VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 14,. 1977 Mr. William McDonald, Director Serial No. 306/102976 U. S. Nuclear Regulatory Corrnnission PO&M/TAP:dgt Office of Management Information and Program Control Docket Nos. 50-280 Washington, D. c. 20555 50-281 Attn: Mr. w. H. Lovelace, Chief License Nos. DPR-32 Regulatory Information DPR-37 Systems Division Plans Branch

Dear Mr. McDonald:

In accordance with your request of October 29, 1976, our 1975 and 1976 monthly operating statistics were reviewed to include your suggestions.

The revised pages are attached. As the Surry Units are base loaded, the reactor reserve shutdown hours should be zero rather than that previously reported.

Very truly yours, G. M. Stallings Vice President-Power Supply and Production Operations Attachments cc: Mr. Norman C. Moseley

< _.~**-.~t*-':., *,* ., **.>:*_.*.--.
, *-._::*:* Co_rr~cted .CopY,
  • --~~:f:f~;if *7:'./~*->:._(Ls~~ry Power Station

, ._UNIT Unit No. 2

  • - .. ! . . . *-*-. _. l .*.**:

, .: ,*-<*-.. ~ ' ..- .. * - - .. ~* *. '* .. -*

  • DOCKET No._5_0_-_2_8_1_ _ __
      • .-'*,...,* . :*~. :- *.; ' . . -',.*

OPERATING STATUS .

l. . REPORTING PERIOD: 0001 740901 THROUGH 2400 740930

~------------

H0 URS IN REPORTING PERIOD: _ _ _ 7_2_0_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _--::o-:-::---

2* . CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3. . LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __N~/_A____~---
4. REASONS FOR RESTRICTION (IFANY): N/ A THIS CUMUL.ATIVE REPORTING PERIOD YR TO DATE TO DATE
5. HOURS REACTOR WAS CRITICAL. . . . . . . . . * . * . _J~O. 7 32908.2 *8 2509. o
6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . . 0
7. HOURS GENERATOR ON LINE . . . . * . . . . . . * * *
8. UNIT RESER VE :;HUTDOWN HOURS ...*.. ; .*.. 0
9. GROSS THERMAL ENERGY GENERATED (M\VH) . . . . . . . * . . * . * * . . . * * . ~ 337,146 8!5402854 1812241789
10. GROSS ELECTRICAL ENERGY ':. ~.

-GENERATED(MWH) . . . . . . . . . * . . * . * . * * . *

  • 110,545 2,783,7.90 620222467

!!. NET Fl l'IT~ICAL ENERGY GENERATED 11'\I.

.LV'"r,;l"t"t nl.I. ')

t:."l/.

'V.J"'T 'J C:/")

I .J c: i::oo ...

-,u.,,..,,, ')00

{MWH) . . . . * . . . . . . . . * . . * . * * . . **.*...*

12. REACTOR AVAILABILITY FACTOR(!) . . * . . . . . . 19.5 59.6 68.4
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . . . . 19.5 58.8 61.~
14. UNIT CAPACITY FACTOR (3) . . . . . . . * . . . . . * . 18.5 51.3 58.2

. 80.4 16.6 . / .

15.

16.

UNIT FORCED OUTAGE RATE (4) ..... ** . . . . . .

  • SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

.12.5 Refueling scheduled February 2 2 1975; approximately six weeks

17. IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: October 18, 1974 ,,!*.
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST . DATE

. FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION

  • HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE .,

(2) UNIT AVAILABILITY FACTOR ~----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR =

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUT AGE HOURS

. (4) . . UNIT FORCED OUT AGE RATE --------------------XlOO HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS

~~~~{~TED.BY*w. C. Earl

..:;;'.~:>.-~)C~ET. NO._s_o_-_2_8_1_ _ _ __

. -- -..* *.~

~

  • -. ~ -.". -

OPERATING STATUS

1. REPORTING PERIOD: 0001 741001 THROUGH 2400 741031 HOURS IN REPORTING PERIOD: _ _J~4~5---------~----------------
2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) -.7-=8'-"8'--_
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IFANY) (MWe-NET): __N~/~A _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

. *-~

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S*. *.HOURS REACTOR WAS CRITICAL. . . . . . . . . * ; *;

  • 3,908.2 ~_Q9.0
6. REACTOR RESER VE SHUTDOWN HOURS ..**.** 0 . 0 .. -* a_*_
7. HOURS GENERATOR ON LINE . . . . . . . . . . * * . .
  • 0 3,854.2 8,384.2
8. . UNIT RESERVE SHUTDOWN HOURS .....***.** 0 0 0

. 9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . * . . . . . . . * * * * . . 0 8,540,854 18,224,789

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . . . * * . . . * . * * . * * . 0 2,783,790 6,022,467

,..~

! !. MET ELF.CTR.WAL ENERGY GENERATED ....

l~'jt* -~ U**

')

'z VJ-r__,

C."ll. c;7")

J 1 . ..1 c; hQQ

_,.., ...... z-""":'.

?QQ (MWH) ..* *.......*.*.*...*...*****.**

12. REACTOR AVAILABILITY FACTOR (I) . . . . * . . .
  • N /A 53
  • 6 (5 7
  • 7)
  • 64. 6 ( 66. 9) *
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . * . . . . 0 52
  • 8 ....6.....3..._._..6'----

I4. UNIT CAPACITY FACTOR (3) . . . . * . . . * * . * * * . 0 45

  • 8 _5,_4~*~9'----
15. UNIT FORCED OUTAGE RATE(4)............ 100.0 28.2  :.:.1."81-8:~.8' "16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH): ... : j Refueling: February 15, 1975; six weeks **
17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: November 15, 1974
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL. OPE RATION) REPORT THE FOLLOWING:

DA TE LAST DATE FORECAST ACHIEVED

~ ...

INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION

. ,* COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

.. (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE *

(2) UNIT AVAILABILITY FACTOR I HOURS IN REPORTING PERIOD x IOO . ' ~*

NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

_FO_R_C_E_D_O_UT_A_G_E_H_O_U_R_S_ _ _ _ _ _ _ _ _ _ _ _ XlOO (4) UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS computed on the following basis -.Hours Reactor Critical+ Reactor Reserve Shutdown Hrs. x 100 Hours in Reporting Period

-;., -*~,"

~:~.*,,

  • '.,*.-;;/.?.*'.:~:_:;'*.* Corrected Copy .

~  : . -

  • .*.-..* .. * (.
;OPERATING STATUS. '.'*I*- *.
1. REPORTING PERIOD: 0001 741101 THROUGH 2400 741130 HOURS IN REPORTING PrRIOD: 720

'-----------~

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) .... z...s...a.___
3. LOWE'ST POWER. LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF.ANY):

. THIS . CUMULATIVE

'* ~-

REPORTING PERIOD YR TO DATE TO DATE s.. HOURS REACTOR WAS CRITICAL. . ' .. *....* *: * . 0 3,908.2 8,509.0 6 * .. REACTOR RESERVE SHUTDOWN HOURS 1...... 0 _*o_._ 0 -

. 7. HOURS GENEk.A TOR ON LINE. . . . . . . * * * * * . . . 0 3.854.2 8.384.2

._. *-~*..* c 8.* *=lJNIT RESERVE SHUTDOWN HOURS ...*.* *.* .*.. *---°'---- 0 0

. 9. GROSS THERMAL ENERGY

  • -'- GENERATED (MWH) . . . . . . . . . * . . . * * .* * * * *
  • 0 8,540,854 18,224,789
  • cc10. * .* GROSS ELECTRICAL ENERGY

- 'GENERATED (MWH) : .. *. . . . . . . . . . . . * ; .*** v 0 2,783,790 6,022,467

'11. *. 'NET ELECTRICAL ENERGY GENERATED .

(MWH) . . . . . . . . . * . . *. . . . . * . . * *.- *.**...

2,634:573 5,699,299.

- 12. . REACTOR. AVAILABILITY FACTOR (l) . : .". . . . . . . . _ _ _Q=-.:- - 48.8 (52.6)* 61. 2 (63. 4)*

  • .. ~B. * - UNIT AVAILABILITY FACTOR (2) . . . . . . * * . . ,
  • 0 . 48 .1
  • 60.3 .
14. *: UNlT CAPACITY FACTOR (3) . . . . . . . . . . .' ..*. 0 41. 7 52.0

-*15 ..

  • UNIT FORCED OUTAGE RATE (4) . . . . . . . . * . . . 100 36.7 _*_24~X- \ . - .~*

c*:\,~16.. 'SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

_:Refueling; April 25, 1975;

  • approximately six weeks .
17. IF SHUT DOWN AT E;ND OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: January 1, 197 5
  • '**'"18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

.

  • FORECAST ACHIEVED
- .*' . -~: .

INITIAL CRITICALI'IY

  • INITIAL ELECTRICAL POWER GENERATION r

.COM!.IERCIAL OPERATION HOURS.REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR - x 100 HOURS IN REPORTING PERIOD HOUR.S. GENERATOR ON LINE

  • . ~<2~(2) *-~UNITAVAILABILITY FACTOR _H_O_U_R-'-S-IN_R_E-PO_R_T_I_N_G_P_E_R_IO_D_ _ X lOO NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPO_RTING PERIOD

_FO_R_C_E_D_O_UT_A_G_E_H_O_U_R_s_ _ _ _ _ _ _ _ _ _~x100

'(4) *UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

  • RAF computed-..as follows - Hours Reactor Critical + Reserve Shutdown Hours

'-------------------------~

Hours in Reporting Period x 100

-- ~~ " ... .' ..

t~~.-"'--~ *-.,.-.~<.*.~* *::;~ ~, ::;~:**..:," .. *, -:._-.' :*-: .__. -*.

  • .; ,)'.-+;:rr*c.~~~ . Cop~ ';.~:

. - ":. ~ . '

' > .: * ~:

Surry Power Station *- _.:~**-~ ~~-': .

. :,>:_,:":::,;;y~:t:~i~~}~\::U~IT Unit No. 2

.DATE January 2, 1975

  • -:-':~,\£Y~~~tOMPLETED BY w. c .. Ear 1 .
. oocKET No:**------- 281 OPERATING STATUS

~-- } . -- .*.:-:-. - ,-:_:.-i '.-.. ., ..

1.. REPORTING PERIOD:_0_0_0_1_7_4_1_2__ 0....,.1_,__ _ _ _ _ _ THROUGH _2_4_0_0_7_4_1_2_3_1_ _ _ _ __

2.

HOURS IN REPORTING PERIOD:.


=-..,....,,.-------------------

CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 744 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

. ~.:,*..

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S.

  • HOURS REACTOR WAS CRITICAL. . . . . . . . . . * :
  • __._0_*-_......,.~ 3 2 908.2 8 2 509.0
6. REACTOR RESERVE SHUTDOWN HOURS . . . . . * . _ __.0"------ 0* - 0
7.
  • HOURS GENERATOR ON LINE . . . . . . . . * * : . * . . ""'0'---- 32854.2 82384.2
8. UNIT RESER VE SHUTDOWN HOURS . . . * * . . . * *
  • _ _0.;..__ __ 0 0

. 9. GROSS THERMAL ENERGY 0* 8,540,854 GENERATED (MWH) . . . . . . ....*..******** 1812242789 . ***1

10. GROSS ELECTRICAL ENERGY

<iENERA TED (MWH) . . . . . . . . . * * . * . * * * . * . . _.,.,._0_ _ __ 2,783,790 6 2 022,467

{~~~ 11. NET ELECTRICAL ENERGY GENERATED

~_:J:.-.J --_-,*- - -*

(MWH) ... -. .. ;* .c. ;- .- . ; ; *.-* .--*~--.--. ; .... * ..* .- , .-  ?.n11i._i;71

- z--*z--- 5.699.?.99

12. REACTOR AVAILABILITY FACTOR (1) . . . . . . . *
  • 0 44.6 (48 .1)* 58.1 (60.2)*

0 44.8 57. 3 ,/

13. UNIT AVAILABILITY FACTOR (2) . . . . * . * * . * . .

0 38.2 49.4

14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . . . ----- -*2a.*9* -
15. UNIT FORCED OUTAGE RATE (4) . . . . . . * . . . . . 0 .43.6*

.16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPEiDATE, AND DURATION OF EACH}:

.Refueling: Commencing power approximately Apri 15, 1975; six weeks duration

17. IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: January 4, 1975
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

. DATE LAST DATE

. FORECAST ACHIEVED INITIAL CRITICALITY INlTIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION

' . .~

.~ -.  : .'

HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE

.- -- . ;. ** *. (2) UNIT AV Al.I.ABILITY FACTOR = -------,-----~---XlOO HOURS IN REPORTING PERIOD

. --*- - ~ (3) .

NET ELECTRICAL POWER GENERATED UNIT CAPACITY FACTOR =

. MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

_FO_RC_E_.D__ O_U_TA_G_E_H_O_U_R_S_ _ _ _ _ _ _ _ _ _ _ _ _ X lOO UNIT FPR<:'ED OUT AGE RATE HOURS'GENERATOR ON LINE+ FORCED qUTAGE HOURS

_COJUPU.t~~  ?-S fo;Llows: Hours Reactor Critical + Reserve Shutdown Hours x 100

-;'""-' *___ Hours in Reporting Period

. .;.  :~ :

~j'

,:~; )~ .;;+~~,~ >;

U'~it N~ ~ : *1:_,'. ;

  • .,.. OPERATING STATUS ...:*.

.. *.:: ' .*' --... - - =~- ~;; ~ .. ---*"';.:*.

l. REPORTING PERIOD: - - 0001 ------------

750101 .. - _THROUGH 2400 7 50131

_ ___;;;;;...;....:;,.;:;.__.;...;:;;..;:;..::.;:=-._ _ _ _ __

HOURS IN REPORTING PERIOD: _ _ _ _...;7_4'-4'-.---:~,--------------------

2. . CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788 3.. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

. 4. . REASONS FOR RESTRICTION (IF ANY):

THIS . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

  • s. .HOURS REACTOR WAS CRITICAL. . . . . . * * . * . * . '. -_ _ 6_6_3_._3_*_,_* 663.3 .,;
  • .\
6. . REACTOR RESERVE SHUTDOWN HOURS *. . **** 0 0
7. HOURS GENERATOR ON LINE *........*..*.**.. _._ _ 6_4_1_._4__ 641.4 9,025.6
8. UNIT RESER VE SHUTDOWN HOURS . . . . . . . * * . . 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) ....**.*..******.***** : _' 1,371,463 1,371,463 19,596,252 -, - -~:. .
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . * . * . * . . . * * * * * * * * * * * . y 44 7, 815 447,815 6,470,282 - .. **

. 11. . NET.ELECTRICAL ENERGY GENERATED 424,102 424.102 6,123,401 (MWH) .*..*.**- , **. * . . . . . . . . . . **.***.*.** *-) . ' .

12. REACTOR AVAILABILITY FACTOR (1) * * . * * * . .
  • 89.2 89.2 59.6'
13. UNIT AVAILABILITY FACTOR (2) . * . . . . * * . * *
  • 86.2 86.2 58./
14.
  • UNIT CAPACITY FACTOR (3) . . . . . . . * . . * . * *
  • 72.3 72 .* 3 50.5
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * * . . . 11.2. 11.2 27.9

. 16. SHUT.DOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling - April, Cl.pproximately six weeks * . . * *

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -

. 18.

  • UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

.

  • DATE LAST DATE
  • -  :., ' . FORECAST ACHIEVED
    • INITIAL CRITICALITY

. . ~. . . *, .,'

~:.*

.: ~" .. INITIAL ELECTRICAL

. . : -:* ~,.

POWER GENERATION COMMERCIAL OPERATION

. I:* - -.:

HOURS REACTOR WAS CRITICAL

.; ;..* (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE .. *...

,['*

(2) . UNIT AVAILABILITY FACTOR -----------~x100 , ,'* ~.~ ~- ... ~.-;* I .; >~:. .

HOURS IN REPORTING PERIOD  ;--

NET ELECTRICAL POWER GENERATED

,-'(3)

  • UNIT CAPACITY FACTOR .=

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

  • G~--"~*--c**-*(4) : UNIT FOR~ED OUTAGE RATE FORCED OUT AGE HOURS -

HOURS GENERATOR ON LINE+ FORCEDOUTAGEHOURS -* X lOO.

,\ ..*

\ ,*

= -- ..,...,,,,"_a_..._..,..,.....#..,... .....,_ . ..

. . .**" ~ .

_,=---....r:'~c'.-::.~ ...._,,n:!'l'.."':"'!':'!'.~~ .,.._.,,<:.":--1""'.""$' "..,...-~-,....-.:""

._.,..-ip-,.,...*~*-.*~~,.~r !".....,... * .,,~*.:-:~---~-"":- .:-r,:;:'J'r:a-~~*-**._......,._,..,,-

    • -..._....,.,--_.., .. ~-.--.. ...,.... ..,,..,.,,.~:SN<~

. *'.: .-. ~**

    • -, ... ** ' .* *:*r~ected .copy

' 'UNIT Surry *Unit No. *2 DATE 3-3-75 W*. C. Earl*

--.. ~~ .'

50-281

*~ .. *~** : *.*' :- ... ': - . ... ~

.*. '* ~- ' .

,._ .' ()l'ERATING STATUS *:,, \.._

  • 1~ REPORTING PERIOD: _ _O_O_O_l___;,_7_5_0_20_1'--------- THROUGH ---=2:o-4;__;0,_,0'--~7=5=0=2=28"'---'-----

.. <:-: . . -- , HOURS IN REPORTl~G PER!OD:_fil(

. 2. . CURRENTLY AUTIIORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDAllLE CAPACITY {MWc*NET) 788

. 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED {IF AN~:) (MWe-NET): _ _ _ _ _ _ _ _ __

4. REASONS FOR RESTRICTION (IF ANY):

THIS

  • CUMULATIVE

'**~

REPORTING PERIOD YR TO DATE TO DATE

5. HOURS REACTOR WAS CRITICAL ...**.******* 655.9 1,319.2 9,828.2
6. REACTOR RESER VE SHl!TDOWN HOURS *.**.** . 0
7. HOURS GE:-.:ERAIOR ON L!~E. .....********* . ~-, 6 8il.1L. ,
8. UNIT RESERVE SHUTDOWN HOURS .**********

0 .

~ GROSS THERMAL ENERGY . . ..

. , - GENERATED (~fWH), .*.*.************ ~ ~ **. 1,539, 183 2,910,646 21,135,435

      • --***~10. GROSS ELECTRICAL EJ\'.ERGY
  • * . -GENERATED {MWH) ....**.*.************ 505,670 953,485 6,975,952
  • I  ::;.  ;-:II.
  • NEl ELECTRIC...\L C~ERGY GEZ..:ERliTI:D

~,;

f. -:~. (MWH) **.***..***.***.******** ~ **** SU4,650 6,603,955

-'\;i:...~.

  • ~ 12. * --RI::ACTCR .~ VA1~_.\BlLrf'{ f ~".C'IOR. (lj ******** **.. 97*.6 -~6~1~-*=?- .. - - , .. --
  • 0 13~ *UNIT A \'AILABILITY FACTOR (2) *.*.********

_,*97,..f:J _ _ 60. 3 ,

14. UNIT CAPACITY FACTOR (3) ..*.***********.

. 90. 7. 52.2 *'I

  • - c~~lS. UNIT FORCED OUTAGE RATE (4) *.***.****** 2.4 ./ 26.7 I
-16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
  • Refueling scheduled April 25, 1975; approximately 6 weeks *
  • ':***17. *IF SHUT DOW~ AT END OF RErORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ _ __
        • 11.
  • ti'NITS IN TEST STATUS {PRIOR TO COMMERCIAL OPERATION) RErORT THE FOLLOWING:

DATE LAST DATE

.* .. . FORECAST ACHIEVED

....... INITIAL CRITICALITY

.- . '. . ;*' INITIAL ELECJ:RiCAL POWER GENERATION

.- -*** *.* .:: *.,: -: COMMERCIAL OPERATION

  • *" :'.-~:* .;  :. : - .

HOURS REACTOR WAS CRITICAL ' .. _-*.

(I)* REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD

. - .. ~' - . .. *, " :*

HOURS GENERATOR. ON LINE

~ ~ ~~~(2) *:*;UNIT AVAILABILITY FACTOR = -~-'--~~~~~~~-~x100 HOURS!:-! REPORTING rERIOD  ::: ; *' ~... ~ .-. :..

  • Nf.T EUTTRICAl. POWF.R CF.NERATF.D MAX. DEPENUABLE C.-\rACITY tMWc-NET) X HOURS IN REPORTING PERIOD

-FORCED OUTAGE llOURs*

. ~) *.. -""'<4) = ~~~-~~~~~-~-~--~~----XIOO HOURS GENJ::ltATOR ON LINE+ FORCED OUTAGE HOURS

~;-

I>.:

.* ... :: *~ .... **. ,,.*. * .. *-*;

.. ' ' .' . . . .. . . . ., . ~

-~ ."

~ ~- .- . ~--~: ~:. ~.:. ~~ -~-. ~4*. _* ~!~- ....:~**-**--

~. *1 _., -*,.*.

- ..... . < ,.. * . ~- *.... . _,._ ... *. *, .,,_.

'.*** . . . .¥ **

. " ~: '

' ~- .. ._ .

, . , . .'""UNIT Surry Unit No. 2

- . (r.:*,~*~/: ..~. .,* ,,- .

\

.. \._ '.:<* - ... *: :DATE 4-2-75

  • -. -: . - - ~ ._, . . .

CO~~LETEDBY W. C. Earl

' ..:.~~:-*_*\.;:. ~
  • .: ~: * ', ** * ~- ' ** *< ***

. -.*~

'. ' . ~CKET N0._5_0_-_2~8_1_ _ __,__. *.. '

  • *. *.:*** . ' .;. ~ ... ...

--.i-. *' **- .. ,* .. '

~- - -* .. . .. . *.

... _.;_ ~

._. *~*: .

OPERATING STATUS ,'

1. REPORTING PERIOD: __o_o_o_1_--'-7-"--5-'--03-"--o"-1~----- THROUGH __.2~4--=0'-"0_ _._7=-5-=-03=3=1=------

HOURS IN REPORTING P~RIOD: __7_4_4_ _- ' - - - - - - - - - - - - - - - - - - - - - - -

. 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) .-7'"""8"""'8"---

3. LOWEST POWER LEVEL TO WHICH SJ.1'.CIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4.
  • REASONS FOR RESTRICTION (IF ANY):
  • THIS CUMULATIVE
  • ** J REPORTING PERIOD YR TO DATE TO DATE

'- S. HOURS REACTOR WAS CRITICAL. . . . . . . * . . . . . 719.4 2,038.6 10,547.6

- 6. REACTOR RESERVE SHUTDOWN HOURS ..*...* 0 0 _*o

.. 7. HOURS GENERATOR ON LINE . . . . * . . . * * * * . . . 690.3 ..:...1,986.~* _J.0,370J_

  • 8.
  • UNIT RESER VE SHUTDOWN HOURS . . . . . . . . **.* Q 0 0
9. . GROSS THERMAL ENERGY GENERATED(MWH) . * . . . . . . . . . . . . * * , *.** 1,634,413 .4, 545 '059 22,769,848'
10. GROSS ELECTRICAL ENERGY

<JENERA TED (MWH) .............*..**.*** 540,860 1,494,345 7,516,812

11. NET ELECTRICAL ENERGY GENERATED 1,41-8 ,309 .., 11 o 1 no l ... , * .&._.&.V , . .&.UV (MWH) . . . * * . . . . . * . . * . . . . . * * * . * * * . * *
12. REACTOR AVAILABILITY FAC:'OR (1) * * * . * . . .
  • 96.7 94.4 62.8 92.8 - -_9_2.Q:_ 61.7 --.....
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . * . *
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . * . . . 87.7 83.4 53.8
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 0 5.6 25.4
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling scheduled April 17, 1975; approximately six weeks

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - - -
18. UNlTS IN TEST STA tus (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DA TE

'::~'.

FORECAST ACHIEVED  ;"~

-  ;" INITIAL CRITICALITY

.*:~1-~:

.. lNITIAL ELECTRICAL POWER GENERATION

. i.

. .... COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACfOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100

  • . (2)

HOURS GENERATOR ON LINE UNlT A VAiLABILITY FACTOR ~--~-~~~-~---XlOO HOURS IN REPORTING PERIOD NET E.LECTRlCAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD (4) UNIT FORCED OUTAGE RATE *_FO~RC_E_D_O_U_T_A_G_E_H_O_U_R_S~~-~~----~-~XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

\ *,,

.*:\\

.\

.~*..

\.

\

\

"':: . Corre~ ted Copy*

  • .. 1 :.:.:. *-. ' .* - .

~*.

,j:.. -, . **

No. 2

, ,;~:CO~P~ETED BY W* C * - Ear 1

< . ~t~ET No:_5_;0;;,...-_2_8~1;;,...*_ _ _ _.

-~* .: .:;;.  ::.......-:.

. OPERATING STATUS

  • .. ..<°:".*' -***- "

l.' REPORTINGPERIOD: 0001 750401 THROUGH 2400 750430


~ ------'--------~

. HOURS lN REPORTING PERIOD: _ ___;7;_;2::..0::.___-,,.-,.-,-,...-------'-------------

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

! THIS. . CUMULATIVE

.

  • REPORTING PERIOD YR TO DATE TO DATE HOURS REACTOR WAS CRITICAL .. ~ ...* - * : .* , . 583.1 , . 2621~7 11, 130. 7 REACTOR RESERVE SHUTDOWN HOURS . . . * '* .* 0 0 0 HOURS GENERATOR ON LINE . . . . . . . * * . . * . . . 578.2 .1_,564. 7 10,946~9_

UNIT RESERVE SHUTDOWN HOURS . . . . . . . . * .

  • 0 0 --'--* Q _-_ ( '

GROSSTHERMALENERGY

  • GENERATED (MWH) . . . . . . . . . . * . . * . * * ~ ~.. 1,355, 720 5, 900, 779 24,125,568 GROSS ELECTRICAL ENERGY

-GENERATED (MWH) . . . . . . . . . . . . . . * . * * * ; : 450,290 1,944,635 7,967,102 NET ELECTRICAL ENERGY GENERATED

.. ---~*-..:!.*".' . (MWH) ...* .*.... _, ................ , .*..**. 1,846.720 7,546,019 REACTOR AVAILABILITY FACTOR (1) *******. ,


91-. 63~5 UNIT AVAILABILITY FACTOR (2) . . . . . . * * * * *

  • 80.3 89.0 62.5 UNIT CAPACITY FACTOR (3) . . . . . . . . . * . . * * . 75.4 81.4 54.6 UNIT FORCED OUTAGE RATE (4) . . . . . . . * * . .
  • 0.0 4.4 24.4 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 15, 197 5 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION *,.

COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I). REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE

. (2) UNIT AVAILABILITY FACTOR = ------------x HOURS IN REPORTING PERIOD 100 NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET)-X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS (4) UNrr fORCED OUTAGE RATE  ;;_;;_-=.==-..::..:...:..:..:.:::=.~.=..;~-----------x100 HOURS GENERATOR ON-LINE+ FORCEDOUT-AGE.HOURS-

~.-

- _.... -

  • _Cole-c ted Copy : .

..... ... ~: . *-

I*.*

.' -  :.*~

____ , .u~;; .-Surry *unit' No'~ 2

--~

"* ;,~  :-=\ *-"i * *, '

,'~;
:~-~:,i>A~E 'June 3, 197 5

'. ~* . . . . -

',-{-~COMPLETED BY .- W* C

  • Ear 1

'.\.--...., /

. : .:. ,;_* :,_:_5:5; :. DOCKET N0,..;5:..0::.-_,2:_:8"--'1.___ _ __

OPERATING STATUS .*

l. REPORTING PERIOD: 0001 750501 THROUGH_~2~4~0~0-~7~50~5~3~1=-------

HOURS IN REPORTING PERIOD: 7 44


~-----------~

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3.
  • LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _......;;_ _._
4. REASONS FOR RESTRICTION (IF ANY): .

THIS , CUMULATIVE

  • REPORTING PERIOD YR TO-DATE TO DATE
s. HOURS REACTOR WAS CRITICAL. . . * . . . . . . . * . 0 2,621. 7 11, 130. 7
6. REACTOR RESERVE SHUTDOWN HOURS . . . . * *
  • 0 0 - o..

-7. HOURS GENERATOR ON LINE . . . * . . . . . * . * . .

  • 0 ~' 5fi.E:..J" - '..10, 9~..8.9:..
8. UNIT RESER VE SHUTDOWN HOURS * . . . . * . . . *
  • 0 0 - 0 9.' GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . * * . . * * * * * * .
  • O* 5,900,779 24,125,568 l_(). GROSS ELECTRICAL ENERGY

<iENERATED (MWH) . . . . . . . . . * . * * * . . * * * *

  • 0 1,944,635 7,967,102 f'.'.L1 11. NET ELECTRICAL ENERGY GENERATED

--\;j;J (MWH) * . ** : -. -:- . ~--; : ; :-:-;-. . ;- ; . *; - .-~ * * * * .- -. .-

0 1,846,720 7 ,546,.019 0 72.3. . --,-60-~ 9

12. REACTOR AVAILABILITY FACTOR (1) . * * * . . * . *
13. UNIT AVAILABILITY FACTOR (2) * * . * . . * * * , ** 0 70. 7 59.9
14. UNIT CAPACITY FACTOR (3) . . . . * . . . . * . * * *
  • 0 64.7 52.4
15. UNIT FORCED OUTAGE RATE (4) . . * * . * * * . * * ** 0 4.4 24.4
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH}:
17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 15' 1975
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

. FORECAST ACHIEVED

.INITIAL CRITICALITY

' *. ~

INITIAL ELECTRICAL POWER GENERATION

' COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (l) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR -------------x HOURS IN REPORTING PERIOD 100

._..NET. ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS ...

_ _;;,,......;_:._;__~--.:.--'---'---.;;__:;:..__-'--.:..=...~~~--x100

_,(4) UNIT FORCfD OUTAGE RATE HOURS GENERATOR QN LINE+ FORCED OUTAGE HOURS

. >>~*-. '. ; *."_;-.,,, *' ._.

  • .* Corrected Copy '

-~r:

~

.. -.*-:* . . . **-~

UNIT Surry Unit No. 2 DATE July 2, 1975

,~ .. COMPLETED BY w~ C. Earl

  • ><> ooc.KET No._5_ 0_-_2_8_1_ _ _ __

... : -*~ .

.. . OPERATING STATUS

, .. - * .. *-,-~- *- *.

. l. REPORTING PERIOD: 0001 750601 THROUGH_2_4_0_0~~7_5_06_3~0~~~~~

HOURS IN REPORTING PERIOD: 720


.,.------------------~

  • 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788 _.; ... _
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

. 4. REASONS FOR RESTRICTION (IF ANY);

THIS . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL . . * . . . . . . * . . . *385.4 3007.1 11 2 516.1

6. REACTOR RESER VE SHUTDOWN HOURS * ; *.... 0 317. 6 '

0 --=-- 'Q. ,t.

7. HOURS GENE:.~ATOR ON LINE ........**....*** _: 2' 882.~ 3.. .ll,266.5
8. UNIT RESERVE SHUTDOWN HOURS ..* - .****.. 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . * . . . . * . * . * * * .
  • 720,968 6,621,747 24,846,536
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . . **.*..*. *. 228, 82 7 2.173,462 8,195.929
11. NET ELECTRICAL ENERGY GENERATED (MWHJ ...... *... *; *: ~ . . . . . . *~ .. ; ... "' *. .- * *.-. *-
  • 216,234 2,062.954 7,762,2~3

"'., 53.5 69.2 --- "60~ 7-- --

12. REACTOR AVAILABILITY FACTOR (l) . . . . . . . . *

' 13. UNIT AV AlLABlLITY FACTOR (2) . . . . . . . * . * *

  • 44.1 66.3 59.3*
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . .
  • 38.1 60.3 51.9 lS. UNIT FORCED OUTAGE RATE (4) . . . . . . * * . . . . 3.0 4.3 23.9
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
  • DATE LAST DATE

. FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION

  • COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

.. (1) REACTOR AVAILABILITY FACTOR HOµRs IN REPORTING PERIOD .

x 100 HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

_FO_R_C_E_D_O_UT_A_G_E_H_O_U_R_S_ _ _ _ _ _ _ _ _ _~XlOO (4) .. UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

... .
~ . :* _ ......._;. . : .*-~ .. *~. . *.
.;.. :.~*~i~ Surry *unit No. 2

. : :. *,{~-:,~j:,,~ ' .: .

' *:--:..::.::~/ ... ;._,,,~iiiAugust 4, 1975

~,.~~
t~MPLETED BY w. c. Earl
  • . '>* .::;:. ::~::'*~-~DOCKET N0. _ _5_0_-_2_8_1_ _ __
  • . ~*, ~
  • r * '< ' * ** :.* .'.' * *
  • .*~ :/'//:*.':_.,_ ,. *.-.'.. ~*~; ;'" .*::. .r* ~ . * * '

OPERATING STATUS -;

1. REPORTING PERIOD: 0001 . 7 50701 THROUGH _ _2_4_0_0__7_5_0_7_3_1_ _ _ __

744 2.

HOURS IN REPORTING PERIOD:

. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441


=-.,....,...,...------------------------------

MAX. DEPENDABLE CAPACITY (MWe-NET) __,7_,8...,8..__

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __  : j*
4. REASONS FOR RESTRICTION (IF ANY):

THIS . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL . . . . . . . * . . . .

  • 622".9 32630.0 122139.0
6. REACTOR RESERVE SHUTDOWN HOURS . * . . . . . ____..0____ 0 *- o'-.:
7. HOURS GENERATOR ON LINE. . . . . . . . * * * * . .* * -~ 19
  • 0 -3..,.,201. 3 .* _\l, 885 _._l:
8. UNIT RESER VE SHUTDOWN HOURS . . . . . . . . * *
  • _ _*_0_ __ O* 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . * . . . . . * * . * * * * * * ... , 1,484, 126 8,1052873 26,330,662
10. GROSS ELECTRICAL ENERGY

-GENERATED (MWH) . . . . . . . . * * .* . . . . * * . * * "

  • 483,045 2~656.507 8.67.S.27!t
11. NET ELECTRICAL ENERGY GENERATED (MWHr . . . . *.- .-; ** .* -.->;-. ; . ;*; -;*;*;--. -.- ;- .-.. , , .. 458. 372 2.521.326 8. 220 ,_6.~..? .. .,-;;*~(* . ,'\,r * '.
12. REACTOR AVAILABILITY FACTOR (I) . . . * * . . * , 83.7 71.3 61.5
13. UNIT AVAILABILITY f ACTOR (2) . . . * . . * * * * *
  • 83.2 68.8 6Q.Z
14. UNIT CAPACITY f ACTOR (3) . . . . . . . . . * * . * * . . 78.2 62.9 52.9
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * . * .
  • 16.8 6.7 23.6

. 16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

I7. IF SHUTDOWN AT END OF REPORTPERIOD,ESTIMATEDDATEOF STARTUP: ___________________

I8. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

. FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x IOO HOURS GENERATOR ON LINE

-*(2) *. UNIT AVAILABILITY FACTOR --------------------XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED

"(3) UNIT CAPACITY FACTOR =

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

_F_O_R_CE_D __O_U_T_AG_E_H_O_U_R_S_ _ _ _ _ _ _ _ _ _ _ _ _ _ XlOO

  • (4) '* uNIT FORCED OUTAGE RATE =

HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

  • ~- ** *_., .* .. .~;**: ".'.* :: Corrected Copy ,

. ;*-,~;-:.:-~ .. '~~:-.: ::,-~..~--~.  : .-*~-~*----  ;-,~~:.:~~~~;.-~.:**i *:.:..*.:-..- .

. ' - :_;:.f!~ ~~-:-~~ .. ) ,;\;-~-~:~~ <.:---:.~~;.~*:*.~:ifJ,~:~_~';:_~~~~;~.-:' . :;~:*:..;->_ ~-: *-,~{~--~<*~~~~:-~:. : > "*.*' ... -..

    • UNIT Surry Unit. No. 2,

-<<~ _'.

  • DATE Oct. 1, 1975

. 'coM~LETEDBY w. c. Earl

~- .

. ' - '**

  • OPERATING ST ATUS

.. . . -.*:*.,***** . ~ .. *,_,_.:*

1. REPORTINGPERIOD: 0001 750801 THROUGH _ _2_4_0_0_ _ 75_0_8_3_1_ _ _ __

HOURS IN REPORTING PERIOD: _ _7_4_4___-:::-'.=--=-"=-----------------=-=---

2. CURRENTLY AUTHORIZED POWER LEVEL (MW th) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) _7_8_8_ _
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S.

  • HOURS REACTOR WAS CRITICAL. . . . . . * * * * . . . *735.4 4,365~4 12,874.4
6. REACTOR RESERVE SHUTDOWN HOURS . . . . . *
  • 0 0 __ o__
7. HOURS GENERATOR ON LINE . . . . . . . . * * . . * * . 730.0 A,231...i_ _.t'.2,615.l S; UNIT RESER VE 3HUTDOWN HOURS . . . * . . * . . .
  • 0 0 0
9. GROSS THERMAL ENERGY GENERATED(MWH) . . . . . . . * * . * . . * * * . * . * * . 1,696,860 9,802,733 28,027,522
10. GROSS ELECTRICAL ENERGY
  • -GENERA TED (MWH) . . . . . . . * . * . . . . * . * . * *
  • 541,690 3,198,197 9,220,664

! !. ~!~T EL~~TR!CA*L ENF.RGY GENERATED (MWH) . . . . . . . . . '. *. '. .. : ........ ', *.... _. : : :* ** *513; i34 -~3,0J4,.460 8,733,759

. 12. REACTOR AVAILABILITY FACTOR (1) . . . . . . . .

  • 98.8 74.8 62.9
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . * . . 98.1 72. 5 61.6
  • 14. UNIT CAPACITY FACTOR (3) . . . . . . . * . * . . . * . 87.5 66.0 54.1 15: UNIT FORCED OUTAGE RATE (4) . . . . . * . * * . . . L9 5.9 22.6
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STA tus (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
  • DATE LAST DATE

. FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE (2) UNIT AVAILABILITY FACTOR* ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

.c.) (4) UNIT FORCED OUTAGE RA TE FORCED OUT AGE HOURS..--* ._ - *- . .

-~--------~------~-~X HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 100,

I.**, -*,* .

    • a
l

~,  : .... -

  • rrected Co_py UNIT Surry Unit No
  • 2

- DA~E Oct* 1,. 197 5 COMPLETED BY w. c. Earl DOCKET NO~

281

- OPERATING STATUS

l. REPORTING PERIOD: 0001 750901 750930 HOURS IN REPORTING PERIOD: 720

,--.,.....,....------------------~

2. CURRENTLY AUTHORIZED POWER LEVEL (MW th) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) _,7""'8""'8=---
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS - CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL . . . . . . . . . . . . . 711.4 52076.8 132585.8

6. REACTOR RESERVE SHUTDOWN HOURS ...... . 0 0 ~ 0_:____._ -
7. HOURS GENEP.A TOR ON LINE . . . . . ,. . . . . . * . . . 707.9 4~_939.,2_ ~12,_,_3_Z]~,~

. 8. UNIT RESERVE SHUTDOWN HOURS . . . . . . . . . . . 0 0 0

9. GROSS THERMAL ENERGY GENERA TED (MWH) . . . . . . . . . . * . . . . * * . * *
  • 1,627,476 11,430 '209 29,654,998
10. GROSS ELECTRICAL ENERGY

-GENERATJ;:D (MWH) . . . . . . . . . . . . . . . . * . . . . 5252095 327232292 9 2 745 2 759 r:--:~*.) - 11. . NET ELECTRICAL ENERGY GENERATED

--=-':d-1"'-- *. .(MWH) . . . . . . . . -.. ; . * . . . . . . . . * . . . . . .

  • h.97.n5l 3.532.~Ul 9.231.410

.-* *- - ,'. ~ -

12. REACTOR AVAILABILITY FACTOR (1) . * * . . . . * . . 98.8 77 .5 64.1
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . . . . 98.3 15.4 62.2
14. UNIT CAPACITY FACTOR (3) ..........*..*. 87.7 68.4 55.3
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 1. 7 5.4 21. 7
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ __
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DA TE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE (2) UNIT AVAILABILITY FACTOR ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) t,JNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

_FO_R_C_E_D_O~U_TA~G_E~ __ H_O_U_R_S_ _ _ _ _ _ _ _ _ _ _ _ XlOO (4) UNIT FORCED OUT AGE RA TE HOURS GENERA TOR ON LINE + FORCED OUT AGE HOURS

  • .~* .

'.  :, . : . ~ .*.

. . . .. *-~- _:;:_,. : .

-- ...,- * ~*: .* ,.: ~~N;T

-  : *.~ .. . * ,**.

-*~: _._*:,f*.*~::**.'.JJ .:._ '** ~-:-.*: *--~ ' -'-.-~. Surry Unit No. 2

. . / ..,.. ( - - _.' _.. __ ;:_;<;.. ~.~ :,..,:~.... -'"-"-:__7 -~' -,;.,~*:..,.-.~~-~- * -

  • .-*. <.; . ' -~ ~DATE Nov. 5, 1975 .

.:, . - . .:c~~P~ETE~ BY w. c. Earl.

...... *:-* ** *,_.,*._,,*", ,-,*_.* **** , ; 'C,,'..;'  :*.,

  • - ~

OPERATING STATUS

1. REPORTING PERIOD: _ _o_o_o_1__7_5_l_O_O_l______ THROUGH _ _ _ 24_0_0_ _7_5_1_0_...3_1_ _ __

HOURS IN REPORTING PERIOD: _ __,_.... 4...__ _ _- - , - - , - - - - - - - - - - - - - - - - - - -

. 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) ..._7_..8.... 8"---

. 3.. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): _ _ _ _ _ _ _ _ __

4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE

.REPORTING PERIOD YR TO DATE TO DATE

s. HOURS REACTOR WAS CRITICAL . . . . . . . * . * ** .* 579.8 5,656.6 14,165.6
6. REACTOR RESERVE SHUTDOWN HOURS ..*..** 0 0 _-o__- .p.*
7. HOURS GENERATOR ON LINE . . . . . . . . . * . . . .
  • 368.6 -5,:SDLB...- ., 3, s91. 6-
8. . 0 . 0 0 9.

UNIT RESERVE SHUTDOWN HOURS . . . . . . . * . * .

GROSS THERMAL ENERGY GENERATED (MWH) ............*..*..**. : 1,356,951 12,787,160 31,011,949

10. GROSS ELECTRICAL ENERGY r:*-.......

. GENERATED (MWH) .........*.*.**.*.*** 446,835 421702127 1021922594

( 1*.j* -1 i. *.NET ELECTRiCAL [.?'~En.CY .GENERATED

~;_;-- 424,7i4 ,...,, nr:J.: O'lC::

~2::1JU2UL.J 0 ,;c;,; 1 ?li.

~--!2"":.'~-2--*

(MWH) . . . . . . . . . . * . . . . . . * * . . * . * * * . * *

12. REACTOR AVAILABILITY FACTOR (1) . * * . * * * *
  • 77 .9 77 .5 64.6
13. UNIT AVAILABILITY FACTOR (2) . . . . * . . . * * . . 76,4 ZS.5 63.3 14 . . UNIT CAPACITY FACTOR (3) . . . . . . . * * * . . * . . 72.4 68.8 55.9
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . .
  • 23.6 7.6 21.8
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH);

Refueling April 15, 1976; approximately six weeks .

17. IF SHUT DOWN AT END OF.REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING: ..

DA TE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION

-.*,' COMMERCIAL OPERATlON *
*
S.

HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 .*.: ...

I:/.

. '. ~

_H_O_U_R_S_G_E_N_E_R_A_T_O_R_O_N_L_I_N_E~~XlOO  ::;:.

(2)

~~ :~..~ ~~-

UNIT AVAILABILITY FACTOR HOURS IN REPORTING PERIOD

. .. ~.

*!~:

. -~!:

NET.ELECTRICAL POWER GENERATED ,,.

(3) UNIT CAPACITY FACTOR =  ;;*

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

  • t-rf.,,*~~--'-**

CJ (4) UNIT FORCED OUTAGE RATE __

FORCED OUTAGE HOURS - * --------------- * - - *- * ---

H_O_U_R_S_G_E_N_E_R-AT_O_R_O_N_L_IN_E_+_F_O_R-CE_D_O_U_T_A_G_E_H_O_U_R_S_X lOO . '. ~;

-.. :f.

~r

___ *_._ CORRECTED COPY

~ *- *-

.-/-*. -...;_ UNIT Surry Unit No .. 2

~*

  • . DATE Dec. 1, 197 5

. COMPLETEDBY w. c. Earl DOCKET No._5_0_-_2_8_1_ _ _ __

OPERA TING ST A TUS

1. REPORTING PERIOD:

0001 7 51101 THROUGH HOURS IN REPORTING PERIOD: _ _7'--2=-0.:___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~-

2400 7 51130 2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 7 88 3-. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

5. HOURS REACTOR WAS CRITICAL . . . . . . . . . . - . . 720 6,376:6 14,885.6
6. REACTOR RESERVE SHUTDOWN HOURS . . . . . .
  • 0 0 - 0
7. HOURS GENERA TOR ON LINE. . . . . . . . . * . . . .
  • 7 20 -6,227~ ..1. ~-,.._6ll_&.
8. UNIT RESERVE SHUTDOWN HOURS . . . . . . . . . * . - _ _ _0_ __ 0 0
9. GROSS THERMAL ENERGY GENERATED(MWH) . . . . . . . . . . . . . . . * * * * .
  • 1,725.269 14,512,429 32,737,218
10. GROSS ELECTRlC'AL ENERGY
  • -GENERATED(MWH) . . . . . . . . . . . . . . . . * . . * . 570,275 4,740,402 10,762,869

.. !l. NET E!..ECTR!CA I. FNERGY GENERATED

{MWH) ... ., . . . . . . . . . . . . . . . . . * . . * . **:. 10, !98,653

12. REACTOR AVAILABILiTY FACTOR (1) . . . . . * . .
  • 100 79.5 65. 7.

. 13. UNIT AVAILABILITY FACTOR (2) . . . . . . * . * . . . 100 77. 7 64.5

14. UNIT CAPACITY FACTOR (3) .....*..******. 95.6 71.2 57 .1.
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 0 6.8 20.9
16. -~*SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling April 15, 1976; approximately six weeks

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DA TE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL _OPERATION HOURS REACTOR WAS CRITICAL (1) . REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE

  • .ii.(2) UNIT AVAILABILITY FACTOR -----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED

--~*5;(3) ..'..:UNIT CAPACITY FACTOR

_=  ::MAX: DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

-_F_O_RC_E_D_O_U_T_AG_E_H_O_U_R_S_ _ _ _ _ _ _ _----XlOO

'_ ::;(4) * - -UNIT-FORCED OUT AGE RA TE

  • .HOURS GENERATOR-ON LINE+ FORCED OUTAGE.HOURS
  • '., ._ ~.. - .

'. ' \: ;.";

-. *., *~- *.

~-**. >-:::-_~;:; .' . >:;.-.,-..-.

  • - I '  ;"
:::.-::.:~.:<:.>*

- ',- .; -.y*..

!* .. *"' , ::, ~,,;,: ;;: UNIT Surry Unit No *

,:, .~  ;

,,*'. *-: -... *-.:;.* . . .-.;:... ; *: *. :, - ,~-o; ...:, *. , -. --; -, .. * - . . -

-~' - . ... , -.

  • -:_.;: * -~ 0 \::~:<J>ATE Jan. 2, 1976

._.. ,., .. , '  ::~.COMP~E~ED BY W* C. Earl

.*. -* ~

.__ -. 50-281

    • . ;,_:,-*OPERATING STATUS
_-_ ~ (  :~ . ',-_ :._-- .:, . :*~--

.- - *~~. .~ -.

l. REPORTING PERIOD: 0001 751201 751231

. HOURS IN REPORTING PERIOD: _ _ _ 7_44_____________________ --=--

.. 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 -MAX. DEPENDABLE CAPACITY (MWe-NET) 788

  • 3.
  • LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):
    • THIS_. CUMULATIVE REPORTING PERIOD . YRTODATE TO DATE S. HOURS REACTOR WAS CRITICAL . . . . . . . * . . . . . 744 7,120.6 15,629.6 *.*
6. REACTOR RESERVE SHUTDOWN HOURS . . . . '. .* 0 0 .. ~ _o.  ;

1- HOURS GENERA. TOR *oN LINE . . . . . . . . * * . . . . . 744 ~971.8 ..15., 355...n._ . . (,

  • 8- UNIT RESER VE SHUTDOWN HOURS . . . . . . * . . *
  • 0 0 0
9. GROSS THERMAL ENERGY
  • .. GENERATED (MWH) . : . . . . . * . . . . . . * * * * * .
  • l, 770, 915 16,283,344 34,508,133
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . . . . * . . . *...**.*. 582,690 5,323,092 11,345,559 *.

! 1. Nt:=:T ELECTRICAL ENERGY GENERATED

. * *** * (MWH) . : . . . . ~~-. -:-*:--:-: .-*. -~ ~-~ *.* -.' : .** '. *. 553 ~ 728 - .5,053,082. 10.752y381*

12. REACTOR AVAILABILITY FACTOR (I) . . * . . . . . . 100 81.3 66.8
13. -* *UNIT AVAILABILITY FACTOR (2) . . . . . . * . * * . . 100 79.6 65.6

' -14. UNIT CAPACITY FACTOR (3) . . . . . . . ; . *. . . . * . 94~4 73.2 58.3 lS. UNIT FORCED OUTAGE RATE (4) . . . . . . * ; ..*. O* 6.1 20.l

- * *:-.SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

_*Refueling; scheduled April 15, 1976; approximately six weeks *

"17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ __

18*. *. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL'OPERATION) REPORT THE FOLLOWING:

DATE LAST . DATE

.. -* . FORECAST ACHIEVED

.**:INITIAL CRITICALITY INITIAL ELECTRICAL

    • POWER GENERATION

~. *. . * . COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

.. *(I) * *. REACTOR AVAILABILITY FACTOR XlOO HOURS IN REPORTING PERIOD

_H_O_U_R_S_G_E_N_E_R_A_T_O_R_O_N_L_I_N_E_ _ X lOO

  • : -.::,.~'(2) -::-'UNIT.AVAILABILITY FACTOR HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED

.. *. ::!i(J>*;:;/UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

  • -~- FORCED OUTAGE HOURS
    • (4) UNIT FORCED OUTAGE RA TE

= . HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS X lOO

    • ~ .. ' ~.. ' '  ; *.

. :*" *- : *l *. ,' .,- .. '* - ,i,.-** ' * ; -.* *_,.:, _; _--. ;.*; ._ ,;~f _._7-,

-Y*/~;;r,,~);i:)~~;;:,~~it Sur~y Unit No~*

.y ...

Feb. 3, 1976

~***. , __ ,__:

W. C. Earl

.*l 50.....;281 .

. . :. -~

... ~"OPERATING

_ -~ .. '

STATUS

1. REPORTING PERIOD: 0001 760101 THROUGH _2_4'-"0'-'0----'-7""--60~*l"--'3~1'--'-----

HOURS IN REPORTING PERIOD: _ _ 74 _ 4 - - - - - - - - - - - - - - - - - - - - - - - - -

";z. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MW_e-NET): _ _ _ _ _ _ _ _ __

A. REASONS FOR RESTRICTION (IF ANY):

THI~. . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

(

S* . HOURS REACTOR WAS CRITICAL. . * . . . . . * * . ; . 548.4 548.4 16,178.Q_

0 0  ; .0 . -

6. REACTOR RESERVE SHUTDOWN HOURS . . . . . * * - - *---
7. HOURS GENERATOR ON LINE . . . . . . . . * * * * * * , 540.9 540.9 _!_5, 896.5*
8. UNIT RESER VE SHUTDOWN HOURS . . . . . . * * . *
  • 0 0 u 9; GROSS THERMAL ENERGY GENERATED(MWH) .......*...*.*.******** l,239,096 1,239,096 35,747,229
10. GROSS ELECTRICAL ENERGY

-GENERATED (MWH) . . . . . . . . . . . . . * . . * * * *

  • 408,380 408,380 11, 753, 939
11. N.ET ELECTRICAL ENERGY GENERATED

.-~>'**'

  • - - * **{MWH) *. ;-. * . . . . . . * . . .*. . . . . . * .-.-.--,--. * * * *.

387 _305* 387.305 11.139,686

73. 7%. 73.7% - -- -~67. 0%~ -"** ..
12. REACTOR AVAILABILITY FACTOR (1) . . . . . . . .
  • 1-3. UNIT A VAILABlLITY FACTOR (2) . . * . . . * . * * * ; 72.7% 72. 7% *65 .8%

. 14. UNIT CAPACITY FACTOR (3) . . . . . . . . . * . . * : .

  • 66.0% 66.0% 58.5%

ts . UNIT FORCED OUTAGE RATE (4) . . . . . . . * * . * : . 27.3% 27.3% 20.4%

..16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE T.YPEiDATE, AND DURATION OF EACH): .

Refueling; approximately six weeks April 15, ~lb

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

PATE LAST DATE

-FORECAST 'ACHIEVED

  • INITIAL CRITICALITY INITIAL ELECTRICAL
. *._;.** .POWER GENERATION COMMERCIAL OPERATION
  • 1*.

HOURS REACTOR WAS CRITICAL (1). REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE *.; ..

.- (2) UNIT AVAILABILITY FACTOR ------------XlOO *_ .. ;.*-

HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GENERATED

  • '* . ** (3) UNIT CAPACITY FACTOR *- . M"AX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS

. (4) UNITFORCEDOUTAGE RATE -~- . ~100 HQURS-GENERATOR ON LINE+ FORCED OUTAGE HOURS

~ . .

I ..

. ~- ..  :

2,* 1976

~ ~ \. *:- .,.,, . .. ~- ~: . :*, .

E.P. DeWandel 50-281

~'-~:

__ -: OPERATING STATUS * *

  • y* ' ** ** * *

' 2_4_00_. _7_6_0_22_9_ _ __

l. REPORTING PERIOD: 0001 760201 THROUGH_-_ _

HOURS IN JlEPORTING PERIOD: _ _..;;_6~9-"-6------------------------

. 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe*NET) 788

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): _ _ _ _ _ _ _ _ __

4, . REASONS FOR RESTRICTION .(IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE*

~- .

. - - S. *HOURS REACTOR WAS CRITICAL. . . . . . . . . . . * . 497.4 1045.8 16,675_.~

  • 6. REACTOR RESERVE SHUTDOWN HOURS . * * . . .
  • 0 0 _ _ Q__
7. HOURSG-ENERATOR ON LINE . . . . * . . . . * * * . . ** 495.4 1036.3 _16' 39J..*.9
8. 'UNIT RESER VF SHUTDOWN HOURS . . . . . * * . * *
  • 0 0 *- .0 -.'

-. 9. -. GROSS THERMAL ENERGY

.GENERATED(MWH) . . . . . . . . . . . . . * * * * * ;. *; . 1,186,517 2,425,613 36,933,746 IO *. - GROSS ELECTRICAL ENERGY

--- :-~ENE RA TED (MWH) . . . . . . . . . * . . . . . * * . : .* ; 391,200 799,580 12,145.139 **.*'.I ll. NET ELECTRICAL ENERGY GENERATED (MWH) *--:. *-_--: * -: ~- : . ~-: :- .-~*:: . -.*-..* **. ;*-:-;-.--:-.---;'. , ____3_7_1_,_5_1_1_ 758.816 !J,511, 197 72.6% "6L1%-- .. * *;c -

12.
  • REACTORAVAILABILITYFACTOR(l)......... 71.5%
  • -.,-13_ *UNIT AVAILABILITY FACTOR (2) * . . . . . . * * . . . 71. 2% 72.0% 66.0%
.14. .UNIT CAPACITY FACTOR (3) . . . . . . . . * . . . . *
  • 67
  • 7% 66.9% 58.8%
  • lS. UNIT FORCED OUTAGE RA TE (4) . . . . . . . * * . .- ;
  • 28
  • 8% 28.0% 20.6% '_

~16.* --SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

-;'-Refueling shutdown. April 15. 1976; approximately six weeks.

17. - IF SHUT-DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ __
  • 18. "UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

.- . FORECAST ACHIEVED

'INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

- (1) *'REACTOR AVAILABILITY FACTOR x 100  :-*: .*~ .'

HOURS IN REPORTING PERIOD

  • "1_:;':'-(2) -~"UNIT A"VAlLABILITY FACTOR _H_O_U_R_S_G_E_N_E_R_A_TO_R_O_N_L_l_N_E_ _ XlOO HOURS IN REPORTING PERIOD

- ~' ~-" J'l.ET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD

. ,:.:.£QB~Ep QU'I_'AGE HOURS X lOO

. HOURS GENERATOR !JN LINE +FORCED OUTAGE HOURS
  • ~ -  :
  • '* .*::.>1

--\ -:_ ~ '* ... ' .- - .. *-~

~. - *. *- -~: _: - - . - ~- .:*

. -*~ ... UNIT Surry Unit No

  • 2

.*... * ("'}j:*-:, *' ***..:c__ ,

_. *. i :';;~_... ..- ~ '. ~ ': -

  • .. DATE Apr. 1, 1976

... ~:~COM~LETED BY

.E .P

  • DeWandel

~ . -*:-. -*-.; .-.

.. boCKET NO*._s_o_-_2_8_1_ _ _ __

. c-,; ,_,~; OPERATING STATUS 0001 760301 2400 760331 1..: REPORTING P E R I O D = - - - - - - - - - - - - - - - , -

  • T H R O U G H - - - - - - - - - - - - -

HOURS IN REPORTING PERIOD: 744


~----------------------

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET); _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRIC~ION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. *HOURS REACTOR WAS CRITICAL. . . * . . . . . . . . . 608.5 1,654.3 17,283.9

6. R'EACTOR RESERVE SHUTDOWN HOURS . . . . . * . 0 0 o.
7. HOURS GENEl:ATOR ON LINE ........**.**** 606.4 1,642.7 16,998.3

. 8. .UNIT RESER VE SHUTDOWN HOURS . . . . . . * . . * . 0 0 0

9.
  • GROSS THERMAL ENERGY

-'***GENERATED (MWH) . . . . . . . . . . * . * . * * * * * *

  • 1,451,862 3,877 ,475 38,385,608
  • 10. -GROSS ELECTRICAL ENERGY

-GENERATED (MWH) . . . . . . . . . . . . . * . . * * * *

  • 473,520 1,273,100 12,618,659
11. . NET ELECTRICAL ENERGY GENERATED

. cMWH) ....... .-*;'*:. :*** **.. ::-. *;-;.; .*~ .*;: ---* 4!;9,305 .... _____l_,2._08..,J_21:. .11,960,.502-:,_

81.8% 75.7% 67.6%

12. REACTOR AVAILABILITY FAC~QR (1) . . . . * * . . *
  • 13. **UNIT AVAILABILITY FACTOR (2) . . * . * * * ; ****

81.5% 75.2% 66.4%

. 14. 76.6% 70.2% 59.3%

UNIT CAPACITY FACTOR (3) . . . . . . . * . * . . . . .

. IS. 18.5% 24.8% 20.6%

UNIT FORCED OUTAGE RATE (4) . . . . . . * * . . . .

16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH): **.:*'
  • Refueling shutdown. April 15, 1976; approximately 6 weeks
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -

_, 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL

. POWER GENERATION COM~:ERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 '~--1

i. I HOURS GENERATOR ON LINE

. -- (2) . -'UNIT AVAILABILITY FACTOR ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED

i!-1
  • .,,;i'(3) ""'UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

<<0- UNIT 1-*oRClm OUTAGE RATE FQB_CED_Ol!JAGE HOURS____ - _ -- --- ** * -'* - - .,. - - X 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

__ -~
-*~ .... ,
  • ~-* ~. <"

0

_ 'OPERATING STATUS

- HOURS IN REPORTING PERIOD: _ _~~--------------------"'=""=--

2, .. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

- THIS . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL .....**. .' .. **. 505.5 2,159.a: 17,789,4

6. REACTOR RESERVE SHUTDOWN HOURS ....*** 0 0 0
7. HOURS GENERA TOR ON LINE . . . . . * . . . : .**** 503.7 2,146.4 l,I., 502.
8. UNIT RESERVE SHUTDOWN HOURS ... _... ;~ .*. 0 0 o-
9. GROSS THERMAL ENERGY GENERATED (MWH) ............****.*** -*-** l, 175,103
  • 5,052,578- 39,560,711 10 .. GROSS ELECTRICAL ENERGY

.GENERATED(MWH) . . . . . . . . . . . . * * . . * . * *

  • 378,580 1,651,680 12,997,239 I l. . NET ELECTRICAL ENERGY GENERATED

- *. -:t<;R ~hl 1;;566~482 12,3_18,863 .

. (MWH.) *** *_ **.***.*.***.** ; -***** :.* *** .- * - ----""'!~-~ >~-= = --

I2; . REACTOR AVAILABILITY FACTOR (1) . * * * . . * ; ._ *. 70.2% 74.* 4% 67.6%

13. UNIT AVAILABILITY FACTOR (2) * . * * * * * * * * * * ..._._.7....,,0.._."""'0""'%.._0 73.9% 66.5%

I4. UNIT CAPACITY FACTOR (3) . . . . . . . . * * . . . * . , 63.2% 68.5% 59.4%

IS * . UN_IT FORCED OUTAGE RATE (4) . . . . . . . * * . .

  • 0 *20.1% 20.1%
  • 16. . SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE,DATE,ANDDURATION OF EACH):
17. IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: May 22, 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

. FORECAST ACHIEVED

. --~. *..

INITIAL CRITICALITY INITIAL ELECTRICAL

  • ':
  • POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL
  • . (1) . REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x IOO
  • (2) UNIT AVAILABILITY FACTOR _H_O_U_R_S'-G_E_N_E_R_A_T_O_R_O_N_L_l_N_E_ _ X lOO HOURS IN REPORTING PERIOD
  • . - -,- * - U> ---UNIT CAPACITY FACTOR NET ELECTRICAL POWER GENERATED
  • MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN-REPORTING PERIOD

__E_D_O_UT_A_G_E_H_O_U_R_s_ _ _ _ _ _ _-.,..._.......,...--x 100

~ * '---(4) . UNlT FORCED-OUT AGE RATE

_FO__R_C HOURS GENERATOR ON LINE+ FORCED OUT AGE HOU-RS

. ~. ~

~ . : . * ,~-~~ *:

. . . .. "a ..  :* ' ..

Corr~cted Copy

. -* . -~

.. . ~ .. ,.. '*:;:~:*,\;i:~"~~:_:.'.;>\~::;;L,.;;t_lJ.NI}". Surry Unit No. 2

. ' .* :**. *. DATE June 1, 1976

-- - . - '. ~

.-: :;-:- .-. , c COMPLETED BY E .. P. DeWandel

  • ..
  • DOCKET NO. 50-281

-,.:-* ~--------

-~

OPERATING STATUS

l. REPORTING PERIOD: 0001 760501 THROUGH _ _~2~4~0~0,____.7~6~D~5~3~1---~
  • HOURS IN REPORTING PERIOD: 7 44  :- ..

-'--------,,-,-,-------------------~

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __ *.*.*
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S.

  • HOURS REACTOR WAS CRITICAL. . . . . . . * . . . . . 0 2159.*8 17,789.4 o

17 , ___

502 .._

6. REACTOR RESERVE SHUTDOWN HOURS . . . * * .
  • 0 ____ Q__
7. HOURS GENERATOR ON LINE . . . . . . * . . . * . * .
  • 0 2146.4 ___ * (
8. UNIT RESERVE :SHUTDOWN HOURS . . . * . . . * * .
  • 0 o o
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . . * * * * * *
  • 0 5,052,578 39,560, 711
10. GROSS ELECTRICAL ENERGY *:.. *I

. -GENERATED (MWH) . . . . . . . . . * * * . * . . * ., *.* 0 1,651,680 11.~ 997 '239 ii. ~ET ELECTR:CAL ENERGY GENEP~ATED .... .. '"' ".' .. n ot:., : -.

(MWH) . . . . . . . . . . . . . . . . . * * . . * * * ***..* 1,566,482 .1"-,.Ji.O' UU.J .,,._._,___ ---::"*

12. REACTOR AVAILABILITY FACTOR (1) * . * * * * . *
  • o 59.2% 65.8%.
13. UNIT AVAILABILITY FACTOR (2) . . . . * . . * * * *
  • 0 58.9% 64.7"( 0
14. UNIT CAPACITY FACTOR (3) . . . . . . . * . * * . * * . 0 54.5% 57.8%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . * * . . * . 0 20.1% 20.1%

16~ SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS cs:rATE TYPE, DATE, AND DURATION OF EACH):

17. IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: June 1, 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

.FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION

. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100

:'-;:=----- ***' * -*-
  • -'(2) HOURS GENERATOR ON LINE UNIT AVAILABILITY FACTOR ~------------XlOO
  • .*.,_-, HOURS IN REPORTING PERIOD
    • ~ *.:"'-" _.- ,~

NET ELECTRICAL POWER GENERATED.

- (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

-~ ~~ =="-. . -- - FORCED OUT AGE HOURS- -- - ---**-- -- --* --------- ---

'(4) UNIT FORCED OUTAGE RATE ~----------~----~---~X 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS .

  • .... ;.a.. .-~.' . .,i.*

Corrected Copy

. * .~ ';.j!".

UNIT Surry Unit #2

. .,., *".:~'. ~-- . .:. ' . ~* '.",*.'. - ... *.;. -~.., ,:: .: ..

DATE July 1, 1976

  • . ~---,_. -
  • ~, * * ** <
    • COMPLETED BY E. P. DeWandel

. -.* .- .' ~- . .**._ *_ .

OOCKET N0. _ _ 5_0_-_2_81~---

.t . ..

OPE.RATING STATUS

1. REPORTING PERIOD: 0001 760601 THROUGH -=2-'-4=0=0_ __,7'-"6"""0'"""6""'3~0_ _ __

HOURS IN REPORTING PERIOD: 720


...,,.-,~-------------------

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) ..._7..,,,8=8.___
3. LOWEST POWE.R LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL. . . . . . . . . . * . . 576.5 2736.3 18,36.5.9

6. REACTOR RESER VE SHUTDOWN HOURS ...... . 0 Q Q
7. HOURS GENEr. ATOR ON LINE . . . . . . . . . . . . . .
  • 502.6 2649.0 18 ~ 004. 6 0 0 0

. 8.

9.

UNIT RESERVE SHUTDOWN HOURS . . . . . . . . . . .

GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . * * . . * * . . 1, 138, 081 6,190,659 40.698.792

10. GROSS ELECTRICAL ENERGY GENERA TED (MWH) . . . . . . . . . . . . . . . . . . . . . 374,915 2!026!595 13 3 372 3 154
11. NET ELECTRICAL ENERGY GENERATED

.. (MWH) . . . . . . . . ;- . . . . . . . . . . . . * * . * * . *.*. *

~c:c; ?7? 1 0?1

.......... - ..... , 7r:,/,_

........ =-:r*F.7!..

1? ..... . , 11c;

12. REACTOR AVAILABILITY FACTOR (1) . . . . . * . . . 80.1% 62.6% 66.1%
13. UNIT AVAILABILITY FACTOR (2) . . . . . , . . * . . .

69.8% 60.7% 64.8%

14. UNIT CAPACITY FACTOR (3) . . . . . . . . . .* . . . * . . 62.6% 55. 8% 57.9%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . .
  • 8% 17.1% 19.7%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ __
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMr.'ERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAlL~BILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE

. (2) UNIT AVAILABILITY FACTOR ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

_FO_R_C_E_D_O_U_T_A_G_E_HO_U_R_S_ _ _ _ _ _ _ _ _ _ _ XlOO (4) UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LINE-+-FORCEDOUTAGFHOURS*-.

~I *

-.:** *'* - .- /. - . f'. '.*-.

.;  : ,, . ;~*, '  : ;~ ,_:-;.-* *~': ' - * < * *: ~ '.' - *: ..

. .* ~-. . ~

/

U~IT- Surry Unit. #2 DATE*_August 2, 1976 E. P. DeWandel

. :., ,-..-..*.. .* '. DoCKET N0._;;..50.;;..-_2;..;;8.;;.l_ _ __

OPERATING STATUS

. l. . REPORTING PERIOD: 0001 760701 . THROUGH --=24.;..;0;...;;0_7;_;6;...;;0..;;..7.;;_31:;.__ __

. HOURS IN REPORTING PERIOD: 7 44

2. CURRENTLY AUTHORIZED POWE_R_L_E_V_E_L...:(M_W:...:...th_)_2_4_4_1_ _M_A_X_.D-.E-_P_E_N_D_A_B_L_E_C_A-PA_C_l_T_Y_CM-W-e--N-ET_)___ 7:a:s:.:-:
3. LOWEST POWER LEVEL TO WHICH SPECu;'ICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY): ..

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE 1

5. HOURS REACTOR.WAS CRITICAL *..**. ; **** ; . 705.2 3,44'1.5 19 ,071.1
6. REACTOR RESER VE SHUTDOWN HOURS ******
  • 0 0 0

.7. HOURS GENERATOR ON LINE ..**....******.* 704.3 3 2 353-:3 *ts.,168! 9

8. UNIT RESER VE SHUTDOWN HOURS ****.******

-*o 0 0

9. GROSS THERMAL ENERGY
  • GENERATED(MWH) *.** : .************.*.** - L71L295 7,901,954 42.410,087
10. GROSS ELECTRICAL ENERGY

<iENERATED (MWH) .*...**.****.******** 555,805 225822400 132927 2959

11. NET ELECTRICAL ENERGY GENERATED a:;?1 i:;1n

--:_------cMWH)-*--: .-. *;.--: .-.---.--.-~-;-:-.-~-.*- ..... -.. ,; . ~ . .;... --* ~-* - ... 2zll49~324 13 .201. 705 .

12. REACTOR AVAILABILITY FACTOR (1) * * * . * * . * * . _.__.9;...4:..:*:.,;;;8;..;.;%~ 67.3% 66.9%
13. UNIT_ AVAILABILITY FACTOR (2) *.**********.* *. -..:9;...4:..:*~7~~~- 65. 6%. 65.6%.

UNIT CAPACITY FACTOR (3) . * * . * * . * * * . * .* *

  • 90
  • 0°0 60.8% 58.8%

14.

15. UNIT FORCED OUTAGE. RATE (4) **..****** ** ; 5
  • 3% 14.8% 19.2%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

_ None .

17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: August 2, 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
  • .*~

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY

  • INITIAL ELECTRICAL

.*POWER GENERATION

  • -_*:_\

. *.- .. COMMERCIAL OPERA TlON HOURS REACTOR WAS CRITICAL (1)

  • REACTOR AVAILABILITY FACTOR XlOO HOURS IN REPORTING PERIOD

- . '* .. t' HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR =* -------------------XlOO HOURS IN REPORTING PERIOD*

NET ELECTRICAL POWER GENERATED.

(3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD .

C:J ,. .,. (4)

UNIT FORCED OUTAGE RATE =

FORCED OUTAGE HOURS HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS x 100

Corrected Copy

_. ,,.* ' ' *0

-*-*a A' ** -~* ~

    • * * *
  • 7 ' ..... ,,.~ ~ -
  • ::.-:i_,.. ,
  • UNlT Surry Unit. #2

~ - ' - * . ---~ ..._."":: - r '

  • -*- DATE Sept. 2, 1976 COMPLETED BY E. P. DeWandel
  • DOCKET NO. 50-281

~

OPERATING STATUS

l. REPORTING PERIOD: 0001 760801
  • THROUGH 2400 760831 HOURS IN REPORTING PERIOD: 7 44

,,....,~--~~---------~-----~

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (lF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (lF ANY):

THIS . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

s. HOURS REACTOR WAS CRITICAL * . . . . . . * . * * * . 691.8 4133.3 19 3 762.9
6. REACTOR RESERVE SHUTDOWN HOURS .*****. *o 0 ~
7. HOURS GENERA TOR ON LINE * . * . . . . . * * * * * *
  • 690.4 4043. 7 19~_399._3.:__ ' .:_.
8. UNIT RESERVE 3HUTDOWN HOURS . . . * * . * * * .
  • 0 0 0
9. GROSS THERMAL ENERGY . '

GENERATED(MWH) . * . . . . * * . .*.******** : 1,661,570 9,563,524 44, 071, 657

10. GROSS ELECTRICAL ENERGY

<JENERATED (MWH) . . . . . . . . . * . . * * * . * * * * * *533,525 3, 115, 925 14, 461, 484 i<-':i\ . ii.-

\_ _ _:;: (MWH) 505,862 *2,222.186 i-3 .- 7Q f D 5 0 i,._

12. REACTOR AVAILABILITY FACTOR (1) . . . . . . . *
  • 93.0% 70. 6%* 67.6%
13. UNIT AVAILABILITY FACTOR (2) * . . . * * * . . . .
  • 92.8% 62.1% 66.3%
14. UNIT CAPACITY FACTOR (3) .*......******. 86.3% 64.1% 59.5%

lS. UNIT FORCED OUTAGE RATE (4) . . . . . . * * * * . . 7.2% 13.6% 18.8%

16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

None

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATEI>DATE OF STARTUP: _ _N ___/A _ _ _ _ _ _ _ _ __
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY

.... * **INITIAL ELECTRICAL POWER GENERATION

.: ~--

  • COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD

. ~ .

HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR -----------------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNlT CAPACITY FACTOR

  • MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD

--:-9

(:/- .* . (4)

UNIT FORCED OUTAGE RATE

--FORCED OUT AGE HOURS - --- - - --- *- * * - - - - ':~

.,_..._ = HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS . X lOO

.-. *. -. .- ~.: ... ';, _....

a**

i*' '.

.. ' .~-  :>

.. - . . Surry Unit #2 *

  • .*~:***.

\/L ... * .**- _._ ....... ,.

October*!, 1976

. * ..  ;.,* * ... ..' * * *.; '!~ -~*  !. r

  • , -.~ . " * * * ** r **

COMPLETED BY E. P. DeWandel

. ' *. DOCKET No.--5..;;..0-...;2;;..;8;;.,;:1=-----

  • _. __ *.OPERATING STATUS
1. REPORTING PERIOD: 0001 760901
  • THROUGH 2400. 760930 HOURS IN REPORTING PERIOD: _ _ _7_2_0 _ _ _,....,..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
  • 2.
  • CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. !JEPENDABLE CAPACITY (MWe-NET) 788 3.. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS C'JMULATIVE REPORTING PERIOD YR TO DATE TO DATE

5. HOURS REACTOR WAS CRITICAL ......**.*.** 349.8 4483."1 20112. 7
6. REACTOR RESER VE SHUTDOWN HOURS ..*..**
  • 0 0 0
7. HOURS GENER HOR ON LINE ...*...***.****
  • 349.8 4393.5 ..12.J.4:2tl_
8. UNIT RESER VE SHUTDOWN HOURS ......*.***. 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . . * . * * * * * , ._._8_3_7_,.,_8_6_7__ 10 2 401,391 44 2 909 2 524
10. GROSS ELECTRICAL ENERGY -.~

-GENERATED (MWH) . . . . . . . . . . . . . . ~ * * * . * *

  • 272, 635 3,388,560 14,734, 119'

_____ :"::;, _____ ,__} ~* _-~ET ~-L!'.CTRICAL ENERGY GENERATED .

---~ (MWH) -. -.-... *:: -:-. ~ :-.-.-~-..*. -;-** -~ * . * * . *

  • 3.?1~_7Q2 258j 516 13 s 966s 083
12. Rt:ACTOR AVAILABILITY FACTOR (1) .*. * ******.. _ _4_8_.;....6~%;;....._

. - ~--68. 21:* 6 7-;T% ___ - * -.,--:..;

13. UNIT AVAILABILITY FACTOR (2) .**.*...*** ~ . --..:.4..:::;8..._ * ..,..6....

%_ 66.8% 65.9%

14. UNIT CAPACITY FACTOR (3) ........****** ; . _ _4..:.:5:;...:*:..::6'-"%"-- 62.0% 59.1%

lS. UNIT FORCED OUTAGE RATE (4)............ 51.4% 18. 7% 19.8%

. 16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

NA

."I-
  • 11. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: October 15' 197 6

.. 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED .. ~"*-

.~ , .*

'* .. -.: *.. *- *. INITIAL CRITICALITY

  • INITIAL ELECTRICAL

. -.* *,* * ... ** POWER GENERATION

.. _ . _ : COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR ~----------------~-

HOURS IN REPORTING PERIOD XlOO HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR = ~-~------~-----XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED* *-~~-

.<3> . UNIT CAPACITY FACTOR =

  • MAX. DEPENDABLE CAPACITY (MWc*NET)--X--HOURS IN REPORTING PERIOD
    • ~ . FORCED.OUTAGE HOURS lOO

.. ~ liOURS GENERATOR ON LINE+ FORCED-OUTAGE HOURS- X . ,

\"

'.. *.*.~-: *.

.'. *~:.

  • ._*. ~- .-9~corrected Copy
'<-~ ~;--~~>*::.::*;, ,, ,;_,:~~$;~~:~,;. _'.: ':~~~-: ;  :. '* *., '"''°'Z
""'*-;~:~i-~,:1~: ;:*.: _.

- '<-- ,  ;,;.UNl;-surrY- Unit No. 2 1/' **.*'. *.;:.,,:. ~:** :~¥~~--,~./'.:*. ~-~ :f{*~* 7,'-'::;~~ ..;-; :- .,.;.,~:.:~:~* *-;. *.

DATE Noy. 2

  • 1976

_, -COMPi~T~D BYE .P. DeWandel

- .-~ '.

. *.. '_ . ~-**. _. -

OPERATING STATUS i . . REPORTING PER10D:_oo_1_ _7_6_1_0~0_1_ _ _ _ _ _ _ THRouciH-_ 2_4_0_0_ __;.7_6_1_0..:,.3..:;.1_ _ _ _ __

HOURS IN REPORTING PERIOD: __ 7_4_5_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~-------,--

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
  • 4. REASONS FOR RESTRICTION (IF ANY):

THIS . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

. S. .HOURS REACTOR WAS CRITICAL .. , . . . . . . * * '. . 0 4 ,483'. l 20,112.7

6. REACTOR RESERVE SHUTDOWN HOURS . . * . * . . . 0 0 0
7. HOURS GENERATOR ON LINE . . . . . . . . . * * . . . -. 0 4,393.5 .19,749.l
  • 8. UNIT RESER VE SHUTDOWN HOURS . . . . . * . : .** 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . * . * . . * * * * * * *
  • 0 10,401,391 44,909,524
10. GROSS ELECTRICAL ENERGY

_-GENERA TED (MWH) . . . . . . . . . . . . . . . * * * * * . 0 3,388,560 14, 734, 119 1 I. NET ELECTRICAL ENERGY GENERATED n ":t ?1~ 70?

(MWH) . . . . . .* . . . . . . . . . . . . . . . . . ~ ~: . . . . . _-. --'"-'v'"-'---- ><*---,,,. *~

11 - %6. 08.3.

12. REACTORAVAILABILITYFACTOR(l) . . . . . * . * * - 0 61.2% 65.5%*'
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . . . . 0 60.0% 64 3%
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . . . 0 55.7% 57.7%

- 15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 100% 28.5% 22.1%

16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: November 18, 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORTTI:IE FOLLOWING:

DATE LAST DATE ...

'o: I

. FORECAST ACHIEVED . I lNlTIAL CRITICALITY *' I INITIAL ELECTRICAL

.. POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACfOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE '-~~

. (2) UNIT AVAILABILITY FACTOR x 100 *"* ._:j-.

HOURS IN REPORTING PERIOD - *~* ~-"

-*~~-:

~~

NET ELECTRICAL POWER GENERATED

.* (3) UNIT CAPACITY FACTOR =

-MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURSIN- REPORTING PERIOD

-~: I f.ORCED OUTAGE HOURS

.. _(4) UNIT FORCED OUTAGE RATE

_,,I JIOURS GENERATOR ON LINE +-"FORCED OUTAGE HOURS. X lOO

  • t.

. _._ - .. "" Corrected Copy

' .=-*:

v -

. -~; ~, -

uni~ No. 2 UNIT Surry

.. ~-:.

' - .~-: '- -

.. : -~ .. ~;:~*** --

- -~ - -~

f :.1'*.~* -:.--*:. \

  • ,DATE Dec. 1, 1976

.- -*.-* . ~~ - . .  ; . COMPLETED BY E. P. DeWandel

. *:'. ' - DOCKET No._5 _ 0_-_2_8_1_ _ _ __

~

... - - ' -. -- - - .. ~ - : - . . . -- . *.

. ' -_ '-~-- -

OPERATING STATUS

.';; *- '~

1. REPORTING'PERIOD:_o_o_o_1_ _ 7_61.,,..1,_,o,....1_ _ _ _ _ _.. THROUGH _ _2_4_0_0_ _ 7_6_11_3_0_ _ _ __

. HOURS IN REPORTING PER10D: _ _7_2_0_ _ _ _..,....,._ _ _ _ _ _ _ _ _ _ _ _ _..___ _ _ __

2. . CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. !)EPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED OF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

.- **THIS CUMULATIVE

\

REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL. .... : .****** 0 4 ,483'. l 20.112.7

6. REACTOR RESERVE SHUTDOWN HOURS ....*.* 0 0 0
7. HOURS GENERATOR ON LINE .........*.**** 0 4,393.5 .] 9, 749. l
8. . UNIT RESER VE SHUTDOWN HOURS .....*..**. 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) .......*..*..**.***** 0 10,401,391 44,909,524
10. GROSS ELECTRICAL ENERGY
  • * -OENERATED (MWH) ..........*......***** 0 . 3,388,560 14,734,119

--*-co----*-* :_ 0 NET ELECTRICAL ENERGY GENERATED

  • (MWH) . . *.*--. :*;*;*-.-. *;*7;""; ;-. -.--~ .-, .--.-.- **--*.*.* -.*.*..

0 0 3,213~702 55-;8%

  • 13,966,083
      • 64 ;OX>-- *
12. REACTOR AVAILABILITY FACTOR (1) *********

1_3. UNIT AVAILABILITY FACTOR (2) * . . . * . . * * * *

  • 0 54. 670 62.8%
14. UNIT CAPACITY FACTOR (3) * . * * * . . * . * * * * *
  • 0 50.7% 56.4%

lS. UNIT FORCED OUTAGE RATE (4) . . . . * * * * * * *

  • 100% 36.0% 24 .3%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17 . . IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 10, 1976

18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DATE FORECAST ACHIEVED

  • .-
  • INITIAL CRITICALITY
_, ... ** .. :,*::.: **--.,- * * , * **
  • INITIAL ELECTRICAL
_ . . : -.:.. * '* *' POWER GENERATION
    • . ....... - .~
  • .. :.*. *.., COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (l) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE ...

~.-,

(2) UNIT AVAILABILITY FACTOR = --------------------XlOO _ -.

HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAP ACl,TY FACTOR =

MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD

_FO_R_C_E_D__ O_U_T_AG_E_H_O_U_R_S_______________ XlOO (4) UNIT FORCED OUTAGE RATE HOURS GENERATOR-ON LINE+ FORCED OUTAGE HOURS I .

' ' : *~ .

- _<co_i-rected Copy.

S1.1rry UH i t 2 *

. ->* - ,, :. - ' DATE __,J..,aa-aa-.-3~,--+/--1.,,.9+7+7-COMPLETED BY E. p. DeWandel 50-281

. -*-. f :: . ' - ;__ .- :**.: .* ~ 1 ".

  • . ~ .'".: ::;-.-

' . * ' .. - - OPERATING STATUS - ; ., ~ :.-*-

1. REPORTING PERIOD: 0001 761201 THROUGH~_ _.2~4~o~o-7~6~1~2~3~1~*~---

HOURS IN REPORTING P~RIOD: _ _~""'--'--------'------------------

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY): *I THIS CUMULATIVE
  • REPORTING PERIOD YR TO DATE TO DATE
5. HOURS REACTOR WAS CRITICAL. . . . . . . * . . . .
  • 206. 2 - 4689~3 io:na. 2
6. REACTOR RESERVE SHUTDOWN HOURS ..**..* 0 a a
7. . HOURS GENEhATOR ON LINE . . . . . . . . . * . . * . . 196.3 ~589.8 ..l..9., 9-45. 4_
8.
  • UNIT RESER VE SHUTDOWN HOURS . . . . . . . . . . . ..

__o ____ 0 0

9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . ......*.******* 435, 103 10,836,494 45,344,62.7
10. GROSS ELECTRICAL ENERGY GENERA TED (MWH) . . . . . . . . . * . . . . . -. *. : ** 137,255 3' 52 5, 815 14,871,374

. I l. NET ELECTRICAL ENERGY GENERATED

--_--(}: (MWH) . . . * . * . . . . * . . . . . * . . . *. * * * * * * * *J29,619 -1.;J~.321 i9:,n9s,1n2

12. REACTOR AVAILABILITY FAC"iOR (1) . . . . * . * *
  • 27.7% 53. 4% 63.1%
13. UNIT AVAILABILITY FACTOR (2) .**...***.* : 2 6
  • 4"~ 52 3"(,, 62. O"lo
14. UNITCAPACITYFACTOR(J) . ; . . . . . . * . . . . * .. 22 l"~ Y.8~3% 55.6%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * . . _-. *. 73. 6% 39. 7% 2 5, 7"/o
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

. FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMZ.iERCIAL OPERATION

. - '* \';.

HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 . -- .~ :. :f.~1 '

  • "'~.' I (2) UNIT AVAILABILITY FACTOR HOURS GENERATOR ON LINE x 100 .:rAif:

HOURS IN REPORTING PERIOD

'f. -~:~1f I

~_'i't.~ I NET ELECTRICAL POWER GENERATED .

(3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

~-FORCED OUTAGE HOURS --~--------x lOO Ca.;__,tf!

(4) UNIT FORCED OUT AGE RATE HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

Corrected* Copy

( .\ . *.

. UNIT Surry Unit No. l

/

DATE 3-3-75 COMPLETED BY w. c. Earl 50-280 DOCKET NO.

OPERATING STATUS

t. REPORTINGPERIOD: 0001 750201 THROUGH 2400 750228 HOURS IN REPORTING PERIOD: .-67L ,_
2. CURRENTLY AUTtlORIZED POWER LEVEL (~tWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO \\'!!!CH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ________________
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PF.RIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL *.*********** 665.3 707 .s 11,431.9.

0 __o__

. 6. REACTOR RESER VE SHVTDOWN HOURS *******

. 7. HOURS GENERA TOR ON LINE. ..*.********** _..:fl32-.:5_

--- 0 .-

  • fiiz;J, _:iJ. .d5.0 .--:;:-

S. UNIT RESERVE SHL'TDOWN HOURS .******** ***

. 0 o* . 'o 9.. GROSS THER~tAL ENERGY GENERATED (MWH) *..***.********.****** 1~329,659 1,330,270 .* ..::.2..3-.,":~.§._5; 6l!O

10. GROSS ELECTRICAL ENERGY * *.

,J--* :.._ -GENERATED(MWH). ... . . . . . * * * * * * * * ** ** * . 434,615 434,615 7,762,378

... -~
  • ,__...._,/ 11. NET ELECTRICAL E!'~[RGY GE!\ERATED ,_,,. 1.n-,

I.~ '"I l.n-r ., ..,,."' nC'n

' -t .&. ,.:. , "'T .;I I -fA..:., ..... JI 1,J,'-2"->-..J

/~-'!\ (MWH) ....***.********.************ **

  • .... "." -~

., ~:l) ___ 59--=-.§_

!2.

13.

R!:A.CTOR AVAILABILITY FACTOR (1) . * * . . * * *

  • U~IT AVAILABILITY FACTOR (2) * * . . * * * * * * * *

~9t:*; . 50.0

-*-57-.fi::_

14. UNIT CAPACITY FACTOR (3) . * . * * * * * * * * * * * * ~.'IB~lt_ 37.0 _ ... 4.£.t!._L
  • o.*_-
  • 9:.-- F-~9.'

IS. UNIT FORCED OUTAGE RA TE (4) . . . * * * * * * * *

  • 2<L1-*

' 16. SHl TDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTI-IS (STATE TYPE, DATE, AND DURATION OF EACH):

1

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ____~--------------

IS. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERA T!ON) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY

... .. ,,. INITIAL ELECTRICAL

. ~*: *.. *' POWER GENERATION COM~1ERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON U:-:E (2) UNIT AVAILABIUTY FACTOR = -------------~XIOO HOURS IN REPORTING l'ERIOD  : ..: _, I NF.T F.1.l:CTR IC.\ t. POWFR GENERA TED (3) UNIT CAPACITY FACTOR

  • MAX. l)l:l'ENDAllLE CAl'ACIT\" lMWc*NET) X llOUllS IN REl'ORTING l'ERIOLJ

(;?.) FORCED OUTAC.E llOURS

.. (4) UNIT FORCED OUT AGE RATE ~-----~----------------XlOO

  • -.l~; llOURS GENERATOR ON LINE t FORCED OUTAGE HOURS

.._.)

-.***'~

      • ~ .... ~ .. !"",..... -;

Surry Unit No. 1 DAT~' 4 75

. *::_ c~~P°i:ETE~ BY W. C. Earl

.***DOCKET No._5_0_-_2_8_0_ _ _ __

..* ~ *, ***.'
  • OPERATING STATUS

. { '.** . . -.:*

.1.. REPORTING PERIOD:---'0...,.:0-.:0_1_--'-7~50"'-'3"'"'0"""1-'------- THROUGH _2_4_0_0_ _ 7 5_0_3_3_1_ _ _ _ __

HOURS lN REPORTING PERIOD: 7 44


~

2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET). 788 *

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _______________._
4. REASONS FOR RESTRICTION (IF ANY):

THlS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

s. HOURS REACTOR WAS CRITICAL . . . . . . . . . . . .
  • 716.1 11423.6 121148.0
6. REACTOR RESERVE SHUTDOWN HOURS . . . . . .
  • 0

---.o---- 0 "

7. HOURS GENERATOR ON LINE . . . . . . . . ** **...* 569.6 ~202.L.:. _;fr~ 61 9 ~ 6
  • 0 0 8.

9.

UNIT RESER VE SHUTDOWN HOURS . . . . . . . * . *

  • GROSS THERMAL ENERGY

0

~

GENERATED (MWH) . . . . . . . . . . . . . . . . . . . . . . 1,363,940 2,694,210 24;L49,_6_20-

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . . . . . . * . *. . * * . . . . 453,670 888,285 8,216,048.

('}:\ 11. NET ELECTRICAL ENERGY GENERATED ,,.,, 0/.1 ctJ (MWH) . . . . . . . . . . . . . . . . . . * * ** * * * * * * *

'""T.J~,.,"'T~ 8l~l:,':38 7. z .*77/,,

"

  • l!:.701
12. REACTOR AVAILABILITY FACTOR (1) . * . * . . . .
  • 96.2 65.9 61
13. UNIT AVAILABILITY FACTOR (2) . . . * . . . * . * .
  • 76.6 . 5--5. t --58. 4 ::.._ '
14. UNIT CAPACITY FACTOR (3) . . . . . . . . * * . . * * . 73.7 49.6_ {i2.5
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * * . *
  • 0 0.,-6:_ 28. 2*
16. SHUTDOWNS SCHEDULEDTO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

. FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE

  • . (2) UNIT AVAILABILITY FACTOR -----------------~x100 HOURS IN REPORTING PERIOD NET ELF.CTRICAL POWER GENERATED (3) UNlT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS (4) UNIT FORCED OUTAGE RATE ------------------------------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
  • ~.

. ,;~

/.. --~.~.

  • . ,,--**' .. ,* *- \* -.:.

.~

~ . *.  ::*~ ' . ' \,.

Corrected Copy

. '  :- : -* .~* ' :

-,*~-. '.:: .. :_.\ . - ;.- . '

. . *. * .-.* *.* -

  • r UNIT Surry Unit No
  • i DATE 5-1-7 5 COMPLETED BY w. c. Earl
  • ~ . DOCKET NO. 50 - 280

. ~ -.:- *:.*.. *. ~

~--------

. *~ . *- .. *.: .. ,. _: .:

.. OPERATING STATUS

',,c*_- - ~-...' ..

-_
--~*

I. . REPORTING PERIOD: 0001 7 50401 THROUGH 2400 7 50430


~--~------- -~--~-----'----~---------

-- .. _,. "~ . HOURS IN REPORTING PERIOD: 720


.,-----------------~~~----

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) ~7~8~8~-
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

. "'" *. -. THIS . CUMULATIV_E REPORTING PERIOD YR TO DATE TO DATE S.

  • HOURS REACTOR WAS.CRITICAL..~.......... _ _6_2_5_...-..... 2048.6 12*2 773
6. REACTOR RESERVE SHUTDOWN HOURS . . .. . . .
  • 0 0 _ _ _9____
7. HOURS GENERA TOR ON LINE. . . . . . . . . * . * * .
  • 620
  • 4 -1B22S _:.~4.0"*
8. UNIT RESERVE'SHUTDOWN HOURS . . . . . . * . * * * *. : _ _ _O_ __ 0 0 .
9. GROSS THERMAL ENERGY . .*.

GENERATED (MWH) . . . . . . , . . * * . * * * * * '* * * .. * ."' l , 475 , 4 0 4 4,169,614 26, 225,.635

10. - GR,OSS ELECTRICAL ENERGY
  • GENERATED (MWH) . * . . . . . . . * . . . . -.****.*. 4862190 1!374!475 8!7022238 1~~ .,. *NET E!.ECTR!CAL ENERGY GENERATED

.,l'\C nc:.'l CMWH) ....*.*..**.*...***.***.****.* *

. 462,515 .,

J. 2 .JVV 2 ::J.J.J 822372306

12. . REACTOR AVAILABILITY FACTOR (1) ********* - _ _ _8_6_._8,.--- 71.1 61:.9~
13. UNIT AVAILABILITY FACTOR (2) . * . . * . . * * * * * . ---8~6_.~l~*- _63 *.3_ __3_9..3 _ ; ' -.-*
14. UNIT CAPACITY FACTOR (3) . . . . . . * * . * . . . * . 81. 5 57.6 50.6 lS. UNIT FORCED OUTAGE RATE ( 4 ) . . . . . . . . . . . . 13.8 --~-~L 27.6

.---.*. I

16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH): -: '
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - - - -

' 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED

. INITIAL CRITICALITY

' *~- ' INITIAL ELECTRICAL POWER GENERATION

. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL o) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR ------------~~-------XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR

. MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS (4) UNIT FORCED OUTAGE RATE ----------~---------------------------XIOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

  • . 'r L 1 .*:.:~ . . ~.-.

.~ ... *.-. ' . - ..

J **

  • .,:;~ -**::* .c~rrected

.:. ~, ' *'

'* . . : :*. -. ~*. .:- . . - * ....

. _, - .. * * * * " .. 1 * *

.* Copy

"* - ~ ,' . . -

---~ .:*

. ~:

' " .. '*** UNIT Surry Unit No. 1

~1 *.. *** .'. *'- . '1. *.. ~ .. *- .... *. ), ~ ;- _. .; . ; : * . * . J June 3,* 1975

.. * ... / ':;_'* .. , ..

COMPLETED BY

~ .;*.:. - : .
w. c. Earl 50-280 DOCKET° NO.

. *. .  ;; ~

OPERATING STATUS

1. REPORTING PERIOD: 0001 750501 THROUGH _,2=4...,o...o.__.....7_.5""0_..5_,_3.. _1_ _ _ _ __

HOURS IN REPORTING P!:'RIOD: _ _7'-4-'-4-'----....,,...,...,.....--------------------

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788 d-
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):------'-----

. _4. REASONS FOR RESTRICTION (IF ANY):  :-~~

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

.: {

S. HOURS REACTOR WAS CRITICAL. . * . . . . * * * * . . 717. 7 2.Z66.3 13,490.7

6. REACTOR RESER VE SHUTDOWN HOURS ....***. .Q *o 0

... 7. HOURS GENERATOR ON LINE . . . . . . . . * * . . . . . 716.3 -1..,_538. ~ 12,956J.., ':

8.* 0 0 0

_9.

UNIT RESERVE SHUTDOWN HOURS . . . . . . * * . .

  • GROSS THERMAL ENERGY

'I GENERATED(MWH) . . . . . . . . . . * * . * * * . * * .

  • l,712,641 52882.255 27.938.216
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . /. . . * . . * * . * * . * *
  • 558,495 1,932,970 9,260,733 Jl. ... NET ELECTRICAL ENERGY GENERATED ___

i:;:~n ,_.,,. RO/, 1,8371847 8,768,200 (MWH) . . . . * . . . . . . . . . . . . * . . * . * . * * . .

  • 12.. REACTOR AVAILABILITY F AC':~JR (1) . . . . . . . .
  • 96.5 76.3 63.1 96.3 .70.1~ _ _§016* :
13. UNIT AVAILABILITY FACTOR (2) * . . . * . . * * . . *
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . . . 90.6 64.4 52 Q i~
15. UNIT FORCED OUTAGE RATE (4) . * . . . . . * * . .
  • 3.7 _ _5.Q_ 26.6" ._-

_ 16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling October 1975; approximately 5 to 6 weeks

17. .lF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -

18.. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

-.* .."'* . FORECAST . ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COM!;~ERCIAL OPERATION

_/- *.

HOURS REACTOR WAS CRITICAL (l) REACTOR AVAILABILITY FACTOR x 100

- HOURS IN REPORTING PERIOD ,

HOURS GENERA TOR ON LINE

- *. _ .(2)- UNIT AVAILABILITY FACTOR ~---~-~~~-~-XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR -:.

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD (4) UNIT FORCED OUTAGE RATE _FO_R_C_E_D_O_UT_A_G_E~H_O_U_R_S~--~----~-~XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

'-.. -1.. --

-:.!~

,. ..... ~. :- -~ .. - . *;_*

_, * --C~rrect"ed Copy Unit No. 1

_,.:-~~.fE: July 2; 1975 *

~'COMPLETED BY
  • _,_ . -.. *. W* C
  • Ear 1
~~ --:-** **.*,.*. -

- ---'-.: **. :~' .~*- _._: .

  • .. . .- **.* '". _-*. _._ .~ - -'

- ..-". *~-~--~*..:.. ~~"-*'- .. ' .-

- */-* . *.-.

. ~*-

1;:**

""*-.-- '. ~.

_OPERA TING STATUS L' REPORTING PERIOD: _ _o_o_o_1_ _ 7_5_0_60_1______ --_._*:_*- THROUGH _ _2_4_0_0_ _ 7_50_6_3_0_ _ _ __

HOURS IN REPORTING PERIOD: _ _7_2_0 _ _ _ _.,,..,..~-------------------

. 2.

  • CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

- 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):---.-----~------

4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE 662~3 3428~.6

s. HOURS REACTOR WAS CRITICAL . . . . . . . * * * . *.* 14,153

'6. REACTOR RESERVE SHUTDOWN HOURS . * . . * . . 0 0 0

7. . HOURS GENERA TOR ON LINE . . . . . . . . * * * . * *
  • 660.8 3:199.6 - 13,617.1
8. UNIT RESERVE SHUTDOWN HOURS . * . . . * ***.** 0 0 0
9. GROSS THERMAL ENERGY

. GENERATED(MWH) . . . . . . . . . . * . . . * * * * * *

  • _ 1,566,410 7,448,665 29,504,075*'

JO. GROSS ELECTRICAL ENERGY

_-GENERATED (MWH) . . . . . . . . . . * . . . . . * . * *

  • 502,800 224351770 927631533 r:*~:~ ':_ 11. NET ELECTRICAL ENERGY GENERATED

\2/ (MWH) . . . . . * . . . . . . * . . . . . * . . * * * * * . *

  • 477 ~277 2,, 31_;>_,:!24 - 922452477

,* ;' ""/*"*

92 78.9 64.0 h 12.

13.

REACTOR AVAILABILITY FACTOR (1) . . . . * . * .

  • UNIT AVAILABILITY FACTOR (2) . . . . . . . . * * * . 91.8 -73~-7~ - -61_~-

_14. UNIT CAPACITY FACTOR (3) . . . . . * . . * * * * * . . 84.1 67.6 53.l

15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * . . . . 8.2 5. 7 - 25.8
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Scheduled refueling October 15, 1975. * * .

17. - - IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DA.TE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING: -. I DATE LAST DATE FORECAST ACHIEVED

. INITIAL CRITICALITY

- *:-: _*.-. . .INITIAL ELECTRICAL POWER GENERATION

.: COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

.. (1) REACfORAVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE

. _*. - (2)- . UNIT AVAILABILITY FACTOR ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY .FACTOR =

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERlOD FORCED OUT AGE HOURS (4) UNIT FORCED OUTAGE RATE ~--------~--~~~~---~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

  • Corrected figure-Corrected error carried forwarded since February 1975

.. . *' **:~- -..*

. *.*'*~ --. '"

' ~

Corrected Copy DATE August 4~ 1975 W. C. Earl OOC~ET NO._s_o_-_2_8_0_ _ _ __

": *. '**: '** OPERATING STATUS *, ...

l. ' REPORTING PERIOD: __o_o_o_1_ _7_5_0_7_0_1_ _ _ _ _ THROUGH _2_4_0_0_ __;_7_5_0..;...7""--3_1_ _ _ __

~: :*... ' ' .. :

HOURS IN REPORTING Pr.RIOD: _ _ _ 7_4_4_*- - - - - - - - - - - - - - - - - - - - - - - - - - - -

2. . CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. l)EPENDABLE CAPACITY (MWe-NET) 788
3.
  • LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

'4. REASONS FOR RESTRICTION (IF ANY):.

. THIS . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL. . , . . . . . . . : ~ . 553.7 3,982.3 14,706.7

6. REACTOR RESERVE SHUTDOWN HOURS .. **..... 0 0 ___ o__ _ . -:
7. HOURS GENEKATOR ON LINE . . . . . . . . . * . * . *
  • 553.7 3,753.3_*, _ 1_4, 170~

0 0 0

8.
  • UNIT RESER VE SHUTDOWN HOURS . . . . . . . . . . * **
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . _*.. ~ *.**.* ; 1,338, 774 8,787,439 30,842.849
10. GROSS ELECTRICAL ENERGY

<iENERATED (MWH) . . . . . . . . . * . . . . * * * . . * .

  • 429,456 2 ,_865. 226 10,192,989

' 11. NET ELECTRICAL ENERGY GENERATED

. (MWH) . . . . * . . . . . . . . . . . . * . * . . . . * * . : ;. *. _._.4'-"0'""7_,,L.::oo.:9:...::1,___ 2.723,015  :,'r>. 9,653.368 12.

13.

REACTOR AVAILABILITY FAC'C)R (1) * . * . * . . * .

UNIT AVAILABILITY FACTOR (2) . . . . . . . . . * :

  • 74
  • 4 74
  • 4 78.3

_73 *.&...:

--- 64.4

_ __,_6._._2 .JL

14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . * . * * *:: 69.5 67.9 53.6
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * * . :, 25.6 9.4 25.8
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling scheduled October 15, 1975, approximately six weeks

17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: August 1, 1975
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

. FORECAST ACHIEVED

,**-: INITIAL CRITICALITY

... . INITIAL ELECTRICAL POWER GENERATION COMI.mRCIAL OPERATION

.. :~ .

HOURS REACTOR WAS CRITICAL (1) REACfOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE . I

. . (2) UNIT AVAILABILITY FACTOR -----------'-----XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED ..

(3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED.OUTAGE HOURS -*- --- -***- -- ---** ... - ... -


XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

. *:;:*.::~:-~~~::;_,~:~f:~~"-~>:>:"

. ~::_*.::.:*:*~~-ec.ted Copy**

,.-*.*.* .. .' . ,._ /.' '.*~....~::  ; .~ . .*

' ' . ~~l~* *~~~r~ Unit No*. i.

DATE Oct. 1,1975

'* I* .. -';. :

.1, . . . -* . ,_ . ,. ... co~~~~TE~ BY W. c. Earl

  • j ::. ~ . ., _*... '. --~ :. *'.< : *. ~.- - ...
    • -,*--_ .. DOCKET No._5_0_-_2_8_0_ _ _ __

~

OPERATING STATUS

1. REPORTING PERIOD:~O_O~O~l~~Z-50_8_0_1_ _ _ _ _ _ THROUGH --=2-'-40.;:;..0~__,7'"""'5'""'0'""8=3=1,___ _ __

HOURS IN REPORTING PERIOD: _ _ _ __ _ . ; 7 _ 4 . ; . . . 4 " ' - - - - - - - - - - - - - - - - - - - - - -

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe*NET) 788 3... LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL. . . . . . . . . . . . . 704.9 42687.2 152411.6*

6. REACTOR RESERVE SHUTDOWN HOURS ..* ; ..* 0 0 0
7. HOURS GENERATOR ON LIN.E ............**.*. 692.9 _it:, 446. 2 .. ' _:_:_14, 86"3 ~.7
8. . UNIT RESER VE SHUTDOWN HOURS . . . . . . * . . . . 0 0 0

. 9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . * : * * . * . .

  • 1, 621, 77 3 10,409,212 32,464,622
10. GROSS ELECTRICAL ENERGY

-GENERATED (MWH) . . . . . . . . . . . . . . * * * . * *

  • 514,149 3,379,375 10,707,138
  • l*!.~:. *:-iET ELECTP..!C.~L F.NF.HGY GENERATED (MWH)  : ...*..*..*..*.........****..* 487,65i 322102666 in 2 .a.""'T.a.

..Lv i1.1 2 n1a v ..__,

94.7 80.4 65.3 12.

' 13.

REACTOR AVAILABILITY FACTOR (1) * * * * * * . *

  • UNIT AVAILABILITY FACTOR (2) . * . . * . . . * * *
  • 93.1 76.l

_63.0_

14. UNIT CAPACITY FACTOR (3) . . . . . . ; . . . . . . * . 83.2 69.9 54.5
15. UNIT FORCED OUTAGE RATE (4) . * . . * . * * * * *
  • 6.& 8.9 25.1

' : 16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling outage October 15, 1975; approximately six weeks

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

. FORECAST ACHIEVED iNlTIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100

_H_O_U_R_S_G_E_N_E_R_A_T_O_R_O_N_L_l_N_E_ _ X lOO **,;

. "*'(2) UNIT AVAILABILITY FACTOR HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) . UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD *-'~'

c:J (4) UNIT FORCED OUTAGE RATE FORCED OUT AGE HOURS

~~--~~-----~~~------XlOO HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS

. *. . .~- .

~  : \ : : ' -: . . . . ~ *~ .: ..

.:*..... ,- Cor;ect~d. Copy* .

.'*:-;.. - ~ -~

- - 1, ' * - .. .J" -

.__i:_*, --, ::< ..* ,;_;: :*. -:** ~-* - ;,_*-*- .. ..

  • -::.:~)'.- :. . ..:. :~~;~~~~:-: }~:~;\~-:~-:~;-~ :-::~L~*:.

~  ? . *--:

~-. *: ... ;- ._. -. *-

UNIT Surry Unit No. 1 *. '. -~-

'*~ .:' .; .: ., ~;.. .' :

DATE Oct. 1, 1975

-** ;-. . ~: i '

. . ~: *: .

'coM~LETED B~ w, 'c, Earl

' ,. ~CKET No._5_0_-_2_8_0_ _ _ __

- . *~ ',.**

OPERATING STA TUS . _,_*.: .... _

750930

1. REPORTING PERIOD:

H0 URS IN REPORTING PERIOD:

0001


750901 720


~

THROUGH ..

  • 2400

-; <. .. ~--

. 2. .CURRENTLY AUTHORIZED POWER LEVEL (MWth) "2441 MAX. DEPENDABLE CAPACITY (MWe-NET) ~7~8_8~--

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):_*- - - - - - - . ; _ _ -
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE .

REPORTING PERIOD. YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL * . . . . . . . . * . * . . 613.4 5,300.6 16,025~0 0 0 0

6. REACTOR RESERVE SHUTDOWN HOURS ..*..**
7. HOURS GENERATOR ON LINE . . . . . . . . . . * * * *
  • 613.4 ~o~  :.1.5, 477 ~-
8.
  • UNIT RESER VE 5HUTDOWN HOURS .......****. 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . * . . * * * * * * * * * , 1,418, 801 11,828, 013 33,883,423
  • 10. . GROSS ELECTRICAL ENERGY

<JENERATED (MWH) . . . . . . . . . . . . . * * * * * * *

  • 452,955 3,832,330

~-

1:,:i,.;:I LI. - N.f.:_T.ELECTRICAL ENERGY GENERATED . .

429*,46_7 'l &./.(\ 1 'l'l 10,570;486

'-;_;t . (MWH). . .***.... *. ~ . . . . . . * * * . *** ** * *. * .J2v~v,*...i-85.2 80.9 65.9

12. REACTOR AVAILABILITY FACTOR (I) . . . . * . . . .

85.2 __ 11.1 -

_ _6~3~ 13. UNIT AVAILABILITY FACTOR (2) .. ~ . . . . . . . . .

14.. UNIT CAPACITY FACTOR (3) , . . . . . . . * ; ..**. 75.7 70.5 ' 55 .2

15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * . . .
  • 14.8 9.7 24.8
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. ' IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: November 5' 1975
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DATE

' !I FORECAST ACHIEVED .,

INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION

  • COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD
r.~*

HOURS GENERATOR ON LINE .

(2) UNIT AV AIL ABILITY FACTOR ----------------~x100 *~  :;.

HOURS IN REPORTING PERIOD .. *t~~:.

~:_~_---~-~fr

  • NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR =

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS (4) . UNIT FORCED OUT AGE RATE ------------------------........ -----XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

~-. .-

. -*: ... ~ : " ~- ___ :,.

_,:correcteci**copy:

l -. .:. ' *** " ~ ** '  : *

    • ~ '. ~ \ ...:i '  ! ' .*: .
  • .* .* UNIT Surry Unit No *

.*DATE Nov. 3, 1975

  • ~* ', :* . -.
  • : oocKET No . .,...5_0_-_2_8_0_-'---,--

_OPERATING STATUS

-- :::-.*** l. . REPORTING PERIOD:_0_0_0_1_ _7_5_1_0_0_1_ _ _ _ _ _ THROUGH _ _ 24_0_0_---"7-"5-"1~0~3..::1_ _ _ __

HOURS IN REPORTING PERIOD: -'-'4""-----,.-,,...-;,----*-*-**---------------.=-::,.-

. 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3. . LOwEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. *,,REASONS FOR RESTRICTION (IF ANY): .

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

.**.I

. S* . HOURS REACTOR WAS CRITICAL . . . . . . . * . * * * . 5,300.6 16,025

6. REACTOR RESERVE SHUTDOWN HOURS .....** 0 0 0
7. HOURS GENERATOR ON LINE . . . . . . . . * * . . * . . 0 -15d477.J.
  • 8. UNIT RESERVE SHUTDOWN HOURS . . . . . . * . * .
  • I) 9; *GROSS THERMAL ENERGY
  • . GENERATED (MWH) . . . . . . . . . . . ! . * . * * . * .
  • 0 11,828,013 33,883,423'

. 10*. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . . . . * . * *

  • 0 3,832,330 11,160,093 R:l\.

_ \];). *.  : :;. *: '~iE; Ei.~CTR!CA!. ENERGY GFNFRATED ,.. ') &../.(\ 1 ':i.':i.

V. .J 'v-rv' ~----' 10,570;48.n (MWH)

12. REACTOR AVAILABILITY FACTOR (1) . * . * * * . *
  • 0 --- 72.6 63.9
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . * . . Q. -
  • 69.3_ --61~7.=
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . . . 0 6J. 3. 53.5

. lS, UNIT FORCED OUTAGE RATE (4) . . . . * . . * * . .

  • 0 9.7 24.7
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IFSHUTDOWNATJ;:NDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: November 21, 1975
18. .UNITS IN TEST STATUS (PRIOR TO COMMERCIAL Ol'ERATION) REPORT THE FOLLOWING:

DATE LAST DATE

.FORECAST ACHIEVED

.

  • INITIAL CRITICALITY

, INITIAL ELECTRICAL POWER GENERATION

. *'coMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

.* (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE

. :.* ' *-.~ (2) UNIT AVAILABILITY FACTOR ---------....:....---x HOURS IN REPORTING PERIOD 100 NET ELECTRICAL POWER GENERATED

(3) *UNIT CAPACITY FACTOR =

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS

  • ' (4) UNIT FORCED OUT AGE RATE ---------------------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

~,.

Surry Unit No. 1

. . **. DATE Dec. 1, 1975

~ . . ..

.COMPLETEDBY W. C. Earl

.". ~ .. DOCK~T NO. _5_0_.-_2_8_0_ _---'---

.. -~ ......~ "*: . . . OPERATING STATUS

' ~: *.
1. REPORTING PERIOD:_0_.0_0_1_ _ 7_5_1_1_0_1_ _ _ _ _ _ THROUGH _ _2_4_0_0_ _ 7_5_1_13_0_ _ _ __

. HOURS IN REPORTING PERIOD: _ _7_2_0 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

2.
  • _CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY).(MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY): ..

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL .. , . . . . . * : .* *. 0 52300.6 162025

6. REACTOR RESERVE SHUTDOWN HOURS ...*..*
  • 0 0 __ ,a__
7. HOURS GENERATOR ON LINE . . . . . . * . . * . . . . *
  • 0 _j,.059 * .0 ...J.5,477....l
8. UNIT RESER VE SHUTDOWN HOURS . . . . . . . . . * * - i _ _ _O _ __ 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . * . . . '. *..********. 0 11,828, 013 33.883.423
10. GROSS ELECTRICAL ENERGY ..

. GENERATED (MWH) . . . . . . . . . . . . . * , .*..**.* 0 3 2832 2 330 11 2 160 2 093

-11. N*Et LLECTKiCA~ ENERGY GI:NERATED *-,.._,,...Int::

(MWH) 0 326402 i33 .L IJ 2J"/"U, '"tU*U 0

.12. REACTOR AVAILABILITY FACTOR (1) * . * * . * . * .

0 66.1

-63 . .L 62.2

-g~:t-

13.
  • UNlT AVAILABILITY FACTOR (2) . * . . . . . . . * . *
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . * .
  • 0 57.6

. 15. UNIT FORCED OUTAGE RATE (4) . * . . . . . . * . . . 0 9.7 24.7

16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONIBS (STATE TYPE, DATE, AND DURATION OF EACH):

i7. IF"SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 8' 197 5

18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED

\

INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION

. .. ~; .. :* - COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

' (lj '* REACTOR AVAILABILITY FACTOR*

HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE  ; ..

. *-** .~(2) . "UNIT AVAILABILITY FACTOR -------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) ...

  • UNIT CAP AClTY FACTOR MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD

_F_O_R_C_ED_O_U_T_A_G_E_H_O_U_R_S_ _ _ _ _ _ _ _ _ _ _ _ _ XlOO

. (4) UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS

..

  • i"
  • ~.

.*- "'*** *., '.' '* ,,-~:*

.~ *: ~. ~-~'* ..

,
,r<~-+* ** *.* . Surry* Unit No. ( *

. . . UNIT--------

, .;;*. ,~ '.
;-,

DATE Jan:* 2, 1976

.. *' -:- ' ..: .~ *, ...

  • 'cOMPLETEDBY w. c. Earl oocKET No:_5'-'0'--...;;;2'""8_:;o_ _ _ __
** OPERATING STATUS
l. REPORTING PERIOD:. 0001 751201 THROUGH 2400 751231
  • --------------~ --------------

HOURS IN REPORTING PERIOD:

2*.* CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 744 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3.
  • LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
,;- . ~*

. 4. REASONS FOR RESTRICTION (IF ANY): .*,..

. . -~

THIS * . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE**

S.

  • HOURS REACTOR WAS CRITICAL. ....*****.*. 471.4 51772 .. 0 162496.4
  • 6. REACTOR RESERVE SHUTDOWN HOURS *.*..*. 0 ___Q__ 0
7. HOURS GENERATOR ON LINE . . . . . . . . * * . . . *
  • 409.2 __ --5, 648...8- -~:fs, 886.3.
8. UNIT RESER VE SHUTDOWN HOURS . . . * . . . . * * . 0 0 0 9: GROSS THERMAL ENERGY
GENERATED (MWH) . . . . . . . * . * . . . *
.***** 8992265 12,727,278 34,782,688
10. GROSS ELECTRiCAL ENERGY GENERATED(MWH) . . . . . . . . . . . . . * . * * * * *
  • 291,450 4 2 123 2 780 l l 24512 543
11. NET ELECTRICAL ENERGY GENERATED 276~394 3,916,5~7 10,846,880 (MWH) . . . . . . . . *, ~ .- ;. ** **. ; .*.* ..*..**.**.* ***.
12. Rl::ACTOR AVAILABILITY FACTOR 0) ........* 65.9. 62*.2 55.0 62.41 __ 59.L
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . . . .
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . ~ .. . 47.1 56.Z 51.2
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . * . 26.6 11.2 24.* 8
16. . SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS ,(STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DA TE OF S T A R T U P : - - - - - - - - - - - - ,: .

. 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

.*FORECAST ACHIEVED INITIAL CRITICALITY

  • INITIAL ELECTRICAL POWER GENERATION
  • COMMERCIAL OPERATION

. *,~

HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GENERATED

(~) . UNIT CAPACITY FACTOR MAX. DEPEN£?ABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

_F_O_R_CE_D_O_U_T_AG~E_H~O~U~R_S_ _ _ _ _ _ _ _ _ _ _ _ XlOO (4) UNIT FORCED OUTAGE RATE HOURS GENERATOR. ON LINE+ FORCED OUTAGE HOURS

.. ~ .

      • - *:-:.:**** * - * > :--~*
  • 4-
~*

i->:

Corrected Copy

-' \*.:  :

.* , * , -._*1_ .:*

~

_..,. ~* '

'~-- ' "

. DA~E Feb~ 3, 1976

... ~. .

-~OMP~ETED BY W* C

  • Earl .

. '.* ~~*:.,. -* ' ...

-~- -: .. ~** -. - *::...*** *--

oocKET No._ 50_ -_2_ 8_ 0_ _ _ __

  • OPERA TING ST A TUS

. 1. REPORTING PERIOD: 0001 760101

  • THROUGH --'2;;;;...4-'--0::...;0~-'-7-=6..::.0..::.1=3=1_ _ _ __

HOURS IN REPORTING PFRIOD:_---'-7_4...;.4_ _ _ _ _ _ _ _ _~--------------

. 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):
  • THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE
5. HOURS REACTOR WAS CRITICAL. . . . . . . . . . . . . 744 744 17,240.4
  • . 7.
6. REACTOR RESERVE SHUTDOWN HOURS HOURS GENEhATOR ON LINE . . . . . . . . . . . . . . *

......* 0 744 0

744


0

_16,6...N.._3

8. UNIT RESER VE SHUTDOWN HOURS . . . . . . . . * . . 0

0 *o

9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . * . . . . ; * . 1,807 ,897 1,807,897 36,590,585
10. GROSS ELECTRICAL ENERGY

-GENERATED(MWH) . . . . . . . . . . . . . . . . * . . *

  • 589, 710 589,710 12,041,253 tf:'.'1 11. ..NET ELECTRICAL ENERGY GENERATED

\.(~j .

(MWH) . . . . . . . . . . . . . . . . * * . ; .**.*.*** 561 z-212 11 li.O~. ocn 100% 100% 63.2/:'.

12. REACTOR AVAILABILITY FAC'7'0R (1) . . * . * . . * .

100% 100%

__61.0_

13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . . . . .*-*:'
14. UNIT CAPACITY FACTOR (3) .............*. 95.7% 95.7% 53.1%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 0 0 24.0%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

/

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COM::!ERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR = HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE (2)

  • UNIT AVAILABILITY FACTOR = ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
  • (*.*'.'**"":'*'].\ _FO_R_C_E_D_O_UT_A_G_E_H_O_U_R_s_ _ _ _ _ _ _ _ _ _~x100 (4) UNIT FORCED OUT AGE RATE

'. . j HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

',_*_ *J

        • : -~ >

'* r *.'

: '. *,.  :*. . :. ~- .-
  • a:~ .*.. *

....,. .1.1orr;;;cted Copy

~* -~ 7 - -*': ..* * - . ... * * .,.-.--.

' . . ,. - *. *. . - _;' '.~-;.-~ - _* -": --.: '

. ,~- . *-* *:**: *- - _: -...~ *::

,*_
:.~. ,.. -.- ' ..-:* * *>~ :-.*;.-; \.-
  • UNIT Surry Unit No
  • 1

. DATE Mar. 2, 1976 *

...._. "f . *.

COMPLETED BY E.P ** DeWandel

~.. '" - ' . ._.-_ ..

' ~*

DOCKET NO. 50-280

. . /-: ~ .-- .: *- *: ... - *~ ._;,_ -:. ... . **' ----------~

~: ...:-.. ..

, . .. . : .... OPERATING STATUS

. 1.

  • REPORTING PERIOD:_0_0_0_1_ _7...,,6~0~2_0_1_ _ _ _ _ _ THROUGH _2_4_0_0_ _ 7_6_0_22_9 _ _ _ _ __

HOURS IN REPORTING PERIOD: _ _6_9_6 _ _ _....,,...,....,...,,--------------...-----,...,.---

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth)2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

4: REASONS FOR RESTRICTION (IF ANY): .

~

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE *

s. HOURS REACTOR WAS CRITICAL . . . . . . . . . . : .. 696 1440 17,936.4
6. REACTOR RESERVE SHUTDOWN HOURS . . . . * . . 0 0 0
7. HOURS GENERATOR ON LINE . . . . . . . . . . . . . . . E-96 .1440 i 7 ,326.3*_
8. UNIT RESER VE SHUTDOWN HOURS . . . . . . . . . . . 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . . . * . . * * * . 1,669,424 3,477 ,321 38,260,009 m GROSS ELECTRICAL ENERGY GENERA TED (MWH) . . . . . . . . . . . . . . . . . . . . . . 543,745 1,133,455 12,584,998

- -11. Nt:~f ELECT~iCAi.. _ENERGY GE~ER.A.. TED (MWH) . . . . . . . . . . . . . . . . . . . . . . . . * *. . . .

Jl. /,Jo\.!. 1

_.a._,~~

n;Q

- ,-r; 7A

.- ,1 l :925 ~458

12. REACTOR AVAILABILITY FACTOR (1) * . . . * * . * * *100% 100% 64.2%
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . ~ *.*. 100% 100% 6~-:-o-. -
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . . . 94.3% 95.1% 54.1%
15. UNIT I'ORCED OUTAGE RA TE (4) . . . . . . . . . . . . 0 0 23.2%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED*

INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION

.o COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) UNIT AV AlLABILITY FACTOR ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR

~AX. DEPENDABLE CAPACITY lMWe-NET) X HOURS IN REPORTING P.ERIOD

. - FORCED OUT AGE HOURS (4) UNIT FORCED OUT AGE RATE --------~-----------~x100 HOURS GENERATOR ON LINE+ .FORCED OUTAGE HOURS

.. ' . ~.

0

Corrected Copy .  :-. " -'*
    • ., . - ~ ..

,* .. ~*

. ... . *:*~  : -.

. , '.;._ ~~- -~

~..

  • . *-~*-

Surry Unit No. 1.

~:

~

. -.>- ,.~ .); !. ';;.U N I T - - - - - - - -

1 DATE Apr. 1, 1976

... COMPLETED BY E. p

  • DeWandel

. ; ... * .. OOCKET NO. 5 o- 28 0


~

  • . ' . . ~ .

.. * . - OPERATING STATUS

1.
  • REPORTING PERIOD: 0001 760301 THROUGH ___2_4_0_0___7_6_0~3_3_1__________

7 44 2.

HOURS IN REPORTING PERIOD:


=-=----

CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

  • 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. . REASONS FOR RESTRICTION (IF ANY): ..- ..

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

  • S* . HOURS REACTOR WAS CRITICAL. . . . . . . * * . . * . . 532 .3 1,972.3 18,468.7

. 6. REACTOR RESERVE SHUTDOWN HOURS ...*..* 0 0 __ 9__ _

7. HOURS GENERATOR ON LINE . . . . . . * . * * . * * . . 520.7 _1,960. 7 _J.-7847 _*.
8. UNIT RESER VE ::::HUTDOWN HOURS . . . . . * . . . *
  • 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . . * . * * * *
  • 1,215,803 4,693,124 39,475,812
10. * . GROSS ELECTRICAL ENERGY
  • GENERATED (MWH) . . . . . . . . . * * . . . * . * * * *
  • 396;325 1,529,780 12,981,323

!L NF.T F.1 .. FCTRJCAL ENERGY GENERATED ,.,(\.., 1nl!:.

(MWH) . . . . . . .' . *. : *. ." : : . : * -. .* . : *** : .* ** 376,648 _ i,455,226 ,~

J.'2.JV~2J..VV ~ :* ' ..

12. REACTOR AVAILABILITY FACTOR {I) . . * . * . . .
  • 7L5% 90.3% 64.3%
13. UNIT AVAILABILITY FACTOR (2) . . * . . . . * . . .
  • 70.0% 89.8% . 62. 2 *.
14. UNIT CAPACITY FACTOR (3) . . . . . * . . * . * * . . . 64.2% 84.6% 54.4%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * * * . . 30.0% 10.3% 23.4% '
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17.
  • IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - ' - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DA TE

  • . FORECAST ACHIEVED INITIAL CRITICALITY
  • INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION
  • HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR -------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD ..

c

~FO~R_C_E_D_O_UT_A_G_E_H_O~U_R_S_ _ _ _ _ _ _ _ _ _ _ _ XlOO (4) . UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

~

(.

I;*

.. . ~ . . .

Corrected liopy

-~ -~

-

  • r* - * *. ~: --

-r- _.,___, --- ._,,,, - ...

  • -~ -, - '
  • --~NIT 'Surry Unit No. 1
  • ,.* - < -* -- 5-3-76

- DATE _ _- - - - - - -

.; - ~ .-

- COMPLETED BY E

  • p. De'Wandel

" '--~~--

' ~ ..- . .. *- ..

DOCKET N0. _ _5_0_-_2-8_0_ _ __

    • 1.-'

OPERATING STATUS --: .**~-

l. REPORTING PERIOD: _ _o_o_o_1_ _ 7_6_0_40_1_ _ _ _ _ _ THROUGH _ _2_4_o_o__7_6_0_4_3_o_ _ _ __

HOURS IN REPORTING PERIOD: _ _ _ _7~1_9~--,...-----------.,.-----------,...,,....,,.--

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) __.7_8__.8'--_
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL . . . . . . . . . . . * . 574 22546.3 12,042 .. 7

6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . . 0 0 Q
7. HOURS GENERATOR ON LINE . . . . . . . . . . . . . -.. 569.7 *Z,530.4 ~8, 416.]:_
8. UNIT RESERVE SHUTDOWN HOURS . . . . . . . . * . . 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . . * . * . * . . 1,363,416 6,056,540 40,839,228
10. GROSS ELECTRICAL ENERGY

-GENERATED(MWH) . . . . . . . . . . . . . * . . * . . *

  • 447,670 129772450 1324282993

!1. - NET ELECTRICAL ENERGY GENERATED 1.t): (MWH) . . . . . . . . . . . . . . . . . . . . . * . . * . . . .  ! 8131 - ')"i2 U~ 7_2_8_,A3-2

12. REACTOR AVAILABILITY F AC-:7-:::>R (1) . . . . . . . . * -79.~lo 87.7% 64.7%

I3. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . * . . 79.2% a1.n - 62;6""-_

14. UNIT CAPACITY FACTOR (3) . . . . . . . . . * . . * . . 75.1% 82.2% 54.9% I
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . * . 20.8% 12.8% 23.4%
. I
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling 2 October 15, 1976, approximately six weeks

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: May 2, 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

- FORECAST ACHIEVED INITIAL CRITICALITY

  • .-,.I

,,. : INITIAL ELECTRICAL POWER GENERATION COM~-1ERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) - REACJ"OR AVAILABILITY FACTOR =

HOURS IN REPORTING PERIOD x 100 . L*

. -~:ZT HOURS GENERATOR ON LINE (2) - UNIT AVAILABILITY FACTOR -------------XlOO HOURS I~ REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOU FORCED OUTAGE HOURS (4) UNIT FORCED OUT AGE RATE --------------------XIOO HOURS GENERA TOR ON LINE+ FORCED OUT AGE HOURS

  • .'; ...,. : - *...' :' "~-.-. '-* *. ,.. .. -* -

-*: *.. ~ -  :','.

. . *.~

Corrected.Copy

~-

,*
*  : ~<**l't:~. -:::. - . . =~*  :- * .*. **.!.._,

' . .- : r: . - -~ -

~.

. .DATE June:1, i976**

.... ::~ -..

,- .....- . COMPLETED BY. E*. P. DeWandel.

.* - ~"  ::-':

DOCKET No._5_0_-_2_8_0_ _ _ __

.. .!_" * < ... : . **'.- OPERATING STATUS

1. .REPORTING PERIOD: 0001 760501 -THROUGH 2400 760531 HOURS IN REPORTING P~RIOD: _ _7~4...:...4-=---------------------------

.2. CURRENTLY .AUTHORIZED POWER LEVEL (MWth) 2 441 MAX. DEPENDABLE CAPACITY (MWe-NET) 7 88 3.. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL.... . . . . . . . . . __6-'4""'"7-"e""'6--~ 3193.;9 19, 690.3 '.

6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . * --"-0_ _ __ 0 0
7. HOURS GENERA TOR ON LINE. . . . . . . . * * . * * * * . . :6=3_.9_,.e_.9_ __ 3170.3 .b9, 056 *.<L.,
8. UNIT RESER VE SHUTDOWN HOURS . . . . . * . . .* . . __ 0__ . --- 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . . * * * * * *
  • 1,504, 199 . . 7 ,560, 739 42,343,427
10. GROSS ELECTRICAL ENERGY

..... -GENERATE~(MWH) . . . . . . . . . * . . . . . * * . . . .

~{~T E1=-~CTR!_CAL (MWH)

E!'!EP..GY GENERATF.D 490,165 465,205-2,467,615 2,346,757 13.919.158

...LJ2.L-:JJ.2V.J~

. . .. ""' t:...,...,

12. REACTOR AVAILABILITY F AClOR (1) . . . . , *.. : 87.0% 87.6% 65~3%
13. UNIT AVAILABILITY FACTOR (2) . . . . , . . . * . .
  • 86.0% 86.9% 6{~_2*=
14. UNIT CAPACITY FACTOR (3) . . . . . . . . * * . . . . .
  • 79.3% 81.6% 55.5%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * . . . . 13.1% 23.1%

16.. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling, October 15, 1976, six weeks . . *

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED

  • INITIAL CRITICALITY

.r I~

  • INITIAL ELECTRICAL POWER GENERATION
  • COMMERCIAL OPERATION

.j HOUR~ REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE ..

(2) UNIT AVAILABILITY FACTOR x 100 *.'

HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED

. (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe_-NET) X HOURS IN REPORTING PERIOD .

n (4) UNIT FORCED OUTAGE RATE _FO_R_CE_D_O_U_T_A_G_E_H_O_U_R_S_*---~----~---XlOO

~. }-:/ HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

,,:r

  • .'.'f

. ..:. ~--

-*--*--:- . _,-*:---\t-

.. 'cbMPLETEri BYE. P. DeWandel

.:': .*' ,~ .. ; ..... '

DOCKET NO. --"""-'-----";...;;..._---~50-280 7*,. ,:;_*,* .*

OPERATING STATUS

1. REPORTING PERIOD: 0001 760601 THROUGH_,=2~4~oo~*~~7~6~0~6~3~0~~~~~
  • - . HOURS IN REPORTING PERIOD:----"7-=2=-=0'------,~,...-----------------........,,..~
2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 7 88
  • 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY).(MWe-NET):_---------
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL. . . . . . * . . ~ . '.

  • 720 20,410.3
6. REACTOR RESERVE SHUTDOWN HOURS . . . . . .
  • 0 0
7. HOURS GENERATOR ON LINE . . . . . . . . . . . . * *
  • _*720* 3890.3_ 19,776.6
8. . UNIT RESER VE SHUTDOWN HOURS . . . . . *.*. .' ** 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . * . . . . * * ** *.* 1,744,255 9,304,994 44, 087' 682
10. GROSS ELECTRICAL ENERGY

~ENERATED(MWH) . . . . . . . . . * . . . . . . * * . *

  • 555,645 3,023,260 14.474;803
11. NET ELECTRICAL ENERGY GENERATED * . *r -*I (MWH) ..- ... *; . . . . . . . . . . . . . . . . . . . . . . . . . . . __,....=-'-5_2_7.._*_7-'-6-' 2.874.520 1 3
  • 721
  • 400 10.0% 66.1%- . ..,*.:.*
12. REACTOR AVAILABILITY FACTOR (1) . . . . . . . .
  • 89.6%
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . * *.. 100% 64.!Q. *
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . . . 93. 0% 83.5% 56.4%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . *. . . . . 0 10.9% 22.4%

. 16. SHUTDOWNS SCHEDULED TC> BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling, October 15, 1976, 6 weeks *

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
  • DATE LAST DATE  :.: _*:f

. FORECAST ACHIEVEp . -*~

INITIAL CRITICALITY

.~ - . *::

INITIAL ELECTRICAL  ; *i.:i POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE

  • (2) UNIT AVAILABILITY FACTOR -----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNITCAPACITY.FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

_FO_R_C~E_D_O_UT_A_G_E_H_O_U_R_S_ _ _ _ _ _ _ _ _ _ _ XlOO (4) UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

. .:. :.:'- .. ~ ' . .* ..:: ,... , . '.*:

  • , -.;:....: . :* ~--

uN 1fSurry Unit *#1

.,~:~,*;,:~(;:A~)u;.:;;]~:::X:~AT~*August 2, 1976 E. P. DeWandel

.*_ .. . ;' 'oocKET N0.'_5..._0_-_2_8_0_ _ __

.. -;:* ~ .... . .., . . . ~. _*: . ' . .

.... ::._ .*.... .*,*_*~ ...' *. *.**

~... .

--
_~--

-~'.

.- ~ ..., : -..

;: , , 1.
  • REPORTING PERIOD: 0001 760701 * . THROUGH 2400 760731 HOURS IN REPORTING PFRIOD: _ __,7'-4"'-4"-----,,...,...,~------------------

. 2*.. CURRENTLY AUTHORIZED POWER LEVEL (MW th) 2441 . MAX. pEPENDABLE CAPACITY (MWe-NET) 7 88

3. LOWEST POWER LEVEL.TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

.

  • 4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

(,',

s. HOURS.REACTOR WAS CRITICAL . . . . . . . : *.*. ~ 568.8 4 ,482 ;7 ~79.J
6. REACTOR RESERVE SHUTDOWN HOURS .* * *.*** 0 0 _,_.:._.0.-~. -~4

. 7. HOURS GENERA TOR ON LINE .........*.**** 56.5.1 4,45b.4 '20, .341;, 7:

0 0 0 .

8.

9.

UNIT RESER VE SHUTDOWN HOURS ; ....*. * .**

GROSS THERMAL ENERGY GENERATED (MWH) .......**.********.**

  • 1,322,138 10,627,132 45,409,820
10. GROSS ELECTRICAL ENERGY

(;; "/.

..... GENERATED (MWH) . . . . * . . . . . . . * - ******* *

~!ET E_!.EC'TRl(:AL .ENERGY GENERATED 417,655 3,440,915 3c270.337 14,892.458 14.117.217 CMWH) . . . * * * . . : * * . . . . . * * * : :*. * .- ** ; *. ~ *

12. Rl::ACTOR AVAILABILITY FACTOR (1) ....*..** 76.5%. 87.7% 66.3%
13. UNIT AV AILABILlTY FACTOR (2) .*..***.***. 76.0% 87.2%
14. UNIT CAPACITY FACTOR (3) .**....** * *..**. 67.5% 81.2%

lS. UNIT FORCED OUTAGE RATE (4) ....* , .....* 24.1% 12.8% 22.5%

. I

16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling - October 15, 1976 - 6 weeks * .I

.*.. I 17_ IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _N.._/_A__________

18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED

.. . : INITIAL CRITICALITY

.. \~ .

  • "* *.** ..** INITIAL ELECTRICAL

...... .*. .. ~ . .

. . '. POWER GENERATION

. -~-

.. . . :. .... . :" ::. . . ~ ..

  • COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR =

HOURS IN REPORTlNG PERIOD x 100

.. " (2) UNIT AVAILABILITY FACTOR =

HOURS GENERATOR ON LINE x 100 .  :*~k

~ .. -~:;*

HOURS IN REPORTING PERIOD *~:.::,~

NET ELECTRICAL POWER GENERATED - ..;

(3) UNIT CAPACITY FACTOR *~,~

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD

  • -FORCED OUTAGE HOURS* -- *** --------- ------- --- ..

. (4) UNIT FORCED OUTAGE RATE = ---~---------~---~------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

~.

. '.~: :"'

' .,_ ... ~- .  :"-.**

.,: UNIT _s_u_r_ry_U_n_i_*t__.#_1__

DATE September 2, , 197 6

.......... " ** .. *. ,. *;-<coMPLETED BY E. P. DeWandel

-~* -.~

- .. -~

.*--** '* .': * *.*.DOCKET N0._;;;.5.;;..0--'2;;;..8;;..;0;;..__ _ __

l . * ** * ;

. , , : OPERA:rING STATUS .. :** *-:--.* .* ..... *.

~.**** 0 l.. REPORTING PERIOD: _ ___;;o_o_o.;:.1_.....:7...;::6;...;:;0...;:;.8.;.01=--*--*'"-'- - THROUGH _.=2..... 40,..0,.___....7_,.6=-=0=83.._1..__ _ __

  • HOURS lN REPORTING PERIOD: _ _ _7_4_4_ _ _. . . . , . - - - - - - - - - - - - - - - - - - - -
2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe*NET) 788

, 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): _ _ _ _ _ _ _ _ __

4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL ..**......***. ** _ _6...,0_7_.,*.._4_.... 5090.1 21158615

6. REACTOR RESERVE SHUTDOWN HOURS . * . . . * * . .0 0 0
7. , HOURS GENERATOR ON LINE. . . * . . . . * * . * * *
  • 597 .1 5052.5 20,9381B

. 8. UNIT RESERVE SHUTDOWN HOURS *..******** *:*-_ ...._ _ _O_ __ 0 Q

9. GROSS THERMAL ENERGY GENERATED (MWH) .**.*.*******.*.***** 1,364,191 11, 991,323 46,774,011
10. GROSS ELECTRICAL ENERGY

-GENERA TED (MWH} .*.*.....*.*.******** 439,365 3:2 8802 280 1533312823

(~~0., ,. 11. NET ELECTRICAL ENERGY GENERATED

"-i*.";J":./

........, 416, 802 33687,139 14~ 5341019

<.* , ... " .. , *~-*********~********-********* 81.6%"* ,,

I?.,, REACTOR AVAILABILITY FACTOR (1) . . . . . . . . . . . . 86. 9% . 66!_7% -*

.~ "

. 13. UNIT AVAILABILITY FACTOR (2) .**.*.****** , .. BO* 3% 86.3% 6.'1 "]. ~

  • 14. UNITCAPACITYFACTOR(3) ...********.***.. * '* 71.1% 79.9% 57.0%
15. UNIT FORCED OUTAGE RAl'.E (4) ****..*.**** , 19. 7% 13.7% 22.4{o 16., SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling - October 15, 1976 - six weeks

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ .... N.._/A....._*- - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL

.. ... , . *: .. ~

.. ,, POWER GENERATION

. . .. *. : ~ .-

. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACfOR AVAILABILITY FACTOR =

HOURS IN REPORTING PERIOD x 100

_H_o_u_R_S_G_E_N_E_R_A_T_O_R_O_N_Ll_N_E_.--x 100 (2) UNIT AVAILABILITY FACTOR "' HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR

  • MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERlOD

.* _FO_R_C_E_D_O_U_T_AG_E_H_O_U_R_S_ _ _ _ _ _ _ _ _ _ _ _ _ _ XlOO (4) UNIT FORCED OUTAGE RATE

  • HOU,RS GENERATOR ON LINE+ FORCED OUTAGE HOURS
  • '_.~.
~.*,

~....

~ ,: .

  • e I *"
  • e* . _

~,

, , . Corrected Copy *

., . '~, . . ::-.

  • uNIT Surry Unit #1 --

.. ~ ;~ .

.__,._... *... .... -~

  • DATE October 1, 1976

. :~:*coMPl.ETED BY E. P. DeWandel

-. * --oocKETNo._-_5_o_-2_8_o_______

'*.I ..**  :*_,.,_

. OPERATING STATUS '..*-**.: ....,,, *: * .. -

l. REPORTlNG PERIOD: _ _o_o_o_1__ 7_60~9,....0_1_ _ _ _ _ _ THROUGH -'"'-24....;..0.;..0.;..__ _.. ;. .7. ;;;.60.;;.. 9.;;..;3"-'0.;. __ __

HOURS IN REPORTING PERIOD: _ _ _ 7_2_0_ _ _,....,....,._,.._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe-NET) 7 88
3. LOWEST POWER LEVEL TO WHlCH SPECIFICALLY RESTRICTED (IFANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. . REASONS FOR RESTRICTlON (IF ANY):

THIS CUMULATIVE

-*-*REPORTING PERIOD YR TO DATE TO DATE

s. HOURS REACTOR WAS CRITICAL ...*..*...*** 568.5. 5658.-6 22155.0
6. REACTOR RESERVE SHUTDOWN HOURS *.*.... 0 0 0
7. HOURS GENERA TOR ON LINE ....*.*.**. , .** 567.3 5619.8 ~1~5Q6J 8.* UNIT RESER VE ~HUTDOWN HOURS ...*.****** 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . * . . * . . . * * * * * *
  • 1, 3 7 8, 11 9 13,369,442 48, 1.52, 130
10. GROSS ELECTRICAL ENERGY

<7ENERATED (MWH) ............*********. --- -444, 215 4z324z495 15 2 776 2 038

?""c_ 11. NET ELECTRICAL ENERGY GENERATED

'{~jj* (MWH) ******* .- ; .- * ; ** ; ,- **** * .--** * *.: .--.-

/,?? ~?1

-r--' --..£. t..*z.-.--3*_:--

1 nq Qf>n 1t.._q56.840

12. Rt::ACTOR AVAILABILITY FACTOR (1) . * * * * * * *
  • 79.0% 86.1% 66~9%
13. UNIT AVAILABILITY FACTOR (2) ....*.***..* 78. 8% 85.5% 65. Q ; .
14. UNlTCAPACITY FACTOR (3) * . . . * * * * * * . * * * . 74.5% 79.3% 57 .4~~

lS. UNIT FORCED OUTAGE RATE (4)............ 21.2% 14.5% 22.4%

16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

Refueling - November 1, 1976 - 6 weeks

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: October 1, 1976
18. UNlTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DATE FORECAST ACHIEVED

~ ~ ...

  • INITIAL CRITICALITY
  • INlTIAL ELECTRICAL
POWER GENERATION

._* .. COMMERCIAL OPERATION

  • HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR =

HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE (2) UNIT AV AILABILlTY FACTOR = ------------x HOURS IN REPORTING PERIOD 100 NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR =

MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD (4) UNIT FORCED OUTAGE RATE . _Fo

__ R_CE_D_O_U_T_A_G_E~H_O_U_R_s_ _ _ _ _ _ _ _ _ _ _ _ _~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

./

.... ~ ., .. :

          • r,"'

' * *;:;:;,/~t1;; ~;~:<h;;~IT S:'1;:cy Unit No ; l .

.. . . ... .**, ~ .-.,. . . '. . .:. "

. ' .,. .... *.. "' ...:.< ...:... 2' 1976 E .P. DeWandel

  • COMPLETED BY
  • .*::*__ ...,.** .... ,~,
  • oocKET No._5_0_-_2_8_0_ __;___

~; ,: ..:- . /: .. *-.

OPERATING STATUS .- ,-.*

. 1. REPORTING PERIOD: 001 761001 . THROUGH 2400 761031 HOURS IN REPORTING PERIOD: _ _7_4_5_ _ ___,::-:-:-:-----..:.---------------...,.....-

.~ 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

  • 3..
  • LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

..* 4. REASONS FOR RESTRICTION (IF ANY):  :-**:

. THIS . CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S." HOURS REACTOR WAS CRITICAL. . . . . . . . * . * * . 399

  • 4 ., _

62058.0 221554.4

6. REACTOR RESERVE SHUTDOWN HOURS .......... _ _..;:;0_ __ 0 0 .
7. HOURS GENEJ1 ATOR ON LINE. . . . . . . . * . * . . . . . 393. 9 6!013.7 .2.L,90~
8. . UNIT RESER VE SHUTDOWN HOURS . . . . . . * . . .
  • 0. 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . * . . . * . . * . .
  • 936 1 226 14!305!668 49.088!356

. 10. GROSS ELECTRICAL ENERGY

-GENERATED (MWH) . . . . . . . . . * . . * . * . . * * .

  • 302,__3_2_5_ _ 4,626,820 16,078*,363
11. NET ELECTRICAL ENERGY GENERATED (MWH) .**.*...*..*..**.****.********* ~~6,925 4!396,885 15,243,765
12. REACTORAVAILABILITYFACTOR(l) . . . . * * . . . 53.6% 82.8% 66. 7%.
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . . . .
  • 52.9% 82.2% -6~7-*
14. UNIT CAPACITY FACTOR (3) . . . . . . . * . * . * * . . 48~9% Z6.2% 5Z.2%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * . . . . 'l.1% 13.8% 22.1%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 11 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

  • .FORECAST ACHIEVED lNITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
  • COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

. (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE

(~) . UNIT AV AILABI.LITY FACTOR ------------XlOO

. :-.i*. HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED

_.;. OUTAGE HOURS

_ _..;:._..;;.;..:;=:....;:._~------------x100 (4) .UNIT FORCED OUTAGE RATE

.. HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS

.- -... _*./--* .

.-. ~ ,.

.-. ' .-. .* .. .' .~. . .

~*-

. . ;-_ **. . , .-~--.:UNIT Surry Unit No.* .l . -*~*

.; . ~- .' --: -: ; . . .

  • -  ; .-* -~ ......... .

_ . DATE Dec. 1, 1976

-- .. **.---. .'*  : ... COMPLETED BY E. p. DeWandel

.':-* .-. .'**.<I

'*r **'\ ,.: * .

    • . *.c'* .*.. DOCKET No._S_0_-_2_s_o_ _ _ __

.. - *.**~...

~ . .., .

OPERATING STATUS *: ; ~: ****:'.

.. 1. REPORTING PERIOD: _ _o_o_o_1_ _7_6_l_l_O_l_*._ _ _ _ _ THROUGH _ _2_4_0_0_ _ 7_6_11_3_0_ _ _ __

HOURS IN REPORTING PERIOD: _ _ _7"""2_0..__ _ _ _ _ _...;.__ _ _ _ _ _ _ _ _ _ _ _ _ _ __

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe*NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

-* ~

s. HOURS REACTOR WAS CRITICAL *.*..******.* 0 62058".0 22,554.4
6. REACTOR RESERVE SHUTDOWN HOURS ........ 0 0 0
7. HOURS GENERATOR ON LINE *..*..*..****** 0 62013;7 21, 900
8. UNIT RESERVE SHUTDOWN HOURS ..*****.*.* 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) .*..*.*****..***** ; ** 0 14,305,668 49,088,356
10. GROSS ELECTRICAL ENERGY

<iENERA TED (MWH) *.*.*....*.*.******.** 0 4 2 626 2 820 16,078 2 363

/

11. . NET ELECTRICAL ENERGY GENERATED

. -- (MWH) . ***** ............................. 0 4,396,885 15,243,765

12. REACTOR AVAILABILITY FACTOR (1) . * * * * * * * . 0 75.3% 65.3% . -
13. UNIT AVAILABILITY FACTOR (2) ... * ........... 0 74.8% i:.3' 4
14. UNIT CAPAClrl FACTOR (3) ................. 0 69. 4/~ 56.0%
15. *UNIT FORCED OUTAGE RATE (4) . * . . . . . * * * . *
  • 0 13.8% 22.1%
16.
  • SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 23' 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY

    • ..... . INITIAL ELECTRICAL

.... ... ~

" ... *)

POWER GENERATION

.. COMMERCIAL OPERATION

  • . ~ ..

HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE

. * (2) . UNIT AVAILABILITY FACTOR --------~-----~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED.

(3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS (4) UNlr FORCED OUTAGE RATE -----------~--~-----------~x100 HOURS GENERATOR ON LINE + FORCED OUT AGE HOURS

Corrected .. Copy

*PNIT Surry IInit 1

~ .. DATE .Ian. 3, 1977

---*: *. *. :.- =* .,*{"

.'..... *.-*. -**~-::* ~- *J*.~*;. ~:coMPLETED BY E. p. DeWandel

~

~

--~*

.... ' . *. OOCKET N0.-5,...0-=--2~8...0.___ _ __

OPERA TING STATUS *.*.  :-*

1. REPORTING PERIOD: 0001 761201 THROUGH _ _~2~4~0~0'"-'-7~6~1=23~1..__ _ __

HOURS IN REPORTING PERIOD: _ _7.:....4..:..4-=---------------------------

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
  • 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __

4~ REASONS FOR RESTRICTION (IF ANY):

TH.IS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL. . . . . . . * . . . * . 6058.Q 22, 554 4

6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . .
7. HOURS GENERA TOR ON LINE . . . . . . . . * * . . * * . 6013.. 7 . 2L_, 900.---
8. UNIT RESER VE ~HUTDOWN HOURS . ; . * . . . . * .
  • _,_ .. ...,0,___ __ ---~0...__ 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . . . * * * * * * *
  • _-*_:*_-°'..._Q,___ __ 14,305,668 49,088,356
10. GROSS ELECTRICAL ENERGY

-GENERATED (MWH) . . . . . . . . . . . . . . * . * * * . * . *o 4,626,820 16,078,363

11. NET ELECTRICAL ENERGY GENERATED (MWH)* .- . . . . . . ~.; . . . . . .* .. -. *.- . . . .-;. .. -.*-. _<+,, J'1n, i'lO:J ..
12. RI::ACTOR AVAILABILITY FACTOR (1) . . . * * . * * . - -0 69.0% 63.9%
13. UNIT AVAILABILITY FACTOR (2) * * . . . * . * . . .
  • 68. 5% --- --62. 0.....,

.. ~

14. UNIT CAPACITY FACTOR (3) . . . . . . . . . . . . . * . 0 63.5% 54 8%
15. UNIT FORCED OUTAGE RATE (4) . . . * . . . . . . .
  • 0 13. 8%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: January 10. 1977

. 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE

':';. *.FORECAST ACHIEVED

. INITIAL CRITICALITY --~

INITIAL ELECTRICAL . *.:

  • POWER GENERATION

. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

..::* (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE -, .

  • . "' (2) UNIT AVAILABILITY FACTOR -----------~-xioo HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED

'. (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD rt'~) *(4) UNIT FORCED OUTAGE RATE _FO~R_CE_D~O_U_T_A_G_E_H_O_U_R_S~-~--~~~~--~XlOO

  • <:> HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS