VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 14,. 1977 Mr. William McDonald, Director U. S. Nuclear Regulatory Corrnnission Office of Management Information and Program Control Washington, D. c.
20555 Attn:
Mr. w. H. Lovelace, Chief Regulatory Information Systems Division Plans Branch
Dear Mr. McDonald:
Serial No.
306/102976 PO&M/TAP:dgt Docket Nos.
50-280 50-281 License Nos.
DPR-32 DPR-37 In accordance with your request of October 29, 1976, our 1975 and 1976 monthly operating statistics were reviewed to include your suggestions.
The revised pages are attached. As the Surry Units are base loaded, the reactor reserve shutdown hours should be zero rather than that previously reported.
Attachments cc: Mr. Norman C. Moseley Very truly yours, G. M. Stallings Vice President-Power Supply and Production Operations
- < _.~**-.~t*-':., *,*., **.>:*_.*.--.
- , *-._::*:* Co_rr~cted.CopY,
- --~~:f:f~;if *7:'./~*->:._(Ls~~ry Power Station
,._UNIT Unit No. 2 l.*.**:
~
--.. ~* *. '*..
- DOCKET No._5_0_-_2_8_1 ___
. :*~. : - *.; '..
OPERATING STATUS.
- l.. REPORTING PERIOD: 0001 740901 THROUGH 2400 740930
~------------
H 0 URS IN REPORTING PERIOD: ___
7_2_0 ____________________
--::o-:-::---
2 *. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __
N~/_A ____ ~---
- 4.
REASONS FOR RESTRICTION (IFANY):
N/ A THIS REPORTING PERIOD
- 5.
- 6.
- 7.
- 8.
HOURS REACTOR WAS CRITICAL.........*.*.
REACTOR RESERVE SHUTDOWN HOURS.......
HOURS GENERA TOR ON LINE....*......****
UNIT RESER VE :;HUTDOWN HOURS...*.. ;.*..
- 9.
GROSS THERMAL ENERGY GENERA TED (M\\VH).......*..*.**...**. ~
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED(MWH).........*..*.*.**.**
NET Fl l'IT~ICAL ENERGY GENERATED
{MWH)....*........*..*.**.. * *.*...*
- 12.
REACTOR AVAILABILITY FACTOR(!)..*......
- 13.
UNIT AVAILABILITY FACTOR (2)............
- 14.
UNIT CAPACITY FACTOR (3).......*.....*.
- 15.
UNIT FORCED OUTAGE RATE (4)..... * *......*
_J~O. 7 0
140.7 0
337,146 110,545 11'\\I.
nl.I.
.LV'"r,;l"t"t 19.5 19.5 18.5
. 80.4 CUMUL.ATIVE YR TO DATE TO DATE 32908.2
- 8 2509. o 32854.2 82-384.2 8!5402854 1812241789 2,783,7.90 620222467
')
t:."l/.
C:/")
c: i::oo ')00
'V.J"'T 'J I.J
-,u.,,..,,,.....,,.,,
59.6 68.4 58.8 61.~
51.3 58.2 16.6./.
.12.5
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling scheduled February 2 2 1975; approximately six weeks
- 17.
IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
October 18, 1974
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR
=
. (4).. UNIT FORCED OUT AGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION
- HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
~----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST
. DATE
. FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUT AGE HOURS
XlOO HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS
':. ~.
,..~
l~'jt* -~
- ~~~~{~TED.BY*w. C. Earl
.. :;;'.~:>.. -~)C~ET. NO._s_o_-_2_8_1 ____
- .~ '.
~ -.
- -. ~ -.". -
OPERATING STATUS
- 1.
REPORTING PERIOD:
0001 741001 THROUGH 2400 741031 HOURS IN REPORTING PERIOD: __
J~4~5---------~----------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) -.7-=8'-"8'--_
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IFANY) (MWe-NET): __
N~/~A ______ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S *. *.HOURS REACTOR WAS CRITICAL.........* ; *; *
- 6.
REACTOR RESER VE SHUTDOWN HOURS..**.**
- 7.
HOURS GENERA TOR ON LINE..........**..*
8.. UNIT RESERVE SHUTDOWN HOURS.....***.**
. 9.
GROSS THERMAL ENERGY 0
0 0
YR TO DATE 3,908.2
. 0..
3,854.2 0
CUMULATIVE TO DATE
~_Q9.0
-* a_*_
8,384.2 0
GENERATED (MWH).......*.......****..
0 8,540,854 2,783,790 18,224,789
- 10.
GROSS ELECTRICAL ENERGY GENERA TED (MWH)........**...*.**.**.
MET ELF.CTR.WAL ENERGY GENERATED (MWH) 0 U**
') C."ll.
c;7")
'z VJ-r
__, J 1...1 6,022,467 c; hQQ ?QQ
_,..,...... z-""":'.
- 12.
REACTOR AVAILABILITY FACTOR (I).... *...
- N /A 53
- 6 (5 7
- 7) *
- 64. 6 ( 66. 9) *
- 13.
UNIT AVAILABILITY FACTOR (2)....... *....
0 52
- 8
.... 6..... 3..._._..6'----
I4.
UNIT CAPACITY FACTOR (3).... *... * *. * * *.
0 45
- 8
_5,_4~*~9'----
- 15.
UNIT FORCED OUTAGE RATE(4)............
100.0 28.2
- .:.1."81-8:~.8'
. *-~
"16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
... : j Refueling: February 15, 1975; six weeks
- 17.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: November 15, 1974
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL. OPE RATION) REPORT THE FOLLOWING:
~...
.. (1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR I
(3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE
- HOURS IN REPORTING PERIOD x 100 x IOO NET ELECTRICAL POWER GENERATED DA TE LAST DATE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_FO_R_C_E_D_O_UT_A_G_E_H_O_U_R_S ____________ XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
~*
~computed on the following basis -.Hours Reactor Critical+ Reactor Reserve Shutdown Hrs. x 100 Hours in Reporting Period
.. ~:~.*,,
"',... -;.,... -*~,"
- '.,*.-;;/.?.*
'.:~:_:;'*.** Corrected Copy.
~ :
. (. -
- ;OPERATING STATUS.
'.'*I*- *.
- 1.
REPORTING PERIOD: 0001 741101 THROUGH 2400 741130 HOURS IN REPORTING PrRIOD:
720
'-----------~
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET).... z... s... a.___
- 3.
LOWE'ST POWER. LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF.ANY):
. THIS REPORTING PERIOD s.. HOURS REACTOR WAS CRITICAL.. '.. *....* *: *.
0 6 *.. REACTOR RESERVE SHUTDOWN HOURS 1......
0
. 7.
HOURS GENEk.A TOR ON LINE....... * * * * *...
0 YR TO DATE 3,908.2
_*o_._
. CUMULATIVE TO DATE 8,509.0 0 -
- -~*..* c 8.* *=lJNIT RESERVE SHUTDOWN HOURS...*.* *.*.*.. *---°'----
3.854.2 0
8.384.2 0
. 9.
GROSS THERMAL ENERGY
- -'- GENERATED (MWH)......... *... * *. * * * * *
- 0
- cc10. *.* GROSS ELECTRICAL ENERGY
- 'GENERATED (MWH) :.. *............* ;.*** v 0
'11. *. 'NET ELECTRICAL ENERGY GENERATED.
(MWH).........*.. *.....*..* *.- *.**...
- 12.. REACTOR. AVAILABILITY FACTOR (l). :."........ ___
Q=-.: --
- .. ~B. * - UNIT AVAILABILITY FACTOR (2)......**..,
- 0.
0
- 14. *: UNlT CAPACITY FACTOR (3)...........'..*.
-*15..
- UNIT FORCED OUTAGE RATE (4)........ *...
100 8,540,854 2,783,790 2,634:573 48.8 (52.6)*
48.1 *
- 41. 7 36.7 18,224,789 6,022,467 5,699,299.
- 61. 2 (63. 4)*
60.3 52.0
_*_24~X-c*:\\,~16..
'SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
_:Refueling; April 25, 1975;
- approximately six weeks
- 17.
IF SHUT DOWN AT E;ND OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
January 1, 197 5
- '**'"18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE
.
- FORECAST ACHIEVED
-~:.
(1)
REACTOR AVAILABILITY FACTOR -
- . ~<2~(2) *-~UNITAVAILABILITY FACTOR INITIAL CRITICALI'IY
- INITIAL ELECTRICAL POWER GENERATION
.COM!.IERCIAL OPERATION HOURS.REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOUR.S. GENERATOR ON LINE
_H_O_U_R-'-S-IN_R_E-PO_R_T_I_N_G_P_E_R_IO_D __ X lOO NET ELECTRICAL POWER GENERATED r
MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPO_RTING PERIOD
_FO_R_C_E_D_O_UT_A_G_E_H_O_U_R_s __________
~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- .;;*RAF computed-.. as follows - Hours Reactor Critical + Reserve Shutdown Hours
'-------------------------~ x 100
'(4)
- UNIT FORCED OUTAGE RATE Hours in Reporting Period
~-
\\. -.~*
.' t~~.-"'--~ *-.,.-.~<.*.~* *::;~ ~,.. ::;~:**..:,"
- .;,)'.-+ ;:rr*c.~~~.. Cop~
' -- ~~.. "...
~:
Surry Power Station
. :,>:_,:":::,;;y~:t:~i~~}~\\::U~IT Unit No. 2
.DATE January 2, 1975
- -:-':~,\\£Y~~~tOMPLETED BY w. c.. Ear 1.
- . oocKET No:** 50- 281 OPERATING STATUS
~--
}.
,-:_:.-i '.-..
1.. REPORTING PERIOD:_0_0_0_1_7_4_1_2 __ 0....,.1_,_ ______ THROUGH _2_4_0_0_7_4_1_2_3_1 _____
HOURS IN REPORTING PERIOD:.
744
=-..,....,,.-------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
- HOURS REACTOR WAS CRITICAL..........* : *
._0_*-_......,.~
- 6.
REACTOR RESERVE SHUTDOWN HOURS
_ __.0"------
- 7.
- HOURS GENERATOR ON LINE........** :. *..
""'0'----
- 8.
UNIT RESER VE SHUTDOWN HOURS... * *... * *
- __
0.;.._ __
. 9.
GROSS THERMAL ENERGY GENERATED (MWH)..........*..********
0*
- 10.
GROSS ELECTRICAL ENERGY
<iENERA TED (MWH)......... * *. *. * * *. *..
_.,.,._0 ___
CUMULATIVE YR TO DATE TO DATE 3 2 908.2 8 2509.0 0*
- 0 32854.2 82384.2 0
0 8,540,854 1812242789 2,783,790 6 2 022,467
?.n11i._i;71 5.699.?.99
{~~~
- 11.
NET ELECTRICAL ENERGY GENERATED
~_:J:.-.J --_-,*- - -*
-z--*z---
44.6 (48.1)*
58.1 (60.2)*
44.8
- 57. 3,/
38.2 49.4
.43.6*
-*2a.*9* -
(MWH)
... -... ;*.c. ;-.-. ; ; *.-*.--*~--.--. ;.... *.. *.-,.-
- 12.
REACTOR AVAILABILITY FACTOR (1).......**
- 13.
UNIT AVAILABILITY FACTOR (2)....*.**.*..
- 14.
UNIT CAPACITY FACTOR (3)...............
- 15.
UNIT FORCED OUTAGE RATE (4)......*.....
0 0
0 0
.16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPEiDATE, AND DURATION OF EACH}:
.Refueling: Commencing power approximately Apri 15, 1975; six weeks duration
- 17.
IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
January 4, 1975
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
.~
.. ~ -. :
(1)
REACTOR AVAILABILITY FACTOR INITIAL CRITICALITY INlTIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
. DATE LAST DATE
. FORECAST ACHIEVED
- * *. (2)
UNIT AV Al.I.ABILITY FACTOR HOURS GENERA TOR ON LINE
= -------,-----~---XlOO HOURS IN REPORTING PERIOD
--*- - ~ (3).
NET ELECTRICAL POWER GENERATED UNIT CAPACITY FACTOR
=
.. MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD UNIT FPR<:'ED OUT AGE RATE
_FO_RC_E_.D __
O_U_TA_G_E_H_O_U_R_S _____________ X lOO HOURS'GENERATOR ON LINE+ FORCED qUTAGE HOURS
_COJUPU.t~~ ?-S fo;Llows: Hours Reactor Critical + Reserve Shutdown Hours x 100
- ___ Hours in Reporting Period
.. ;. :~ :
';.~:
. -":. ~. '
_.:~**-~
~~-':.
. ~.:,*..
. ***1
~j'
.: ~"...
. I:*
- ,:~; )~.;;+~~,~ >;
U'~it N~ ~ : *1:_,'. ;
OPERATING STATUS
=~-
~;; ~..
REPORTING PERIOD:
0001 750101
.. - _THROUGH 2400 7 50131
- l.
_ ___;;;;;...;....:;,.;:;.__.;...;:;;..;:;..::.;:=-. _____
HOURS IN REPORTING PERIOD: ____...;7_4'-4'-.---:~,--------------------
- 2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788 3..
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
. 4.. REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- s.
.HOURS REACTOR WAS CRITICAL......**.*.*. '. -__
6_6_3_._3_* _,_*
- 6.
. REACTOR RESERVE SHUTDOWN HOURS 0
- 7.
HOURS GENERATOR ON LINE *........*..*.**.. _. __
6_4_1_._4 __
- 8.
UNIT RESER VE SHUTDOWN HOURS....... * *..
0
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)....**.*..******.***** : _' 1,371,463
- 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH)..*.*.*...***********. y 44 7, 815
. 11.. NET.ELECTRICAL ENERGY GENERATED (MWH)
- 12.
REACTOR AVAILABILITY FACTOR (1) **.***..*
- 13.
UNIT AVAILABILITY FACTOR (2).*....**.***
- 14.
- UNIT CAPACITY FACTOR (3).......*..*.***
- 15.
UNIT FORCED OUTAGE RATE (4).......**...
424,102 89.2 86.2 72.3 11.2.
YR TO DATE 663.3 0
641.4 0
1,371,463 447,815 424.102 89.2 86.2 72.* 3 11.2
. CUMULATIVE TO DATE 9,025.6 0
19,596,252 6,470,282 6,123,401 59.6' 58./
50.5 27.9
. 16.
SHUT.DOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling - April, Cl.pproximately six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
. 18.
- UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
~:.*
.. ~... *, .,'
~,.
(1)
REACTOR AVAILABILITY FACTOR
- INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE x 100
.
- DATE LAST DATE
. FORECAST ACHIEVED
,['*
(2). UNIT AVAILABILITY FACTOR
~x100 HOURS IN REPORTING PERIOD
,,'* ~.~ ~-... ~.-;* I
. ; >~:..
NET ELECTRICAL POWER GENERATED
,-'(3)
- UNIT CAPACITY FACTOR
.=
MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
- .\\
-, - -~:..
- -). '
- G~--"~*--c**-*(4) : UNIT FOR~ED OUTAGE RATE FORCED OUT AGE HOURS HOURS GENERATOR ON LINE+ FORCEDOUTAGEHOURS -* X lOO.
\\,*
,\\.. *
~.
=
--..,...,,,," a.....,..,.....#..,........,
_,=---....r:'~c'.-::.~.... _,,n:!'l'.."':"'!':'!'.~~.,...,,<:.":--1""'.""$' "..,...-~-,....-.:""
._.,..-ip-,.,...*~*-.*~~,.~r !".....,... *.,,~ *.:-:~---~-"":-.:-r,:;:'J'r:a-~~*-**._......,._,..,,-** -.......,.,--..,.. ~-.--.....,......,,..,.,,.~:SN<~
~**
'.* *:*r~ected.copy
' 'UNIT Surry *Unit No. *2 DATE 3-3-75 W *. C. Earl*
--.. ~~.'
- *~..
- I
~,;
50-281
- ~** :
~
~- '.
()l'ERATING STATUS
- ,, \\.._
- 1~
REPORTING PERIOD: __ O_O_O_l___;,_7_5_0_20_1'--------- THROUGH ---=2:o-4;__;0,_,0'--~7=5=0=2=28"'---'-----
.. <:-:.. --, HOURS IN REPORTl~G PER!OD:_fil(
. 2.. CURRENTLY AUTIIORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDAllLE CAPACITY {MWc*NET) 788
. 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED {IF AN~:) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
'**~
THIS REPORTING PERIOD
- 5.
- 6.
- 7.
HOURS REACTOR WAS CRITICAL...**.*******
REACTOR RESER VE SHl!TDOWN HOURS *.**.**
HOURS GE:-.:ERAIOR ON L!~E......*********
- 8.
UNIT RESERVE SHUTDOWN HOURS.**********
655.9
~ GROSS THERMAL ENERGY
., - GENERATED (~fWH),.*.*.************ ~ ~ **. 1,539, 183
- --***~10.
GROSS ELECTRICAL EJ\\'.ERGY
- *. -GENERATED {MWH)....**.*.************
505,670
- -
- II.
- NEl ELECTRIC...\\L C~ERGY GEZ..:ERliTI:D (MWH) **.***..***.***.******** ~ ****
YR TO DATE 1,319.2
. 0 2,910,646 953,485 SU4,650
- CUMULATIVE TO DATE 9,828.2
. ~-, 6 8il.1L.,
0 21,135,435 6,975,952 6,603,955
- f. -:~.
-'\\;i:...~.
- ~ 12. * --RI::ACTCR.~ VA1~_.\\BlLrf'{ f ~".C'IOR. (lj ******** * *..
013~ *UNIT A \\'AILABILITY FACTOR (2) *.*.********
97*.6
-~6~1
~-*=?-.. - -,.. --
- 14.
UNIT CAPACITY FACTOR (3)..*.***********.
- - c~~lS.
UNIT FORCED OUTAGE RATE (4) *.***.******
_,*97,..f:J __
. 90. 7.
2.4./
- 60. 3,
52.2 26.7
- -16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- Refueling scheduled April 25, 1975; approximately 6 weeks
- ':***17.
- IF SHUT DOW~ AT END OF RErORT PERIOD, ESTIMATED DATE OF STARTUP: ____________ _
- 11.
- ti'NITS IN TEST STATUS {PRIOR TO COMMERCIAL OPERATION) RErORT THE FOLLOWING:
(I)* REACTOR AVAILABILITY FACTOR
~ ~ ~~~(2) *:*;UNIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECJ:RiCAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR. ON LINE
= -~-'--~~~~~~~-~x100 HOURS!:-! REPORTING rERIOD
- Nf.T EUTTRICAl. POWF.R CF.NERATF.D DATE LAST
. FORECAST DATE ACHIEVED
- *" :'.-~:*.; :. : -.
. -.. ~' -... *, " :*
- ; *' ~... ~.-. :..
.. ~) *.. -""'<4)
=
MAX. DEPENUABLE C.-\\rACITY tMWc-NET) X HOURS IN REPORTING PERIOD
-FORCED OUTAGE llOURs*
~~~-~~~~~-~-~--~~----XIOO HOURS GENJ::ltATOR ON LINE+ FORCED OUTAGE HOURS
~;-...
I>.:
.*... :: *~
~
~ ~ -
. -.. ~--~: ~:. ~.:. ~~ -~-. ~4*. * ~!~-....:~**-**--
-~. "
- 'I I
~. *1
~- *....
¥ **
. " ~: '
~-..
- -. (r.:*,~*~/:.. ~.
\\
,..'""UNIT Surry Unit No. 2
- :DATE 4-2-75
.. \\. __ '.:<*
- ~
' \\ *,,
- .\\ \\.
- .*:\\\\
\\
.~
. \\
- - ~._,.
.. :.~~:-*_*\\.;:.
~
CO~~LETEDBY W. C. Earl
--.i-.
- .: ~: * ',
- ~-
. '. ~CKET N0._5_0_-_2~8_1 ___ _,__. *.. '
-.*~
~...
,' ~-----*..,.
OPERATING STATUS
- 1.
REPORTING PERIOD: __
o_o_o_1_--'-7-"--5-'--03-"--o"-1~----- THROUGH __.2~4--=0'-"0 _ _._7=-5-=-03=3=1=------
HOURS IN REPORTING P~RIOD: __
7_4_4 __ -'-----------------------
. 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET).-7'"""8"""'8"---
- 3.
LOWEST POWER LEVEL TO WHICH SJ.1'.CIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
- REASONS FOR RESTRICTION (IF ANY):
- THIS REPORTING PERIOD YR TO DATE CUMULATIVE TO DATE
. *... ~
S.
HOURS REACTOR WAS CRITICAL.......*.....
719.4 2,038.6 0
10,547.6
_*o
- 6.
REACTOR RESERVE SHUTDOWN HOURS..*...*
.. 7.
HOURS GENERA TOR ON LINE....*...****...
- 8.
- UNIT RESER VE SHUTDOWN HOURS........ * *.*
- 9.. GROSS THERMAL ENERGY 0
690.3 Q ---
GENERATED(MWH).*............**, *.**
1,634,413
- 10.
GROSS ELECTRICAL ENERGY
<JENERA TED (MWH).............*..**.***
540,860
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH)...**.....*..*.....***.***.**
- 12.
REACTOR AVAILABILITY FAC:'OR (1) ***.*...*
96.7
- 13.
UNIT AVAILABILITY FACTOR (2).........*.*
- 14.
UNIT CAPACITY FACTOR (3)...........*...
92.8 87.7
- 15.
UNIT FORCED OUTAGE RATE (4)............
0
..:...1,986.~*
0
.4, 545 '059 1,494,345 1,41-8,309 94.4
--_9_2.Q:_
83.4 5.6
_J.0,370J_
0 22,769,848' 7,516,812 11 o 1 no l..., *.&._.&.V,..&.UV 62.8 61.7 53.8 25.4
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling scheduled April 17, 1975; approximately six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------
- 18.
UNlTS IN TEST STA tus (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
. i.
(1)
REACfOR AVAILABILITY FACTOR
- . (2)
UNlT A VAiLABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY lNITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
~--~-~~~-~---XlOO HOURS IN REPORTING PERIOD NET E.LECTRlCAL POWER GENERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
- _FO~RC_E_D_O_U_T_A_G_E_H_O_U_R_S~~-~~----~-~XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
._. *~*:.
- ** J
'::~'.
- "~
- ~1-~:
- .. 1 :.:.:. *-. '
.. ---~*-..:!.*".'.
"':: ~*.
. Corre~ ted Copy*
- ,j:.. -,.. **
,,;~:CO~P~ETED BY W
- C * - Ear 1 No. 2
<.. ~t~ET No:_5_;0;;,...-_2_8~1;;,...* ____
-~*.:.:;;.
. OPERATING STATUS
- .... <°:".*' -***-
l.'
REPORTINGPERIOD: 0001 750401 THROUGH 2400 750430
~
'--------~
. HOURS lN REPORTING PERIOD: _ ___;7;_;2::..0::._ __ -,,.-,.-,-,...-------'-------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS.
.
- REPORTING PERIOD HOURS REACTOR WAS CRITICAL.. ~...* -* :.*,.
REACTOR RESERVE SHUTDOWN HOURS...* '*.*
HOURS GENERATOR ON LINE.......**..*...
UNIT RESERVE SHUTDOWN HOURS........*.*
GROSSTHERMALENERGY
- 583.1 0
578.2 0
GENERATED (MWH)..........*..*.** ~ ~..
1,355, 720 GROSS ELECTRICAL ENERGY
-GENERATED (MWH)..............*.*** ; :
NET ELECTRICAL ENERGY GENERATED (MWH)
REACTOR AVAILABILITY FACTOR (1) *******.,
UNIT AVAILABILITY FACTOR (2)......******
UNIT CAPACITY FACTOR (3).........*..**.
UNIT FORCED OUTAGE RATE (4).......**..*
450,290 80.3 75.4 0.0 YR TO DATE 2621~7 0
.1_,564. 7 0
5, 900, 779 1,944,635 1,846.720
91-. 89.0 81.4 4.4
. CUMULATIVE TO DATE 11, 130. 7 0
10,946~9_
--'--* Q _-_ ( '
24,125,568 7,967,102 7,546,019 63~5 62.5 54.6 24.4 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 15, 197 5 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST FORECAST DATE ACHIEVED (I).
REACTOR AVAILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
. (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNrr fORCED OUTAGE RATE HOURS GENERA TOR ON LINE
= ------------x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET)-X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
- _;;_-=.==-..
- ..:...:..:..:.:::=.~.=..;~-----------x100 HOURS GENERATOR ON-LINE+ FORCEDOUT-AGE.HOURS-
- I.
'. ~*.... -
f'.'.L1
--\\;j;J
-:_:; - -----~.:..
~.- -..
--_.... -
- _ Cole-c ted Copy :.
... ~:. *-
I*.*
- .*~
--~
u~;;.-Surry *unit' No'~ 2
"* ;,~ :-=\\
- -"i *
- ,'~;
- :~-~:,i>A~E 'June 3, 197 5
',-{-~COMPLETED BY.- W
- C
- Ear 1
'.\\.--...., /
. :.:.,;_* :,_:_5:5; :. DOCKET N0,..;5:..0::.-_,2:_:8"--'1.__ ___
OPERATING STATUS
- l.
- 2.
- 3.
- 4.
- s.
- 6.
-7.
- 8.
9.'
l_().
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
(l)
(2)
REPORTING PERIOD:
0001 750501 THROUGH_~2~4~0~0-~7~50~5~3~1=-------
HOURS IN REPORTING PERIOD:
7 44
~-----------~
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ________......;; _ _._
REASONS FOR RESTRICTION (IF ANY):.
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL...*.......*.
REACTOR RESERVE SHUTDOWN HOURS....***
HOURS GENERATOR ON LINE...*.....*.*..*
UNIT RESER VE SHUTDOWN HOURS *....*...**
GROSS THERMAL ENERGY GENERA TED (MWH).........**..******.*
GROSS ELECTRICAL ENERGY
<iENERATED (MWH).........*.***..*****
NET ELECTRICAL ENERGY GENERATED (MWH)
- . * * : -. -:-. ~--; : ; :-:-;-.. ;- ;. *; -.-~ * * * *.- -..-
REACTOR AVAILABILITY FACTOR (1).***..*.*
UNIT AVAILABILITY FACTOR (2) **.*..***, **
UNIT CAPACITY FACTOR (3)....*....*.****
UNIT FORCED OUTAGE RATE (4)..**.***.** **
0 0
0 0
O*
0 0
0 0
0 0
YR TO-DATE 2,621. 7 0
~' 5fi.E:..J" -
0 5,900,779 1,944,635 1,846,720 72.3.
- 70. 7 64.7 4.4
, CUMULATIVE
- TO DATE 11, 130. 7
- o..
'..10, 9~..8.9:..
- 0 24,125,568 7,967,102 7,546,.019
. --,-60-~ 9 59.9 52.4 24.4 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH}:
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
June 15' 1975 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
~
REACTOR AVAILABILITY FACTOR UNIT AVAILABILITY FACTOR
. INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
' COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
x 100 HOURS IN REPORTING PERIOD DATE LAST DATE
. FORECAST ACHIEVED (3)
UNIT CAPACITY FACTOR
._..NET. ELECTRICAL POWER GENERATED
_,(4)
UNIT FORCfD OUTAGE RATE MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD
. FORCED OUTAGE HOURS...
_;;,,......;_:._;__~--.:.--'---'---.;;__:;:..__-'--.:..=...~~~--x100 HOURS GENERATOR QN LINE+ FORCED OUTAGE HOURS
,.. - *.. *-,-~- *- *.
I
. >>~*-. '.
- .* Corrected Copy UNIT Surry Unit No. 2 DATE July 2, 1975
,~.. COMPLETED BY w~ C. Earl
' *:><> ooc.KET No._5_0_-_2_8_1 ____ _
-*~.
... OPERATING STATUS
. l.
REPORTING PERIOD:
0001 750601 THROUGH_2_4_0_0~~7_5_06_3~0~~~~~
HOURS IN REPORTING PERIOD:
720
.,.------------------~
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
. 4.
REASONS FOR RESTRICTION (IF ANY);
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL..*......*...
- 385.4
- 6.
REACTOR RESER VE SHUTDOWN HOURS 0
- 7.
HOURS GENE:.~ATOR ON LINE........**....***
317. 6 '
- 8.
UNIT RESERVE SHUTDOWN HOURS..* -.****..
0
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).......*....*.*.***.*
720,968
- 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH).............. * *.*..*. *.
228, 82 7
- 11.
- 12.
' 13.
NET ELECTRICAL ENERGY GENERATED (MWHJ...... *... *; *: ~......
- ~.. ;... "' *..- * *.-. *-
- REACTOR AVAILABILITY FACTOR (l)........*
UNIT AV AlLABlLITY FACTOR (2).......*.***
UNIT CAPACITY FACTOR (3)..............*
UNIT FORCED OUTAGE RATE (4)......**....
216,234
"'., 53.5 44.1 38.1 3.0
. CUMULATIVE YR TO DATE TO DATE 3007.1 11 2 516.1 0
--=-- 'Q.,t.
_: 2' 882.~ 3..
.ll,266.5 0
0 6,621,747 24,846,536 2.173,462 8,195.929 2,062.954 7,762,2~3 69.2
--- "60~ 7-- --
66.3 59.3*
60.3 51.9 4.3 23.9
- 14.
lS.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING: *
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4).. UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
- COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL x 100 HOµRs IN REPORTING PERIOD.
HOURS GENERA TOR ON LINE x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DATE
. FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_FO_R_C_E_D_O_UT_A_G_E_H_O_U_R_S __________
~XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
-~r:
~
.. **-~
~--------- -----*1-~ '""'-'
-~-~,,.~...- --
~ -.~'~: ~~**-
-~
~.-:----~~
- ~. :*
. :.*-~
- ~.. *.
. : :. *,{~-:,~j:,,~ '.:.
' *:--:..::.::~/
- .;.. :.~*~i~ Surry *unit No. 2
... ;._,,,~iiiAugust 4, 1975
- ~,.~~
- t~MPLETED BY w. c. Earl
- . '>*.::;:.. ::~::'*~-~DOCKET N0. __
5_0_-_2_8_1 ___ _
- . ~*, ~
- r
- .*~.. :/'//:*.':_.,_,. *.-.'.. ~*~; ;'".*::.
OPERATING STATUS
.r* ~. * * ' **.**
- 1.
REPORTING PERIOD:
0001
. 7 50701 THROUGH __
2_4_0_0 __
7_5_0_7_3_1 ____ _
HOURS IN REPORTING PERIOD:
744
=-.,....,...,...------------------------------
- 2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) __,7_,8...,8..__
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.......*....*
622".9
- 6.
REACTOR RESERVE SHUTDOWN HOURS
___ _..0 ___ _
- 7.
HOURS GENERATOR ON LINE........ * * * *..* *
-~ 19
- 0
- 8.
UNIT RESER VE SHUTDOWN HOURS........ * *
- __
- _0 __ _
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).... *..... * *. * * * * * *..., 1,484, 126
- 10.
GROSS ELECTRICAL ENERGY
- 11.
- 12.
- 13.
- 14.
- 15.
-GENERATED (MWH)........**. *....**.** "
- NET ELECTRICAL ENERGY GENERATED (MWHr.... *.-.-; **.* -.->;-. ;. ;*; -;*;*;--. -.- ;-.-...,,..
REACTOR AVAILABILITY FACTOR (I)...**..*,
UNIT AVAILABILITY f ACTOR (2)...*..******
UNIT CAPACITY f ACTOR (3).........**.**..
UNIT FORCED OUTAGE RATE (4).......*.*.*
483,045 458. 372 83.7 83.2 78.2 16.8
. CUMULATIVE YR TO DATE TO DATE 32630.0 122139.0 0 *-
o'-.:
-3..,.,201. 3.*
_\\l, 885 _._l:
O*
0 8,1052873 26,330,662 2~656.507 8.67.S.27!t 2.521.326
- 8. 220,_6.~..?
71.3 61.5 68.8 6Q.Z 62.9 52.9 6.7 23.6
. 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
I7.
IF SHUTDOWN AT END OF REPORTPERIOD,ESTIMATEDDATEOF STARTUP: __________________ _
I8.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR
-*(2) *. UNIT AVAILABILITY FACTOR
"(3)
UNIT CAPACITY FACTOR
=
- (4) '* uNIT FORCED OUTAGE RATE
=
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x IOO HOURS GENERATOR ON LINE
XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DATE
. FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_F_O_R_CE_D __
O_U_T_AG_E_H_O_U_R_S ______________ XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- j*
...,-;;*~(*.,'\\,r
- ~- ** *_.,.*... ~;**: ".'.* ::
Corrected Copy,
. ;*-,~;-:.:-~.. '~~:-.:
- ,-~.. ~--~. :.-*~-~*----
- -,~~
- .:~~~~;.-~.:**i
. ' - :_;:.f!~ ~~-:-~~.. ),;\\;-~-~:~~ <.:---:.~~;.~*:*.~:ifJ,~:~_~';:_~~~~;~.-:'.. :;~:*:..;->_ ~-: *-,~{~--~<*~~~~:-~:.. : >
- UNIT Surry Unit. No. 2,
-<<~ _'.
- DATE Oct. 1, 1975
. 'coM~LETEDBY w. c. Earl
~-
'**
- OPERATING ST A TUS
~..
- 1.
REPORTINGPERIOD:
0001 750801 THROUGH __
2_4_0_0 __
75_0_8_3_1 ____ _
HOURS IN REPORTING PERIOD: __
7_4_4 ___ -:::-'.=--=-"=-----------------=-=---
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MW th) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) _7_8_8 __
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
- HOURS REACTOR WAS CRITICAL......****...
- 735.4
- 6.
REACTOR RESERVE SHUTDOWN HOURS.....**
0
- 7.
HOURS GENERATOR ON LINE........**..**.
730.0 S;
UNIT RESER VE 3HUTDOWN HOURS...*..*...*
0
- 9.
GROSS THERMAL ENERGY GENERATED(MWH).......**.*..***.*.**. 1,696,860
- 10.
GROSS ELECTRICAL ENERGY
- -GENERA TED (MWH).......*.*....*.*.***
~!~T EL~~TR!CA*L ENF.RGY GENERATED (MWH)......... '. *. '... :........ ', *.... _. : : :* **
. 12.
REACTOR AVAILABILITY FACTOR (1)........*
- 13.
UNIT AVAILABILITY FACTOR (2).........*..
- 14.
UNIT CAPACITY FACTOR (3).......*.*...*.
15:
UNIT FORCED OUTAGE RATE (4).....*.**...
541,690
- 513; i34 98.8 98.1 87.5 L9 YR TO DATE 4,365~4 0
A,231...i_
0 9,802,733 3,198,197
-~3,0J4,.460 74.8
- 72. 5 66.0 5.9 CUMULATIVE TO DATE 12,874.4
__ o __
_.t'.2,615.l 0
28,027,522 9,220,664 8,733,759 62.9 61.6 54.1 22.6
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
- 18.
UNITS IN TEST STA tus (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR*
(3)
UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED
- DA TE LAST DATE
. FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
. c.)
(4)
UNIT FORCED OUTAGE RA TE FORCED OUT AGE HOURS..--*._ -*-..
-~--------~------~-~X
- 100, HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
I.**,
r:--:~*.) -
--=-':d-1"'-- *.
OPERATING STATUS a **
l
- l.
REPORTING PERIOD:
0001 750901 HOURS IN REPORTING PERIOD:
720
~,
- rrected Co_py UNIT Surry Unit No
- 2
- DA~E Oct* 1,. 197 5 COMPLETED BY w. c. Earl DOCKET NO~ 50-281 750930
,--.,.....,....------------------~
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MW th) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) _,7""'8""'8=---
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.............
- 6.
REACTOR RESERVE SHUTDOWN HOURS.......
- 7.
HOURS GENEP.A TOR ON LINE.....,......*...
. 8.
UNIT RESERVE SHUTDOWN HOURS...........
- 9.
GROSS THERMAL ENERGY GENERA TED (MWH)..........*....**.***
- 10.
GROSS ELECTRICAL ENERGY
-GENERATJ;:D (MWH)................*....
- 11.. NET ELECTRICAL ENERGY GENERATED
.(MWH)........ -.. ;.*........*......*
- 12.
REACTOR AVAILABILITY FACTOR (1).**....*.
- 13.
UNIT AVAILABILITY FACTOR (2)............
- 14.
UNIT CAPACITY FACTOR (3)..........*..*.
- 15.
UNIT FORCED OUTAGE RATE (4)............
711.4 0
707.9 0
1,627,476 5252095 h.97.n5l
. 98.8 98.3 87.7
- 1. 7
- CUMULATIVE YR TO DATE TO DATE 52076.8 132585.8 0
~
0 _:____._ -
4~_939.,2_
~12,_,_3_Z]~,~
0 0
11,430 '209 29,654,998 327232292 9 2745 2759 3.532.~Ul 9.231.410 77.5 64.1 15.4 62.2 68.4 55.3 5.4
- 21. 7
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3) t,JNIT CAPACITY FACTOR (4)
UNIT FORCED OUT AGE RA TE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DA TE LAST DA TE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_FO_R_C_E_D_O~U_TA~G_E~
H_O_U_R_S ____________ XlOO HOURS GENERA TOR ON LINE + FORCED OUT AGE HOURS
.-* *- -,'. ~ -
,:.t.*
- .~*.
- ,. :. ~.*.
..... *-~- _:;:_,. :.
- -*~: _._*:,f*.*~::**.'.JJ.:._ '**
~-:-.*:
- --~ '
-'-.-~.
- .~.. -
- ~*:.*
,.: ~~N;T Surry Unit No. 2
/..,..
(
_.. __ ;:_;<;.. ~.~ :,..,:~.... -'"-"-:__7 -~'
-,;.,~*:..,.-.~~-~-
r:*-.......
( 1*.j*
~;_;--
C
- t-rf.,,*~~--'-**
J
-~
~DATE Nov. 5, 1975.
.:c~~P~ETE~ BY w. c. Earl.
- *,_.,*._,,*",,-,*_.* *** *,; 'C,,'..;'
~
OPERATING STATUS
- 1.
REPORTING PERIOD: __
o_o_o_1 __ 7_5_l_O_O_l ______ THROUGH ___
24_0_0 __
7_5_1_0_...3_1 ___ _
HOURS IN REPORTING PERIOD: _ __,_.... 4..._ ___ --,--,-------------------
. 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET)..._7_..8.... 8"---
. 3.. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
- s.
- 6.
- 7.
- 8.
- 9.
- 10.
-1 i.
- 12.
- 13.
14.
- 15.
- 16.
- 17.
- 18.
(1)
(2)
(3)
(4)
THIS
.REPORTING PERIOD HOURS REACTOR WAS CRITICAL.......*.* **.*
REACTOR RESERVE SHUTDOWN HOURS..*..**
HOURS GENERATOR ON LINE.........*....*
UNIT RESERVE SHUTDOWN HOURS.......*.*.
GROSS THERMAL ENERGY GENERATED (MWH)............*..*..**. :
GROSS ELECTRICAL ENERGY
. GENERATED (MWH).........*.*.**.*.***
- .NET ELECTRiCAL [.?'~En.CY.GENERATED (MWH)..........*......**..*.***.**
REACTOR AVAILABILITY FACTOR (1).**.*****
UNIT AVAILABILITY FACTOR (2)....*...**..
. UNIT CAPACITY FACTOR (3).......***..*..
UNIT FORCED OUTAGE RATE (4)...........*
579.8 0
368.6
. 0 1,356,951 446,835 424,7i4 77.9 76,4 72.4 23.6 CUMULATIVE YR TO DATE TO DATE 5,656.6 14,165.6 0
_-o __ -
-5,:SDLB...-
0
., 3, s91. 6-0 12,787,160 31,011,949 421702127 1021922594 nr:J.:
O'lC::
0
,;c;,; 1 ?li.
~2::1JU2UL.J
~--!2"":.'~-2--*
77.5 64.6 ZS.5 63.3 68.8 55.9 7.6 21.8 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH);
Refueling April 15, 1976; approximately six weeks IF SHUT DOWN AT END OF.REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:..
REACTOR AVAILABILITY FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR
=
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERA TlON HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
_H_O_U_R_S_G_E_N_E_R_A_T_O_R_O_N_L_I_N_E~~XlOO HOURS IN REPORTING PERIOD NET.ELECTRICAL POWER GENERATED DA TE LAST DATE FORECAST ACHIEVED
~.
MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS H_O_U_R_S_G_E_N_E_R-AT_O_R_O_N_L_IN_E_+_F_O_R-CE_D_O_U_T_A_G_E_H_O_U_R_S_X lOO
- S.
I:/.
~
~~ :~.. ~ ~~-
- *!~:
. -~!:
. '. ~;
-.. :f.
~r
.p.*
.-/-*. -...;_
~*
CORRECTED COPY
~ *-
UNIT Surry Unit No.. 2
- . DATE Dec. 1, 197 5
. COMPLETEDBY w. c. Earl DOCKET No._5_0_-_2_8_1 ____
OPERA TING ST A TUS
- 1.
REPORTING PERIOD:
0001 7 51101 THROUGH 2400 7 51130 HOURS IN REPORTING PERIOD: __
7'--2=-0.:__ _______________________ ~-
2..
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 7 88 3-.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.......... -..
720
- 6.
REACTOR RESERVE SHUTDOWN HOURS 0
- 7.
HOURS GENERA TOR ON LINE......... *....
- 7 20
- 8.
UNIT RESERVE SHUTDOWN HOURS.........*. - ___
0 __
- 9.
GROSS THERMAL ENERGY GENERATED(MWH)...............****.*
1,725.269
- 10.
GROSS ELECTRlC'AL ENERGY
.. !l.
- 12.
. 13.
- 14.
- 15.
- -GENERATED(MWH)................*..*.
NET E!..ECTR!CA I. FNERGY GENERATED
{MWH)
REACTOR AVAILABILiTY FACTOR (1).....*..*
UNIT AVAILABILITY FACTOR (2)......*.*...
UNIT CAPACITY FACTOR (3).....*..******.
UNIT FORCED OUTAGE RATE (4)............
570,275 100 100 95.6 0
YR TO DATE 6,376:6 0
-6,227~
0 14,512,429 4,740,402 79.5
- 77. 7 71.2 6.8 CUMULATIVE TO DATE 14,885.6 0
..1. ~-,.._6ll_&.
0 32,737,218 10,762,869 10, !98,653
- 65. 7.
64.5 57.1.
20.9
- 16. -~*SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling April 15, 1976; approximately six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
. REACTOR AVAILABILITY FACTOR
- .ii.(2)
UNIT AVAILABILITY FACTOR
--~*5;(3)..'..:UNIT CAPACITY FACTOR
'_ ::;(4) * - -UNIT-FORCED OUT AGE RA TE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL _OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DA TE LAST DA TE FORECAST ACHIEVED
_= ::MAX: DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
-_F_O_RC_E_D_O_U_T_AG_E_H_O_U_R_S ________ ----XlOO
- .HOURS GENERATOR-ON LINE+ FORCED OUTAGE.HOURS
lo
~.. -.
'. ' \\: ;.";
- ~- *.
- ',-.; -.y*..
,:,. ~
.*. -* ~
-~' -...., -.
~-**. >-:::-_~;:;.'. >:;.-.,-.. -.
I
- :::.-::.:~.:<:.>*
, ::, ~,,;,: ;;: UNIT Surry Unit No *
.-.;:... ; *: *. :, -,~-o;...:, *.,
-~ 0 \\::~:<J>ATE Jan. 2, 1976
- ~.COMP~E~ED BY W
- C. Earl 50-281
- . ;,_:,-*OPERATING STATUS
- _-_ ~ ( :~. ',-_ :._--.:,. :*~--
751231
- l.
REPORTING PERIOD:
0001 751201
- ~~.
.~ -.
. HOURS IN REPORTING PERIOD: ___
7_44 _____________________ --=--
.. 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441
-MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
- LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
- THIS_.
REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.......*.....
- 6.
REACTOR RESERVE SHUTDOWN HOURS.... '..*
1-HOURS GENERA. TOR *oN LINE........**.....
- 8-UNIT RESER VE SHUTDOWN HOURS......*..**
- 9.
GROSS THERMAL ENERGY 744 0
744 0 ---
- .. GENERATED (MWH). :.....*......*** * *.
- l, 770, 915
- 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH).........*... *...**.*.
! 1.
Nt:=:T ELECTRICAL ENERGY GENERATED
. * *** * (MWH). :.... ~~-. -:-*:--:-:.-*. -~ ~-~ *.* -.' :.** '. *.
- 12.
REACTOR AVAILABILITY FACTOR (I)..*......
- 13. -* *UNIT AVAILABILITY FACTOR (2)......*.**..
' -14.
UNIT CAPACITY FACTOR (3)....... ;. *....*.
lS.
UNIT FORCED OUTAGE RATE (4)......* ;..*.
582,690 553 ~ 728 -
100 100 94~4 O*
. YRTODATE 7,120.6 0
~971.8 0
16,283,344 5,323,092
.5,053,082.
81.3 79.6 73.2 6.1 CUMULATIVE TO DATE 15,629.6 *.*
~ _o.
..15., 355...n._.
0 34,508,133 11,345,559 *.
10.752y381*
66.8 65.6 58.3 20.l
- * *:-.SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
_*Refueling; scheduled April 15, 1976; approximately six weeks "17.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________ _
18 *. *. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL'OPERATION) REPORT THE FOLLOWING:
.. *(I) * *. REACTOR AVAILABILITY FACTOR
- : -.::,.~'(2) -::-'UNIT.AVAILABILITY FACTOR
.. *. ::!i(J>*;:;/UNIT CAPACITY FACTOR
- (4)
.**:INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
. *. COMMERCIAL OPERATION
~. *.
HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD XlOO
_H_O_U_R_S_G_E_N_E_R_A_T_O_R_O_N_L_I_N_E __ X lOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST.
DATE
. FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
- -~- FORCED OUTAGE HOURS
=. HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS X lOO
. (,
- ~.. ' ~.. ' ' ; *.
~***.
- l *.,'.,-.. '* -,i,.-** ' * ; -.* *_,.:,
_; _--. ;.*;._,;~f _._7-,
-Y*/~;;r,,~);i:)~~;;:,~~it Sur~y Unit No~*
.y...
Feb. 3, 1976 W. C. Earl
.*l 50.....;281.
. ~"OPERATING STATUS
-~ _.. -~..
- 1.
REPORTING PERIOD:
0001 760101 THROUGH _2_4'-"0'-'0----'-7""--60~* l"--'3~1'--'-----
";z.
- 3.
HOURS IN REPORTING PERIOD: __
7 4_4-------------------------
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788 LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MW_e-NET): _________
A.
REASONS FOR RESTRICTION (IF ANY):
THI~.
REPORTING PERIOD S *. HOURS REACTOR WAS CRITICAL..*.....**. ;.
- 6.
REACTOR RESERVE SHUTDOWN HOURS.....**
- 7.
HOURS GENERATOR ON LINE........******,
- 8.
UNIT RESER VE SHUTDOWN HOURS......**.**
9; GROSS THERMAL ENERGY 548.4 0
540.9 0
GENERATED(MWH).......*...*.*.********
l,239,096
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED (MWH).............*..*****
- 11.
N.ET ELECTRICAL ENERGY GENERATED
- -- * **{MWH)
- 12.
1-3.
. 14.
REACTOR AVAILABILITY FACTOR (1)........*
UNIT A VAILABlLITY FACTOR (2)..*...*.*** ;
UNIT CAPACITY FACTOR (3).........*..* :.
- UNIT FORCED OUTAGE RATE (4).......**.* :.
408,380 387 _305*
- 73. 7%.
72.7%
66.0%
27.3%
YR TO DATE
(
548.4 0
540.9 0
1,239,096 408,380 387.305 73.7%
- 72. 7%
66.0%
27.3%
. CUMULATIVE TO DATE 16,178.Q_
- . 0
_!_5, 896.5*
u 35,747,229 11, 753, 939 11.139,686
- -- -~67. 0%~ -"**..
- 65.8%
58.5%
20.4%
ts.
..16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE T.YPEiDATE, AND DURATION OF EACH):.
Refueling; approximately six weeks April 15,
~lb
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1).
REACTOR AVAILABILITY FACTOR
. - (2)
UNIT AVAILABILITY FACTOR
- '*. ** (3)
UNIT CAPACITY FACTOR
. (4)
UNITFORCEDOUTAGE RATE
~..
- INITIAL CRITICALITY INITIAL ELECTRICAL
.POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GENERATED PATE LAST
-FORECAST DATE
'ACHIEVED
- 1*.
. M"AX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
-~-
~100 HQURS-GENERATOR ON LINE+ FORCED OUTAGE HOURS I..
-~>'**'
..:.._.. ~...
. ~-.. :
2,* 1976
~
~ \\. *:-.,.,,
... ~-
~:
E.P. DeWandel 50-281 OPERATING STATUS
- ** y*
~'-~: **
- l.
REPORTING PERIOD:
0001 760201 THROUGH_-__
2_4_00_
.. _7_6_0_22_9 ___ _
HOURS IN JlEPORTING PERIOD: _ _..;;_6~9-"-6------------------------
. 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe*NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): _________
4,. REASONS FOR RESTRICTION.(IF ANY):
THIS REPORTING PERIOD
- S.
- HOURS REACTOR WAS CRITICAL...........*.
497.4
- 6.
REACTOR RESERVE SHUTDOWN HOURS.**...*
0
- 7.
HOURSG-ENERATOR ON LINE....*....***.. **
495.4
- 8. 'UNIT RESER VF SHUTDOWN HOURS.....**.***
0
-. 9.
-. GROSS THERMAL ENERGY
.GENERATED(MWH).............***** ;. *;. 1,186,517 IO *. -GROSS ELECTRICAL ENERGY
--- :-~ENE RA TED (MWH).........*.....**. :.* ;
ll.
NET ELECTRICAL ENERGY GENERATED 391,200
~-.
YR TO DATE 1045.8 0
1036.3 0
CUMULATIVE TO DATE*
16,675_.~
__ Q__
_ 16' 39J.. *. 9
. 0 (MWH) *--:. *-_--: * -: ~- :. ~-: :-.-~*::. -.*-..* **. ;*-:-;-.--:-.---;'., ____ 3_7_1_,_5_1_1_
- 12.
- REACTORAVAILABILITYFACTOR(l).........
71.5%
2,425,613 799,580 758.816 72.6%
72.0%
36,933,746 12,145.139
!J,511, 197 "6L1%--.. * *;c -
66.0%
- -.,-13_ *UNIT AVAILABILITY FACTOR (2) *...... * *...
- 71. 2%
- .14.
.UNIT CAPACITY FACTOR (3)........ *.... *
- 67
- 7%
- lS.
UNIT FORCED OUTAGE RA TE (4).......**..- ;
- 28
- 8%
58.8%
66.9%
20.6%
28.0%
~16.* --SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
-;'-Refueling shutdown. April 15. 1976; approximately six weeks.
- 17. -
IF SHUT-DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
- 18.
"UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
'INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST DATE
.-. FORECAST ACHIEVED
-(1) *'REACTOR AVAILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
- -*:.*~.'
- "1_:;':'-(2) -~"UNIT A"VAlLABILITY FACTOR
_H_O_U_R_S_G_E_N_E_R_A_TO_R_O_N_L_l_N_E __ XlOO HOURS IN REPORTING PERIOD
- ~' ~-" J'l.ET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD
.,:.:.£QB~Ep QU'I_'AGE HOURS X lOO
- . HOURS GENERATOR !JN LINE +FORCED OUTAGE HOURS
- ~ - :
--\\ -:_
~
.. *-~
~. - *. *-
-~: _: - -.
-~-
.*... * ("'}j:*-:, *'
- **..:c __,
_. *. i :';;~_...
. -*~... UNIT Surry Unit No
- 2
.. - ~ '. ~ ': -
~. -*:-.
- .. DATE Apr. 1, 1976
... ~:~COM~LETED BY.E.P
- DeWandel
.. boCKET NO*._s_o_-_2_8_1 ____
. c-,;
,_,~; OPERATING STATUS 0001 760301 2400 760331 1..: REPORTING PERIOD=---------------,-* THROUGH-------------
HOURS IN REPORTING PERIOD:
744
~----------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET); _________ _
- 4.
REASONS FOR RESTRIC~ION (IF ANY):
THIS REPORTING PERIOD S.
- HOURS REACTOR WAS CRITICAL...*.........
- 6.
R'EACTOR RESERVE SHUTDOWN HOURS.....*.
- 7.
HOURS GENEl:A TOR ON LINE........**.****
. 8.
. UNIT RESER VE SHUTDOWN HOURS......*..*.
- 9.
- GROSS THERMAL ENERGY
-'***GENERATED (MWH)..........*.*.*******
- 10. -GROSS ELECTRICAL ENERGY
-GENERATED (MWH).............*..*****
608.5 0
606.4 0
1,451,862 473,520 YR TO DATE 1,654.3 0
1,642.7 0
3,877,475 1,273,100
- 11.. NET ELECTRICAL ENERGY GENERATED
. cMWH)........ -*;'*:. :* ** * *.. ::-. *;-;.;.*~.*;: ---* 4!;9,305.... _____ l_,2._08..,J_21:.
- 12.
REACTOR AVAILABILITY FAC~QR (1)....**..*
- 13. **UNIT AVAILABILITY FACTOR (2)..*.*** ; ****
UNIT CAPACITY FACTOR (3).......*.*.....
UNIT FORCED OUTAGE RATE (4)......**....
81.8%
81.5%
76.6%
18.5%
75.7%
75.2%
70.2%
24.8%
CUMULATIVE TO DATE 17,283.9
- o.
16,998.3 0
38,385,608 12,618,659
.11,960,.502-:,_
67.6%
66.4%
59.3%
20.6%
. 14.
. IS.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- Refueling shutdown. April 15, 1976; approximately 6 weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
_, 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR
. -- (2). -'UNIT AVAILABILITY FACTOR
- .,,;i'(3) ""'UNIT CAPACITY FACTOR
<<0-UNIT 1-*oRClm OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL
. POWER GENERATION COM~:ERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FQB_CED_Ol!JAGE HOURS ____ - _ -- --- ** * -'* - -.,. -
- X 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
.*::.>1
'~--1
- i. I
- i!-1
- __ -~
- -*~....,
- ~-* ~. <"
.* _ 0
'OPERATING STATUS
-HOURS IN REPORTING PERIOD: __ ~~--------------------"'=""=--
2,.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
- THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.....**..'.. * *.
- 6.
REACTOR RESERVE SHUTDOWN HOURS....***
- 7.
HOURS GENERA TOR ON LINE.....*... :.****
- 8.
UNIT RESERVE SHUTDOWN HOURS... _... ;~.*.
- 9.
GROSS THERMAL ENERGY 505.5 0
503.7 0
GENERATED (MWH)............****.*** -*-**
l, 175,103
- 10.. GROSS ELECTRICAL ENERGY
.GENERATED(MWH)............**..*.***
I l.. NET ELECTRICAL ENERGY GENERATED
. (MWH.)
I2;. REACTOR AVAILABILITY FACTOR (1).***..* ;._
378,580
-:t<;R
~hl
""'!~-~ >~-= = --
70.2%
- 13.
UNIT AVAILABILITY FACTOR (2) *. * * * * * * * * * *..._._.7....,,0.._."""'0""'%.._
0 63.2%
0 I4.
UNIT CAPACITY FACTOR (3)........**...*.,
IS *. UN_IT FORCED OUTAGE RATE (4).......**..*
YR TO DATE 2,159.a:
0 2,146.4 0
5,052,578-1,651,680 1;;566~482 74.* 4%
73.9%
68.5%
- 20.1%
. CUMULATIVE TO DATE 17,789,4 0
l,I., 502.
o-39,560,711 12,997,239 12,3_18,863.
67.6%
66.5%
59.4%
20.1%
- 16.. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE,DATE,ANDDURATION OF EACH):
- 17.
IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
May 22, 1976
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
. --~. *..
- . (1). REACTOR AVAILABILITY FACTOR
- (2)
UNIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL
- POWER GENERATION
.,. -* COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x IOO
_H_O_U_R_S'-G_E_N_E_R_A_T_O_R_O_N_L_l_N_E __ X lOO HOURS IN REPORTING PERIOD DATE LAST
. FORECAST DATE ACHIEVED U> ---UNIT CAPACITY FACTOR NET ELECTRICAL POWER GENERATED
- MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN-REPORTING PERIOD
~ * '---(4)
. UNlT FORCED-OUT AGE RATE
_FO
__ R_C __ E_D_O_UT_A_G_E_H_O_U_R_s _______ -.,..._.......,...--x 100 HOURS GENERATOR ON LINE+ FORCED OUT AGE HOU-RS
"a..
. ~. - ~
~. :.
Corr~cted Copy
~..,..
. - '. ~
OPERA TING STATUS
- l.
REPORTING PERIOD:
0001 760501
'*:;:~:*,\\;i:~"~~:_:.'.;>\\~::;;L,.;;t_lJ.NI}". Surry Unit No. 2
.* :**. *. DATE June 1, 1976
, c COMPLETED BY E.. P. DeWandel
- ..
- DOCKET NO.
50-281
~--------
. -~.
THROUGH __
~2~4~0~0,____.7~6~D~5~3~1---~
- HOURS IN REPORTING PERIOD:
7 44
-'--------,,-,-,-------------------~
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 2.
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
- HOURS REACTOR WAS CRITICAL.......*.....
0
- 6.
REACTOR RESERVE SHUTDOWN HOURS...**.*
0
- 7.
HOURS GENERATOR ON LINE......*...*.*.*
0
- 8.
UNIT RESERVE :SHUTDOWN HOURS...*...**.*
0
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)..............*******
0
- 10.
GROSS ELECTRICAL ENERGY
. -GENERATED (MWH).........***.*..*., *.*
0 YR TO DATE 2159.*8 o
2146.4 o
5,052,578 1,651,680 CUMULATIVE TO DATE 17,789.4
____ Q__
17 502.. * (
o 39,560, 711 11.~ 997 '239
- ...,~-~~ *:
. -* -~.
- .. *I ii.
~ET ELECTR:CAL ENERGY GENEP~ATED (MWH).................**..** * ***..*
1,566,482 59.2%
".'.. n ot:., :
.1"-,.Ji.O' UU.J.,,._._, ___ ---::"*
- 12.
- 13.
- 14.
- 15.
16~
REACTOR AVAILABILITY FACTOR (1) *.****.**
UNIT AVAILABILITY FACTOR (2)....*..*****
UNIT CAPACITY FACTOR (3).......*.**.**.
UNIT FORCED OUTAGE RATE (4)......**..*.
o 0
0 0
58.9%
54.5%
20.1%
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS cs:rATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
June 1, 1976
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
65.8%.
64.7"(0 57.8%
20.1%
DATE LAST DATE (1)
REACTOR AVAILABILITY FACTOR
- :'-;:=----- ***' *
- -'(2)
UNIT AVAILABILITY FACTOR
- ~ *.:"'-" _.-
,~
- (3)
UNIT CAPACITY FACTOR
'(4). -~ *.... ~~=="-.. -- -
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
~------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED.
.FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUT AGE HOURS-
~----------~----~---~X 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- .... ;.a..
Corrected Copy
.-~.'
i.*
.~ ';.j!".
UNIT Surry Unit #2
..,., *".:~'. ~--
..:.. '. ~* '.",*.'.
-~..,,::. :..
DATE July 1, 1976
~---,_.
- ~, ** ** <
- COMPLETED BY E. P. DeWandel
. ' ~-.
OOCKET N0. __
5_0_-_2_81~---
.t...
OPE.RATING STATUS
- 1.
REPORTING PERIOD:
0001 760601 THROUGH -=2-'-4=0=0 __
_,7'-"6"""0'"""6""'3~0 ___ _
HOURS IN REPORTING PERIOD: 720
...,,.-,~-------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET)..._7..,,,8=8.___
- 3.
LOWEST POWE.R LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL..........*..
- 6.
REACTOR RESER VE SHUTDOWN HOURS.......
- 7.
HOURS GENEr. A TOR ON LINE..............*
. 8.
UNIT RESERVE SHUTDOWN HOURS...........
- 9.
GROSS THERMAL ENERGY GENERA TED (MWH).............**..**..
- 10.
GROSS ELECTRICAL ENERGY GENERA TED (MWH).....................
- 11.
NET ELECTRICAL ENERGY GENERATED
.. (MWH)........ ;-............**.**. *.*. *
- 12.
REACTOR AVAILABILITY FACTOR (1).....*...
- 13.
UNIT AVAILABILITY FACTOR (2).....,..*...
- 14.
UNIT CAPACITY FACTOR (3).......... *...*..
- 15.
UNIT FORCED OUTAGE RATE (4)............
576.5 0
502.6 0 ---
1, 138, 081 374,915
~c:c; ?7?
80.1%
69.8%
62.6%
- 8%
CUMULATIVE YR TO DATE TO DATE 2736.3 18,36.5.9 Q
Q 2649.0 18 ~ 004. 6 0
0 6,190,659 40.698.792 2!026!595 13 3 372 3 154 1
0?1 7r:,/,_
1? F.7!.. 11c;
=-:r*.....
62.6%
66.1%
60.7%
64.8%
- 55. 8%
57.9%
17.1%
19.7%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAlL~BILITY FACTOR
. (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMr.'ERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_FO_R_C_E_D_O_U_T_A_G_E_HO_U_R_S ___________ XlOO HOURS GENERATOR ON LINE-+-FORCEDOUTAGFHOURS*-.
~I *
.. * ~-.. ~ /
.- /. -
f'.
.. ;~*, ' :
- ~
- ~': '
~ '.'
OPERATING STATUS
. l.. REPORTING PERIOD:
0001 760701.
U~IT- Surry Unit. #2 DATE*_August 2, 1976 E. P. DeWandel
.* '. DoCKET N0._;;..50.;;..-_2;..;;8.;;.l ___
THROUGH --=24.;..;0;...;;0_7;_;6;...;;0..;;..7.;;_31:;._ __
. HOURS IN REPORTING PERIOD:
7 44
- 2.
CURRENTLY AUTHORIZED POWE_R_L_E_V_E_L...:(M_W:...:...th_) _2_4_4_1 __
M_A_X_. D-. E-_ P_E_N_D_A_B_L_E_C_A-PA_C_l_T_Y_CM-W-e--N-ET_) ___ 7:a:s:.:-:
- 3.
LOWEST POWER LEVEL TO WHICH SPECu;'ICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
1 HOURS REACTOR.WAS CRITICAL *..**. ; **** ;.
- 6.
REACTOR RESER VE SHUTDOWN HOURS ****** *
.7.
HOURS GENERATOR ON LINE..**....******.*
- 8.
UNIT RESER VE SHUTDOWN HOURS ****.******
- 9.
GROSS THERMAL ENERGY
- 705.2 0
704.3
-*o GENERATED(MWH) *.** :.************.*.** -
L71L295
- 10.
GROSS ELECTRICAL ENERGY
<iENERATED (MWH).*...**.****.********
555,805 CUMULATIVE YR TO DATE TO DATE 3,44'1.5 19,071.1 0
0 3 2353-:3
- ts.,168! 9 0
0 7,901,954 42.410,087 225822400 132927 2959 2zll49~324 13.201. 705.
- 11.
NET ELECTRICAL ENERGY GENERATED a:;?1 i:;1n
--:_------cMWH)-*--:.-. *;.--:.-.---.--.-~-;-:-.-~-.*-..... -..,;. ~..;...
--* ~-* -
- .*~
- 12.
REACTOR AVAILABILITY FACTOR (1) ***.**.**. _. __.9;...4:..:*:.,;;;8;..;.;%~
UNIT_ AVAILABILITY FACTOR (2) *.**********.* *. -..:9;...4:..:*~7~~~-
UNIT CAPACITY FACTOR (3). * *. * *. * * *. *.* *
- 90
- 0° 0
UNIT FORCED OUTAGE. RATE (4) **..****** ** ;
5
- 3%
67.3%
66.9%
- 65. 6%.
65.6%.
60.8%
58.8%
14.8%
19.2%
- 13.
- 14.
- 15.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
- 18.
None IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
August 2, 1976 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
- -_*:_\\
INITIAL CRITICALITY
- INITIAL ELECTRICAL
.*POWER GENERATION COMMERCIAL OPERA TlON DATE LAST FORECAST (1)
- REACTOR AVAILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD XlOO (2)
UNIT AVAILABILITY FACTOR HOURS GENERATOR ON LINE
=* -------------------XlOO HOURS IN REPORTING PERIOD*
UNIT CAPACITY FACTOR NET ELECTRICAL POWER GENERATED.
DATE ACHIEVED
'*.. t' (3)
MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD.
C:J,...,.. (4)
UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS
=
x 100 HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS
. : ~--
i<-':i\\
\\_ _ _:;:
. ~.
--:-9
(:/-
- ::.-:i_,..,
Corrected Copy
-*-*a
*0 A'
-~* ** ~ * *
- 7
.....,,.~ ~
- UNlT Surry Unit. #2
~ -
. ---~..._.""::
r DATE Sept. 2, 1976 COMPLETED BY E. P. DeWandel
- DOCKET NO. 50-281
~
OPERATING STATUS
- l.
REPORTING PERIOD:
0001 760801
- THROUGH 2400 760831 HOURS IN REPORTING PERIOD:
7 44
,,....,~--~~---------~-----~
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (lF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (lF ANY):
- s.
- 6.
- 7.
- 8.
- 9.
- 10.
. ii.-
- 12.
- 13.
- 14.
lS.
- 16.
- 17.
- 18.
(1)
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL *......*.***.
REACTOR RESERVE SHUTDOWN HOURS.*****.
HOURS GENERA TOR ON LINE *.*.....*******
UNIT RESERVE 3HUTDOWN HOURS...**.***.*
GROSS THERMAL ENERGY 691.8
- o 690.4 0
GENERATED(MWH).*....**..*.******** : 1,661,570 GROSS ELECTRICAL ENERGY
<JENERATED (MWH).........*..***.*****
(MWH)
REACTOR AVAILABILITY FACTOR (1).......**
UNIT AVAILABILITY FACTOR (2) *...***....*
UNIT CAPACITY FACTOR (3).*......******.
UNIT FORCED OUTAGE RATE (4)......****..
- 533,525 505,862 93.0%
92.8%
86.3%
7.2%
. CUMULATIVE YR TO DATE TO DATE 4133.3 19 3 762.9 0
~
4043. 7 19~_399._3.:__
0 0
9,563,524 44, 071, 657 3, 115, 925 14, 461, 484
- 2,222.186 i-3.- 7Q f D 5 0 i,._
- 70. 6%*
67.6%
62.1%
66.3%
64.1%
59.5%
13.6%
18.8%
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
None IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATEI>DATE OF STARTUP: __ N
/ A _________ _
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR AVAILABILITY FACTOR INITIAL CRITICALITY
- INITIAL ELECTRICAL POWER GENERATION
- COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DATE LAST DATE FORECAST ACHIEVED HOURS GENERATOR ON LINE
~x100 HOURS IN REPORTING PERIOD (2)
UNIT AVAILABILITY FACTOR (3)
UNlT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE NET ELECTRICAL POWER GENERATED
- MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD
--FORCED OUT AGE HOURS -
= HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS. X lOO
':~
i*' '.
a**
~-
~.:
- .*~:***.
. Surry Unit #2 *
\\/L... *.**-
October*!, 1976
- * *.; '!~ -~* !. r
-.~
- ** ** r
- .OPERATING STATUS COMPLETED BY E. P. DeWandel
. ' *. DOCKET No.--5..;;..0-...;2;;..;8;;.,;:1=-----
- 1.
REPORTING PERIOD:
0001 760901
- THROUGH 2400. 760930 HOURS IN REPORTING PERIOD: ___
7_2_0 ___
- 2.
- CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. !JEPENDABLE CAPACITY (MWe-NET) 788 3..
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL......**.*.**
349.8
- 6.
REACTOR RESER VE SHUTDOWN HOURS..*..**
- 0
- 7.
HOURS GENER HOR ON LINE...*...***.****
- 349.8
- 8.
UNIT RESER VE SHUTDOWN HOURS......*.***.
0
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).............. *. * * * * *,. _._8_3_7_,.,_8_6_7 __
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED (MWH).............. ~ * * *. * *
- 272, 635 C'JMULATIVE YR TO DATE TO DATE 4483."1 20112. 7 0
0 4393.5
..12.J. 4:2tl_
0 0
102401,391 442909 2524 3,388,560 14,734, 119'
_______ :"::;, _____, __ } ~* _-~ET ~-L!'.CTRICAL ENERGY GENERATED
---~
(MWH) -. -.-... *:: -:-. ~ :-.-.-~-..*. -;-** -~ *. * *. *
- 258j 516 3.?1~_7Q2 13 s 966s 083
- ~
.. ~
- 12.
Rt:ACTOR AVAILABILITY FACTOR (1).*. * ******.. __
4_8_.;....6~%;;....._
- 13.
UNIT AVAILABILITY FACTOR (2).**.*...*** ~. --..:.4..:::;8..._ *..,..6.... %_
. -~--68. 21:*
6 7-;T% ___ -
- 66.8%
65.9%
- 14.
UNIT CAPACITY FACTOR (3)........****** ;. __
4..:.:5:;...:*:..::6'-"%"--
62.0%
59.1%
lS.
UNIT FORCED OUTAGE RATE (4)............
51.4%
- 18. 7%
19.8%
. 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
NA
- 11.
.. 18.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
October 15' 197 6 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
. ~
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR
.<3>
. UNIT CAPACITY FACTOR
\\"
- - *. INITIAL CRITICALITY
- INITIAL ELECTRICAL POWER GENERATION
. _ : COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL
~----------------~-XlOO HOURS IN REPORTING PERIOD DATE LAST DATE FORECAST ACHIEVED HOURS GENERATOR ON LINE
= ~-~------~-----XlOO HOURS IN REPORTING PERIOD
= NET ELECTRICAL POWER GENERATED*
- MAX. DEPENDABLE CAPACITY (MWc*NET)--X--HOURS IN REPORTING PERIOD
. FORCED.OUTAGE HOURS lOO liOURS GENERATOR ON LINE+ FORCED-OUTAGE HOURS-X.,
-.~
- ."I-
.. ~"*-
- -~~-
- '.. *.*.~-: *.
-.. - ~ '.
. '. *~:.
- . _*. ~-.-9~corrected Copy
- '<-~ ~;--~~>*::.::*;,,,,;_,:~~$;~~:~,;. _'.: ':~~~-: ;
- . '* *., '"'°'Z:""'*-;~:~i-~,:1~: ;: *. ::_.
- '<--, ;,;.UNl;-surrY-Unit No. 2
- .;:.,,:. ~:** :~¥~~--,~./'.:*. ~-~ :f{*~* 7,'-'::;~~.. ;-; :--.,.;.,~:.:~:~***-;. *.
1/' **.*'.
DATE Noy. 2
- 1976
_, -COMPi~T~D BYE.P. DeWandel OPERATING STATUS
. *.. '_. ~-**. _. -
i.. REPORTING PER10D:_oo_1 __
7_6_1_0~0_1 _______ THRouciH-_ 2_4_0_0 _
__;.7_6_1_0..:,.3..:;.1 _____
HOURS IN REPORTING PERIOD: __
7_4_5 ________________ ~-------,--
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
. S.
.HOURS REACTOR WAS CRITICAL..,......** '..
- 6.
REACTOR RESERVE SHUTDOWN HOURS..*.*...
- 7.
HOURS GENERATOR ON LINE.........**... -.
- 8.
UNIT RESER VE SHUTDOWN HOURS.....*. :.**
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)........*.*..********
- 10.
GROSS ELECTRICAL ENERGY
_-GENERA TED (MWH)...............*****.
1 I.
NET ELECTRICAL ENERGY GENERATED 0
0 0
0 0
0 n
(MWH)...... *................. ~ ~:..... _-. --'"-'v'"-'----
- 12.
REACTORAVAILABILITYFACTOR(l).....*.** -
0
- 13.
UNIT AVAILABILITY FACTOR (2)............
- 14.
UNIT CAPACITY FACTOR (3)...............
- 15.
UNIT FORCED OUTAGE RATE (4)............
0 0
100%
YR TO DATE 4,483'. l 0
4,393.5 0
10,401,391 3,388,560
":t
?1~ 70?
><*---,,,. *~
61.2%
60.0%
55.7%
28.5%
. CUMULATIVE TO DATE 20,112.7 0
.19,749.l 0
44,909,524 14, 734, 119 11 -%6. 08.3.
65.5%*'
64 3%
57.7%
22.1%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
November 18, 1976
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORTTI:IE FOLLOWING:
(1)
REACfOR AVAILABILITY FACTOR
. (2)
UNIT AVAILABILITY FACTOR
.* (3)
UNIT CAPACITY FACTOR
=
.. _(4)
UNIT FORCED OUTAGE RATE lNlTIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE HOURS IN REPORTING PERIOD x 100 NET ELECTRICAL POWER GENERATED DATE LAST DATE
. FORECAST ACHIEVED
-MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURSIN-REPORTING PERIOD f.ORCED OUTAGE HOURS JIOURS GENERATOR ON LINE +-"FORCED OUTAGE HOURS.
X lOO
'o:
I
. I
- ' I
'-~~
._:j-.
- ~* ~-"
-*~~-:
~~
-~: I
_,,I
- t.
Corrected Copy
.=-*: *".
v
. -~; ~, -'
UNIT Surry uni~ No. 2
- ,DATE Dec. 1, 1976
.~-: '- -
- -~.. - : -~.. ~;:~*** --
-~
f :.1'*.~* -:.--*:. \\
. - -*.-*. ~~ -.. ;
. COMPLETED BY E. P. DeWandel
' - DOCKET No._5_0_-_2_8_1 ____
' -. -- --.. ~ - : -..
.... ~. '.
OPERATING STATUS
- . ' -_ '-~--
'~
REPORTING'PERIOD:_o_o_o_1 __
7_61.,,..1,_,o,....1 ______
.. THROUGH __ 2_4_0_0 __
7_6_11_3_0 ____
. HOURS IN REPORTING PER10D: __
7_2_0 ____
- 1.
2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. !)EPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED OF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
.- **THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL..... :.******
- 6.
REACTOR RESERVE SHUTDOWN HOURS....*.*
- 7.
HOURS GENERATOR ON LINE.........*.****
- 8.. UNIT RESER VE SHUTDOWN HOURS.....*..**.
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).......*..*..**.*****
- 10.
GROSS ELECTRICAL ENERGY 0
0 0
0 0
0
\\
YR TO DATE 4,483'. l 0
4,393.5 0
CUMULATIVE TO DATE 20.112.7 0
.] 9, 749. l 0
---*-co----*-* :_
0
- 12.
- * -OENERATED (MWH)..........*......*****
NET ELECTRICAL ENERGY GENERATED (MWH).. *.* --. :*;*;*-.-. *;*7;""; ;-. -.--~.-,.--.-.- ** --*.*.* -.*.*..
REACTOR AVAILABILITY FACTOR (1) *********
UNIT AVAILABILITY FACTOR (2) *...*..*****
UNIT CAPACITY FACTOR (3) *.***..*.******
UNIT FORCED OUTAGE RATE (4)....********
0 0
0 10,401,391
. 3,388,560 3,213~702 55-;8%
- 54. 670 44,909,524 14,734,119 13,966,083
- ***64 ;OX>--
- 62.8%
1_3.
- 14.
lS.
0 100%
50.7%
56.4%
36.0%
24.3%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17.. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 10, 1976
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(l)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR
- .-
- INITIAL CRITICALITY
- INITIAL ELECTRICAL
-.:.. * '* *' POWER GENERATION
- .., COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
= --------------------XlOO HOURS IN REPORTING PERIOD DA TE LAST DATE FORECAST ACHIEVED
~.-,... _ -.
NET ELECTRICAL POWER GENERATED (3)
UNIT CAP ACl,TY FACTOR
=
MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD (4)
UNIT FORCED OUTAGE RATE
_FO_R_C_E_D __
O_U_T_AG_E_H_O_U_R_S _______________ XlOO HOURS GENERATOR-ON LINE+ FORCED OUTAGE HOURS I.
~-:.
.~
- ~
-_ <co_i-rected Copy.
S 1.1rry UH it 2 *
-,, :. - ' DATE __,J..,aa-aa-. -3~, --+/--1.,,.9+7+7-COMPLETED BY E. p. DeWandel 50-281
. -*-. f ::. ' - ; __.- :**.:.*
~
1 ".
~
- OPERATING STATUS
~ :.-*-
--_--(}:
Ca
.; __,tf!
- 1.
REPORTING PERIOD:
0001 761201 THROUGH~
_.2~4~o~o-7~6~1~2~3~1~*~---
HOURS IN REPORTING P~RIOD: __ ~""'--'--------'------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.......*....*
- 6.
REACTOR RESERVE SHUTDOWN HOURS..**..*
- 7.
. HOURS GENEhATOR ON LINE.........*..*..
- 8.
- UNIT RESER VE SHUTDOWN HOURS.............
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)............*.*******
- 10.
GROSS ELECTRICAL ENERGY GENERA TED (MWH).........*..... -.*. : **
. I l.
NET ELECTRICAL ENERGY GENERATED (MWH)...*.*....*.....*... *. * * * * * * *
- 12.
REACTOR AVAILABILITY FAC"iOR (1)....*.***
206. 2 -
0 196.3 o ___ _
435, 103 137,255
- J29,619 27.7%
- 13.
UNIT AVAILABILITY FACTOR (2).**...***.* :
2 6
- 4"~
- 14.
UNITCAPACITYFACTOR(J). ;...... *.... *..
22 l"~
CUMULATIVE YR TO DATE TO DATE 4689~3 io:na. 2 a
a
~589.8
..l..9., 9-45. 4 _
0 0
10,836,494 45,344,62.7 3' 52 5, 815 14,871,374
-1.;J~.321 i9:,n9s,1n2
- 53. 4%
63.1%
52 3"(,,
- 62. O"lo Y.8~3%
55.6%
- 15.
UNIT FORCED OUTAGE RATE (4).......*.. _-. *.
- 73. 6%
- 39. 7%
2 5, 7"/o
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUT AGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMZ.iERCIAL OPERATION HOURS REACTOR WAS CRITICAL x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DATE
. FORECAST ACHIEVED
\\';.
'f.
MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
~-FORCED OUTAGE HOURS
--~--------x lOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
. ~ :. :f.~1 '
- "'~.'
I
.:rAif:
-~:~1f I
~_'i't.~ I
(.\\
/
,J--* :.._
- ... -~
- ,__.... _,/
/~-'!\\
., ~:l)
Corrected* Copy
. UNIT Surry Unit No. l DATE 3-3-75 COMPLETED BY w. c. Earl DOCKET NO. 50-280 OPERATING STATUS
- t.
REPORTINGPERIOD:
0001 750201 THROUGH 2400 750228 HOURS IN REPORTING PERIOD:
.-67L
- 2.
CURRENTLY A UTtlORIZED POWER LEVEL (~tWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 7 88
- 3.
LOWEST POWER LEVEL TO \\\\'!!!CH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _______________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PF.RIOD YR TO DATE CUMULATIVE TO DATE S.
HOURS REACTOR WAS CRITICAL *.***********
. 6.
REACTOR RESER VE SHVTDOWN HOURS *******
. 7.
HOURS GENERA TOR ON LINE...*.**********
S.
UNIT RESERVE SHL'TDOWN HOURS.******** * **
9.. GROSS THER~tAL ENERGY GENERATED (MWH) *..***.********.******
665.3 0 ---
_..:fl32-.:5_
0 1~329,659
- 10.
GROSS ELECTRICAL ENERGY
- 11.
!2.
- 13.
- 14.
IS.
-GENERATED(MWH)......... * * * * * * * * ** ** *.
434,615 NET ELECTRICAL E!'~[RGY GE!\\ERATED (MWH)....***.********.************ **
R!:A.CTOR AVAILABILITY FACTOR (1).**..****
U~IT AVAILABILITY FACTOR (2) **..********
UNIT CAPACITY FACTOR (3).*.************
UNIT FORCED OUTAGE RA TE (4)...*********
I.~ '"I l.n-r
' -t.&.,.:., "'T.;I I
- .... "." -~
~9t:*;.
~.'IB~lt_
- o.*_-
- 9:.--
707.s 0.-
- fiiz;J, o*
1,330,270 434,615
,_,,. 1.n-,
-fA..:.,..... JI 50.0 37.0 F-~9.'
11,431.9.
__ o __
_:iJ.. d 5.0.--:;:-
. 'o
.*..::.2..3-.,":~.§._5; 6l!O 7,762,378
.,..,,."' nC'n 1,J,'-2"->-..J 59--=-.§_
-*-57-.fi::_
_... 4.£.t!._L 2<L1-*
' 16.
SHl1TDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTI-IS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ____ ~--------------
IS.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERA T!ON) REPORT THE FOLLOWING:
. ~*: *..
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABIUTY FACTOR
=
(3)
UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COM~1ERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON U:-:E
~XIOO HOURS IN REPORTING l'ERIOD NF.T F.1.l:CTR IC.\\ t. POWFR GENERA TED DATE LAST DA TE FORECAST ACHIEVED
- ..: _, I
(;?.)
- -.l~;
.. _.)
.. (4)
UNIT FORCED OUT AGE RATE MAX. l)l:l'ENDAllLE CAl'ACIT\\" lMWc*NET) X llOUllS IN REl'ORTING l'ERIOLJ FORCED OUTAC.E llOURS
~-----~----------------XlOO llOURS GENERATOR ON LINE t FORCED OUTAGE HOURS
~
- ~.... ~..
('}:\\
ctJ Surry Unit No. 1 DAT~' 4-2-7 5
. *::_ c~~P°i:ETE~ BY W. C. Earl
- OPERATING STATUS
- ..* --.*,,.. ~
.***DOCKET No._5_0_-_2_8_0 ____
. {
. 1..
REPORTING PERIOD:---'0...,.:0-.:0_1_--'-7~50"'-'3"'"'0"""1-'------- THROUGH _2_4_0_0 __
7 5_0_3_3_1 _____
HOURS lN REPORTING PERIOD:
7 44
~
2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET). 788 *
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ______________ _._
- 4.
REASONS FOR RESTRICTION (IF ANY):
- s.
- 6.
- 7.
- 8.
- 9.
THlS REPORTING PERIOD HOURS REACTOR WAS CRITICAL............*
REACTOR RESERVE SHUTDOWN HOURS......*
HOURS GENERA TOR ON LINE........ ** **...*
UNIT RESER VE SHUTDOWN HOURS.......*.**
GROSS THERMAL ENERGY 716.1 0
569.6 0
CUMULATIVE YR TO DATE TO DATE 11423.6 121148.0
.o 0
~202.L.:.
0
_;fr~ 61 9 ~ 6
- 0
~
GENERATED (MWH)......................
1,363,940 453,670 2,694,210 24;L49,_6_20-
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
GROSS ELECTRICAL ENERGY GENERATED (MWH)...........*. *..**....
NET ELECTRICAL ENERGY GENERA TED (MWH)..................* * ** * * * * * *
- REACTOR AVAILABILITY FACTOR (1).*.*....*
UNIT AVAILABILITY FACTOR (2)...*...*.*.*
UNIT CAPACITY FACTOR (3)........**..**.
UNIT FORCED OUTAGE RATE (4).......**.**
,,.,, 0/.1
'""T.J~,.,"'T~
96.2 76.6 73.7 0
888,285 8l~l:,':38 65.9
. 5--5. t 49.6_
0.,-6:_
8,216,048.
7 77/,, 701
. z.* "
- l!:. - -
61
--58. 4 ::.._ '
{i2.5
- 28. 2*
SHUTDOWNS SCHEDULEDTO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST
. FORECAST DATE ACHIEVED (1)
REACTOR AVAILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
- . (2)
UNIT AVAILABILITY FACTOR (3)
UNlT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE HOURS GENERA TOR ON LINE
~x100 HOURS IN REPORTING PERIOD NET ELF.CTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- ~.
.,;~
/..
--~.~.
- ~ '
~. *.
. ' \\,.
- - \\*.~ -.:.
Corrected Copy
.~* ' :
- -,*~-. '.::.. :_.\\
- r
- ~.
. ~
-.:- *:.*.. *. ~
. *~.. *-
.. OPERATING STATUS
',,c*_-
~-...'..
UNIT Surry Unit No
- i DATE 5-1-7 5 COMPLETED BY w. c. Earl DOCKET NO. 50- 280
~--------
I.. REPORTING PERIOD: 0001 7 50401 THROUGH 2400 7 50430
~--~-------
-~--~-----'----~---------
"~.
HOURS IN REPORTING PERIOD:
720
.,-----------------~~~----
- 2.
- 3.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) ~7~8~8~-
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS
. CUMULATIV_E REPORTING PERIOD YR TO DATE TO DATE 2048.6 12*2 773 0
__ _9 ____
S.
- HOURS REACTOR WAS.CRITICAL..~.......... __
6_2_5_...-.....
- 6.
REACTOR RESERVE SHUTDOWN HOURS 0
-1B22S
_:.~4.0"*
0 0.
- 7.
HOURS GENERA TOR ON LINE......... *. * *.
- 620
- 4
- 8.
UNIT RESERVE'SHUTDOWN HOURS......*.*** *.. : ___
O __ _
- 9.
GROSS THERMAL ENERGY
. "' l 475 4 4 GENERATED (MWH)......,.. * *. * * * * * * *. *.
, 0 4,169,614 26, 225,.635
- 10. - GR,OSS ELECTRICAL ENERGY
- GENERATED (MWH).*.......*.... -.****.*.
4862190 1!374!475 8!7022238
.,l'\\C nc:.'l 822372306 J. 2.JVV 2 ::J.J.J 1~~.,. *NET E!.ECTR!CAL ENERGY GENERATED 462,515 CMWH) 71.1 61:.9~
_63 *.3_
__3_9..3 _ ; '
57.6 50.6
--~-~L 27.6
. REACTOR AVAILABILITY FACTOR (1) ********* - ___
8_6_._8,.---
UNIT AVAILABILITY FACTOR (2). *.. *.. * * * * *. ---8~6_.~l~* -
UNIT CAPACITY FACTOR (3)...... * *. *... *.
- 81. 5 UNIT FORCED OUTAGE RATE (4)............
13.8
- 12.
- 13.
- 14.
lS.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
' 18.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:--------------
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
- ~-
o)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE
. INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
~~-------XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DATE FORECAST ACHIEVED
. MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
~---------------------------XIOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- . 'r L
- -_
- --~*
.---.*. I 1.* :.:~..
~.-.
.. ~ *.
- .,:;~ -**::*.* .c~rrected Copy
.~... *.-. ' -. -..
~, ' *'
- *** ".. 1* *
. : :*. -. ~*.
J **
~,'.
---~.:*
. ~:
~1 *.. ***
UNIT Surry Unit No. 1
. '1. *..
~..
),
_.. ;.;:*.*. J
~
June 3,* 1975
.. *... / ':;_'*
COMPLETED BY w. c. Earl
~. ;*.:. - :.
DOCKET° NO. 50-280 OPERATING STATUS
. *.. ;; ~
- 1.
REPORTING PERIOD:
0001 750501 THROUGH _,2=4...,o... o.__..... 7_.5""0_..5_,_3..._1 _____ _
HOURS IN REPORTING P!:'RIOD: __ 7'-4-'-4-'----....,,...,...,.....--------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):------'-----
. _ 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL..*....****..
717. 7
- 6.
REACTOR RESER VE SHUTDOWN HOURS....***.
.Q
... 7.
HOURS GENERATOR ON LINE........**.....
716.3 8.*
UNIT RESERVE SHUTDOWN HOURS......**..*
0
_ 9.
GROSS THERMAL ENERGY GENERATED(MWH)..........**.***.**.* l,712,641
- 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH)...... /...*..**.**.***
558,495 Jl.... NET ELECTRICAL ENERGY GENERATED (MWH)....*............*..*.*.**..*
i:;:~n RO/,
12..
REACTOR AVAILABILITY F AC':~JR (1)........*
96.5
- 13.
UNIT AVAILABILITY FACTOR (2) *...*..**..*
96.3
- 14.
UNIT CAPACITY FACTOR (3)...............
90.6
- 15.
UNIT FORCED OUTAGE RATE (4).*.....**..*
3.7 CUMULATIVE YR TO DATE TO DATE 2.Z66.3 13,490.7
- o 0
-1..,_538. ~
12,956J.., ':
0 0
52882.255 27.938.216 1,932,970 9,260,733 1,8371847 8,768,200 76.3 63.1
.70.1~
__ §016* :
64.4 52 Q
__ 5.Q_
26.6"
_ 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling October 1975; approximately 5 to 6 weeks
- 17.
.lF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
18.. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
_/- *.
(l)
REACTOR AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COM!;~ERCIAL OPERATION HOURS REACTOR WAS CRITICAL
- HOURS IN REPORTING PERIOD,
x 100 DATE LAST DATE
. FORECAST.
ACHIEVED
- *. _.(2)-
UNIT AVAILABILITY FACTOR HOURS GENERA TOR ON LINE
~---~-~~~-~-XIOO HOURS IN REPORTING PERIOD (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_FO_R_C_E_D_O_UT_A_G_E~H_O_U_R_S~--~----~-~XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS d-
- -~~
.: {
'I i~
-1.. --
-:.!~
. - -. :.:. :~~. _-
- . :~'.~*- _._:.
~ - -'
,...... ~. :- -~.. -. *;_*
_, * --C~rrect"ed Copy Unit No. 1
_,.:-~~.fE: July 2; 1975 *
- ~'COMPLETED BY W
- C
- Ear 1
- ~-~--~*..:.. ~~"-*'-.. '.-
~*-
- */-*
r:*~:~
\\2/
_OPERA TING STATUS 1;:**
L' REPORTING PERIOD: __
o_o_o_1 __
7_5_0_60_1 ______
--_._*: _* - THROUGH __
2_4_0_0 __
7_50_6_3_0 ____ _
HOURS IN REPORTING PERIOD: __ 7_2_0 ____.,,..,..~-------------------
. 2.
- CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):---.-----~------
- 4.
REASONS FOR RESTRICTION (IF ANY):
- s.
'6.
- 7.
- 8.
9.
JO.
':_ 11.
- 12.
- 13.
_ 14.
- 15.
- 16.
- 17.
- 18.
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL.......***. *.*
REACTOR RESERVE SHUTDOWN HOURS.*..*..
. HOURS GENERA TOR ON LINE........***.***
UNIT RESERVE SHUTDOWN HOURS.*...* * **.**
GROSS THERMAL ENERGY 662~3 0
660.8 0
. GENERATED(MWH)..........*...******* _ 1,566,410 GROSS ELECTRICAL ENERGY
_-GENERATED (MWH)..........*.....*.***
NET ELECTRICAL ENERGY GENERATED (MWH).....*......*.....*..*****.**
REACTOR AVAILABILITY FACTOR (1)....*.*.*
UNIT AVAILABILITY FACTOR (2)........***.
UNIT CAPACITY FACTOR (3).....*..*****..
UNIT FORCED OUTAGE RATE (4).......*....
502,800 477 ~277 92 91.8 84.1 8.2 CUMULATIVE YR TO DATE TO DATE 3428~.6 14,153 0
0 3:199.6 -
13,617.1 0
0 7,448,665 29,504,075*'
224351770 927631533 2,, 31_;>_,:!24 -
922452477 78.9 64.0 h
-73~-7~ --
61_~
67.6 53.l
- 5. 7 -
25.8 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Scheduled refueling October 15, 1975.
- - IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DA.TE OF STARTUP:------------
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
. INITIAL CRITICALITY
.. INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST FORECAST DATE ACHIEVED
.. (1)
REACfORAVAILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
. _ *. - (2)-
. UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY.FACTOR
=
(4)
UNIT FORCED OUTAGE RATE HOURS GENERA TOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERlOD FORCED OUT AGE HOURS
~--------~--~~~~---~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- Corrected figure-Corrected error carried forwarded since February 1975
'. ~.
,* ;' ""/*"*
-. I
... *' **:~- -.. *
- . ~ -- '"
~
Corrected Copy DATE August 4~ 1975 W. C. Earl OOC~ET NO._s_o_-_2_8_0 ____
- . '**: '** OPERATING STATUS
~: :*... ' '... :
- l. ' REPORTING PERIOD: __
o_o_o_1 __
7_5_0_7_0_1 _____ THROUGH _2_4_0_0 _
__;_7_5_0..;...7""--3_1 ____
HOURS IN REPORTING Pr.RIOD: ___
7_4_4_* ----------------------------
- 2.
. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. l)EPENDABLE CAPACITY (MWe-NET) 788
- 3.
- LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
'4.
REASONS FOR RESTRICTION (IF ANY):.
. THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL..,....... : ~.
553.7
- 6.
REACTOR RESERVE SHUTDOWN HOURS.. * *.....
0
- 7.
HOURS GENEKATOR ON LINE.........*.*.**
- 8.
- UNIT RESER VE SHUTDOWN HOURS..........* **
553.7 0
- 9.
GROSS THERMAL ENERGY
- 10.
' 11.
GENERATED (MWH).......... _ *.. ~ *.**.* ; 1,338, 774 GROSS ELECTRICAL ENERGY
<iENERATED (MWH).........*....***..*.
- NET ELECTRICAL ENERGY GENERATED 429,456
. (MWH)....*............*.*....**. : ;. *. _. _.4'-"0'""7_,,L.::oo.:9:...::1,___
REACTOR AVAILABILITY FAC'C)R (1) *. *. *.. *.
7 4
- 4 UNIT AVAILABILITY FACTOR (2).........* :
- 74
- 4 UNIT CAPACITY FACTOR (3)..........*.** *::
69.5 UNIT FORCED OUTAGE RATE (4).......**. :,
25.6 YR TO DATE 3,982.3 0
3,753.3_*,
0 8,787,439 2,_865. 226 2.723,015 :,'r>.
78.3
_73 *.&...:
67.9 9.4
. CUMULATIVE TO DATE 14,706.7
___ o __ _
_ 1_4, 170~
0 30,842.849 10,192,989 9,653.368 64.4
__,_6._._2.JL 53.6 25.8
- 12.
- 13.
- 14.
- 15.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
- 18.
(1)
Refueling scheduled October 15, 1975, approximately six weeks IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
August 1, 1975 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
~.
REACfOR AVAILABILITY FACTOR INITIAL CRITICALITY
. INITIAL ELECTRICAL POWER GENERATION COMI.mRCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
. FORECAST ACHIEVED
. (2)
UNIT AVAILABILITY FACTOR HOURS GENERATOR ON LINE
'-----XlOO HOURS IN REPORTING PERIOD
. I (3)
UNIT CAPACITY FACTOR NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED.OUTAGE HOURS
XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
. *:;:*.::~:-~~~::;_,~:~f :~~"-~>:>:"
. ~::_*.::.:*:*~~-ec.ted Copy**
. '.,._ /.' '.*~.... ~::
- . ~..*
. ~~l~* *~~~r~ Unit No*. i.
'* I*.. -';. :
DATE Oct. 1,1975 co~~~~TE~ BY W. c. Earl
.1,...
- j ::. ~.
.,,_*... '. --~ :.
- *. ~.-
OPERATING STATUS
- .-.. *,.. * ~..
DOCKET No._5_0_-_2_8_0 ____
- 1.
REPORTING PERIOD:~O_O~O~l~~Z-50_8_0_1 ______ THROUGH --=2-'-40.;:;..0~__,7'"""'5'""'0'""8=3=1,__ ___
HOURS IN REPORTING PERIOD: ____ __.;7_4.;...4"'----------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe*NET) 788 3... LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.............
- 6.
REACTOR RESERVE SHUTDOWN HOURS..* ;..*
- 7.
HOURS GENERATOR ON LIN.E............**. *.
- 8.
. UNIT RESER VE SHUTDOWN HOURS......*....
. 9.
GROSS THERMAL ENERGY 704.9 0
692.9 0
GENERATED (MWH).............* : * *. *..
- 1, 621, 77 3
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED (MWH)..............***.***
514,149
- l*!.~:. *:-iET ELECTP..!C.~L F.NF.HGY GENERATED (MWH) 487,65i CUMULATIVE YR TO DATE TO DATE 42687.2 152411.6*
0 0
_it:, 446. 2.. '
_:_:_14, 86"3 ~.7 0
0 10,409,212 32,464,622 3,379,375 10,707,138 322102666 in i1.1 n1a
..Lv 2.a.""'T.a. 2 v..__,
- 12.
' 13.
REACTOR AVAILABILITY FACTOR (1) ******.**
UNIT AVAILABILITY FACTOR (2).*..*...****
94.7 93.1 80.4 76.l 65.3
_63.0_
- 14.
- 15.
' : 16.
UNIT CAPACITY FACTOR (3)...... ;......*.
83.2 69.9 54.5 UNIT FORCED OUTAGE RATE (4).*..*.******
6.&
8.9 25.1 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling outage October 15, 1975; approximately six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR
. "*'(2)
UNIT AVAILABILITY FACTOR (3)
. UNIT CAPACITY FACTOR iNlTIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
_H_O_U_R_S_G_E_N_E_R_A_T_O_R_O_N_L_l_N_E __
X lOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DATE
. FORECAST ACHIEVED c:J (4)
UNIT FORCED OUTAGE RATE MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUT AGE HOURS
~~--~~-----~~~------XlOO HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS
~-.
~ : \\ : : ' -:.... ~ *~.:..
- -'~'
.:*.....,- Cor;ect~d. Copy*.
~
-~ - -
1,
.J"
. __ i:_*,
..*,;_;: : *. -:** ~-* - ;,_*-*-
- -::.:~)'.-:
~~;~~~~:-: }~:~;\\~-:~-:~;-~ :-::~L~*:.
~-. *:... ;-._. -. *-
~ ?.* --:
UNIT Surry Unit No. 1
- . '. -~-
'*~. : '. ;
. :., ~;... ' :
DATE Oct. 1, 1975
~: i
.. ~: *:.
~-
1:,:i,.;:I
'-;_;t.
.*,; 'coM~LETED B~ w, ' c, Earl
',. ~CKET No._5_0_-_2_8_0 ____
. *~
OPERATING ST A TUS
- 1.
REPORTING PERIOD:
0001 750901 THROUGH..
- 2400 750930 H 0 URS IN REPORTING PERIOD:
720
~
. 2.
. CURRENTLY AUTHORIZED POWER LEVEL (MWth) "2441 MAX. DEPENDABLE CAPACITY (MWe-NET) ~7~8_8~--
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):_* -------.;__-
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD.
S.
HOURS REACTOR WAS CRITICAL *........*.*..
- 6.
REACTOR RESERVE SHUTDOWN HOURS..*..**
- 7.
HOURS GENERA TOR ON LINE..........*****
- 8.
- UNIT RESER VE 5HUTDOWN HOURS.......****.
- 9.
GROSS THERMAL ENERGY 613.4 0
613.4 0
GENERATED (MWH)......... *.. * * * * * * * * *, 1,418, 801
- 10.. GROSS ELECTRICAL ENERGY
<JENERATED (MWH).............********
LI. - N.f.:_T.ELECTRICAL ENERGY GENERATED (MWH).
..***.... *. ~......***. * ** ** * *. *
- 12.
REACTOR AVAILABILITY FACTOR (I)....*....
- 13.
UNIT AVAILABILITY FACTOR (2).. ~.........
14..
UNIT CAPACITY FACTOR (3),.......* ;..**.
- 15.
UNIT FORCED OUTAGE RATE (4).......*...*
452,955 429*,46_7 85.2 85.2 75.7 14.8 YR TO DATE 5,300.6 0
~o~
0 11,828, 013 3,832,330
'l &./.(\\ 1 'l'l
.J2v~v,*...i-80.9 11.1 -
70.5 9.7 CUMULATIVE.
TO DATE 16,025~0 0
- .1.5, 477 ~-
0 33,883,423 10,570;486 65.9 6~3~ ' 55.2 24.8
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17. ' IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: November 5' 1975
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AV AIL ABILITY FACTOR (3)
UNIT CAPACITY FACTOR
=
(4)
. UNIT FORCED OUT AGE RATE
~-..-
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
- COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE.
~x100 HOURS IN REPORTING PERIOD
- NET ELECTRICAL POWER GENERATED DA TE LAST DATE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
........ -----XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
~--
I
- r.~*
- ~ :;.
.. *t~~:.
~:_~_---~-~fr
.**.I R:l\\.
.. _. \\];). *.
. -*:... ~ : "
~-
_,:correcteci**copy:
l
~ ** '
- ~ '. ~ \\... :i ' ! '
_OPERATING STATUS
- ~* ', :*. -.
- .*.* UNIT Surry Unit No *
.*DATE Nov. 3, 1975
- : oocKET No..,...5_0_-_2_8_0_-'---,--
- l.. REPORTING PERIOD:_0_0_0_1 __
7_5_1_0_0_1 ______ THROUGH __
24_0_0_---"7-"5-"1~0~3..::1 ____
HOURS IN REPORTING PERIOD:
-'-'4""-----,.-,,...-;,----*-*-** ---------------.=-::,.-
. 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.. LOwEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4. *,,REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
. S *. HOURS REACTOR WAS CRITICAL.......*.***.
- 6.
REACTOR RESERVE SHUTDOWN HOURS.....**
- 7.
HOURS GENERATOR ON LINE........**..*..
- 8.
UNIT RESERVE SHUTDOWN HOURS......*.*.*
9;
- GROSS THERMAL ENERGY 0
0 I)
YR TO DATE 5,300.6 0
CUMULATIVE TO DATE 16,025 0
-15d477.J.
- . GENERA TED (MWH)........... !.*.**.*.*
0 11,828,013 33,883,423'
. 10*.
GROSS ELECTRICAL ENERGY GENERATED (MWH)................*.***
0
- :;. *: '~iE; Ei.~CTR!CA!. ENERGY GFNFRATED V.
(MWH)
- 12.
REACTOR AVAILABILITY FACTOR (1).*.***.**
0
- 13.
UNIT AVAILABILITY FACTOR (2).........*..
Q.
- 14.
UNIT CAPACITY FACTOR (3)...............
0
. lS, UNIT FORCED OUTAGE RATE (4)....*..**..*
0 3,832,330
') &../.(\\ 1 ':i.':i.
.J 'v-rv' ~----'
72.6
-* 69.3_
6J. 3.
9.7 11,160,093 10,570;48.n 63.9
--61~7.=
53.5 24.7
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IFSHUTDOWNATJ;:NDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: November 21, 1975
- 18.
. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL Ol'ERATION) REPORT THE FOLLOWING:
.* (1)
REACTOR AVAILABILITY FACTOR
.
- INITIAL CRITICALITY
, INITIAL ELECTRICAL POWER GENERATION
. *'coMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DATE LAST DATE
.FORECAST ACHIEVED
. :.* ' *-.~ (2)
UNIT AVAILABILITY FACTOR HOURS GENERATOR ON LINE
....:....---x 100 HOURS IN REPORTING PERIOD
- (3)
- UNIT CAPACITY FACTOR
- ' (4)
UNIT FORCED OUT AGE RATE
~,..
=
NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- *** *l".,,,
~ -.
.". ~
Surry Unit No. 1 DATE Dec. 1, 1975
.COMPLETEDBY W. C. Earl
.. DOCK~T NO. _5_0_. -_2_8_0 __ ---'---
-~
...... ~ *:.. OPERATING STATUS
- ' ~: *.
- 1.
REPORTING PERIOD:_0_.0_0_1 __
7_5_1_1_0_1 ______ THROUGH __
2_4_0_0 __
7_5_1 _13_0 ____
. HOURS IN REPORTING PERIOD: __
7_2_0 _______________________
- 2. **
_CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY).(MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL..,.....* :.* *.
0
- 6.
REACTOR RESERVE SHUTDOWN HOURS...*..*
- 0
- 7.
HOURS GENERATOR ON LINE......*..*....*
- 0
- 8.
UNIT RESER VE SHUTDOWN HOURS.........** - i ___
O __ _
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).....*... '. *..********.
- 10.
GROSS ELECTRICAL ENERGY
. GENERATED (MWH).............*,.*..**. *
-11.
N*Et LLECTKiCA~ ENERGY GI:NERATED (MWH)
.12.
REACTOR AVAILABILITY FACTOR (1) *.**.*.*.
- 13.
- UNlT AVAILABILITY FACTOR (2).*.......*.*
- 14.
UNIT CAPACITY FACTOR (3).............*.
- UNIT FORCED OUTAGE RATE (4).*......*...
0 0
0 0
0 0
0 CUMULATIVE YR TO DATE TO DATE 52300.6 162025 0
__,a __
_j,.059 *.0
...J.5,477....l 0
0 11,828, 013 33.883.423 3 2832 2330 11 2160 2 093 326402 i33
- -,.._,,...Int::
.L IJ 2 J"/"U, '"tU*U 66.1 62.2
-63..L
-g~:t-57.6 9.7 24.7
. 15.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONIBS (STATE TYPE, DATE, AND DURATION OF EACH):
i7.
- 18.
IF"SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
December 8' 197 5 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
. ~;..
' (lj '* REACTOR AVAILABILITY FACTOR*
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DATE LAST FORECAST DATE ACHIEVED
. *-**.~(2). "UNIT AVAILABILITY FACTOR HOURS GENERATOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3)...
- UNIT CAP AClTY FACTOR MAX. DEPENDABLE CAPACITY (MWe*NET) X HOURS IN REPORTING PERIOD
. (4)
UNIT FORCED OUTAGE RATE
_F_O_R_C_ED_O_U_T_A_G_E_H_O_U_R_S _____________ XlOO HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS
- ~.
i"
- \\
~-::/* /~.::;-~*'*~*~.~ **~~\\': *.~
~.-:..-.,.:
,,-~:*
.~ *:.. ~. ~-~'*..
- ,
- ,r<~-+* ** *.**. Surry* Unit No. ( *
... UNIT--------
- ,.;;*.,~ '.
- ;-,
DATE Jan:* 2, 1976
'.. :.~
- 'cOMPLETEDBY w. c. Earl oocKET No:_5'-'0'--...;;;2'""8_:;o ____
- ** OPERATING STATUS
- l.
REPORTING PERIOD:.
0001 751201 THROUGH 2400 751231
- --------------~
HOURS IN REPORTING PERIOD:
744 2 *.
- CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
- LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
. 4.
REASONS FOR RESTRICTION (IF ANY):
THIS
- REPORTING PERIOD S.
- HOURS REACTOR WAS CRITICAL.....*****.*.
- 6.
REACTOR RESERVE SHUTDOWN HOURS *.*..*.
- 7.
HOURS GENERA TOR ON LINE........**...**
- 8.
UNIT RESER VE SHUTDOWN HOURS...*....**.
9:
GROSS THERMAL ENERGY
- GENERATED (MWH).......*.*...*
- .*****
- 10.
GROSS ELECTRiCAL ENERGY GENERATED(MWH).............*.******
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH)........ *, ~.- ;. ** **. ;.*. *..*..**.**.* * **.
- 12.
Rl::ACTOR AVAILABILITY FACTOR 0)........*
- 13.
UNIT AVAILABILITY FACTOR (2)............
- 14.
UNIT CAPACITY FACTOR (3)........... ~...
- 15.
UNIT FORCED OUTAGE RATE (4)...........*.
471.4 0
409.2 0
8992265 291,450 276~394 55.0 47.1 26.6
. CUMULATIVE YR TO DATE TO DATE**
51772.. 0 162496.4
___ Q __
0
__ --5, 648...8-
-~:fs, 886.3.
0 0
12,727,278 34,782,688 4 2 123 2 780 ll 24512 543 3,916,5~7 10,846,880 65.9.
62*.2 62.41 59.L 56.Z 51.2 11.2 24.* 8
- 16.
. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS,(STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DA TE OF STARTUP:------------
. 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR
(~). UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE DATE LAST DA TE
.*FORECAST ACHIEVED INITIAL CRITICALITY
- INITIAL ELECTRICAL POWER GENERATION
- COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GENERATED
. *,~
MAX. DEPEN£?ABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_F_O_R_CE_D_O_U_T_AG~E_H~O~U~R_S ____________ XlOO HOURS GENERATOR. ON LINE+ FORCED OUTAGE HOURS
~
~*.*,..
... -~
tf:'.'1
\\.(~j.
- (*.*'.'**"":'.\\
- ']
'.. j
- --~*
- 4-
- ~*
i->:
Corrected Copy
-' \\*.: :
~ ~*
-._*1_.:*
'~-- ' "
- . DA~E Feb~ 3, 1976
... ~. ".
. '.* ~~*:.,. -* '...
-~- -:
-~OMP~ETED BY W
- C
- Earl.
~** -.
oocKET No._50_-_2_8_0 ____
- OPERA TING ST A TUS
. 1. REPORTING PERIOD:
0001 760101
- THROUGH --'2;;;;...4-'--0::...;0~-'-7-=6..::.0..::.1=3=1 ____
HOURS IN REPORTING PFRIOD:_---'-7_4...;.4 _________ ~--------------
. 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
- THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.............
744
- 6.
REACTOR RESERVE SHUTDOWN HOURS......*
0
- . 7.
HOURS GENEhATOR ON LINE..............*
744
- 8.
UNIT RESER VE SHUTDOWN HOURS........*..
0
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).............*.... ; *.
1,807,897
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED(MWH)................*..**
589, 710
- 11.
..NET ELECTRICAL ENERGY GENERATED (MWH)................**. ;.**.*.***
- 12.
REACTOR AVAILABILITY FAC'7'0R (1)..*.*..*.
- 13.
UNIT AVAILABILITY FACTOR (2)............
- 14.
UNIT CAPACITY FACTOR (3).............*.
100%
100%
95.7%
- 15.
UNIT FORCED OUTAGE RATE (4)............
0 CUMULATIVE YR TO DATE TO DATE 744 17,240.4 0
0 744
_16,6...N.._3 0
- o 1,807,897 36,590,585 589,710 12,041,253 561 z-212 11 li.O~. ocn 100%
63.2/:'.
100%
__61.0_
95.7%
53.1%
0 24.0%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COM::!ERCIAL OPERATION HOURS REACTOR WAS CRITICAL REACTOR AVAILABILITY FACTOR = HOURS IN REPORTING PERIOD x 100 (2)
- UNIT AVAILABILITY FACTOR HOURS GENERATOR ON LINE
= ------------XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST FORECAST DATE ACHIEVED (3)
UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD (4)
UNIT FORCED OUT AGE RATE
_FO_R_C_E_D_O_UT_A_G_E_H_O_U_R_s __________
~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
/
'-~*,; '* *,. '",*r, r
~* -~
7 - -*':.. *
- ,*_
- :.~..,.. -.- '.. -:***
- >~ :-.*;.-; \\.-
~.. '" -
"f
~*
.. /-: ~.--. : *-
- ~. _;,_ -:....
. :.... OPERATING STATUS
~-
- J
- *** : -~ >
- a:~.*.. *.>*
....,..1.1orr;;;cted Copy
'.~-;.-~ - _* -": --.: '
,~-. *-* *:**: *-
- _: -... ~ *::
- UNIT Surry Unit No
- 1
. DATE Mar. 2, 1976
- COMPLETED BY E.P ** DeWandel DOCKET NO. 50-280
~
~:... :-..... -.
. 1.
- REPORTING PERIOD:_0_0_0_1 __
7...,,6~0~2_0_1 ______ THROUGH _2_4_0_0 __
7_6_0_22_9 _____
HOURS IN REPORTING PERIOD: __ 6_9_6 ___....,,...,....,...,,--------------...-----,...,.---
- 2.
- 3.
CURRENTLY AUTHORIZED POWER LEVEL (MWth)2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788 LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
4:
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- s.
- 6.
- 7.
- 8.
- 9.
HOURS REACTOR WAS CRITICAL.......... :..
REACTOR RESERVE SHUTDOWN HOURS....*..
HOURS GENERATOR ON LINE...............
UNIT RESER VE SHUTDOWN HOURS...........
GROSS THERMAL ENERGY GENERATED (MWH)...............*..***.
m GROSS ELECTRICAL ENERGY GENERA TED (MWH)......................
- -11.
Nt:~f ELECT~iCAi.. _ENERGY GE~ER.A
.. TED (MWH)........................* *....
- 12.
REACTOR AVAILABILITY FACTOR (1) *...**.**
- 13.
UNIT AVAILABILITY FACTOR (2)....... ~ *.*.
- 14.
UNIT CAPACITY FACTOR (3)...............
- 15.
UNIT I'ORCED OUTAGE RA TE (4)............
696 0
E-96 0
1,669,424 543,745
- Jl. /,Jo\\.!.
- 100%
100%
94.3%
0 YR TO DATE 1440 0
.1440 0
3,477,321 1,133,455 1
n;Q r; 7A
_.a._,~~ -,-. -
100%
100%
95.1%
0 CUMULATIVE TO DATE 17,936.4 0
i 7,326.3*_
0 38,260,009 12,584,998
,1 l :925 ~458 64.2%
6~-:-o-. -
54.1%
23.2%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
.o (1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AV AlLABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUT AGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST FORECAST DATE ACHIEVED*
~AX. DEPENDABLE CAPACITY lMWe-NET) X HOURS IN REPORTING P.ERIOD FORCED OUT AGE HOURS
~-----------~x100 HOURS GENERATOR ON LINE+.FORCED OUTAGE HOURS
~.
~
0:Corrected Copy.
..... *:*~ : -.
~..
~..
~,.,....
~~- -~
~:
- -~*-
Surry Unit No. 1.
UNIT--------
,.~.); !. ';;.
1
',*.. ~* '.,__,: "
DATE Apr. 1, 1976
... COMPLETED BY E. p
- DeWandel
. ;... *.. OOCKET NO. 5o-280
~
~.
. - OPERATING STATUS
- 1.
- REPORTING PERIOD: 0001 760301 THROUGH ___ 2_4_0_0 ___
7_6_0~3_3_1 ________ __
HOURS IN REPORTING PERIOD:
7 44
=-=----
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.. REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- S *. HOURS REACTOR WAS CRITICAL.......**..*.
. 6.
REACTOR RESERVE SHUTDOWN HOURS...*..*
- 7.
HOURS GENERATOR ON LINE......*.**.**..
- 8.
UNIT RESER VE ::::HUTDOWN HOURS.....*...**
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)..............*.*****
- 10. *. GROSS ELECTRICAL ENERGY
!L
- GENERATED (MWH).........**...*.*****
NF.T F.1.. FCTRJCAL ENERGY GENERATED (MWH).......'. *. : *.." : :. : * -.. *. : *** :.* **
REACTOR AVAILABILITY FACTOR {I)..*.*...*
UNIT AVAILABILITY FACTOR (2)..*....*...*
UNIT CAPACITY FACTOR (3).....*..*.**...
UNIT FORCED OUTAGE RATE (4).......***..
. 532.3 0
520.7 0
1,215,803 396;325 376,648 7L5%
70.0%
64.2%
30.0%
YR TO DATE 1,972.3 0
_1,960. 7 0
4,693,124 1,529,780
_ i,455,226 90.3%
89.8%
84.6%
10.3%
CUMULATIVE TO DATE 18,468.7
__ 9 __ _
_J.-7847 _*.
0 39,475,812 12,981,323
,~,.,(\\..,
1nl!:.
J.'2.JV~2J..VV 64.3%
. 62. 2 *.
54.4%
23.4% '
- 12.
- 13.
- 14.
- 15.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
- IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------'---------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
. UNIT FORCED OUTAGE RATE INITIAL CRITICALITY
- INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION
- HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DA TE
- . FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
~FO~R_C_E_D_O_UT_A_G_E_H_O~U_R_S ____________ XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- ~
(.
I;*
~ :* '..
c
-~ -~ -
-r- _., ___, ---._,,,, --
1.t):
Corrected liopy
~...
- r *
~: --
~ - - '
- --~NIT 'Surry Unit No. 1
-- 5-3-76 DATE __ -------
. ; - ~. -
'--~~--
- COMPLETED BY E
- p. De'Wandel
' ~.. -...
DOCKET N0. __
5_0_-_2-8_0 ___ _
OPERATING STATUS
- l.
REPORTING PERIOD: __
o_o_o_1 __
7_6_0_40_1 ______ THROUGH __
2_4_o_o __ 7_6_0_4_3_o ____ _
HOURS IN REPORTING PERIOD: ____
7~1_9~--,...-----------.,.-----------,...,,....,,.--
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) __.7_8__.8'--_
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL...........*.
- 6.
REACTOR RESERVE SHUTDOWN HOURS.......
- 7.
HOURS GENERATOR ON LINE............. -..
- 8.
UNIT RESERVE SHUTDOWN HOURS........*..
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)..............*.*.*..
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED(MWH).............*..*..**
!1. -
NET ELECTRICAL ENERGY GENERATED (MWH).....................*..*....
- 12.
REACTOR AVAILABILITY F AC-:7-:::>R (1)........*
I3.
UNIT AVAILABILITY FACTOR (2).........*..
- 14.
UNIT CAPACITY FACTOR (3).........*..*..
- 15.
UNIT FORCED OUTAGE RATE (4)..........*.
574 0
569.7 0
1,363,416 447,670
-79.~lo 79.2%
75.1%
20.8%
CUMULATIVE YR TO DATE TO DATE 22546.3 12,042.. 7 0
Q
- Z,530.4
~8, 416.]:_
0 0
6,056,540 40,839,228 129772450 1324282993
! 8131 -')"i2 U~ 7_2_8_,A3-2 87.7%
64.7%
a1.n
- 62;6""-_
82.2%
54.9%
12.8%
23.4%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling 2 October 15, 1976, approximately six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: May 2, 1976
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1) - REACJ"OR AVAILABILITY FACTOR =
(2) -
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUT AGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COM~-1ERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
XlOO HOURS I~ REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DATE
-FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOU FORCED OUTAGE HOURS
XIOO HOURS GENERA TOR ON LINE+ FORCED OUT AGE HOURS
- 1.-'
--:.**~-
- . I
- .-,.I
. L*
. -~:ZT
- -. -~..
~
- - *... ' :' "~-.-.
. *.~.
Corrected.Copy
~-. -
~<**l't:~. -:::. -.. =~* :-
r:
-~ -
.DATE June:1, i976**
~.
.... ::~ -..
COMPLETED BY. E *. P. DeWandel.
~ "
DOCKET No._5_0_-_2_8_0 ____ _
OPERATING STATUS
- 1.
.REPORTING PERIOD: 0001 760501
-THROUGH 2400 760531 HOURS IN REPORTING P~RIOD: __ 7~4...:...4-=---------------------------
.2.
CURRENTLY.AUTHORIZED POWER LEVEL (MWth) 2 441 MAX. DEPENDABLE CAPACITY (MWe-NET) 7 88 3.. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.............
6-'4""'"7-"e""'6--~
- 6.
REACTOR RESERVE SHUTDOWN HOURS
--"-0 ___ _
- 7.
HOURS GENERA TOR ON LINE........ * *. * * * *
....:6=3_.9_,.e_.9 __ _
- 8.
UNIT RESER VE SHUTDOWN HOURS.....*... *..
0 __
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).............. * * * * * *
- 1,504, 199.
- 10.
GROSS ELECTRICAL ENERGY
- 12.
- 13.
- 14.
- 15.
-GENERATE~(MWH).........*.....**....
~{~T E1=-~CTR!_CAL E!'!EP..GY GENERATF.D (MWH)
REACTOR AVAILABILITY F AClOR (1)...., *.. :
UNIT AVAILABILITY FACTOR (2)....,...*..*
UNIT CAPACITY FACTOR (3)........**.....
- UNIT FORCED OUTAGE RATE (4).......*....
490,165 465,205-87.0%
86.0%
79.3%
YR TO DATE 3193.;9 0
3170.3 0
. 7,560, 739 2,467,615 2,346,757 87.6%
86.9%
81.6%
13.1%
CUMULATIVE TO DATE 19, 690.3 '.
0
.b9, 056 *. <L.,
0 42,343,427 13.919.158
.. ""' t:...,...,
.LJ2.L-:JJ.2V.J~
65~3%
6{~_2*=
55.5%
23.1%
16..
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling, October 15, 1976, six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
I~ *
.r (1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR
- INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
- COMMERCIAL OPERATION HOUR~ REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST FORECAST
.j DATE ACHIEVED n
~
.. }-:/
. (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE MAX. DEPENDABLE CAPACITY (MWe_-NET) X HOURS IN REPORTING PERIOD.
_FO_R_CE_D_O_U_T_A_G_E_H_O_U_R_S_*---~----~---XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
...:. ~--
,,:r
- .'.'f
_,-*:---\\t-
.. 'cbMPLETEri BYE. P. DeWandel
. :':.*',~.. ;..... '
DOCKET NO. 50-280
--"""-'-----";...;;..._---~
OPERATING STATUS 7*,.
- 1.
REPORTING PERIOD:
0001 760601 THROUGH_,=2~4~oo~*~~7~6~0~6~3~0~~~~~
. HOURS IN REPORTING PERIOD:----"7-=2=-=0'------,~,...-----------------........,,..~
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 7 88
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY).(MWe-NET):_---------
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL......*.. ~. '. *
- 6.
REACTOR RESERVE SHUTDOWN HOURS......*
- 7.
HOURS GENERATOR ON LINE............***
- 8.. UNIT RESER VE SHUTDOWN HOURS..... *.*..' **
- 9.
GROSS THERMAL ENERGY GENERA TED (MWH)..........*....*** * *.*
- 10.
GROSS ELECTRICAL ENERGY
~ENERATED(MWH).........*......**.**
720 0
_*720*
0 1,744,255 555,645
- 11.
NET ELECTRICAL ENERGY GENERATED
- . *r -*I (MWH)
.. -... *;........................... _ _,....=-'-5_2_7.._* _7-'-6-' 10.0%
- 12.
REACTOR AVAILABILITY FACTOR (1)........*
100%
- 13.
UNIT AVAILABILITY FACTOR (2)........ * *..
- 14.
UNIT CAPACITY FACTOR (3)...............
- 93. 0%
- 15.
UNIT FORCED OUTAGE RATE (4)....... *.....
0 YR TO DATE 3890.3_
0 9,304,994 3,023,260 2.874.520 89.6%
83.5%
10.9%
CUMULATIVE TO DATE 20,410.3 0
19,776.6 0
44, 087' 682 14.474;803 1 3
- 721
- 400 66.1%-.
64.!Q.
- 56.4%
22.4%
. 16.
SHUTDOWNS SCHEDULED TC> BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling, October 15, 1976, 6 weeks
- 17.
- 18.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
- DATE LAST DATE
- .: _*:f (1)
REACTOR AVAILABILITY FACTOR
- (2)
UNIT AVAILABILITY FACTOR (3)
UNITCAPACITY.FACTOR (4)
UNIT FORCED OUTAGE RATE
. FORECAST ACHIEVEp
-*~
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_FO_R_C~E_D_O_UT_A_G_E_H_O_U_R_S ___________ XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
.~ -. *::
- *i.
- i
,, :!.~~~~;**r{\\;.;... :
.... ~ ~:..... ***...
~ '..*
.. -;:* ~....
- , -.;:....:. :* ~--
uN1fSurry Unit *#1
.,~:~,*;,:~(;:A~)u;.:;;]~:::X:~AT~*August 2, 1976 E. P. DeWandel
. ;' 'oocKET N0.'_5..._0_-_2_8_0 ___ _
...,... ~. _*:
- ,*_*~...
~...
- --
- _~-- ;., *:. -~'. ": ::*--
~..., : -..
(;;
- ;:,, 1.
- REPORTING PERIOD:
0001 760701 *
. THROUGH 2400 760731 HOURS IN REPORTING PFRIOD: __
_,7'-4"'-4"-----,,...,...,~------------------
. 2 *.. CURRENTLY AUTHORIZED POWER LEVEL (MW th) 2441.
MAX. pEPENDABLE CAPACITY (MWe-NET) 7 88
(,',
"/.
- 3.
LOWEST POWER LEVEL.TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
.
- 4.
REASONS FOR RESTRICTION (IF ANY):
- s.
- 6.
. 7.
- 8.
- 9.
- 10.
- 12.
- 13.
- 14.
lS.
- 16.
17_
- 18.
THIS REPORTING PERIOD HOURS.REACTOR WAS CRITICAL....... : *.*. ~
REACTOR RESERVE SHUTDOWN HOURS.* * *.***
HOURS GENERA TOR ON LINE.........*.****
UNIT RESER VE SHUTDOWN HOURS ;....*. *.**
GROSS THERMAL ENERGY 568.8 0
56.5.1 0
GENERATED (MWH).......**.********.**
- 1,322,138 GROSS ELECTRICAL ENERGY GENERATED (MWH)....*.......* - ******* *
~!ET E_!.EC'TRl(:AL.ENERGY GENERATED CMWH)
... * * *.. : * *..... * * * : :*. *.- * * ; *. ~
- Rl::ACTOR AVAILABILITY FACTOR (1)....*..**
UNIT AV AILABILlTY FACTOR (2).*..***.***.
UNIT CAPACITY FACTOR (3).**....** * *..**.
UNIT FORCED OUTAGE RATE (4)....*,.....*
417,655 76.5%.
76.0%
67.5%
24.1%
YR TO DATE 4,482 ;7 0
4,45b.4 0
10,627,132 3,440,915 3c270.337 87.7%
87.2%
81.2%
12.8%
CUMULATIVE TO DATE
~79.J
_,_.:._.0.-~.
-~4
'20,.341;, 7:
0 45,409,820 14,892.458 14.117.217 66.3%
22.5%
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling - October 15, 1976 - 6 weeks
- IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _N.._/_A _________ _
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
~
\\~.
. : INITIAL CRITICALITY INITIAL ELECTRICAL
.. '. POWER GENERATION
- COMMERCIAL OPERATION DATE LAST DATE FORECAST ACHIEVED
... ~..
(1)
REACTOR AVAILABILITY FACTOR HOURS REACTOR WAS CRITICAL x 100
= HOURS IN REPORTlNG PERIOD HOURS GENERATOR ON LINE (2)
UNIT AVAILABILITY FACTOR
=
x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3)
UNIT CAPACITY FACTOR
. (4)
UNIT FORCED OUTAGE RATE MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
- -FORCED OUTAGE HOURS* -- *** --------- ------- ---
= ---~---------~---~------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
. I
. I I
. -~-
- ~k
~..
-~:;*
- ~:.::,~
- ~,~
~.
---:t.**...... *{\\*'
- . '.~: :"'
'.,_... ~-
-~*
-.~
-.. -~
l.* ** *; -,
.,: UNIT _s_u_r_ry_U_n_i_* t__.#_1 __
DATE September 2,, 197 6
- -<coMPLETED BY E. P. DeWandel
- *.*.DOCKET N0._;;;.5.;;..0--'2;;;..8;;..;0;;.._ ___ _
.,, : OPERA:rING STATUS
(~~0.,
"-i*.";J":./
~.****
0 l.. REPORTING PERIOD: _
___;;o_o_o.;:.1_.....:7...;::6;...;:;0...;:;.8.;.01=--* --*'"-' -- THROUGH _. =2.....
40,..0,.___....7_,.6=-=0=83.._1.._ ___ _
- HOURS lN REPORTING PERIOD: ___ 7_4_4 ___....,.--------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe*NET) 788
, 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL..**......***. ** __ 6...,0_7_., *.._4_....
- 6.
REACTOR RESERVE SHUTDOWN HOURS
.. 0
- 7., HOURS GENERATOR ON LINE... *.... * *. * * *
- 597.1
. 8.
UNIT RESERVE SHUTDOWN HOURS *..******** *:*-_
O __ _
- 9.
- 10.
- 11.
GROSS THERMAL ENERGY GENERATED (MWH).**.*.*******.*.*****
GROSS ELECTRICAL ENERGY
-GENERA TED (MWH}.*.*.....*.*.********
NET ELECTRICAL ENERGY GENERATED 1,364,191 439,365 416, 802
- ~-*********~********-*********
81.6%"*
I?.,,
REACTOR AVAILABILITY FACTOR (1)............
. 13.
UNIT AVAILABILITY FACTOR (2).**.*.******,..
BO* 3%
- 14.
UNITCAPACITYFACTOR(3)...********.***.. *
'* 71.1%
- 15.
UNIT FORCED OUTAGE RAl'.E (4) ****..*.****,
- 19. 7%
CUMULATIVE YR TO DATE TO DATE 5090.1 21158615 0
0 5052.5 20,9381B 0
Q 11, 991,323 46,774,011 3:2 8802 280 1533312823 33687,139 14~ 5341019
- 86. 9%.
66!_7%
86.3%
6.'1
"].
~
79.9%
57.0%
13.7%
22.4{o 16.,
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling - October 15, 1976 - six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _....
N.._/A....._* ---------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
.....,. *:.. ~
.... *. : ~.-
(1)
REACfOR AVAILABILITY FACTOR =
(2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
_H_o_u_R_S_G_E_N_E_R_A_T_O_R_O_N_Ll_N_E_. --x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERlOD
_FO_R_C_E_D_O_U_T_AG_E_H_O_U_R_S ______________ XlOO HOU,RS GENERATOR ON LINE+ FORCED OUTAGE HOURS
.~ "
?""c_
'{~jj*
- ~. ~....
- e*.. _
'_.~. **" ' '*'
- "' ~,:.
e I
~,.. -
,,. Corrected Copy *
'~,
- uNIT Surry Unit #1
.. ~ ;~.
- DATE October 1, 1976
-~
. :~:*coMPl.ETED BY E. P. DeWandel
-. * --oocKETNo._-_5_o_-2_8_o ______ _
'*.I
. OPERATING STATUS
- l.
- 2.
- 3.
- 4.
- s.
- 6.
- 7.
8.*
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
lS.
- 16.
- 17.
- 18.
(1)
(2)
(3)
(4)
REPORTlNG PERIOD: __
o_o_o_1 __
7_60~9,....0_1 ______ THROUGH -'"'-24....;..0.;..0.;.._ __
...;...7..;;;.60.;;...9.;;..;3"-'0.;.._ __ _
HOURS IN REPORTING PERIOD: ___
7_2_0 ___
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe-NET) 7 88 LOWEST POWER LEVEL TO WHlCH SPECIFICALLY RESTRICTED (IFANY) (MWe-NET): _________ _
. REASONS FOR RESTRICTlON (IF ANY):
THIS
-*-*REPORTING PERIOD HOURS REACTOR WAS CRITICAL...*..*...***
REACTOR RESERVE SHUTDOWN HOURS *.*....
HOURS GENERA TOR ON LINE....*.*.**.,.**
UNIT RESER VE ~HUTDOWN HOURS...*.******
GROSS THERMAL ENERGY 568.5.
0 567.3 0
GENERATED (MWH)....... *.. *... * * * * * *
- 1, 3 7 8, 11 9 GROSS ELECTRICAL ENERGY
<7ENERATED (MWH)............*********. --- -444, 215 NET ELECTRICAL ENERGY GENERA TED (MWH)
Rt::ACTOR AVAILABILITY FACTOR (1).********
UNIT AVAILABILITY FACTOR (2)....*.***..*
UNlTCAPACITY FACTOR (3) *...******.***.
/,??
~?1
-r--' --..£.
79.0%
- 78. 8%
74.5%
YR TO DATE 5658.-6 0
5619.8 0
13,369,442 4z324z495 t.. 1 nq Qf>n
- z.-.--3*_:--
86.1%
85.5%
79.3%
UNIT FORCED OUTAGE RATE (4)............
21.2%
14.5%
CUMULATIVE TO DATE 22155.0 0
~1~5Q6J 0
48, 1.52, 130 15 2 776 2 038 1t.._q56.840 66~9%
- 65. Q ;.
57.4~~
22.4%
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling - November 1, 1976 - 6 weeks IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
October 1, 1976 UNlTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
. -. ~.
~...
- INITIAL CRITICALITY
- INlTIAL ELECTRICAL
- POWER GENERATION
.. COMMERCIAL OPERATION DA TE LAST DATE FORECAST ACHIEVED
- HOURS REACTOR WAS CRITICAL REACTOR AVAILABILITY FACTOR = HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
= ------------x 100 HOURS IN REPORTING PERIOD UNIT AV AILABILlTY FACTOR NET ELECTRICAL POWER GENERATED UNIT CAPACITY FACTOR
= MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_Fo __
R_CE_D_O_U_T_A_G_E~H_O_U_R_s _____________
~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS UNIT FORCED OUT AGE RATE
~;,:.. :-.. /:
. /.... ~.,.. :. :-... -."
- r,"'
' * *;:;:;,/~t1;; ~;~:<h;;~IT S:'1;:cy Unit No ; l.
~.-.,...
2' 1976
- COMPLETED BY E.P. DeWandel
- oocKET No._5_0_-_2_8_0 __ _;_ __
,~,
OPERATING STATUS
. 1.
REPORTING PERIOD:
001 761001
. THROUGH 2400 761031 HOURS IN REPORTING PERIOD: __ 7_4_5 ___ __,::-:-:-:-----..:.---------------...,.....-
.~ 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3..
- LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
..
- 4.
REASONS FOR RESTRICTION (IF ANY):
. THIS REPORTING PERIOD S."
HOURS REACTOR WAS CRITICAL........ *. * *.
399
- 4
- 6.
REACTOR RESERVE SHUTDOWN HOURS.......... __
..;:;0 __
- 7.
HOURS GENEJ1 A TOR ON LINE........ *. *....
. 393. 9
- 8.
. UNIT RESER VE SHUTDOWN HOURS...... *...
- 0.
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).......... *... *.. *..
- 936 1 226
. 10.
GROSS ELECTRICAL ENERGY
-GENERATED (MWH)......... *.. *. *.. * *.
- 302, __ 3_2_5 __
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 12.
REACTORAVAILABILITYFACTOR(l)....**...
- 13.
UNIT AVAILABILITY FACTOR (2)...........*
- 14.
UNIT CAPACITY FACTOR (3).......*.*.**..
- 15.
UNIT FORCED OUTAGE RATE (4).......*....
~~6,925 53.6%
52.9%
48~9%
'l.1%
. CUMULATIVE YR TO DATE TO DATE 62058.0 221554.4 0
0.
6!013.7
.2.L,90~
0 0
14!305!668 49.088!356 4,626,820 16,078*,363 4!396,885 15,243,765 82.8%
- 66. 7%.
82.2%
-6~7-*
Z6.2%
5Z.2%
13.8%
22.1%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 11 1976
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE
- .FORECAST ACHIEVED lNITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
- COMMERCIAL OPERATION
. (1)
REACTOR AVAILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
(~). UNIT AV AILABI.LITY FACTOR
.. :-.i*.
(3)
UNIT CAPACITY FACTOR (4)
.UNIT FORCED OUTAGE RATE HOURS GENERA TOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
..;:._..;;.;..:;=:....;:._~------------x100
.. HOURS GENERATOR ON LINE+ FORCED OUT AGE HOURS
~,.
~-.' --: -: ;...
- .-* -~..........
. --... _*./--*.
.*...'.~.
~*- :,..
.. ;-_ **..,.-~--.:UNIT Surry Unit No.*.l
_. DATE Dec. 1, 1976
- ... COMPLETED BY E. p. DeWandel
.'**.<I
'*r ** '\\
- . *.c'*
.*.. DOCKET No._S_0_-_2_s_o ____
.. - *.**~...
~...,.
OPERATING STATUS
- ; ~:
.. 1.
REPORTING PERIOD: __
o_o_o_1 __ 7_6_l_l_O_l_*. _____ THROUGH __
2_4_0_0 __
7_6_11_3_0 ____
~
/
~
HOURS IN REPORTING PERIOD: ___
7"""2_0.._ ______
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe*NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE
- s.
HOURS REACTOR WAS CRITICAL *.*..******.*
0 62058".0 22,554.4
- 6.
REACTOR RESERVE SHUTDOWN HOURS........
0 0
0
- 7.
HOURS GENERATOR ON LINE *..*..*..******
0 62013;7 21, 900
- 8.
UNIT RESERVE SHUTDOWN HOURS..*****.*.*
0 0
0
- 9.
GROSS THERMAL ENERGY GENERATED (MWH).*..*.*****..***** ; **
0 14,305,668 49,088,356
- 10.
GROSS ELECTRICAL ENERGY
<iENERA TED (MWH) *.*.*....*.*.******.**
0 4 2626 2820 16,078 2363
- 11.
. NET ELECTRICAL ENERGY GENERATED
. -- (MWH).
0 4,396,885 15,243,765
- 12.
REACTOR AVAILABILITY FACTOR (1).*******.
0 75.3%
65.3%
- 13.
UNIT AVAILABILITY FACTOR (2) 0 74.8%
i:.3' 4
- 14.
UNIT CAPAClrl FACTOR (3) 0
- 69. 4/~
56.0%
- 15.
- UNIT FORCED OUTAGE RATE (4).*.....***.**
0 13.8%
22.1%
- 16.
- SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
December 23' 1976
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DA TE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY
. INITIAL ELECTRICAL POWER GENERATION
... ~
- )........
(1)
REACTOR AVAILABILITY FACTOR COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
~-----~x100 HOURS IN REPORTING PERIOD
. * (2)
. UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNlr FORCED OUTAGE RATE NET ELECTRICAL POWER GENERATED.
MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
~--~-----------~x100 HOURS GENERA TOR ON LINE + FORCED OUT AGE HOURS
-*~*
rt'~)
-~
Corrected.. Copy
- *PNIT Surry IInit 1
~.. DATE.Ian. 3, 1977
=*
-**~-::* ~-
- J*.~*;.. ~:coMPLETED BY E. p. DeWandel
.,*{"
- . OOCKET N0.-5,...0-=--2~8... 0.__ ___ _
~.. ;
~ --~*.... '.
OPERA TING STATUS
- 1.
REPORTING PERIOD:
0001 761201 THROUGH __
~2~4~0~0'"-'-7~6~1=23~1.._ ___ _
HOURS IN REPORTING PERIOD: __ 7.:....4..:..4-=---------------------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________
4~
REASONS FOR RESTRICTION (IF ANY):
TH.IS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.......*...*.
- 6.
REACTOR RESERVE SHUTDOWN HOURS.......
YR TO DATE 6058.Q CUMULATIVE TO DATE 22, 554 4
- 7.
HOURS GENERA TOR ON LINE........**..**.
6013.. 7
. 2L_, 900.---
- 8.
UNIT RESER VE ~HUTDOWN HOURS. ;. *.... *. *
.....,0,__ __ _
---~0...__
0
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)............. * * * * * * *
- _-*_: *_-°'..._Q,__ __ _
14,305,668 49,088,356
- 10.
GROSS ELECTRICAL ENERGY
- 11.
- 12.
- 13.
- 14.
- 15.
-GENERATED (MWH)..............*.***.*.
NET ELECTRICAL ENERGY GENERATED (MWH)*
.-...... ~.;...... *.. -. *.-.... -;... -.*-.
RI::ACTOR AVAILABILITY FACTOR (1)...**.**.
UNIT AVAILABILITY FACTOR (2) **...*.*...*
UNIT CAPACITY FACTOR (3).............*.
UNIT FORCED OUTAGE RATE (4)...*.......*
- o
- -0 0
0 4,626,820
_<+, J'1n, i'lO:J..
69.0%
- 68. 5%
63.5%
- 13. 8%
16,078,363 63.9%
--62. 0
---.. ~
54 8%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: January 10. 1977
. 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR
- . "' (2)
UNIT AVAILABILITY FACTOR
'. (3)
UNIT CAPACITY FACTOR
- (4)
UNIT FORCED OUTAGE RATE
. INITIAL CRITICALITY INITIAL ELECTRICAL
- POWER GENERATION
. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
~-xioo HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST
- .FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD
_FO~R_CE_D~O_U_T_A_G_E_H_O_U_R_S~-~--~~~~--~XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
--~
.,:: *,_.~.~.