Commission. Region 11 l

Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Faricy j l

Alabama Departmem of Public Health Dr. D. E. Williamson, State Heal:h OfEcer 1

l l

l l

l I

I l

. 1 l

Enclosure 1 l

Joseph M. Farley Nuclear Plant J Control Room, Penetration Room, and Containment Purge Filtration Systems I and Radiation Monitoring Instrumentation Technical Specification Changes 1

JJnit 1 & 2 Corrected Technical Specification Pares 1

l l

l 1

\

s m-