Submit Monthly Operating Report for the Month of November 1976
ML19105A318
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/09/1976
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Mcdonald W
Office of Nuclear Reactor Regulation
References
Serial No. 322/021974
Download: ML19105A318 (7)


Text

Fi\e Cy, VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND.VIRGINIA 23261 December 9, 1976 If~~

~~

0 Mr. William McDonald, Director 11

, Bi Serial No. 322/021974 Office of Management Information cy.nd o~i~ 1SZ.6> PO&M/ALH:clw Program Control

~ .

Mail S.,ctton 5

U* S, N f UC 1 ear Regu 1 atory COmml.SSl. Docket Clerk Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32 DPR-37

Dear Mr. McDonald:

Operating information for Surry Power Station, Unit Nos.land 2, for the month of November 1976 is attached.

Very truly yours,

_,./

'/- * ,,_ I' - *.

C. M. Stallings Vice President-Power Supply and Production Operations Attachment cc: Mr. Norman C. Moseley

'ii*;* .

'1r~ ,,/. . -*.

(/_

v,-c . . .

n"'

  • f

,... ' ..,J .... .-* .'

I} 1* !,*

    • ~i-11:. " .: .
    • 4 /';. ;,:- -
i,,. ",I. -- ,I

'",'(.~ ',.,* /

N~*-.-..

~

  • 1

~iY 'l(J*',

1

~"'V

e DOCKET NO. 50-280 UNIT Surry Unit No. 1 DATE Dec. 1, 1976 COMPLETED BY E, P, DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH NOVEMBER AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) . DAY (MWe-net) 1 0 0 17 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 31 16 0 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds* the I 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

e UNIT Surry Unit Ho. l DATE Dec. 1, 1976 COMPLETED BY E. p. DeWandel DOCKET NO.

50-280 OPERATING STATUS

l. REPORTING PERIOD: _ _0_0_0_1_ _ 7_6_1_l0_1_ _ _ _ _ THROUGH _ _ 2_4_00_ _7_6_1_1_:3....:0_ _ _ __

HOURS IN REPORTING PERIOD: _ _ _7 : . . . . : 2 = - 0 = - - - - - - - - - - - - - - - - - - - - - - - - -

2. Ct:RRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (~!We-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF AN'l'.) (~!We-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOL'RS REACTOR WAS CRITICAL . . . . . . . . . . . . . 0 61058.0 221554.4

6. REACTOR RESER \"E SHL"TDOWN HOURS . . . . . . . 0 0 0
7. HOCRS GENERA TOR ON LINE . . . . . . . . . . . . . . . 0 61013.7 211858.2
8. UNIT RESERVE SHCTDOWN HOURS . . . . . . . . . . . 0 0 0
9. GROSS THER\IAL ENERGY GENERATED (MWHJ . . . . . . . . . . . . . . . . . . . . . 0 14,305,668 49,088,356
10. GROSS ELECTRICAL ENERGY

,GENERA TED (MWH) . . . . . . . . . . . . . . . . . . . . . 0 4,626,820 16,078,363

11. NET ELECTRICAL E:,.iERGY GENERATED (MWH) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 423962885 1522432765
12. REACTOR AVAILABILITY FACTOR (1) . . . . * * . * . 0 75.3% 65.3%
13. llNIT AVAILABILITY FACTOR (2) . . . . . . . . . . . . 0 74. 8;~ 63.2%
14. l:1NIT CAPACITY FACTOR (3) . . . . . . . . . . . . . . . 0 69. 41~ 56.0%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 0 13 .8;~ 22 .11~
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONIBS (STATE TYPE, DATE, AND DURA TIO!',/ OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTt:P: _ _ D_e_c_em_b_e_r_23~,_19_7_6_ __
18. l 1NITS IN TEST STATUS (PRIOR TO COM~!ERCIAL OPERA TIO!'/) REPORT THE FOLLOWING:

DA TE LAST DA TE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (l) REACTOR AVAILABILITY FACTOR X 100 HOURS IN REPORTING PERIOD HOURS GENERA

= ~~.:..:.....;:.;.... _ _TOR __ ON_ LINE

_;___ _ X I 00 (2) UNIT AVAILABlLITY FACTOR HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GENERATED (3) UNIT CAPACITY FACTOR =

MAX. DEPENDABLE CAPACITY (MWc-NETJ X HOURS IN REPORTINli l'ERIOO FORCED OUTAGE HOURS (4) UNIT FORCED OllT AGE RATE  ;.. H. ::.O::..;.U. ::.R~S=.. G. : .E. : .N. : .E: . ;.R. : .AT_O_R_O_N_L_I_N_E_+_F_O_R_C_E_D_O_U_'T_A_G_E_H_O_U_R_S-X I OO

DOCKET NO. _s_o_-_28_0_ _ __

UNIT SHUTDOWNS UNIT NAME Surry Unit No. 1 DATE Dec. 1, 1976 COMPLETED BY E .P. DeWandel REPORT MONTH ----'--N_OV---'--E.:. . :MB-=..:.:E=R_ __

TYPE METHOD OF NO. DATE r76-14 101776 F-FORCED S-SCHEDULED s

DURATION (HOURS) 720 REASON (1)

C SHUTTING DOWN THE REACTOR (2) 1 CORRECTIVE ACTIONS/COMMENTS Scheduled refueling outage. Outage started on Oct. 17, 1976 and unit was out for entire month.

([) REASON (2) METHOD A EQUIPMENT 1-AILURE (EXPLAIN) I-MANUAL B MAINT. OR TEST 2-MANUAL

(' REFUELING D* REGl'LATORY RESTRICTION E OPERATOR TRAINING AND SCRAM 3--AUTOMATIC SCRAM e

LICENSE EXAMINATION I* ADMINISTRATIVE

(; 01'1-.RA TIONAL ERROR ILXPI.AIN)

II OTIII.R II* Xl'I.AIN)

SUMMARY

DOCKET NO. 50-281 UNIT Surry Unit No. 2 DA TE Dec. 1 , 197 6 COMPLETED BY E. P. DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH NOVEMBER AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 0 17 0 2 0 18 0 3 0 19 0 0 0 4 20 0 0 5 21 6 0 22' 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 16 0 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this fonn, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100~~ line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

e e UNIT Surry Unit No. 2 DATE Dec. 1, 1976 COMPLETED BY E. P. DeWandel DOCKET NO. 5 o- 2 S l OPERATING STATUS

l. REPORTING PERIOD: _0_0_0_1_ _7_6..,,,1..,,.1..,,.0_1_ _ _ _ _ _ THROCGH _ _ 24_0_0_---'-7~6.::..l.::..l3=-0=------

HOURS IN REPORTING PERIOD: 720 Ct.:R RE NTL Y A UTHO RIZ ED POV.'_E_R_L_E_V_E_L_(_M_W-th_)_2_4.,...4..-,1=---~-1A-X-.D_E_P_E_N-'D_A_B_L_E_C_A_P_A_C_IT_Y_(_~1-W-e--N-.E-T_)_ _ 7_8_8_

2.

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED OF ANY) (MWe-1'-ET): _ _ _ _ _ _ _ _ __
4. REASO!',S FOR RESTRICTION (IF ANY):

THIS C~MllLA TIVE REPORTING PERIOD YR TO DATE TO DATE

5. HOL!RS REACTOR WAS CRITICAL . . . . . . . . . . . . . 0 4,483.1 20.112.7
6. REACTOR RESER VE SHL'TDOWN HOURS ......* 0 0 0
7. HOC RS GENERA TOR Ol'< Ll!\'E . . . . . . . . . . * . . . . 0 4,393.5 19,748.0
8. UNIT RESERVE SHUTDOWN HOURS . . . . . . . . . . . 0 0 0
9. GROSS TH[R~1AL ENERGY GENERATED(MWH) . . . . . . . . . . . . . . * . . . * . . 0 10,401,391 44,909,524
10. GROSS ELECTRICAL ENERGY GENERA TED (MWH) . . . . . . . . . . . . . * . . . . * . . 0 3,388,560 14,734,119
11. :"<ET ELECTRICAL ENERGY GENERATED

(~1WH) o* 3,213,702 13,966,083 0 55. 81~ 64. 01~

12. REACTOR AVAILABILITY FACTOR (I) . . . . * . . . .
13. t,JNIT A \'AILABILITY FACTOR (2) ......****..

54

  • b~o i:i2. s~~

0 50.7% 56 .4~~

14. UNIT CAPACITY FACTOR (3) ...**..*.***.*.
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * * . * . 100% 36.0% 24. J;;
16. SHL'TDOWNS SCHEDL:LED TO BEGIN IN SEXT 6 MONTHS (STATE TYPE, DATE. A:-ID DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STAR TCP: December 10, 1976
18. UNITS IN TEST STATt.:S (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DA TE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I) REACTOR AVAILABILITY FACTOR X 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LI!'IE (2) UNIT A YAILABILITY FACTOR = ------------x HOURS IN REPORTING PERIOD 100 NET ELECTRICAL POWF.R GFNERATED (3) UNIT CAPACITY FACTOR =

MAX. DEPENDABLE CAPACITY (MWc-NET) X HOURS IN RLPORTIN<.; PERIOL>

FORCED OUT AGE HOURS (4) UNIT FORCED OUT AGE RA TE -H..:..O..:..U_R_S..:..G_E_N_E_R_AT_O_R_O_N_L_l_N_E_+_F_O_R_C_E_D_O_U_'T_A_G_E_H_O_U-'R-5-X l OO

DOCKET NO. _so_-_2_8 _1 _ __

UNIT SHUTDOWNS UNIT NAME Surry Unit No. 2 DATE Dec. 1, 1976 COMPLETED BY E.P. DeWandel REPORT MONTH __N_O_V_E_M_BE_R_ __

TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

76-9 DATE 091576 S-SCHEDULED F

(HOURS) 720 REASON (1)

A THE REACTOR (2) 2 CORRECTIVE ACTIONS/COMMENTS Steam generator tube leak. Extensive e

investigation of the problem is in progress. Piping in recirculation spray system being replaced.

(I) REASON (2) METHOD A EQUIPMENT FAILURE (EXPLAIN) I-MANUAL B MAINT. OR TEST 2-MANUAL C'

D*

1:-.

REFUELING REGl'LATORY RESTRICTION Ul'FRATOR TRAINING AND SC"RAM 3--AllTOMATIC SCRAM e

LICENSE EXAMINATION 1:-

  • ADMINISTRATIVE G OPERATIONAi. ERROR (l-.Xl'I.AINJ II 01111.R 11-.XPI.AINJ

SUMMARY