Submit Operating Report for the Month of October 1975 & Corrected Copy for Unit 2 for the Month of September 1975
ML19095A338
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/14/1975
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Mcdonald W
Office of Nuclear Reactor Regulation
References
Serial No. 733/021974
Download: ML19095A338 (9)


Text

VIRGINIA ELECTRIC.A.ND POWER COMPANY //':;}f.\\_'

/~~)*> *

.n,,-

RICHMOND, VIRGINIA 23261

/

  • -~./

I f '/ '.

/

November 14~ 1975 Mr. William McDonald, Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. McDonald:

Serial No. 733/021974 PO&M/JTB:clw Docket Nos.

License Nos.

50-280 50-281 DPR...,.32 DPR-37 Operating information for Surry Unit Nos. 1 and 2 for the month of October 1975 and a corrected copy for Unit No. 2 for the month of September 1975 is attached.

Attachment cc: Mr. Norman C. Moseley Very truly yours, C *. M. Stallings Vice President-Power Supply and Production Operations 131.65

DOCKET NO. 50-280 UNIT Surry Unit No. 1 DATE Nov. 3, 1975 COMPLETED BY W. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit pO\\ver output sheet should be footnoted to explain the apparent anomaly.

'{;

OPERATING STATCS

l.

REPORTl:'\\G PERIOD: 0001 751001 UNIT Surry Unit No. l DATE Nov. 3, 1975 COMPLETED SY w. c. Earl

. DOCKET NO. 50-280 THROUGH __

2_4_00 __

7_5~1~0~3_1 ____ _

HOCRS IN REPORTISG PERIOD:

7_4_4-------------------'---

2.

CCRRE\\"TLY AUTHORIZED POWER LEVEL (:-.1Wth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (lf ASY) (MWe-NET): _________ _

4.

REASO\\"S FOR RESTRICTION {If ANY):

THIS REPORTING PERIOD

5.
6.
1.
8.

HOL'RS REACTOR WAS CRITICAL.............

REACTOR RESERVE SHCTDOWN HOURS.......

HOL"RS GENERA TOR O~i LINE...............

UNIT RESERVE SHlTDOWN HOURS...........

0 0

0 0

9.

GROSS THERMAL E\\"ERGY GENERATED (MWHJ.....................

_0 __ _

10.

GROSS ELECTRICAL ENERGY CENERATED (MWH).....................

0

11.

NET ELECTRICAL E~:ERGY GENER.HED C*fWHJ.............................

0

12.

REACTOR AVAILABILITY FACTOR (1).........

0 UNIT AVAILABILITY FACTOR (2)............

0 UNIT CAPACITY FACTOR (3)......... *......

0 UNIT FORCED OUTAGE RATE (4)............

._0 __ _

CU~ICLATIVE YR TO DATE TO DATE 5,300.6 16,025 0

0

~017._?

15,Lf35.3 0

0 11,828,013 33,883,423 3~832,330 11>160 Jl93 3,640,133 10,570,486

-~----

72.6 63.9 68.8

61. 6 63.2 53.5 9!_L_

24.7

13.
14.

I5.

16.

SHL'TDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.
18.

(1)

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: November 21, 197 5 UNITS IN TEST STA TCS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERA TlON

. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL REACTOR AVAILABILITY FACTOR = HOURS IN REPORTING PERIOD x 100 DA TE LAST D..\\ TE FORECAST ACHIEVED (2)

UNIT A VAILAI3ILITY FACTOR HOURS GENERA TOR ON LINE HOURS IN REPORTING PERIOD x 100 NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PEH.IOD (3)

UNITCAPACITY FACTOR (4)

UNIT FORCED OUT;\\GE RATE FORCED OUTAGE HOURS

  • XIOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

TYPE F-FORCED DURATION NO.

DATE S-SCHEDULED (HOURS) 75-22 100175 S*

744 I

UNIT SHUTDOWNS DOCKET NO. 5o-2so UNIT NAME Surry Unit No. 1 DATE Nov. 3, 1975 COMPLETED BY W. C. Earl REPORT MONTH _o_c_T_O_B_ER ____ _

METHOD OF I

SHUTTING DOWN REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS c

1 Unit was shut down for the entire month for refueling.

(IJ RFASON (2l MFTIJOD A E()lllPMFNT !."All.UIU: (EXPLAIN)

I MANllAl.

B MAINT. OR TEST 2 MANUAL c REFUELING SCRAM D-REGULATORY RFSTRICT!ON 3 AUTOMATIC E-OPERATOR TRAINING AND S('RAM LICENSE EXAMINATION F-ADMINISTRATIVE G--OPERATIONAL ERROR (EXPLAIN)

H-OTllER (EXPLAIN)

SUMMARY

~*Unit was initially shut down as a result of a forced outage.

The scheduled refueling was moved up to this time.

Outage No. 75-21 reflects the est:lmated duration of the forced outage and No. 75-22 represents the scheduled portion.

DOCKET NO. 50-_2_8_1 __ _

UNIT _i)urry Unit No. 2 DATE _Nov. 3, 1975 COMPLETED BY W. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER A VERA GE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 739.8 17 756.4 2

744.6 18 739.0 3

756.3 19 19.1 4

757.7 20 0

r 0 743.6 21 473.2 6

756.2 22 759.9 7

757.0 23 761.8 8

757.9 24 765.2 9

115. 5 25 765.7 10 0

26 787.9 11 0

27 755.5 12 0

28 767.1 13 0

29 766.9

  • 14 574.3 30 765.7 15 587.7 31 765.7 16 754.8 DAlLY UNIT POWER LEVEL FORM INSTRUCTIONS On this fonn, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the l 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

C~IT Surry Unit No. 2 D..\\TE Nov. 5, 1975 co:-.1PLETED BY.¥. c. Earl DOCKET NO. 50-281.

-~----~~~-

OPERATING STATCS OO_O_l __

._75~1~0~0_1 ______ THROUGH ___

2_40_0 __

7_5_1_0_3_1 ___ _

744 I.

REPORT! 1'G PERIOD:

HOCRS IN REPORTI:-.:G PERIOD:

2.

CL'RRENTLY AL:THORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) _._7_,.8'""'8'---

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _

4.

REASONS FOR RESTRICTION (IF ANYJ:

THIS REPORTING PERIOD

5.

HOURS REACTOR WAS CRITiCAL.. *...........

6.

REACTOR RESERVE SHL"TDOWN HOCRS.......

7.

HOCRS GENERA TOR O\\" LI!\\E...............

8.

l"NIT RESERVE SHUTDOWN HOCRS...........

9.

GROSS THER~!AL ENERGY GENERATED(MWH).....................

IO.

GROSS ELECTRICAL ENERGY GENERATED(MWH).....................

11.

NET ELECTRICAL ENERGY GENER..\\TED

('.\\1WH).............................

12.

REACTOR AVAILABILITY FACTOR (l).........

13.

UNIT AVAILABILITY FACTOR (2)............

14.

L'NIT CAPACITY FACTOR (3).............,..

15.

L'NIT FORCED OUTAGE RATE (4)............

579.8 0

.568.6 0

!i]56,951 446,835 424,714 77.9 76.4 72.4 23.6 CUMULATIVE YR TO DATE TO DATE 5,656.6 lli,165.6 0

304,3 5~506.7

~-890.5 0

0 12,787,160 3_LOll,949 lf21702127 lQ_,_192,594 3,95.6,825 2_,. 656 ~ 124 77.5 64.6 25 *. 5-

. _-6.3_,_J__

68.8 55.9 7.6 21.8

16.

SHCTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling April 15, 1976; approximately six weeks

17.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

18.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

(1)

REACTOR AVAILABILITY FACTOR (2)

UNIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATI.ON CO:'>lMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE


~--------XlOO HOURS IN REPORTING PERIOD NET ELFCTRICAl POWER GENERATED DATE LAST FORECAST DATE ACHIEVED (3)

UNIT CAPACITY FACTOR

  • ~----~~----~

MAX. DEPENDABLE CAPACITY (M\\Vc-NETJ X HOURS IN REPORTING PE!<IOD (4)

UNIT FORCED OUTAGE RATE FORCED OCTAGE HOURS HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS X JOO

UNIT SHUTDOWNS REPORT MONTH OCTOBER Page 1 of 2 DOCKET NO. 50-281 UNIT NAME Surry Unit No. 2 DATE Nov. 3, 1975 COMPLETED BY W. C. Earl

---~------~--------.--------- - -*------*- -----~-----------------------.

~~[DATt TYPE F*FORCED DURATION S-SCHEDULED (HOURS)

REASON (1) 7 5-16110097 5 F

114.3 A

75-17 101375 F

3 a A

75-18101575 F

3.9 G

SUMMARY

METHOD OF

~HUTTING DOWN THE REACTOR (2) 3 3

3 CORRECTIVE ACTIONS/COMMENTS Rod position indication failure due to secondary steam leak.

Feed reg. valve failed resulting in steam generator level trip._ Replaced valve operator.

Main steam trip valve failed shut when operator secured air to valve operator while conducting containment isolation valve leak rate test on other unit.

Re-turned air to valve.

(I l REASON (2) MFT!IOD A EQUIPMENT !'Al.LURE (EXPLAIN)

I* MANUAL B MAINT. OR TEST 2 -MANUAL C-REFUELING SCRAM D-REGllLATORY RESTRICTION 3-AUTOMATIC E-OPERA TOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINlSTRA TIVE G-OPER/\\TIO.}JAI. ERROR (EXPLAIN)

H**OTIIER (EXPLAIN)

TYPE F-FORCED DURATION NO.

DATE S-SCHEDULED (HOURS) 175-19 10197 5 F

53.. 4 I

SUMMARY

UNIT SHUTDOWNS Page 2 of 2 DOCKET NO. _5_0_-_28_1 ___ _

UNIT NAME Surry Unit No. 2 DATE Nov. 3, 1975 COMPLETED BY W. C. Earl REPORT MONTH __

O_CTOB_E_R ___

METHOD OF SHUTTING DOWN REASON (1)

Tri E REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS A

1 Steam leaks on steam generator level tap<

Rewelded level taps.

I I (1) REASON (2) METHOD A EQUIPMENT FAILURE (EXPLAIN)

!--MANUAL B-- MAINT. OR TEST 2-MANUAL

  • I C-REFUELING SCRAM D-REGllLATORY RESTRICTION 3--AUTOMATIC E-Ol'ERATOR TRAINING AND SCRAM I

LICENSE EXAMINATION I

F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H*--OTBER (EXPLAIN)

I I I

9rrected Copy CNIT Surry Unit No. 2 DATE Oct. 1, 1975 COMPLETED BY w. c. Earl DOCKET NO. 50-281

~------

OPERA TING STATL"S

l.

REPORTI!\\G PERIOD:

0001 750901 THROUGH 2400 750930 HOCRS IN REPORTING PERIOD:

720

2.

CL:RRENTL Y AL"THORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (M\\Ve-NET) _,7'--'8"'-'8~-

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWc-NET) : _________ _

4.

REASONS FOR RESTRICTIO:-.l OF A\\'Y):

THIS REPORTING PERIQD

5.
6.
7.
8.
9.

HOURS REACTOR WAS CRITICAL.............

REACTOR RESER VE SHCTDOWN HOL'RS.......

HOCRS GE;\\ERATOR ON LINE...............

L'NIT RESER \\'E SHUTDOWN HOURS...........

GROSS T!II~R~IAL ENERGY GENERATEDCMWH).....................

10.

GROSS ELECTRICAL ENERGY

-GENERATED (~1WH).....................

11.

NET ELECTRICAL ENERGY GENERATED (MWH).............................

RL\\CTOR AVAILABILITY FACTOR (1).........

llNIT AVAILABILITY FACTOR (2)............

L'NIT CAPACITY Fll.CTOR (3)...............

_ __:_7 ;::_;11,,_,.:....;4~,.

0 707.9 0

_l, 627 '4 76 525,095 497.651 98.8

__9..""-8_,_. 3.L.-_

87.7

1. 7 YR TO DATE 5,076.8 0

4.938.1 0

11,430,209 3,723,2~2 3.532,1J.1

  • 77.5

___15._,.!L __

68. I+

5.4 CUML"LATlVE TO DATE J]_, 5 8 5.Ji_

30Lf. 3

__l_L_3 2J._,_2_

____ o __

29,654,99?

9,745,759

__6.2_._9 __

55.3

21. 7
12.
13.
14.
15.
16.

LN!T FORCED OUTAGE RA TE (4)............

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.
18.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S.TARTUP: -------------

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

(I)

REACTOR AVAILABILITY FACTOR (2)

UNIT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR (4)

UNIT FORCED OUTAGE RATE IN!TlAL CRITICALITY IN!TiAL ELECT'RICAL POWER GENERATION COMMERCIAL OPERATION HOURS REAC!:OR WAS CRITl~X lOO HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE HOURS IN REPORTING PERIOD x 100 DATE LAST FORECAST DATE ACH!EVED NET ELECTRICAL POWEi~ GENERA TED

-~~..;__~~~-~-~-~~~~~-

MAX. DEPENDABLE CAPACITY (MWe-M:':T) X HOURS IN REPORTING PERIOD FORCEfJ OUTAGE HOURS x 100 HOURS GENERA TOR ON LINE+ FORCED OUTAGE HOURS