e e
VIRGINIA ELECTRIC.A.ND POWER COMPANY RICHMOND, VIRGINIA 23261 June 8, 1977 r= =11~ t~rt
\\\\~i!llll\\l~i\\1 ~~ttlld ~r i,
~
Mr. William McDonJ~~' Director Serial No. 229/021974 Office of Management Information and PO&M/TAP:das Program Control Docket Nos. 50-280 U. S. Nuclear Regulatory Connnission 50-281 Washington, D. C.
20555 License Nos. DPR-32 DPR-37
Dear Mr. McDonald:
Operating information for Surry Power Station, Unit Nos. 1 and 2, for the*month of May 1977 is attached.
Attachments cc: Mr. Norman C. Moseley Very truly yours, J
C. M. Stallings Vice President-Power Supply and Production Operations
'0.
~ **)Ob 1
--~1.i.'- -
I I.i.
OPERATI!\\G STATUS-UNlT Surry Unit Ill DATE -June 1, 1977 E. P. DeWande:l COMPLETEDBY_-'-------
DOCKET NO __ s_o_-_2_s_o ____ _
- 1.
REPORTING PERlOD: __
0_00_1_7_7_0_5_0_1 ______ TilROUGH 2400 770531 HOt:RS rs REPORTING PERIOD: _ __,_7....:4....:4 ___ --=~--------------------
- 2.
ct:RRENTLY AI.JTHORIZED POWER LEVEL (MWth) 2441
~LA.X. pEPENDABLE CAPACITY (MWe-NET) 77 5. :
- 3.
- LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASO~S FOR RESTRICTION (lF.ANY):
THIS REPORTING PERIOD
.S~
HOL'RS REACTOR WAS CRITICAL. *...********
- 6.
REACTOR RESERVE SHUTDOWN HOURS *******
- 7.
HOt:RS GE~ERATOR ON LINE ***************
- 8.
UNIT RESERVE SHUTDOWN HOURS **.***, ***.*
9; GROSS THERMAL ENERGY GE~ERATED {MWH) ************* ; ** ; ****
- 10.
GROSS ELECTRICAL ENERGY
-GE:-O"ERA TED (MWH) ****.*..*..*******, **
- 11.
!\\ET ELECTRICAL ENERGY GENERATED
(!>l\\lrtiJ
- 12.
REACTOR AVAILABILITY FACTOR {1) *********
- 13.
t:'NIT AVAILABILITY FACTOR (2) ******* ; ****
- 14.
(.::-;IT CAPACITY FACTOR (3).**.***********
- 15.
. l'NIT FORCED OUTAGE RA TE (4)..**********
409.6 0
406.1 0
981,028 324,325 308,286 55.1%
- 54.6%
53.5%
.5%
YR TO DATE 2,186.1 0
. 5,282,832 1,752,340 h~68,585 62.3%
. 60, 3%
59.4%
3.8%
CUM).ILATIVE TO DATE 24,813.2
- 0.
24,086.1 0
54,371,188 17,830,703 16.912.350 63.7%
56.1%
20,7%
- 16.
SHl"TDOWNS SC'HEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
St:eam Generator Inspection -11.:...19 6 weeks
- 17.
IF SHl,"T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __
N_/_A _________ _
- 18.
L"NlTS IN TEST STATUS {PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
Cl)
REACTOR AVAILABILITY FACTOR (2) liNIT AVAILABILITY FACTOR (3) l;i'lilTCAPACITY FACTOR (4) l.'1'1T FORCED OUTAGE RATE e
. INITIAL CRITICALITY INITIAL ELECTRICAL
- POWER GENERATION COMM:RCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD X 100 DA TE LAST DATE FORECAST ACHIEVED HOURS GENERATOR ON LINE
= --------------XlOO HOURS IN REPORTING PERIOD
= NET ELECTRICAL POWER GENERATED MAX. DEPE!-IDABLE CAPACITY (MWe-NET) X HOUR~ lN REPORTING PERIOD FORCED OUT AGE HOURS
x 100 HOURS GENERA TOR ON LINE+ FORCED OUT AGE HOURS
- e.
- ~
- e
-e DOCKET NO. _5_0-e_.2_8_0 __
UNIT Surry f!l
- _1_9_7_7 COMPLETED BY E. P. DeWandel
.*.:...r
-..... *.~..
- AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY PO\\VER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 0
17 768.6
- 2
-0 18 766.9 3
0 19 768.7 4
I i) 20 768.0 5
0 21 767.5 6
0 22 766.5 7
0 23 760.9 8
0 24 766.6 9
0 25 767.9 10 0
26 767.6 11 0
27 767.5 12 0
28 770.4 13 0
29 767.4
- 14
.3 30 769.0 15 559.5 31 768.2 16 767.7
--~ :,
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit" power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the*net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
.... -~- -*.. -.
--~-... **.... '
... **.. *-. -.-,-*r
/
NO.
77-0 77-0
~ :',... '..
J.
,i, *.*: {. *:-
..,*....,.* *i..1
.. I TYPE F-FORCED DATE
$-SCHEDULED i 5-1 s
> 5-25 F
\\
SUMMARY
DURATION (HOURS) 335.7 2.2 I
i 1*
- I UNIT SHUTDOWNS i REPORT MONTH May, 1977 REAS0N*(1)
D A
I, I
T METHOD OF HUTTING DOWN HE REACTOR (2) 1 N/A
- i' POCKET'NO. _,;,;,_,so_-_2_80 __ -
UNIT NAME ___
s=-ur_r_.y_f/_1 __
DATE June 1, 197'7 COMPLETED BY E. p
- DeHnndel*
CORRECTIVE ACTIONS/COMMENTS Required S/G Inspection Auto-stop oil leakage at the interface valve.
Reactor was not required to be shut down.
(I) REASON A*-EQUll'MENT FAILURE (EXPLAIN)
B-MAINT. OR TEST C-*REfUELlNG D-llEGLILATORY RESTRICTION E-Ol'ERATOlt'TllAINING AND LICENSE EXAMINATION P-ADMINISTllATIVE G-*Ol'ERATIONAI. ERROil (EXPLAIN) 11-*0TI 11'.ll (EXl'I.AIN)
(2) METHOD
, I-MANUAL 2-MANUAL SCRAM 3--AUTOMATIC SCRAM
. i
- i I
e
.i ;
I
UNIT Surry Unit /12
_ DATE June 1, 1977 E. P. DeWandel COMPLETED BY--------'-
DOCKET No:_5_-o_-_2_8..;;;l;._.. ___ _
OP_ERATISG STATUS
- l.
REPORTI!':G PERIOD:
0001 770501 THROUGH 2400 770531 HOURS lS REPORTING PERIOD: __ 7.a..4..!.4...:.._ _____________ -'------------
- 2.
Cl.!RRE?'o"TLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (~!We-NET) 77">
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):.----------,--
- 4.
- REASO~S FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOt:RS REACTOR WAS CRITICAL **********, **
- 6.
R~ACTOR.RESERVE SHUTDOWN HOURS *******
- 7.
HOL"RS GE::-11:'.RA TOR ON LINE ***************
- 8~
t:NIT RESERVE SHUTDOWN HOURS ***, ****, **
- 9.
GROSS THERMAL ENERGY GE!'.ERATED (MWH) *********************
- 10.
GROSS ELECTRICAL ENERGY
<iE~'ERA TED (~WH} *********************
- 11.
SET ELECTRICAL ENERGY GENERATED
(~WH) i~.
KJ:..'\\l..1UK -~ Y r\\&Ln.DU.. 11 l,_1\\\\.1 Vl\\. \\lJ **, * *,,,,
13:
- UNIT AVAILABILlTY FACTOR (2) ************
- 14.
l'NITCAPACITY FACTOR (3) ***.**, **** * ****
- 15.
- CNIT FORCED OUTAGE RATE (4) **.**********
744.0 0
744.0 0
1,SC.S,031 593,625
- 564,584 100!
- 1..00%
97.9%
0 CUMULATIVE YR TO DATE
-TO.DATE 2195.1 22,514.0 0
0 2,177.-6 22~123.0 0
0 5,194,734 50,539,361 1,720,995 16,592,369 1,635,593 15~231~225
~IJ. ~?'.'.
(:.?
9~~
60.1%
6J, 8%
58.3%
56.7%
39.9%
27.4%
- 16.
SHUTOOVt"NS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Stean Generator Inspection and Refueling 05 6 weeks l7.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _....;N;.;,./:...;A;;:._.,..;-_______ _
- 18.
UNITS IN TEST STA tus (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DA TE LAST
REACTOR AVAILABILITY FACTOR = HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD X 100
- (2)
UNIT AYAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LINE
= ------------x 100 HOURS IN REPORTING PERIOD
= NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
.;..H..::.O.:..;U..::.R..::.S;.;..G....;E_N....;.E;.;..R....;.A_T_O_R_O_N....;L_I_N_E_+_F_O_R_C_E_D_O_U_T_A_G_E_H_O_U_R_S -X l OO
- 't
- 'I
I
- - -- ----- ------* -~-
DOCKl:"T NO.
50-281*
UNIT Surry* 112 DATE June 1, 1977 COMPLETED BY E. P.* DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1977 AVERAGE DAILY POWER LEVEL
- DAY (l\\1We-net)
AVERAGE DAILY POWER LEVEL DAY (MWc-net.)
- 1 763.6 17 760.3 2
765.0 18*
759.6*
3 766.4 19
.76L3 4
762.6 20 759.2 5
761.8 21 758.8 6
762.5 22 759.2 7513.7
-***-- *-*. - -=---.....
7*
750.8
~~
- 8 759.9 24 759.8 9
760.0 25
- . 760.5 10 761.1*
26 761.0 11 762.4 27 749."5 12 760.5 28 685.6 13 76i.6 29 762.8 14 760.9 3(1 764.9 763.6 765.7
. ~-:.~. -
15 31
. 16 764.8 DAILY UNIT POWER LEVEL FOR:\\t INSTRUCTIONS On this form. list the ::i.vcragt: daily unit power kvd in t-.1Wc-nl.!t for each day in the reporting month.
Compute to the nearest whole megawatt.
Tlh.*:-c figures will be used to plot a gr:iph for each reporting month. Note th:it by using maximum dcpcnJahlc capacity for the rn:t dc.:ctrkal rating or the unit. there may be occasions whrn the d:iily
- avcr-fc powl*r kvd cxi:cclls the 1 oo~*;. line C or the rcstrktcd powc.:r kvcl line). In such cascs, the avc.:r:1gc <l:iily unit power output shec t should be.: foo tnotetl to ex plain the apparcn t anomaly.
__ __,_ ___.:..,__._. ________.. _~/,...
4, I
(
\\'
- i" *.
. 11
- .DOCKET NO. *_s_o-_2_s_1 _* _ _,___
UNIT SHUTDOWNS
- UNIT NAME Surry Unit 2 *
- DATE June 1, 1977.
COMPLETED DY E. P. DeWande'l REP.ORT MONTH May, 1971 TYPE 1v1ETH0D OF F*FORCED DURATION
~HUTTING DOWN NO.
DATE
$-SCHEDULED
.(HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS
(~one during this reporting per od.)
(I) REASON (2) METHOD A*-EQUIPMENT FAILURE (EXPLAIN)
I-MANUAL 8-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORV RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM I
LICENSE EXAMINATION e
1:-ADMINISTRATIVE G--Ol'ERATIONAL ERllOR (EXPLAIN)
II-OTHER (EXPLAIN)
SUMMARY
__ _