e November 14; 1975 Mr. William McDonald, Director Office of Management Information and Program Control U.S *. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. McDonald:
Seri~l No. 733/021974 PO&M/JTB:clw Docket Nos.
License Nos.
50-280
- 50-281 DPR...,.32 DPR-37 Operating information for Surry Unit Nos. 1 and 2 for the month of October 1~75 and a corrected copy for Unit No. 2 for the month of September 1975 is attached.
Attachment cc: Mr. Norman C. Moseley Very truly yours,
- to. )2?. vfi:t1t~~r1 C *. M. Stallings Vice President-Power Supply and Production Operations 131.65
- 1 ;,,
j I
l
\\
I i l
i.,
l l l I
e DOCKET NO. 50-280
---~--'-
UNIT Surry ~nit No. 1 DATE Nov. 3, 1975 COMPLETED BY W. *c. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER AVER.o\\GE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 0
17 0
2 0
18 0
0 0
3 19
~
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
0 0
10
- 26.
11 0
27
- o 1"2 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day.in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net elt:ctrical rating of the unit, there may be occasions when the daily average power level exceeds the I 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
r,
' l
-l 1....
J
\\
\\
\\
e UNIT Surry Unit No. 1 DATE Nov. 3, 1975 COMPLiTEo BY w. C. Earl_
. DOCKET NO._s_o_-_2_8_0 ____ _
OPERATING STATCS
- 1.
REPORTING PERIOD: 0001 751001 THROCGH __
2_40_0-,--7--=*5_1_0_3.=1 ____ _
HOl"RS IS REPORT!'.\\G PERIOD:
7 __ 4_4----..~--=---"----'---------------=--
- 2.
CCRRE'.\\TLY AL"THORIZED POWER LE\\'EL (~1Wthi 2441 MAX. DEPD/DABLE CAPACITY (MWe-NETJ 7 88
- 3.
LOWEST POWER LE\\'EL TO WHICH SPECIFICALLY RESTRICTED (IF A'.\\Y) (MWe-NET): _________
- 4.
R~ASO'.\\S FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- s.
- 6.
- 7.
- 8.
- 9.
HOCRS REACTOR WAS CRITICAL........*...*
REACTOR RESERVE SHCTDOWN Hot.1RS.......
HOL"RS GE~ERA TOR OS L!!',;E.........*.....
L'NIT RESERVE SHCTDOWN HOURS..... ;....*
GROSS THERMAL E'.\\ERGY GEKERATED (~1WHJ.....*...........**.*
- 10.
GROSS ELECTRICAL E;-.;ERGY
- 11.
- 12.
- 13.
- 14.
- 15.
-GENERATED (:,tWHJ.........*......*....
NET ELECTRICAL E'.':ERGY GESERATED
(~tWH).*..................*...* * *.**
REACTOR AVAILABILITY FACTOR (1)..***..**
UNIT AVAILABILITY FACTOR (2)............
UNIT CAPACITY FACTOR (3).........- *...*.
l'NIT FORCED OlT.\\GE RA TE (4)........*...
0 0
0 0
0 0
0 0
0 0
0 G.!~il"LATiVE YR TO DATE TOD.HE 5,300.6 16,025 0
0 5,017.8 15,435.3 0
0 11,828,013.
33,883,423 3,8322330 11!160,093 3,640,133 10,570,486
~---
72.6 63.9 68,8
- 61. 6 63.3 53.5 9.J__
24.7
. 16.
SHL"TDOWNS SCHEDl!LED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHL'T DOWN.n E~D OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: November 21, 197 5
- 18.
t:~ITS I~ TEST STATlS (PRIOR TO COM~1ERCIAL OPERATION) REPORT THE FOLLOWING:
- 0)
REACTOR AVAILABILITY FACTO.R (2)
UNIT AVAILADILITY FACTOR (3)
UNIT CAPACITY. FACTOR (4)
- UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR \\\\'AS CRITICAL HOURS IN REPORTING PERIOD X 100 HOURS GENERATOR ON LINE
= _l_lO_U_R_S_I __ N_R_E_* P_O_R_T-IN-'G-Pl-~R-1_0_!)--X l OO NF.T ELECTRICAL POWER GE~ERATED DATE LAST FORECAST DATE*
ACHIEVED MAX. DEPEM)ABLE CA.PA CITY (MWc-NET) X HOURS IN REPURTIN<.i PEH.IUU FORCED OUTAGE HOURS
- ...
- ;.~c
- .:..:.....::..:-..::.:.c~..c...-=c..:;..:..:__. ____________ x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
..,-.. ~,,,_ ---~ -.---*-** ***-'*** -..
TYPE F-FORCED DURATION NO.
- oATE S-SCHEDULED (HOURS) 75-22 100175 S*
744 UNIT SHUTDOWNS DOCKET NO. _5_o-_2_e_o ___
UNIT NAME Surry Unit No. 1 DATE Nov. 3, 1975 COMPLETED BY W. C. Earl REPORT MONTH __
oc_T_O_B_ER ___
METHOD OF SHUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS e*
C 1
Unit was shut down for the entire month for refueling.
\\
(I) REASON (2l Ml'TIJOI)
A EQtlll'MFNT 1-"AII.UIU: (t-:Xl'l.AIN)
I 1\\11\\Nl'Al.
B MAINT. OR TEST 2 MANUAL
(' REFUELING SCRAM e
I). RFGllLATORY RESTRICTION 3 AllTmtATIC E Ol'ERATOR TRAINING ANO SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G--OPERATIONAL ERROR *
(EXPLAIN)
H---OTIILR (EXPLAIN)
SUMMARY
- *Unit was initially shut down as a result of a forced outage.
The scheduled refueling was moved up to this time.
- Outage No. 75-21 reflects the estimated duration of the forced outage and No. 75-22~~~--
represcnts the scheduled portion.
~ !.
}':....
/:
I:.
i ',;
i:,
'6 :.
t, j,
v -
)..
! i;,
j:,
l t ' f,
~;.
.r*,
T
~;
/.
DOCKET NO. _s_o_-2_8_1 __ _
- -1
\\
UNIT Surry Unit Nb. 2 DA TE Nov. 3, 19 7 5 COMPLETED BY W. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY
_ (MWe-net)
DAY (MWe-net) 1 739.8
-17 *_
756.4 2
744.6 18 739.0 3
756.3 19 19.1 4
757.7 20 0
5 743.6 21 473.2 6
756.2
-22 759.9 757.0 761.8*
7 23 '.-
8 757.9 24 765.2 9
115.5 25 765.7 10 0
26 787.9 11 0
27 755.5 12 0
28 767.1 13 0
29 766.9 14 574.3 30 765.7 15 587.7 31 765.7 16 754.8 DAILY UNIT POWER LEVEL..FORl\\f INSTRUCTIONS On this fonn, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily
_ average power level exceeds the I 00% line (or the restricted power_ level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
.*e OPERATING STATCS
\\
.,,\\. \\
\\
\\
e t.:~IT Surry Unit No. 2 DATE Nov. 5, 1975 C0~1Pl.ETED BY W
- C. Ear.1 DOCKET NO. 50-281.
- 1.
REPORTJ;-.;G PERIOD:
00._0_1 __ 7_5_1_0_0_1 ______ THROUGH ___
2_4_00 __
7_5_1_0_3_1 ___ _
HOL'RS IN REPORTl:-;G PERIOD:
7 44
- 2.
Cl'RRENTL Y AL:THORIZED POWER LEVEL (~1Wthl 24 41 MAX. DEPESDABLE CAPACITY (MWe-NETJ..._7-"8""'8'----
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (~tWe-SETJ:--.,.--------
- 4.
REASo:-.;s FOR RESTRICTIOS (IF ASYJ:
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CR!TiC..\\L..*.......*...
579.8
- 6.
REACTOR RESERVE SHL'TDO\\\\'S HOCRS *.......
0
- 7.
HOCRS GESERA TOR O:' LISE...........*...
568.6
- 8.
L"NIT RESER \\"E SHlJTDO\\\\*:,,; HOC_RS...... ~-....
0
- 9.
GROSS THER~IAL E:--:ERGY GENERATED(M~TI)...............**...* 1)356,951 IO.
- GROSS ELECTRICAL ENERGY GENERATED(MWH)................ *...*
446,835
- 11.
- --ET ELECTRICAL ESERGY GESER.-\\TED t~1WH)
- 12.
REACTOR A\\'AILABILITY FACTOR (1)...**.**.
424,714 77.9
- 13.
t!NIT AVAIL..\\BILITY FACTOR (2)......*.....
1-1.
L'NITCAPAC'ITY FACTOR (3).'.*.*.*.**** ~., **
- 15.
L'NIT FORCED OuTAGE RATE (4).......*....
76.4 72.4 23.6 CUMULATIVE YR TO DATE TO DATE 5,656.6 14,165.6 0
3Q1.3 5,506.7 13,890.5 0
0 12,787,160-31,011,949 4,170,127 10,192,594 3,956,825 9,656,124
- 77. 5 64.6 25,5 63.3 68.8 55.9 7.6 21.8
- 16.
SHL"TDO\\\\'~S SCHEDL'LED TO BEG!~ IN NEXT 6 MOSTHS (STATE TYPE, DATE, AND Dl'RATION OF EACH):
Refueling April 15, 1976; approximately six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, EST!~!:\\ TED DATE OF STARTL'P:
- 18.
UNITS IN TEST STATliS (PRIOR TO CO~fMERCIAL OPERA T!ON) REPORT THE FOLLOWING:
{l)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
/
ISITIAL CRITICALITY l!'iITIAL ELECTRICAL POWER GENERA Tl.ON CO~l~IERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD X 100 HOURS GENERATOR ON LINE
x 100 HOURS IN REPORTING PERIOD NET ELFCTRICAL POWER GENER.'\\TED.
DATE LAST DATE FORECAST ACHIEVED MAX. DEPE1'lMBLE CAPACITY (M\\Vc-NETJ X HOURS IN REl'ORTIN(i l'E!UOO
_FO_R_C_E_,D_O_L:_T_AG_E_* -'H-'-O_U_R_S _______ -'-----X lOO HOURS GESERATOR ON LINE+ FORCED OL'TAGE HOURS
\\
/.
C e
I
- UNIT SHUTDOWNS REPORT MONTI-I OCTOBER Page 1 of 2 DOCKET NO. 50-"-281 UN IT NAME Surry Unit No. 2 DATE Nov. 3, 1975 COMPLETED BY W. c. Earl
~--*----*~-------,-----,.-------y-----~* --------,----------------------
TYPE F-FORCED DURATION NO.
DATE S-SCHEDULED (HOURS)
REASON (1) 75..:.16 100975 F.
114.3 A
75-17 101375 F.
3.9 A.
75-18101575 F
3.9 G
SUMMARY
METHOD OF SHUTTING DOWN IBE REACTOR (2) 3 3
3 CORRECTIVE ACTIONS/COMMENTS Rod position indication failure due to secondary steam leak.
Feed reg. valve failed resulting in steam generator level trip._ Replaced valve operator.
Hain steam trip valve failed shut when operator secured air to valve operator while conducting containment isolation valve leak rate test on other unit.
Re-turned air to valve.
(I) Rl*:ASON A FQUil'MFNT FAIJ.URE (EXPLAIN) ll MAINT. OR TEST C'- REi'UELING D-REGllLATORY RESTRICTION.
E-OPERATOR TRAINING AND LICENSE EXAMINAtION F-ADMINlSTRATIVE G-Ol'ERATIO;-lAI. ERROR (EXPLAIN)
H.. QTIIER (EXPLAIN)
(2) MFTIIOD I MANUAL 2 -MANUAL SCRAM 3-AUTOMATIC SCRAM
'.. -*~ *-- -:~ *¥-*~-d- \\.~.-, ~.-- ~-,-,... y.****.*. '*"' ~
.... ~.--,.*
l '
\\
NO.
DATE rl5-19 101975
-*</
. t
SUMMARY
TYPE F-FORCED DURATION S-SCHEDULED (HOURS)*
F 53..4 (J
C UNIT SHUTDOWNS Page 2 of 2 DOCKET NO. _5_0_-2_8_1 ___
UNIT NAME Surry Unit No. 2 DATE Nov. 3, 1975 COMPLETED BY W. C. Earl
. REPORT MONTH __
oc_T_O_B_E_R __
METHOD OF
$HUTTING DOWN REASON (1)
TrlE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS A
1 Steam leaks on steam generator level tap~
I Rewelded level taps.
{l) REASON (2) METHOD A EQUIPMENT FAILURE (EXPLAIN)
I-MANUAL B--MAINT. OR TEST 2 -MANUAL
- C-REFUELING SCRAM D-REGlfLATOR Y RESTRICTION 3--AUTOMATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*OPERA TIONAL ERROR (EXPLAIN)
H---OTIIER (EXl'LAIN)
\\ \\
- e t;orrected-Copy t:SIT Surry Unit No.. 2 DATE Oct. 1, 1975 COMPLETED BY W
- C. Earl DOCKET :S:O. _5_0_-_2_8_1 ____ _
OPERA TI:SG ST A TL'S
- 1.
REPORTl:S:Ci PERIOD:
0001 750901 THROUGH 2400 750930 HOL"RS IS REPORTISG PERIOD:
720
- 2.
Ct.:RRENTL Y AL"THORIZED POWER LEVEL (MWth) 2441 MAX. DEPE!\\DABLE CAPACITY (M\\Ve-NET) 7 88
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (If ANY) (!,1\\Vc-SET): ___ ~------
- 4.
REASO:-.:S FOR RESTRICTIOS (If ASY):
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
(1)
(2)
THIS REPORTING PERIOD HOURS REACTOR WAS C!dTIC..\\L.............
REACTOR RESER VE SHL'TDOW:S HOL:RS.......
HOL'RS GE:SERATOR ON Ll!\\E.............. *.
L'NIT RESER \\"E SHUTDOWN.HOL'RS......**..*.
GROSS Tli[R~IAL ENERGY 711.4 O*
707.9 0
GE!\\ERATED(~twH)*.............*......* 1,627,476 GROSS ELECTRIC'AL ENERGY GE~ERATED (~1WH)................*.**.
NET ELECTRIC' AL ENERGY GE:-;ERATED
(!>-1Wl:I)
RLKTOR AVAILABILITY FACTOR (1) **..*..*.
- l 1NIT AVAILABILITY FACTOR (2).........*.*
L'!'IITCAPACITY FACTOR (3)............**.
l'N!T FORCED OUTAGE RATE (4)...........*
525,095 497,651 98.8
.___9.~8 ~* 3~-
- 87. 7
- 1. 7 CiJML"LATl\\'E YR TO DATE.
TO DATE 5,076.8 13,585.8 0
304.3 4,938.1 13,321.9 0
0 11,430,209. 29,654,998 32723,292 9.27452759 3,532,111.
9,231, 4-1.0
. 77.5.
64.1
__]_5~
6?,9
- 68. L1 55.3 5.4
- 21. 7 SHL'TDOWNS SCHEDULED TO BEGIS IN NEXT 6 MONTHS (STATE TYPE, DATE, ASD DURATION OF EACH):
IF SHVT DOWS AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:_*-----------
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR AVAILABILITY FACTOR UNIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELEC1'RICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD
- X 100 HOURS GENERA TOR ON LINE
X JOO HOURS IN REPORTING PERIOD DATE LAST DATE FORECAST ACHIEVED (3}
UNIT CAPACITY FACTOR NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING l'l:.RlOLJ FORCED OUTAGE HOURS (4)
UNIT FORCED OUTAGE RATE
"----------x 100 HOURS GE~ERA TOR ON LINE+ FORCED OUT AGE HOURS