ML19105A326

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for Surry 2 for the Month of July 1976
ML19105A326
Person / Time
Site: Surry  
(DPR-032, DPR-037)
Issue date: 08/02/1976
From: Dewandel E
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Reactor Regulation
References
Download: ML19105A326 (3)


Text

.._

e THIS REPORTING PERIOD

5.

HOURS REACTOR WAS CRITICAL.............

6.

REACTOR RESER VE SHUTDOWN HOURS.......

7.

HOURS GENERATOR ON LINE.........*..*..

8.

UNIT RESERVE SHUTDOWN HOURS...........

9.

GROSS THER~tAL ENERGY GENERATED (MWH)..........*..***.****

10.

GROSS ELECTRIC'AL ENERGY

11.

GENERATED (MWH)............... ; **.**

NET ELECT.KiCAL DiERGY GENERATED.

(~tWII)

REACTOR AVAILABILITY FACTOR (1) *...*....

UNIT AVAILABILITY FACTOR (2) *...........

UNIT CAPACIT:'( FACTOR (3)...............

UNIT FORCED OUTAGE RATE (4) **.........*

705.2 0

704. 3.

0 li711,295 555,805 527,570

94. 8:'.
  • 94.7~

9o.m:

s. 3:-s GJ~IULATIVE YR TO DATE TO DATE 3,441.5 19,071.1 0

0 3,354.3 182708.8 0

0 7l9012954 42 l4J.O l087 22582,400 13,,..)927 2959

~4£i9..2.}24 1

" "01 y,r:.

l.)2£'._

2 U-.1

. 67. 3%

66.9~{

--ci,:-r~r

):)

  • t) 0
65. 6;J

--g-0-.8%

--58.8%

14.8%

19. 2~~

12.
13.
14.
15.
16.

SHUTDOWNS SCHEDULf-D TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

N_co_n_e _____ ~

~~~

17.
18.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

Auq US t 2, 1976 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

(l)

REACTOR AVAILABILITY FACTOR =

(2)

UNIT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR (4)

UNIT FORCED.OUT,\\GE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GESER.-\\ noN COMMERCIAL OPER,\\110N HOURS REACTOR W~\\S CRlT!CAL HOURS IN REPORTING PERIOD HOURS GENERATOR ON Ll~E HOURS lN REPORTING PERIOD X 100 X 100 NET EL!':CTRICAL PO\\VFR GENERATED DATE LAST FORECAST DATE ACHiEVED 840:1 MAX. DEl'ENDAULE CAPACITY (~!Wc-NEl) _X HOURS IN Rl:.l'ORTlN(; l'EKIOD FORCED OUTAGE HOt.:Rs


~----x 100 HOURS GENJ:RATOR ON Ll~E + FORCED OUTAGE HOURS

. DOCKET NO.

50-281 UNIT Surry //2 DATE August 2, 1976 COMPLETED BY E. P. De\\,/andel AVERAGE DAILY UNIT POWER LEVEL MONTH Julv 1976 AVERAGE DAILY POWER LEVEL A VE RAGE DAILY POWER LEVEL DAY

{MWe-net)

DAY

(~1Wc-1ict) 1 755.5 17 Z5~

2 746.3 18 754 4 3

736.6 19 Z52. 5 4

761. 5 20 750.5 5

761.2 21 Z1Z 0 6

-,r,(\\

')

/LIU, L 22 752.5 7

760.8 23 246,Q 8

759. 0 24

. 743.3 9

750.3 25 2J5 10 740.2 26 7<16.5 11 759.8 27 748 8 12 758.9 28 745 0 13 760.8 29 740.9 14 760.3 30 flZ. 5 15 749.3 31 0

~~

16 751.8 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit" po\\Ver level in M\\Ve-nct for each day in the reporting month.

Compute to.the ncaiest who)e megawatt.

These figures will be used to plot a gr::i.ph for each reporting month. Note th,1t by using 1i1axirnum dependabk capacity for the net dectrical rating of the unit, there may be occasions when the d,1ily average power level cxcc~ds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain.the apparent anomaly.

TYPE F-FORCED DURATION NO.

DATE S-SCHEDULED (HOURS) 76.,-8 7 /30/76 F-Forced 39.3

SUMMARY

UNIT SHUTDOWNS DOCKET NO. ---=5:....::0_--=-23~:=--; __ _

UNIT NAME Surrv #2 DATE Auctst 2, 197 5 COMPLETED BY E. P. De~Ja:-ide.l REPORT M ONTII __

l-=--J u;:;__l_,_Y__,,'---"-19"-'7~6 __

METHOD OF

$HUTTING DOWN REASON (1)

THE REACTOR.(2)

CORRECTIVE ACTIONS/COMMENTS A

Manual A-Excessive leakage from reactor cool a.nt system.

Repair.leaks.

I (Unit is sti 11 dm.;n at the end of this i reporting period).

I

-1 I

I (1) REASON (2) ~!ETHOD I

A EQUll'MENT FAILURE (EX!'LAIN) 1-M..\\N t;A:_

I I

ll-MA!NT. OR TEST 2-MANL\\L C-REFUELING SCllA~l D-REGLILATOkY RESTRlCTlO!'l 3 *-A UTO~,IA TiC E--OPERATOR TRAINING AND SC'RA),!

LICENSE EXAMINATION F-ADMINISTilAT!VE G-OPERA TIONAL ERROR (EXPLAIN)

H **OTIIER (EXP LAIN)

I l