ML19095A317

From kanterella
Jump to navigation Jump to search
Submit Operating Report for the Month of October 1976
ML19095A317
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/10/1976
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Mcdonald W
Office of Nuclear Reactor Regulation
References
Serial No. 281/021974
Download: ML19095A317 (7)


Text

VIRGINIA. ELECTRIC.A.ND POWER COMPANY RICHMOND, VIRGINIA 23261 November 10, 1976 Mr. William McDonald, Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.. C.

20555

Dear Mr. McDonald:

Serial No. 281/021974 PO&M/ALH:clw Docket Nos. 50-280 50-281 License Nos. DPR-'32 DPR-37 Operating information for Surry Power Station~ Unit Nos. 1 and 2, for _._

the month of October 1976 is attached.

Attachment cc:

Mr. Norman.C. Moseley Vice and Very truly yours,

~~~--~

c. M. Stallings ~

President-Power ~ply Production Operations

DOCKET NO. 5o-23o UNIT Surry Unit No. 1 DATE Nov. 2, 1976 COMPLETED BY E.P. DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH __

O_C_T_O_B_E_R ______ _

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 433.2 17 387.1 2

734.4 18 0

3 718.4 19 0

4 751. 7 20 0

5 726.8 21 0

6 7 /. 1 1

I '-t.I- *.L 22 0

7 741.3 23 0

8 733.5 24 0

19 743.2 25 0

10 746.5 26 0

11 747.0 27 0

12 747.7 28 0

13 747.3 29 0

14 747.4 30 0

15 754.6

. 31 0

16 754.2 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe~net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the*net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

-,*y,

I UNIT Surry Unit No. l DATE Nov. 2, 1976 COMPLETED BY E.P. DeWandel DOCKET NO. 50- 280

-~----~~

OPERATING STATUS

l.

REPORTING PERIOD:

001 761001 THROUGH 2400 761031

--~-~-~-~-~-~-

-~-~~~-~--~---

HOURS IN REPORTING PERIOD:

745

2.

~---------------~

CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) ~7_8_8 __

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________

4.

REASONS FOR RESTRICTION (IF ANY):

5.
6.
7.
8.
9.
10.

l l.

12.
13.
14.
15.
16.
17.
18.

(1)

(2)

CUMULATIVE THIS REPORTING PERIOD YR TO DATE TO DATE HOURS REACTOR WAS CRITICAL............

  • 399. 4 6,058.0 22,554.4 REACTOR RESERVE SHUTDOWN HOURS

.... 0 __ _

0 0

HOURS GENERATOR ON LINE........ *......

393. 9 6,013.7 li.,858. 2 UNIT RESER VE SHUTDOWN HOURS.....**. -..

0 __ _

0 0

GROSS THERMAL ENERGY GENERATED (MWH)... *......... *.. *. *.

  • 936, 226 GROSS ELECTRICAL ENERGY 14,305,668 49,088,356 GENERATED (MWH)...................*.. 302,325 NET ELECTRICAL ENERGY GENERATED (MWH).....*....*.....*.......**...

REACTOR AVAILABILITY FACTOR (1) **..**.*.

UNIT AVAILABILITY FACTOR (2)......*.....

UNIT CAPACITY FACTOR (3)................

UNIT FORCED OUTAGE RATE (4)...........*

. 286. 925 53.6%

52.9%

48.9%

1.1%

4,626,820 16,078,363 4,3961__.8§5 15,243,765 82.8%

66.7%

82;2%

64,6%

Z6,2%

5Z.2%

13.8%

~1%

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF-EACH):

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 1 2 1976 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

REACTOR AVAILABILITY FACTOR UNIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE


XlOO HOURS IN REPORTING PERIOD DATE LAST

. DA TE

. FORECAST ACHIEVED NET ELECTRICAL POWER GENERATED (3)

UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOIJ (4)

FORCED OUTAGE HOURS


XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS UNIT FORCED OUT AGE RA TE

-*.~

. i

.1*.

DOCKET NO.

50-280

~

UNIT SHUTDOWNS UNIT NAME S1n:r~ :Unit N!l. l

,, I 1976 I

DATE Nov. 2, COMPLETED BY E,E, DeHaodel REPORT MONTH OCTOBER TYPE METHOD OF F*FORCED DURATION SHUTTING DOWN NO.

DATE

$-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS 76-13 100176 F

4.3 A&H 1&3 A-Primary-to-secondary leakage in steam generator H-Automatic trip during shutdown due to feed control system sensitivity Plugged leaking tubes in "C" steam generator

l.

NOTE:

Unit. was down at end of last reporting period.

76-14 101776 s

- 346. 8 c

l Refueling (1) REASON (2) METHOD

  • {

A--EQUJPMENT FAILURE (EXPLAIN)

I-MANUAL

  • B-MAINT._OR TEST 2-MANUAL I

C-- REFUEi.iNG SCRAM l

l' i

. i i

i i

D-REGLILATORY RESTRICTION 3-AUTOMATIC i

E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERA TIONAL ERROR (EXPLAIN)

I-I-OTHER (EXPLAIN)

I

SUMMARY

\\

~ t

DOCKET NO. 50-281 UNIT Surry Unit No. 2 DATE Nov. 2, 1976 COMPLETED BY E. P. De Wandel AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

a 0

22 0

7 o*

23 0

~

8

o.

24 0

9 0

25 0

10 0

26 0

  • .. 11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this fonn, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

._. ~

UNIT Surr,y Unit No. 2 DATENov. 2, 1976 COMPLETED BYE. p. DeWandel DOCKET No.50-281 OPERATING STATUS

1.

REPORTING PERIOD:_o_o_1 __

7_6-=l,...,.O-=O_l _______ THROUGH _2_4_0_0 __

7_6_1_0_3_1 _____

HOURS IN REPORTING PERJOD: __

7_4_5 _________________________ _

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _

4.

REASONS FOR RESTRICTION (IF ANY):

THIS REPORTING PERIOD

5.

HOURS REACTOR WAS CRITICAL..,.*..*.**.*

6.

REACTOR RESER VE SHUTDOWN HOURS.*.****

7.

HOURS GENERA TOR ON LINE.........*****.

8.

UNIT RESER VE S 0

HUTDOWN HOURS....*..****

9.

GROSS THERMAL ENERGY GENERATED(MWH).......*..*.*********

10.

GROSS ELECTRICAL ENERGY

11.
12.
13.
14.

-GENERATED (MWH).........*..*..**.***

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR AVAILABILITY FACT('R (1).*..*..**

UNIT AVAILABILITY FACTOR (2)..*.*.*.****

UNIT CAPACITY FACTOR (3)...............

UNIT FORCED OUTAGE RATE (4)............

0 0

0 0

0 0

0 0

0 100%

. CUMULATIVE YR TO DATE TO DATE 4,483". l 20,112.z Q

Q,

~,393.5 0

~L4.8_._0_

0 10,401,391 44,909,524 3,388,560 14,734,119

'L ?.J'L 702 13 Sfi6.~3.

61.2%

65.5%

60.0%

6t!. 3{~

55.7%

57.7%

28.5%

22.1%

15.
16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTI-IS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:

November 18, 1976

18.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWIN.G:

(l)

REACTOR AVAILABILITY FACTOR (2)

UNIT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR (4)

UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMF.RCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE


XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED D.ATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc-NET) X HOURS JN REPORTINli PERIOL>

_FO_R_C_E_D_O_U_T_A_G_E_H_O_U_R_S ___________

~XIOO

-HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

., ~-

/

NO.

DATE 76-9 091576

SUMMARY

/"'

TYPE F*FORCED S*SCHEDULED F

'o..

< -J * '. '

  • *~ * * *.
  • UNIT SHUTDOWNS REPORT MONTH OCTOBER
  • METHOD OF DURATION

!:lHUTTING DOWN (HOURS)

REASON (1)

THE REACTOR (2) 745 A

2

---l. "

I I

-.~. '

-~.

DOCKET NO. 50-281 J

UNIT NAME Surry Unft No. 2

~.

DATE Nov. 2 2 1976 COMPLETED BY E.P. DeWandel CORRECTIVE ACTIONS/COMMENTS Excessive steam generator primary-to-secondary leakage.

Extensive investigation of steam genera.,,._.

tor tubes..

NOTE:

Unit was down at end of last re-porting period,.....

(1) REASON (2) METHOD A*-EQUlPMENT FAILURE (EXPLAIN)

I-MANUAL B-MAINT. OR TEST 2-MANUAL C-* REFl)ELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*Ol'ERA TIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)