ML19105A321

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of October 1976
ML19105A321
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/10/1976
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Mcdonald W
Office of Nuclear Reactor Regulation
References
Serial No. 281/021974
Download: ML19105A321 (7)


Text

    • e

'V1no11'{1.A. ELECTRIC AND PoWER Co:M:PANY RIOJIMOND.VIROINIA 23261 November 10, 1976 Mr. William McDonald, Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. McDonald:

Serial No. 281/021974 PO&M/ALH:clw Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Operating information for Surry Power Station, Unit Nos. land 2, for the month of October 1976 is attached.

Attachment cc:

Mr. Norman C. Hoseley Vice and Very truly yours,

-12)v

/~r'i'/c)4'~

C. M. Stallings ~~

President-Power S'upply Production Operations

DOCKET NO. 5o-zso UNIT Surry Unit No. 1 DA TE Nov. 2, 197 6 COMPLETED BY E.P, DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWe-nct}

DAY (MWe-net) 1 433.2 17 387.1 2

734.4 18 0

3 718.4 19 0

4 751. 7 20 0

.5 726.8 21 0

6 7 !. 1 1

~.l. *.L 0

7 741.3 23 0

8 733.5 24 0

,9 71.,,3. 2 25 0

10 7l16. 5 26 0

11 747.0 27 0

12 747.7 28 0

13 747.3 29 0

14 747.4 30 0

  • 15 75l1. 6 31 0

16 751,. 2 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level. in MWe-net for each day in the reportine month.

Compute lo the nearest whok megawatt.

These figures will be used to plot a graph for each reporting month. Note that by 11sing m:1ximum dependable capacity for the net ckctrkal rating of the unit, there may be occasions when the daily average power level exceeds the I OO<i{i line (or the restricted power level line). In such 1.:ascs, the nvcrage d,1ily unit power output sheet should be footnoh:d to cxpl:dn th_c appar.ent anomaly.

    • e UNIT Surry Unit No. l DATE Nov. 2, 1976 COMPLETED BY E.P. DeWandel

/

DOCKET No._5_0_-_2_8_0 ____ _

OPERATING STATUS

1.

REPORTING PERIOD:

001

  • 761001 THROUGH 2400 761031 HOURS IN REPORTING PERIOD:

745


::--:-:-~----------------:::-c:c-=--

2.

CURRENTLY AUTIIORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDAl3LE CAPACITY (MWe-NET) 788

3.

LOWEST POWER LEVEL TO WIIICII SPECIFICALLY RESTRICTED (IF ANY) (MWc-NET): _________ _

4.

REASONS FOR RESTRICTION {IF ANY):

THIS REPORTING PERIOD S.

IIOURS REACTOR WAS CRITICAL.........***.

399.4

6.

REACTOR RESERVE SHUTDOWN HOURS.......

0

7.

HOURS GENERA TOR ON LINE....- **..***...*

393,g

3.

UNIT RESERVE SilUTDOWN HOURS.....**.**,

0

9.

GROSS THERMAL ENERGY GENERATED (MWH).....,. *.. * *. * * *. * *..

-~6, 226

10.

GROSS ELECTRICAL ENERGY

11.
12.
13.
14.

IS.

GENERA TED (MWIJ)....*.***.********.**

!\\ET ELECTRICAL ENERGY GENERATED (MWll)

REACTOR AVAILAillLITY FACTOR(!).......*.

UNIT AVAILAl31LITY F,\\CTOR (2) ***.*.******

UNIT CAPACITY FACTOR (3)...*** *..***.***

UNIT FORCED OUTAGE RATE (4)..*.********

302,325 286,925 53.6%

_5_2.9%

48.9%_

1.1%

CUMULATIVE YR TO DATE TO DATE 61058.0 222554.4 0

0 6,013.7 li...,858. 2 0

0 14,305,668 49,088,356 4,626,820 16,078,363 4,396.~~5 12-2243 1 76.5 82.8%

66.7%

82;2%

6~, 6%

Z6,2%

~Z,?L~

13.8%

__lb_lL_

. 16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF-EACH):

17.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 1, 197 6

18.

UNITS IN TEST STATUS (PRIOR TO COM~IERCIAL OPERATION) REPORT TIIE FOLLO\\\\'INy:

(l)

REACTOR AVAll.AlllLITY FACTOR =

INITIAL CRITICALITY INITIAL,ELECTRICAL POWER GENERATION COMMERCIAL OPERA Tl ON HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PE~IOD X 100 HOURS GENERATOR ON LINE

-------------x 100 IIOUltS IN REl'OllTING PERIOD (2) llNIT AVAIi.ABiLiTY FACTOR Nf.T f.l.FC'TlllC'AL POWF.R CFNFRATFD DATE LAST FORECAST DATE ACHIEVED (3)

UNIT CAPACITY FACJ"OR MAX. DEl'ENDAIII.E CAPACITY (MWc-NET) X IIOURS IN IU-.l'ORTING l'EIUOIJ FORCED OUTAGE IIOURS


,--------,< JOO IIOURS GENERATO!t ON LINE i FQRCED OUTAGE IIOURS (4)

UNIT FORCED OUTAGE RATE

1:

NO.

DATE 76-13 100176 76-14 *101776

SUMMARY

TYPE F-FORCED S-SCHEDULED F

s DURATION (HOURS) 4.3 346.8

\\ \\..

DOCKET NO. _ 5_o_-2_s_o ___ _

UNIT SHUTDOWNS UNIT NAME Surry U:r..i.t No. 1 DATE "'Nov. 2, 1976 COMPLETED BY.J::..LP, DeWandel REPORT MONTH OCTOBER REASON (1)

A&l-1 C

METHOD OF

$HUTTING DOWN THE REACTOR (2) 1&3 1

CORRECTIVE ACTIONS/COMMENTS

-Primary-to-secondary leakage in steam.

generator

-Automatic trip during shutdown due to feed control system sensitivity Plugged leaking tubes in "C" steam generator NOTE:

Unit. was down at end of last reporting period.

Refueling (1) REASON A*-EQUIPMENT FAILURE {EXPLAIN)

B-MAINT. OR TEST C-* REFUELING D-REGULATORY RESTRICTION E-OPERA TOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONALERROR (EXPLAIN)

H-OTIIER (EXPLAIN)

(2) METHOD I-MANUAL 2-MANUAL SCRAM 3-AUTOMATIC SCRAM

e DOCKET NO. 50-281 UNIT _J)urry lJni t No. 2 DATE Nov. 2, 1976 C01-1PLETED BY _E_._P_._D_e,_fa_n_d_el AVERAGE DAILY UNIT POWER LEVEL MONTH __

o_c_T_O_BE_* R ____ _

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-netj DAY (MWe-nct) 1 0

  • n 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 b

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

DAlLY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWc-nct for each clay in the reporting month.

Compute to the nearest whole mcr,awatt.

  • These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the nel electrical rating of the unit, lhcn~ may be occasions when the daily average power level cXC:l~cds the I 00% line* (or the reslri.cted power -kvcl line). 111 such cases, the nvcragc daily unit power output shed should be footnoted to cxpl:ii11 the npparcnt anomaly.

I j

~-~,,., IJ*:..,

UNIT Surry Unit No. 2 DATENoy, 2, 1976 COMPLETEDBYE.P~ DeWandel DOCKET NO. 50

__ -_2_8...;;l~----

OPERATING STATUS

1.

~EPORTING PERIOD: 001 __

7_6 =--10~0~1_______ THROUGH _24_0_0 __

7_6_1_0_3_1 ___ _

IIOURS IN REPORTING PERIOD: __

7_4_5 ____ -.,,...,....,...-=--------------------

2.

CURRENTLY A UTllORIZED POWER LEVEL (MW th) 2441 MAX. DEPENDABLE CAPACITY (MWc-NET) 7 88

3.

LOWEST POWER LEVEL TO WHICH SPECIFlCALLY RESTRICTED (IF ANY) (MWe-NET): __________ _

4.

REASONS FOR RESTRICTION (IF ANY):

TIIIS CUMULATIVE YR TO DATE REPORTING PERIOD __

__:..:_:__.:..=...:;_:__;.=_

TO DATE

5.

HOURS REACTOR WAS CRITICAL............*.

0

,,,483.J.

2Q,'ll2,Z

6.

REACTOR RESER VE SHUTDOWN IIOURS......*

0 0

0

7.

IIOURSGENERATOR ON LINE...... _....***.

8.

UNIT RESER VE SHUTDOWN HOURS......,...*

B,323,2 l.9..,.1A8-.iL 0

0 0

0

9.

GROSS TIIERMAL ENERGY GENERATED (MWH) _..*...*.************

10,401,391 44,909,524 0

  • 10.

GROSS ELECTRICAL ENERGY GENERATED(M\\\\'H)....... _.....*.*..*.*

0 3,38'8,560 111,734,119

11.

NET ELECTRICAL ENERGY GENERATED (MW!!)..........*.........**..*..*.

0

,J..._J.1 'L 702 13,.% 6 :-*Q8.. 3.

12.

REACTORAVAIL.ABILITYFACT0R(l)....*...*

.61. 2%

65.5%

0 ---

13.

UNIT A VAil.AB! LITY FACTOR (2).........**.

1*1.

UNIT CAPACITY FACTOR (3).......*....*.*

15.

UNIT FORCED OUTAGE RATE (4).. ;.........

___ frQ_._Qi"'-

___6.L.35,;__

55. 7%

57.7%

.28.5%

22.1%

0 0

100%

16.

SHUTDOWNS SCIIEDULED TO BEGIN IN NEXT 6 MON11IS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IF SIIUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

November 18, 197 6

18.

UNITS IN TEST STATUS (PIUOR TO COMMERCIAL OPERATION) REPORTTIIE FOLLOWING:

(I)

REACTOR AVAll.ABILITY FACTOR "

(2)

UNIT AVAILABILITY FACTOR

())

lJNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMl~RCIAL OPERA 110N

  • IIOURS REACTOll WAS CRITICAL X IOO IIOURS IN REl'Oll TING.l'l~RIOD IIOURS C.ENEllATOll ON LINE IIOUllS IN REl'OllTlNG l'ElllOD
  • X LOO Nf.T ELl,CTlllCAl. l'OWER GENERATED DATE LAST FORECAST DATE ACl!lEVED

('1) lJNIT FORCE I) OUTAGE RA TE MAX. lll*.l'l*:NDAl!Lt-: CAl'ACITY (MWc-NET) X IIOUllS IN REl'OllTINli l'EIUOIJ FORCED OlJTAGF IlOlJRS 11otmS<JENl*:1t_A_'I-.O-ll_O_; r~-,-.1N_E_1_:-1,-*o-R_(_'F_.D_OlJ"I-.A-C-,I:-* 1-IO_U_l_lS-. -x IOO

  • 1

[

/

NO.

DATE 176-9 !091576

SUMMARY

-UNIT SHUTDOWNS REPORT MONTH OCTOBER DOCKET NO. 50-281...

a UNIT NAME Surry Unit Ne. 2 DATE -]fov. 2, 1976 COMPLETED BY X.:_P. DeWandel TYPE F*FORCED DURATlON S-SCHEDULED (HOURS)

REASON (1)

F 745

.A METHOD OF

$HU°TTING DOWN

. THE REACTOR (2) 2 CORRECTIVE ACTIONS/COMMENTS Excessive steam generator primary-to-secondary leakage.

Extensive investigation of steam genera-.

tor tubes *.

NOTE:

Unit was down at end of last re-porting period,~..

(l) REASON A--EQUIPMENT FAILURE (EXPLAIN)

B-MAINT. OR TEST C-* REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION f-ADMIN!STRATIVE G.-Ol'ERATIONAL ERROR (EXPLAIN)

H-OTIIER (EXPLAIN)

(2) METHOD I-MANUAL 2-MANUAL SCRAM 3-A UT0~1ATIC SCRAM