.._
e THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.............
- 6.
REACTOR RESER VE SHUTDOWN HOURS.......
- 7.
HOURS GENERATOR ON LINE.........*..*..
- 8.
UNIT RESERVE SHUTDOWN HOURS...........
- 9.
GROSS THER~tAL ENERGY GENERATED (MWH)..........*..***.****
- 10.
GROSS ELECTRIC'AL ENERGY
- 11.
GENERATED (MWH)............... ; **.**
NET ELECT.KiCAL DiERGY GENERATED.
(~tWII)
REACTOR AVAILABILITY FACTOR (1) *...*....
UNIT AVAILABILITY FACTOR (2) *...........
UNIT CAPACIT:'( FACTOR (3)...............
UNIT FORCED OUTAGE RATE (4) **.........*
705.2 0
704. 3.
0 li711,295 555,805 527,570
- 94. 8:'.
- 94.7~
9o.m:
- s. 3:-s GJ~IULATIVE YR TO DATE TO DATE 3,441.5 19,071.1 0
0 3,354.3 182708.8 0
0 7l9012954 42 l4J.O l087 22582,400 13,,..)927 2959
~4£i9..2.}24 1
" "01 y,r:.
l.)2£'._
2 U-.1
. 67. 3%
66.9~{
--ci,:-r~r
):)
- t) 0
- 65. 6;J
--g-0-.8%
--58.8%
14.8%
19. 2~~
- 12.
- 13.
- 14.
- 15.
- 16.
SHUTDOWNS SCHEDULf-D TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
N_co_n_e _____ ~
~~~
- 17.
- 18.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
Auq US t 2, 1976 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(l)
REACTOR AVAILABILITY FACTOR =
(2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED.OUT,\\GE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GESER.-\\ noN COMMERCIAL OPER,\\110N HOURS REACTOR W~\\S CRlT!CAL HOURS IN REPORTING PERIOD HOURS GENERATOR ON Ll~E HOURS lN REPORTING PERIOD X 100 X 100 NET EL!':CTRICAL PO\\VFR GENERATED DATE LAST FORECAST DATE ACHiEVED 840:1 MAX. DEl'ENDAULE CAPACITY (~!Wc-NEl) _X HOURS IN Rl:.l'ORTlN(; l'EKIOD FORCED OUTAGE HOt.:Rs
~----x 100 HOURS GENJ:RATOR ON Ll~E + FORCED OUTAGE HOURS
. DOCKET NO.
50-281 UNIT Surry //2 DATE August 2, 1976 COMPLETED BY E. P. De\\,/andel AVERAGE DAILY UNIT POWER LEVEL MONTH Julv 1976 AVERAGE DAILY POWER LEVEL A VE RAGE DAILY POWER LEVEL DAY
{MWe-net)
DAY
(~1Wc-1ict) 1 755.5 17 Z5~
2 746.3 18 754 4 3
736.6 19 Z52. 5 4
761. 5 20 750.5 5
761.2 21 Z1Z 0 6
-,r,(\\
')
/LIU, L 22 752.5 7
760.8 23 246,Q 8
759. 0 24
. 743.3 9
750.3 25 2J5 10 740.2 26 7<16.5 11 759.8 27 748 8 12 758.9 28 745 0 13 760.8 29 740.9 14 760.3 30 flZ. 5 15 749.3 31 0
~~
16 751.8 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit" po\\Ver level in M\\Ve-nct for each day in the reporting month.
Compute to.the ncaiest who)e megawatt.
These figures will be used to plot a gr::i.ph for each reporting month. Note th,1t by using 1i1axirnum dependabk capacity for the net dectrical rating of the unit, there may be occasions when the d,1ily average power level cxcc~ds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain.the apparent anomaly.
TYPE F-FORCED DURATION NO.
DATE S-SCHEDULED (HOURS) 76.,-8 7 /30/76 F-Forced 39.3
SUMMARY
UNIT SHUTDOWNS DOCKET NO. ---=5:....::0_--=-23~:=--; __ _
UNIT NAME Surrv #2 DATE Auctst 2, 197 5 COMPLETED BY E. P. De~Ja:-ide.l REPORT M ONTII __
l-=--J u;:;__l_,_Y__,,'---"-19"-'7~6 __
METHOD OF
$HUTTING DOWN REASON (1)
THE REACTOR.(2)
CORRECTIVE ACTIONS/COMMENTS A
Manual A-Excessive leakage from reactor cool a.nt system.
Repair.leaks.
I (Unit is sti 11 dm.;n at the end of this i reporting period).
I
-1 I
I (1) REASON (2) ~!ETHOD I
A EQUll'MENT FAILURE (EX!'LAIN) 1-M..\\N t;A:_
I I
ll-MA!NT. OR TEST 2-MANL\\L C-REFUELING SCllA~l D-REGLILATOkY RESTRlCTlO!'l 3 *-A UTO~,IA TiC E--OPERATOR TRAINING AND SC'RA),!
LICENSE EXAMINATION F-ADMINISTilAT!VE G-OPERA TIONAL ERROR (EXPLAIN)
H **OTIIER (EXP LAIN)
I l