Submit Operating Report for the Month of August 1975
ML19095A342
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/08/1975
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Reactor Regulation
References
serial No. 650/021974
Download: ML19095A342 (7)


Text

VIRGINIA. ELECTRIC A.ND POWER COMPANY RIOHMOND, VIRGINIA. 2 3 2 61 September 8, 1975~

Office of Plans and Schedules Serial No. 650/021974 Division of Reactor Licensing PO&M/JTB:clw U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37

Dear Sir:

Operating information for Surry Unit Nos. 1 and 2 for the month of August 1975 is attached.

Very truly yours,

,__./') ~

ZJ). /l)r;_ ":LJ;/Zl"£/c-u.:;~

C. M. Stallings Vice President-Power Supply and Production Operations Attachment cc: Mr. Norman C. Moseley

DOCKET NO. _5_0-_2_8_0_ __

UNIT Surrv Unit No. 1 DATE Seut. 2. 1975 COMPLETED BY W. C. Earl AVERAGE DAlLY UNIT POWER LEVEL MONTH ~.~UG~U~S~T..____ _ _ _ __

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (1...1We-net) DAY (MWe-net) 1 99.3 17 739.0 2 678.8 18 737.8 3 607.5 19 726.2 4 715.6 20 719.7 5 735.3 21 722 .1 6 731.1 22 7i5.5 7 736.9 23 520.3 8 737.3 24 0 9 716.1 25 373.6 10 739.6 26 647.7 11 738.9 27 678.9 12 741. 3 28 703.6 13 744.4 29 706.8 14 744.4 30. 700.6 15 731.6 31 702.9 16 725 .6 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS

. On this f 01m, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph ior each reporting month. Note that by using rna:-:imnm dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power ievel iine). ln such cases, the average daily unit power output sheet should be footnoted to explain the apparer:.t anomaly ..

.UNIT Surry Unit No

  • l DATE Se:Qt. 2, 1975 COMPLETED BY w. c. Earl DOCKET NO. .50-280 OPERATING STATUS l.. REPORTl~G PERIOD: O~O~O~l=-----'-7=5=0=80=1=--~~~~THROUGH__,2~4~0~0<--_,_7~5~08~3~1.__~~~~

HOL.:RS I~ REPORTISG PERlOD: _ __.:.7_4:....4'----.,,,,-r-.,.....---------------------

2. CL:RRESTLY AUTHORIZED POWER LEVEL (MWth) 2441  !-.iAX. DEPENDABLE CAPACITY (~{We-NET) 788
3. LOWEST POWER LEVEL TO WH!CH SPECiFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ _ __
4. REASO~S FOR RESTRICTIO!\ {IF ANY):

THIS C\..:'~!LiLl. T!VE REPORTI~G PERIOD YR TO DATE TO DATE

5. HOL'RS REACTOR WAS CRITICAL. . ; . . . . * . . . . . 704.9 4,867.2 15,411.6
6. REACTOR RESERVE SHCIBOW}~ HOURS *...... 0 0 0
7. HOCRS GESER ..\TOR O?\ LINE. . . . . . . . . . . . . : . 692.9 4,404.4 14.821.9 s: l!NIT RESER VE SHUTD{)\\~ HOl!RS . . . . . . . . * . . 0 0 0
9. GROSS THER~IALE~ERGY GE:SERATED (~IWH) . : . . . . . . . . . . . . . . . * * . . 1.621,773 l0,!109,212 32,464,622
10. GROSS ELECTRICAL El'\ERGY

<:;ENERA TED (!>IWH) . * . * * * * . . . . . . . . . . * * .

  • 514,149 3,379,375 10, 707 .138
11. NET ELECTRICAL ESERGY GE:s'ERATED (MWH) ............***..*........... 487,651 3,210,666 10,141,019
12. REACTOR AVAILABILIIT F.-\CTOR (1) . . * . * * * * . 94.7 80.4 __22~
13. UNIT AVAILABILITY FACTOR (2.) . . . . . . . . * . . . 93.1 75.5 62.8
14. UNIT CAPACITY FACTOR (3) . . . . . . . . * . . . ; . . 83.2 69.9 54.5
15. UNIT FORCED OliTAGE RA TE (4) . . . . . . . . . . . . 6.8 8.9 25.l
16. SHt:TDOWSS SCHEDULED TO BEGIN IN NEXT 6 ~msms (STATE TYPE' DATE, AND DURATION OF EACH):

Refueling outage October 15, 1975; anproximately six weeks

17. IF SHL:T DOWN A1 END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPER.ATto~) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHlEVED IX!T1AL CRITICALITY

!::\1TTAL ELECTRICAL POWER GENERATION COM.MERCIAL OPERATION HOURS REACTOR. \li'AS CRITICAL

{l) REACTOR AVAILABILITY FACTOR x 100 HOURS !KREPORTixG PERIOD HOURS GE~ERA TDR ON LINE (2) UNIT A VAiLABILlTY FACTOR HOURS l~ REPORTING PERIOD x 100 .- *,,

NET ELECTR lCAL f*OWER GENERATED (3) *UNIT CAPACITY FACTOR MAX. DE.PE~DJ-.BLE CAPACITY (MWc-NET) X HOURS l:-l REPORTLNG PERlOD

~:.

FORCED Ol"TAGE HOURS (4) UNl.T FORCED Ol*Tl..GE RATE ~-------------------~XlOf.I HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

DOCK ET NO. _5_0_-_2_8_0_ _ __

UNIT SHUTDOWNS UNIT NAME Surry Unit No. 1 DATE Sept. 2, 1975 COMPLETED BY W. C. Earl REPORT MONTH AUGUST r:.[:19 -~*_.,

080175 TYPE F*FORC~D S*SCHEDULED

___ -~------

F DURATION (HOURS)

--*~-*---

18.7 REASON (1)

A METHOD OF

$HUTTING DOWN THE REACTOll {2) CORRECTIVE ACTIONS/COMMENTS 3 Repaired air compressors.

175-20 082375 F 32.3 A 1 Repaired leaking valve.

(I) REASON (2) METl!OD A*-EQUli'MENT J:AILURE (EXPLAIN)  !-*MANUAL

!3- MAINT. OR TEST . 2-MANUAL C-*REFUELJNG SCRAM D-REGliLATORY RESTRICTION 3-AUTOMATIC

£--OPERA TOR TRAINING AND SCRAM LICENSE EXAMINATION r--ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN) 11--0TllER (EXl'l.AlN)

SUMMARY

DOCKET !'0. 50-281 lJ~IT Surry Unit No. 2 DATE Sept. 2, 197 5 COMPLETED BY W. C. Earl AVERAGE DAlLY UNIT POWER LEVEL MONTH _ _u,A,.,_UG"'-'u"-'-s,,___~.1_- - - - - -

AVERAGE DAILY POWER LEVEL AVERAGE DAILY PO\'t'ER LEVEL DAY (MWe-net) DAY (MY,'e-:rret) 724.3 17 733.4 1

2 581.8 18 730.2 678.8 19 731.4 3

734.2 20 734.0 4

733~3 5 676. 9 21 688.6 22 72.5.4 6

738.2 23 502.5 7

7 51.lf 24 721.4 8

741. 8 25 721.4 9

727 .9 26 719.6 10 739.8 27 719.5 11 674.0 28 721.3 12 727 .2 29 724 .0 13 563.8 . 30 723.9 14 241.5 *31 728 15 16 720.8 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this fomi, list the average daily unit power level in MWe-net for each day in ihe reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note- th.at by using maximum dependable capacity for the net electrical rating of. the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power leYe! iine). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent a11omaly.

UNIT Surrv Unit No. 2 DATE Se12t. 2, 1975 COMPLETED BY w. c. Earl.

DOCKET NO. 50-281 OPERATING STATUS __

L REPORTING PERIOD: _ _ 0_0_0_1_ _ 75_0_8_0_1_._____ THROUGH _2~4~0~0__7~5~0~8~3~1~-----

HOURS IN REPORTING PER10D: _ _7_4_4__________________________

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) ?!dd MAX. DEPENDABLE CAPACITY OlW;o-NET) ]_,.8~8_ _
3. LOWEST POWER LEVEL TO wmCH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ __
4. REASONS FOR RESTRICTIO.S (IF ANY):

THIS Ci.:'~*H.iLAT!VE REPORTING PERIOD YR TO DATI TO DATE

5. HOURS REACTOR WAS CRITICAL. . . . . . * . . . . . . 735.4 4,365.4 lL874.4
6. REACTOR RESERVE SHCTDOWi'-< HOURS ...... . 0 0 0
7. HOCRS GE'.\ERATOR O~ Ll~E. ............. . 730.0 4,230.2 12,614.0
8. UNIT RESERVE SHUTDOW~ HOURS . . . . . . . ; .. . 0 0 0
9. GROSS THERMAL ENERGY GE!\ERATED (~fWH) .. _ . _ . . . . . . . . . . . . . . _ . . 1, 696, 860 ~802.733 28,027,522
10. GROSS ELECTRICAL P~ERGY CENERATED (MWH) . . . . . . . . . . . . . . . . . . . . . 541,690 31198,197 9,220.644
11. NET ELECTRICAL ENERGY GE:-.IERATED (MWH) ....*..... _ .........**....*.* 513,134 320342460 82733,75_9
12. REACTORAVAILABILJTYFACTOR(l) . . . . . . . . . 98.8 74.8 62.9
13. UNIT AVAILABILITY FACTOR (2) . . . . . . * . . . * . . 98 .1 72.5 61.6
14. UNIT CAPACITY FACTOR {3) . . . . . . . ; * * . . * .. .

87.5 *66.0 - -54 -.1-

15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 1.9 5.9 22.6
16. SHVTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTrlS (STATE TYPE, DATE, AND DL'RA T!OS OF EACH}:
11. IF SHVT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE L\ST DATE.

FORECAST ACHlEVED IKITIAL. CRITICALITY INITIAL ELECTRICAL POWER GENERATION CO.!>iMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1).

  • REACTOR A VAILABILJTY FACTOR x 100 ~-

HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) UNITA VAlLAB!LlTY FACTOR -------------XlOO HOURS IN REPORTINGI'ERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAP ACITY FACTOR

  • MAX. DEPE!\DABLE CAPACIJY (MWe-NET) X HOURS !N REPORTtNG Pl:.RiOD *:"'

FORCED Ol"TAGE HOURS (4) UNIT FORCED OllTt.GE RATE x 100 HOURS GE:SERATOR ON LINE+ FORCED OUTAGE HOURS

/

DOCKET NO. _50-281 *---

UNIT SHUTDOWNS UNIT NAME Surry Unit No. 2 DATE Sept. 2, 1975 COMPLETED BY W. C. Earl REPORT MONTH . AUGUS._T_ _ __

TYPE METHOD OF F*FORCED DURATION $HUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS

-n--..- -*--*----- ---*------- *---------- -**--*h.-~.----~--aV-~ ..- - - - *---

75-13 081475 F 3.3 A 2 Rcpa :I.reel t*o<l control system failure.

75-14 081575 F 10. 7 A 3 Repaired operator on main steam trip valve.

I (I) RFl\SON (2) Ml,.Tl IOI>

A ,.:QUIPMENT l.'l\ILURE (IOi.1'1.AIN) I Mi\N\11\l.

I II Mi\INT. OJ~ TEST /. Mi\Nlli\l.

II C- R EHJELI Nli D--REGllLJ\TOR Y RESTRICTION Sm AM 3 --1\ LITOMATIC E-*Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMIN!STRATiVE G-*Ol'ERATIONAL ERROR (EXPLAIN)

H-OTllER (EXPLAIN)

I I I I

SUMMARY