vn~.GINIA. ELECTRIC A.ND POWER COMP.A.NJ<""'~"-
R10HMOND, VIRGINL\\. 23261
,/',,':':-
~
Ot9(1r,,c
-_,\\
~..
llJ..l,f/11;.\\ : \\
August 9, *197T.
" 4Uc l.,,/ fl,,t)
.. \\
- $, Nu.
- 1. 'P/"l
., 1 Mr. William McDonald, Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. McDonald:
_),
Co~t,41{ ~'!!/t~
\\ i
~,~'%.!ON~~
/
- ,~ ~.,.,,
/
- ~~\\)/~
Serial No~
PO&M/TAP:das Docket
- License Nos. 50-28~
c:so!2§ =:>
Nos. DPR-.32 DPR-37 Operating information for Surry Power Station, Unit Nos. 1 and 2, for the month of July 1977 is attached.
I Attachments cc:
Mr. James P. 0 'Reilly Very truly yours,
~?'.-~ :.
-;', --~, /.
.-:/~ :- '.'. ;/
~
(__;. -;. ;'. / '-!.)/;u;. c.,; r.,_//.k*'
C. M. Stallings Vice President-Power Supply and Production Operations 7722:31)052
- e.
UNiT Surry Uni*t l DATE August 1, 1977 COMPLETED BY E. P. DeWandel 50-280
- DOCKET NO. _______
OPERATING STATUS
- l.
- REPORTING PERIOD:
0001 770701 THROUGH 2400 770731 HOURS IN REPORTING PERIOD: ____
7-;...4_4 __,__ _________________ :-:-=--
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe-NET)
- 77 5
- 3.
LO\\liEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):-------'-----
- 4.
REASONS FOR RESTRICTION (!F ANY):
THIS REPORTING PERIOD YR TO DATE S.
HOURS REACTOR WAS CRITICAL *****.*..****
- 6.
REACTOR RESER VE SHUTDOWN HOURS. *.*.****
- i.
HO~RS GENERA TOR ON LINE ***************
- 8.
l'NIT RESER VE SHUTDOWN HOURS ***********
- 9.
GROSS THER!>fAL E;NERGY GE~ERA TED (!>fWH) *..******************
- 10.
GROSS ELECTRICAL ENERGY
- 11.
- 13.
1 1*...
GENERATED (MWH) ******************* : *
- SET ELECTRICAL ENERGY GENERA TED
(!>fWH)
_REACTOR~ VAlLABILlTY FACTOR (1) *********
UNIT AVAILABILITY FACTOR (2) **.*********
UNIT CAPACITY FACTOR (3) ***************
741 2,
0 740.3 0
1,777 ;31;1.
576,860 3, na* a 0
3,646.4 0
8,817,646 2,909,235' 547,791 2,767,856 99.6%
73.1%
99.5%
71.7%
95.0%
70.2%
UNIT FORCED OUTAGE RAl'E (4) * *. * * * * * * * * *
, 5%
- 2. 4%
. CUMULATIVE TO DATE 26,2~4.4 0
25,546.4 0
57,906,002 18,987,598..
18,011,621 65, J %
63, 2%
57.5%
19.7%
15 *.
- 16.
SHliTDOW~S SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE,DATE,AND DURATION OF EACH):
Steam Generator Inspection - 11/19/77 - 6 weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED D_ATE OF STARTUP: _ _;:N.;...:./..:;A=----------
1s: *. UNITS IN TEST STATUS (PRIOR TO COMMERC[AL OPERATION) REPORT THE FOLLOWING:
\\
1~1TIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION cmi~ERCIAL.OPERA TION DA TE LAST DA TE FORECAST ACHIEVED
- 0)
REACTOR AVAILABILITY FACTOR = HOURS. REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD X 100 (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4) l'NIT FORCED OUTAGE RATE HOURS GENERATOR ON.LINE
= -"-----------x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
.;...::..:..;_;_..:.-=...~...:;....---.:..'-'-------------x 100 HOURS GENERA TOR ON LI~E i: FORCED OUT AGE HOURS
e e
DOCKET NO.
50-280 UNIT Surry Unit 1.
- DATE August 1, 1977 COMPLETED BYE. P. DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH Julv 1977 AVERAGE DAILY POWER LEVEL
. AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 757.5 17 741.8 2
Z'.i8 2 18 746.5 3
7 58. 8 19 742.4 4
758.0 20 745.3 5
755.7 21 749.0
- 6 755.5 22 750.1 7
753.5 23 750.2 8
754.4 24 752.3 9
428.5 25 756;3 10 755.1 26 633.7 11
- 757.5 27 658.* 5 12 745. 9.
28 760.5 13 z1,.z, 6 29 757.5 14 746.4 30
. 759. ti
- 15.
740.6 31 758.7 16 744.2 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit' power level in M\\Ve-net for each day in the reporting month.
Compute to the nearest wh0Ie megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted _power level line). In such cases, the average daily unit power output sheet should be footnoted to explain'the apparent anomaly..
. UNIT !,HUTDOWNS REPORT MONTH July 1, 1977 TYPE METHOD OF
].
F*FORCEO DURATION
~HUTTING DOWN NO.
DATE
$-SCHEDULED (HOURS)
REASON (1)
THE R EACTO A (2) 77-06 7 I 26/77 F
3.7 H
3 I
. I
SUMMARY
... ~;-,:
I
- . \\
- 1*., '!-'* l.
DOCKET NO. __ s_o_-_23_0 __ _
UNIT NAMi! Surry Unit 1 DATE August 1, 19_77 COMPLETED BY E. P. DeWandel CORRECTIVE ACTIONS/COMMENTS Reactor trip on Lo Lo Steam Generator level due to governor valve oscillation.
- Verified proper operation of EHC system and recovered from trip.
~
(l) REASON (2) METIIOD A--EQUIPMENT FAILURE (EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFl!ELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-0~1:'.RATOR TRAINING AND SCRAM LICENSE EXAMINATION
. 1:-ADMINISTRATIVI.:'.
- G-*Ol'ERATIONAI. ERROR (EXPLAIN) 11-0TIIEll (EXPLAIN)
- I,
. '.., : ~...
-. ---i e
i;."'*"
e UNIT Surry Unit 2 DATE August 1, 1977 COMPLETED BY E
- p
- DeWandel DOCKET NO._so_-_2_8_1 ____ _
OPERA TI~G ST A TUS I:
REPORTl~G PERIOD:
0001 770701 TIIROUGH 2400 770731 HOt;RS IS REPORTISG PERIOD: ____
7 4_4------------...------------
2-Ct:RRE!'--"TLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (~iWe*NET) 77 5.
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFrCALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASO:'.'iS FOR RESTRICTION (IF ANY):
TIIIS REPORTING PERIOD S.
HOt:RS REACTOR WAS CRITICAL *************
- 6.
REACTOR RESERVE SHUTDOWN HOURS, *** ~ ***
- 7.
HOt.:RS GENERA TOR ON LINE ***************
S.
l:~IT RESER VE SHUTDOWN HOURS ***********
- 9.
GROSS THER~lAL E.'.'iERGY GE!'iERATED (~fWH) ******************* ~
- IO.
GROSS ELECTRICAL ENERGY
-GE~"'ERA TED (!.IWH) *********************
- 11.
~ET ELECTRICAL ENERGY GENERA TED OlYiH)
- * * ~ **** -************ * *********
- 12.
REACTOR *.\\VAILABlLITY FACTOR (1) *********
- 13.
t:NlT AVAILABILITY FACTOR (2) **.****** * ***
- 14.
UNIT CAPACITY FACTOR (3) ***************
15 *. l'SIT FORCED OUTAGE RATE (4) ************
447 o 3 I
0 441.4 0
1,059,51-3 341,320 323 1 5Q2 60.1%
59.3%
56.1%
40.7%
C"JMULA TIVE YR TO DATE-TO DATE 3,362.4 23z681.3 0
0 3~339.0 23,284.4 0
Q 8,008,276 53,352,903 2,634,540 17,505,914 2,502.565 16, 598. 26:Z fiG. l %
63.5%
- 65. 6%
- 62.5%
- 63. 5~~
57.5%
34.4%
27.0%
- 16. *
- SHL"TDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTI-lS (STATE TYPE, DATE, AND DURATION OF EACH):
Srean Generator Jns:pectjpn and Refueling - 9/18/7.7-6 weeks
- 17.
- . IF SHUT DOWN AT ESD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _N"""/_A __________ _
- 18.
L-:,ilTS IN TEST STATUS (PRIOR TO cmtMERCIAL OPERA TIO~) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR =
. INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERA 110N HOURS-REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD X 100 DA TE LAST DATE FORECAST ACHIEVED HOURS GENERA TOR ON LINE
= ------------x 100 HOURS IN REPORTING PERIOD (2)
UNIT AVAILABILITY FACTOR (3) t,:1'1T CAPACITY FACTOR
=
(4)
L'!'ilT FORCED OUTAGE RA TE NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NEn X HOURS IN R.l:PORTlNG Pl:::R10D FORCED OUT AGE HOURS
x*100 HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS
1..
e DOCKET NO.
50-281
. UNIT Surry Unit 2 DATE August* 1, 1977 COMPLETED BY E. P. DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH Julv 1977 AVERAGE DAILY POWER LEVEL AVER..\\.GE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 751.3 17 0
2 751.2 18 0
3 750.0 19 0
4 750.1 20 0
5 746.5 21 0
6 745.5 22 7
j 745.0 23 0
8 747.4 24 222.3
_9 721.6 25 753.3 10 702.3 26 740.1 11 600.5 27 753~0 12 0
28 753.0 13 0
29 751.0 14 0
30 742.5 15*
0 31 752.5 16 0
DAILY UNIT POWER LEVEL FORM INSTRUCTio"NS On this form, list the average daily unit"-power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the-net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted ~o explain the apparent anomaly.
. -----~--...... -* -- *-*-*-*-****. *-*. -***
.. --1!""'"-
t
TYPE
- F*FORCED DURATION
. UNIT SHUTDOWNS
- 1--**
. REPORT MONTH July 1977 METHOD OF fiHUTTING DOWN DOCKlrr NO. ~---28_1 __
UNIT NAMH ~rry Unit 2 DATE August.l, 1~)77_
COMPLETED BY E. p. DeWanclel
- (
-~
NO.
DATE
- S-SCHl=DULED. (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS I
~
'""'1
.I 77-04 7-11-77 I
SUMMARY
F 302.6 A
1 I
- ..,,1,
- *i' Primory to Secondary Steam Generator tube leaks.
Plugged leaking tubes.
(1) REASON (2) METIIOD A**EQUIPMENT f-'AILURE (EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL
- C--REfoUEUNG SCRAM
- D-IU:GULATORV RESTRICTION 3-AUTOMATIC e
£-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE
. G-*OPERATIONAL ERROR (EXl'LAIN).
11-0TllER (EXPLAIN)