Text
'ii
~*
f ffeg~latory Docket fl VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 Office of Plans and Schedules Division of Reactor Licensing June 12'. 197 5~
Serial No. 528/021974 PO&M/ JTB: clw United States Nuclear ~egulatory Commission Washington, D. C.
20555
. Docket Nos. t"=~~p
Dear Sir:
License Nos. DPR-32 DPR-37 Pursuant to Mr *. L. Manning.Muntzing's directive of.February 19, 1974 requiring that certain operating information be forwarded to you on a monthly basis, the Virginia Electric and Power Company submits the information enclosed herewith for the month of May 1975.
Very truly yours,
~m.J~
.C. M. Stallings Vice President-Power Supply and Production Operations Attachments cc:
Mr. Norman C. Moseley, Director Region II
.e e*
iRegutatory Do~ket File DOCKET NO. 50-280 UNIT Surry Unit No. 1 DATE June 3, 1975 COMPLETED BY W. C. Earl.
AVERAGE DAILY UNIT POWER LEVEL MONTH MAY
~~~~~~~~~~-
AVER AGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 0
17 732.1 2
442.5 18 746.3 3
728.4 19 746.7 4
745.3 20 749.5 5
744.7 21 750.6 6
748.2 22 749.3 7
751.5 23 750.4 8
758.5 24 734.7 9
757.7
.25 751.1 10 741.1 26 750.1 11 756.0 27 749.0 12 753.8 28 747.6 13 753.9 29 746. 6' 14 753.9 30 745.4 15 753.7 31 733.7 16 747.9 DAIL y UNIT 'powER LEVEL FORM INSTRUCTIONS On this form, !\\st the average daily unit power level in MWe-net for each day in the. reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note* that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions *when the daily
.average power level exceeds the l 00% line (or the restricted 'power lev'el line). In such cases, the average daily unit power output sheet should be footrtoted to explain the apparent anomaly.
l
DOCKET NO. 50- 281 UNIT Surry Unit No. 2 DATE June 3, 1975 COMPLETED BY W. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH MAY AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) i 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6
.0 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, Ii.st the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting. month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted-power level lihe). In such cas.es, the average daily unit power output sheet should be footnote*d to explain the apparent anomaly.
" \\.
e*
UNIT Surry Unit No.
DATE June 3, 1975 COMPLETED B.Y W. c. Earl DOCKET NO. 50-280 OPERA TING ST A TUS
- 1.
REPORTING PERIOD:
0001 750501 THROUGH ~2~4~0~0~~7~5~0~5~3~1 ______ _
HOURS IN REPORTING PERIOD: __...:..7-'4-'4---~~--------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET); _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.............
717.7
- 6.
REACTOR RESERVE SHUTDOWN HOURS.......
0
- 7.
HOURS GENERA TOR ON LINE...............
716.3
- 8.
UNIT RESERVE SHUTDOWN HOURS...........
0
- 9.
GROSS THERMAL ENERGY YR TO DATE 2,766.3 0
2,497.0 0
CUMULATIVE TO DATE 13,490.7 0
12,914.5 0
1 GENERATED(MWH)..................... 1,712,641 5,882,255 27.938.276 IO.
GROSS ELECTRICAL ENERGY I I.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
(1)
(2)
GENERATED(MWH).....................
NET ELECTRICAL ENERGY GENERATED (MWH).............................
REACTOR AVAILABILITY FACTOR (1).........
UNIT AVAILABILITY FACTOR (2)............
UNIT C~PACITY FACTOR (3)...............
UNIT FORCED OUTAGE RATE (4)............
558,495 530,894 96.5 96.3 90.6 3.7 1,932,970 1,837,847 76.3 68.9 64.4
. 5.1 9,260,733 8,768,200 63.l 60.4 52 0 26.6 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling October 1975; approximately 5 to 6 tveeks IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR AVAILABILITY FACTOR UNIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
XIOO HOURS IN REPORTING PERIOD DATE LAST FORECAST DATE ACHIEVED (3)
UNIT CAPACITY FACTOR NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS *
(4)
UNIT FORCED OUTAGE RATE
XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
UNIT Surry Unit No. 2 DATE June 3, 1975 COMPLETEDBY W. c. Earl DOCKET NO. ~5~0~--2=8"-=l ____ _
OPERATING STATUS
- 1.
REPORTING PERIOD:
0001 750501 THROUGH 2400 750531 HOURS IN REPORTING PERIOD: ____
7_4_4 _______________________ _
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPEC:IFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL..............
0 __ _
- 6.
REACTOR RESERVE SHUTDOWN HOURS 0 __ _
- 7.
HOURS GENERA TOR ON LINE............... ___ 0 __ _
- 8.
UNIT RESERVE SHUTDOWN HOURS............ ___ 0 __ _
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)... *..................
0 __ _
- 10.
GROSS ELECTRICAL ENERGY
-GENERA TED (MWH)......................
0
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH).............................
- 12.
- REACTOR AVAILABILITY FACTOR (1).........
0 0
- 13.
UNIT A VAILABlLITY FACTOR (2)............
0
- 14.
UNIT CAPACITY FACTOR (3)................
0
- 15.
UNIT FORCED OUTAGE RATE (4)............
0 CUMULATIVE YR TO DATE TO DATE
_h621. 7 ll ~ 130. 7 0
304.3 2!563.6
. 102947.8 0
0 5 '900' 779 2421252568 1,944,635 7,967,102
- 1, 846' 720 7,546,019 72.3 60.9 70.7 59_q 64.7 52.4 4.4 24.4
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
June 15, 1975
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(l)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITiAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
x 100*
HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PER IOU FORCED OUTAGE HOURS
~-~-----~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
TYPE F-FORCED DURATION NO.
DATE S-SCHEDULED (HOURS)
~5-16 050175 F
27.7
SUMMARY
UNIT SHUTDOWNS DOCKET NO. 50-280 UNIT NAME Surry Unit No. 1 DATE June 3, 1975 COMPLETED BY W. C. Earl REPORT MONTH __
MA_Y ____
METHOD OF qHUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS A
3 No. 3 diesel generator failure.
(1) REASON (2) METHOD A -EQUIPMENT FAILURE (EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C-RHUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERA TOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
.e
TYPE F-FORCED DURATION NO.
DATE S-SCHEDULED (HOURS) 75-7 04267.5 s
744
SUMMARY
UNIT SHUTDOWNS DOCKETNO. _5_0-_2_8_1 ___
UNIT NAME Surry Unit No. 2
. DATE June 3, 1975
- COMPLETED BY W
- c
- Earl REPORT MONTH __
MA_Y ____
METHOD OF SHUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS c
1 Refueling (1) REASON (2) METHOD A*-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL B-MAlNT. OR TEST 2-MANUAL C-REfUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G--OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
...