VIRGINIA ELEOTRIO AND POWER COMPANY RICHMOND, VIRGINIA 23261 August* 8, 1975*
Office of Plans and Schedules Division of Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D *. C.
20555
Dear Sir:
Serial No. 595/021974 PO&M/JTB:clw Docket Nos. 50-280 5Qr281 License Nos. DPR-32
- DPR-37 Operating information for Surry Unit Nos. 1 and 2 for July 1975 is attached.
Attachment cc: Mr. Norman C. Moseley Very truly yours, J
-)/'1
~ *
~'
Mail Section u.1~11.,L)/z?.Lt'tr~*cd ;_/, ~ Docket Clorl;
/ -
/r*'
C. M *. Stallings
- t. F-7--
Vice President-Power Supply G
and Production Operations
\\
8558
' -*1**.*
DOCKET NO.
50-280 I
UNIT Surry Unit No~ 1 DATEAugust 4, 1975 COMPLETED BYW. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH JULY AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 746.7 17 740.7 2
738.7 18 743.5 3
746.7 19 728. 7 4
746.2 20 735.3 5
734.8 21 734.2 6
745.2 22 742.1 7
738.9 23 736.6 8
737.4 24 25.9 9
697.4 25 0
10 735. 7 26 0
\\
11 737.6 27 0
12 730.6 28 0
13 743.2 29 0
14 743.8 30 0
15 743.1 31 0
- 16 742.2 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole. megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the *net elcctrital rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit.power output sheet should be footnoted to explain the apparei1t anomaly..
UNIT Surrl Unit No. 1 DATE Au8ust 4z 1975 COMPLETED BY w. c. Earl DOCKET NO. 50-280 OPERATING STATUS
- 1.
REPORTING PERIOD: __ 0_0_0_1 __._7_5_0_7_0_1 _____ THROUGH _2_4_0_0 __
7_5_0_;_7_3_1 ____ _
HOURS IN REPORTING PERIOD: ___ 7_4_4 ________________________ _
2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (~l\\Ve-t\\ETJ _,7'--'8""'8"--_
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION OF ANY):
THIS REPORTING PERIOD
. 5.
HOURS REACTOR WAS CRITICAL.............
- 6.
REACTOR RESERVE SHt.:TDOWS HOURS...*...
- 7.
HOURS GENERATOR ON LINE........**.....
55 3:....:;._,_7_~
0 553.7 0
- 8.
UNIT RESERVE SHUTDOWN HOURS.......**..
- 9.
- GROSS THERMAL ENERGY GENERATED(MWH)..........*..*..***.* 1,338,774
- 10.
GROSS ELECTRIC' AL ENERGY
<.;ENERATED (MWH)..............*...*..
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH)............................*
- 12.
REACTOR AVAILABILITY FACTOR (1) *...**...
- 13.
UNIT AVAILABILITY FACTOR (2)............
- 14.
UNIT CAPACITY FACTOR (3)...............
429,456 407,891 74.. 4 Z4.4 69,5 25.6 c;_*~tt.:LATIVE YR TO DATE TO DATE 3,982.3 14,706.7 0
0 3' 711.5 14,129.0 0
0 8,787,439 30,842,849 2,865,226 10,192,989 2,723,015 9,653,368 78.3 64.4 Z2,2 61.8 6Z.2 53.6 9.4 25.8
- 15.
. UNIT FORCED OUTAGE RATE (4)............
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURA TIO~ OF EACH):
Refueling scheduled October 15, 1975, approximately six weeks
- 17.
IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
August 1, 1975'
- 1s.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACfOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACl.TY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION
- ~~~~ ~:~~~:;~~~ ~=~~~C:L X 100 HOURS GENERATOR ON LINE
--'-'----'-------~*x100
. HOURS IN REPORTING PERIOD NF.T ELECTRICAL POWER GENERATED DA TE LAST DA TE FORECAST ACHIEVED MAX: DEPENUABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PER IOU FORCED OUTAGE HOURS
XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOL'RS
NO.
DATE 5-18 072475
SUMMARY
UNIT SHUTDOWNS REPORT MONTH JULY
,'t*
DOCKETNO. _5_o_-2_8_
0~~~
UNIT NAME Surry Unit No. 1 DATE August 4, 1975 COMPLETED BY W. C. Earl
~~~~~~~~-
TYPE METHOD OF F-FORCED DURATION S-SCHEDULED (HOURS)
REASON (1)
F 190.25 A
SHUTTING DOWN THE REACTOR (2) 1 & 3 CORRECTIVE ACTIONS/COMMENTS Failure of both containment air com-pressors required unit to be removed from service.
During the rampdown an auto scram occurred due to spike on feed control instrumentation.
(1) REASON A EQUIPMENT FAILURE (EXPLAIN)
B MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G--OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
(2) METHOD I-MANUAL 2-MANUAL SCRAM 3-AUTOMATIC SCRAM
DOCKET NO. 50-281 UNIT Surry Unit No. 2 DATE August 4, 1975 COMPLETED BY W. c. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH JULY AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER.LEVEL DAY (MWe-net)
DAY (MWe-net) 1 736.5 17 750.3 2
760.8 18 749.5 3
759.3 19 753.3 4
760.3 20 737.3 5
753.5 21*
747.2 6
354.0 22 735.9 7
0 23 733.7 8
0 24 738.1 9
0 25 746.4-10 0
26 747.8
\\
11 79.9 27 741.5 12 732.8 28 746.9 13 758.3 29 740.1 14 759.3 30 73l*. 1 15 755.4 31 734.2
'16 752.2 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
- Compute to the nearest whole megawatt.
These figures wlll be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, tl1erc may he occasions when the daily average power level exceeds the 100% line (or the restricted power ievcl line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
~
OPERATING STATUS UNIT Surry Unit No. 2 DATE August 4, 1975 COMPLETEDBYW. c. Earl DOCKET NO.
50-281
- 1.
REPORTING PERIOD: ___
o_o_o_1;___7_50_7_o_1 _____ THROUGH -~2_4_0_0 __
7_50_7_3_1 __ __,_ __
HOURS IN REPORTING PERIOD:
744
;o-.,--,-:;---------~-----------
- 2.
CliRRENTLY AUTHORIZED POW.ER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL JO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
- REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.............
- 6.
REACTOR RESER VE SHUTDOWN HOURS.......
- 7.
HOURS GENERATOR ON LINE..............*
- 8.
l'NIT RESERVE SHUTDOWN HOURS... ;....*..
- 9.
GROSS THERMAL ENERGY 622.9 619.0 0
GENERATED(MWH)............**......* 12484,i26
- 10.
GROSS ELECTRICAL ENERGY GE~ERATED (MWH).............. ;.*..*.
483,045
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH).....*....*. :......***.***.*.
458,372 12.. REACTOR AVAILABILITY FACTOR(!).........
83.7 13.. llNIT AVAILABILITY FACTOR (2)........*...
l 1NIT CAPACITY f ACTOR (3)...............
UNIT FORCED OUTAGE RATE (4)............
- 83. 2 78.2 16.8 CUMULATIVE YR TO DATE TO DATE 32630.0 122139.0 0
304.3 32500.2 11,884. 0 0
0 82105,873 26,330,662 2,656,507 8,6Z8,2Z9 225212326 8,220,625 71.3 61.5 68.8 f.iQ.Z 62.9 52.9 6.7 23.6
- 14.
- 15.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:--------'----
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL l'OWF.R GENERATED DA TE LAST DA TE FORECAST ACHIEVED MAX. DEPENDAllLE CAPACITY (MWc*NET) X HOURS IN REPORTING PERIU~
FORCED OUTAGE HOURS
XlOO HOURS GENERA TOR ON LINE+ FORCED OUTAGE HOURS
TYPE F-FORCED DURATION NO.
DATE S-SCHEDULED (HOURS) 75-11 070675 F
121.2 75-12 071175 F
3.8
SUMMARY
UNIT SHUTDOWNS REPORT MONTH JULY
"~~~-,}~~~:~ r
"'~';
DOCKET NO.
50-281 UNIT NAME Surry Unit No. 2 DATE August 4, 1975 COMPLETED BY W. C. Earl METHOD OF SHUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS A
3 Failure in air system which holds main steam trip valves open.
Auto scram occurred when trip valve slammed closed.
H 3
During start-up a steam generator level trip occurred during manual feedwater control.
(1) REASON.
(2) METHOD A--EQUIPMENT FAILURE {EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AVTOMATIC E-Ol'ERATOR TRAINING AND SCRA~I LICENSE EXAM.INATION
!-"-ADMINISTRATIVE G-OPERA Tl ON AL ERROR (EXPLAIN)
II - OTllER (EXPLAIN)
~-