VIRGINIA ELECTRIC AND POWER COMPANY R:ICHMOND,V:IBG:IN.IA 23261 October 11, 197T.
Mr. William McDonald, Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington,.D. C.
20555
Dear Mr. McDonald:
Serial No. 453 PO&M/T.8P :dgt Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Operating information for Surry Power Station, Unit Nos. 1 and 2 for the month of September 1977 is attached.
Attachments cc:
Mr. James.P. O'Reilly r-l /1 Y, urs,
/ I
(. / ~ 4/tt{lJtfll/.lt~/<
_/ C M. Stal11:ngs
/ /. //
Vice President-Power Supply'./
and Production Operations
e e*
UNIT Surry Unit 1 DATE October 3, 1977 COMPLETED BY o. w. Akins DOCKET NO, 50-280 OPERATING STATUS
- 1.
REPORTISG PERIOD:
0001 770901 THROUGH 2400 770930 HOt.:RS IN REPORTING PERIOD:. _ __:_7.=.2.:;.0 ___ __,:,-,-,,..,,.-------------------
- 2.
CURRENTLY AlJTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLECAPACITY (MWe-NET) 775
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) {MWe-NET):
N / A
- 4.
REASO:-lS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD YR TO DATE CUMULATIVE TO DATE S.
HOURS REACTOR WAS CRITICAL **..*********
718.8 5167.1 0
27,721.5 0
- 6.
REACTOR RESERVE SHUTDOWN HOURS *******
0
- 7.
HOURS GENERATOR ON LINE ***************
712.5 5072.8 0
26,972.8 0
- 8.
U!lilT RESERVE SHUTDOWN HOURS ***********
0
- 9.
GROSS THERMAL ENERGY 1,729,792 12,193,702 4,009,580 61,282,058 GE!l:ERATED (MWH) ******************** ;
- 10.
GROSS ELECTRICAL ENERGY
<iE!'iERATED (MV,'H) *********************
565,955
- 11. * ~ET ELECTRICAL ENERGY GENERATED 20,087,943 19,056.134
- 12.
- 13.
- 14.
IS.
- 16.
- 17.
- 18.
,{l) c~t '" a,....... *....... *................
Rl:..\\CTOR AVAILABILITY FACTOR (1) *********
UNiT AVAILABILITY FACTOR (2) **** * ********, __ 9;;..;9...a*;...;0=;--
TY cro (3
- 96. 3%
l:NITCAPACI FA R
) ***************
1.0%*
537.539 99~8%
UN!T FORCED OUTAGE RATE (4) ************
77, 4;;
2.4%
64.4%
- 58. 7%
19.0%
SHt'TJ)OWNS SCHEDULED TO BEGIN JN NEXT 6 MONWS (STATE TYPE, DATE, AND DURATION OF EACH):
SIG Inspection, Nov. 19, 1977 - 4 weeks IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __
N;.;..:../ A~----------
UNITS lN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) RE~ORTTHE FOLLOWING:
REACTOR AVAILABILITY FACTOR =
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD XIOO DATE LAST DATE FORECAST ACHIEVED t2)
UNIT AV AILABH.In* FACTOR HOURS GENERATOR ON LINE
=.;;.;;.:~;;:..:==:...;..:;..:;.;.;_..:...;.;...::.:;;.:.;:.. __ x 100 HOURS IN REPORTI~G PERIOD (3) ux:T c.~P,\\CITY FACTOR (4;
l~IT FORCED Ol\\"fAG:! RATE NET ELECTRICAL POWER GENERATED
=-~-.;...;.. ____....;..~---------------
MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
.;;..H.;;.O;;.:.U;;.;RS~G.;:.EN.;:.E.;;..R....:A.;;..T;_O_R.;;..O;;.;N~Ll-N_E_+_F_O_R_C_E_D_o_u_rr_A_G_E_H_O_U_R_S_x l 00
- -~~~------------------*
-e*
DOCKET NO.
50-280 UNIT Surry Unit 1 DATE October 3, 1977 COMPLETED BY 0. W. Akins AVERAGE DAILY UNIT POWER LEVEL
. MONTH September 1977*
AVERAGE DAILY POWER LEVEL*.
AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY
(.MWe-net)
. 1 402.3 17 759.8 2
756.1 18 752.3 3
759.6 19 755.0 4
748.6 20 760.9 5
753.4 21 761.5 6
749.0 22 760.7 7
760.9 23 758.3 8
762.8 24 760.3 9
762.2 25 760.0
- 10 755.5
- 26 761.9 11 V 754. 3 27 764.0 12 758.7 28 765.6 13 759.1 29 761.5 14 755.4 30 760.5 15 756.0 31
- 16 756.5
- oAIL Y UNIT POWER LEVEL FORM INSTRUCTIONS On this fonn, list the average daily unit" power level in MWe-net for each day in the reporting month.
- Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the*net electrical rating of the unit, there may be occasions when the daily average power level exceeds the l 00% line (or the restricted power level line). In such cases, the
. average daily unit power output sheet should be footnoted to explain the apparent anomaly.
/
- rvPe F*FORCED DURATION NO.
DATE S*SCHEOULED
.(HOURS) l 1-1 9-1-77 F
7.5 I.
I
SUMMARY
UNIT SHUTDOWNS DOCKET NO. _s_o-_2_s_o __ _
UNIT NAME Surry Unit 1 DATE October 3, 1977 COMPLETED BY o. w
- Akins*
REPORT MONTH September, 1977 METHOD OF
-~HUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS fai°led A
3 "C" Main Feed Regulation valve shut - replaced.ruptured diaphragm.
I (1) REASON (2) METIIOI>
A* EQLlll'Ml~NT FAILUI\\E (EXPLAIN) 1-MANL'AL D* MAINT. OR TEST 2-MANUAL C-IU!FUELINCi SCRAM
\\
D-REGULATOR Y RESTRICTION 3-AUTOMATIC E-orrnATOR TIUINING AND SCRAM LIC'l::NSI~ EXAMINATION I
F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAlf'i) e e
e e**
UNIT Surry Unit 2 DATE October 3, 1977 COMPLETED BY o. w. Akins DOCKET NO.
50-2:31 OPERATl:-iG STATUS
- 1.
REPORTI~G PERIOD:. __
0_0_0_1_7_7_0_9_01 ______ THROUGH _2_4_o_o __
7_7_09_3_o _____ _
HOt.:RS IN REPORTING PERIOD: ___
7..;;2... 0 ____ __,....,....,...-------------------
- 2.
Ct:RRE~"TLY At.THORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 775
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):_~N./~A'--------
4 *.
- REASO:O.S FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOt.:RS REACTOR WAS CRITICAL *****.*******
- 6.
REACTOR RESER VE SHUTDOWN HOURS *******
- 7.. HOl:RS GE!'iERA TOR ON LINE ***************
- 8.
UNIT RESERVE SHUTDOWN HOURS *******, **,
- 9.
GROSS THER~fAL E~ERGY GE~ERA TED (MWH) ******************.***
- 10.
GROSS ELECTRICAL ENERGY
-GE~"ERATED (~lWH) ********.************
- 11.
- -;fT ELECTRIC,\\L E!'!F;RGY GENERATF.D (MWH) *****************, **., *******,
- 12.
RJ::ACTOR,\\V AllAB1LlTY FACTOR (l) ***.**.**
- 13.
UNIT AVAILABILITY FACTOR (2) ************
- 14.
l!NIT CAPACITY FACTOR (3) *************,
- IS.
CNIT FORCED OUTAGE RATE (4) *********.**
217.4 0
216.0 0
519,205 167_,065 158,287 30.2%
30.0%
28.4%
0 CUMULATIVE YR TO DATE TO DATE 4301-.2 24,620.1 0
0 4270.0 24~215.4 0
0 10,260,937 55 2605,564 3,355,705 18,227,079 3,185,89-2 17,281,594 65.7%
63.61o 65.2%
62 1 5%
- 62. a;~
57.6%
- 29. 4,~
26.3%
- 16.
- 17.
.18.
~Hl"'ItlOWNS SCHEDljLED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
S/G Inspection, April 9 1978 4 weeks (1)
IF SHL"T DOWN AT END OF-REPORT PERIOD, ESTIMATED DATE OF STARTUP:
October 9, 1977 UNITS I!'l TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
REAqOR AVAILABILITY FACTOR =
INITIAL CRlTICALITY
.NITIAL ELECTRICAL POWER GENERATION COM~~ERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD X 100 DA TE LAST DATE.
FORECAST ACHIEVED (2)
- UNIT AVAILABILITY FACTOR
= _H_O_U_R_S_G_E_N_ER_A_T_o_R_ON_, _L_IN_E;..__x 100 HOURS IN REPORTING PERIOD (3)
U:-,ilT CAPACITY FACTOR (4) l:NIT FORCED Ol'TAGE RATE NET ELECTRICAL POWER GENERATED MAX. 01::P.ENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING Pl::RIOD FORCED OUTAGE HOURS
_H_O_U_R_S _G-EN_E_R_A_T_O_R_O_N_LI_N_E_+_F_O_R_C_E_D_O_U_T_A_G_E_H_O_U_R_S_ X I OO
e e*
DOCKET NO. _so_-_2_81 __
UNIT Surry Unit 2 DATE October 3, 1977 COMPLETED BY o. w. Akins AVERAGE DAILY UNIT POWER LEVEL MONTH Septenber 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 740.4 17 0
2 746.0 18 0
3 742.2 19 0
750.4
- o.
4 20 5
745.3 21 0
6 731.0 22 0
7
'742.8 23 0
\\
8 748.0 24 0
- g
. 649. 4 25 0
- 10 0
26 0
11 Q.
27 0
12 0
28 0
13 0
29 0
14 0
30 0
- 15 0
31 16 0
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Noce that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the l 00% line (or the restricteG power level line}. In suc:1 cases, the average daily unit power output sheet should be footnoted to exp!ain the apparent anomaly.
DOCKET NO
- 50-281 UNIT SHUTDOWNS UNlTNAME Surry Unit 2 DATE October 3, 1977 COMPLETED BY o. W. Akins REPORTMONTH September, 'J..977
'TYPE METHOD OF F*FORCED DURATION
~HUTTING DOWN.
e NO.
DATE S*SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS II-1 9-10-77 s
504..
C 1
- Refueling Outage I
I, I
I (1) Rl!ASON (2) METIIOD A* EQL'll'MENT FAILURE (EXPLAIN) 1-MANL'AL I
D* MAINT, Olt Tc.ST 2-MANUAL C-*ltEl'UHI Ne; SC'RAM D-REGLILATOll V ltESTRICTION 3-AUTOMATlC E-Ol'EIUTOI\\ TRAINING ANO SCRAM e
LIC"ENSH EXAMINATION I
F-ADMINJSTRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)
H-OTHEI\\ (EXPLAIN)
\\
I.
. I I
SUMMARY
/