ML20205A287
| ML20205A287 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/19/1999 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20205A291 | List: |
| References | |
| NEL-99-0125, NEL-99-125, NUDOCS 9903300352 | |
| Download: ML20205A287 (2) | |
Text
7 Dava Morey Southern Nuclear g/
Vice President.
Operating C:mpaIy,.
Farley Project P.O. Box 1295 W '
Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERN O
' March 19, 1999 Energy toServe YourWorld" Docket No.:
50-364 NEL-99-0125 U. S. Nuclear Regulatory Commission -
ATrN: Document Control Desk.
Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Unit 2 Reactor Vessel Surveillance Cansule Z Results Ladies and Gentlemen:
l in accordance with the provisions o' 10 CFR 50 Appendix H, Southern Nuclear J
Operating Company (SNC) hereby submits Westinghouse Report WCAP-15171, l
" Analysis of Capsule Z from the Alabama Power Company Joseph M. Farley Unit 2 i
Reactor Vessel Radiation Surveillance Program." This report presents the surveillance
' capsule test results from Capsule Z, which were used to evaluate the reactor vessel -
I material properties following 13.24 effective full power years (EFPY) of plant operation.
Based on the ~1M surveillance capsule test results, properties of tw reactor beltline materials remam more than adequate for continued safe plant operation These test results will be used in reviewing the Unit 2 Pressure Temperature Limits Report (PTLR) and, ifnecessary, a revision to the PTLR will be issued within one year from the date of this letter. Submittal of this report within one year is considered an NRC commitment.
If there are any questions please advise.
Respectfully submitted, f7 N#H
)
Dave Morey -
c i
DWD/maf: capsuleZ. doc p
Enclosures:
WCAP-15171," Analysis of Capsule Z from the Alabama Power Company
' Joseph M. Farley Unit 2 Reactor Vessel Radiation Surveillance Program" 9903300352 990319 PDR ADOCK 05000364-P PDR i b
y-4 Page 2 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operatina Comoany Mr. L. M. Stinson, General Manager U. S. Nuclear Renulatory Commission. Wa=hinMon_ D. C.
Mr. J. I. Zimmerman, Licensing Project Manager - Farley U. S. Nuclear Renulatory Commission. Reaion II Mr. L. A. Reyes, Regional Administrator I
Mr. T. P. Johnson, Senior Resident Inspector - Farley I
4 r
l l
Y
.