ML19095A320

From kanterella
Jump to navigation Jump to search
Submit Operating Report for the Month of August 1976, & Corrected Copies of Data for Mach Through July 1976 on Unit 1 and April Through July 1976 on Unit 2
ML19095A320
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/13/1976
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Mcdonald W
Office of Nuclear Reactor Regulation
References
Serial No. 182/021974
Download: ML19095A320 (17)


Text

VIRGINIA ELECTRIC AND RIOHMOND, VIRGINIA 232.61 September 13, 1976 Mr. William McDonald, Director Serial No. 182/021974 Office of Management Information and PO&M/ALH:jlf

  • program Control
u. s *. Nuclear. Regulatory Cormnission Docket Nos. 50~280 Washington, D. c. 20555 50-281 License Nos. DPR-32 DPR-37

Dear Mr. McDonald:

Operating information for Surry Power Station, Unit Noso 1 and 2, for the month of August 1976 is attached. Corrected copies of data for March through July 1976 on Unit No. 1 and April through July 1976 on Unit No,. 2 are also.attached.*

Very truly yours,

  • ~.>>!.~~
  • c. M. Stallings Vice .President-Power Supply and Production Operations
  • -. UNIT e Surry Unit #1

. DATE September 2, *1976 COMPLETED BY E. P. DeWandel DOCKET NO. -"-5-'-0_-.;;:.2..;;.8..;;.0_ _.__ __

OPERATING STATUS

1. REPORTING PERIOD: _ _o_o_o_1_ _7_6_0_8_0_1_ _ _ _ _ _ THROUGH -*-=2'-"'4"°"0_,.Q_ __._7.,,_6_-=0=83:;.a.1_ _ _..___

HOURS IN REPORTING PERIOD:--.._ _.;_7_4....;.4_ _ _....,...,._ _ _ _ _ _~-------------

2. CURRDITLY AUTHORIZED POWER LEVEL (MWth) 2441
  • MAX. pEPENDABLE CAPACITY(MWe*NETl ...:J~8~8__
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE.

S. HOURS REACTOR WAS CRITICAL . . . . . . * . * * * . . 607.4 5090.1 21,586.5

6. REACTOR RESERVE SHUTDOWN HOURS *..*..* 0 0 0
7. HOURS GENERATOR ON LINE .*. ~ . . . . . * * . * * . 597.1 5052L2_ 20,897.0
  • 8. UNIT RESER VE SHUTDOWN HOURS ..****...** 0 0 0

~ GROSSTHERMALENERGY GENERATED (MWH) . . . . , . . . . . . . . . . . . . . . . . 1,364,191 11,991,323 46, 774, 011

10. GROSS ELECTRICAL ENERGY

-GENERATED (MWH) . * . * . * * . . . * * . * . . . * * .

  • 439,365 3 2 8802 280 15 2-3312 823
11. NET ELECTRICAL ENERGY GENERATED (MWH) . . . . . * * . . * * * *, ...*.**.******** 416, 802 3,687,139 14,534,019 1i: REACTORAVAILABILITY.FACTOR(l) .*.*.***. 81.6% 86.9% 66.7%
13. UNIT.AVAlLABILITYFACTOR(2) ***....**. ~ ** 86
  • 3°/. 69:. 5°!.
14. UNIT CAPACITY FACTOR (3) ***...* ; **.**.. 71.1% 79.9% 57.0%
15. UNIT FORCED OUTAGE RATE (4) .*.*..***..* 19.7% 13!7% . 22!4%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT-6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

.* Refueling - October 15, .1976 - six weeks . *

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __ N~/_A_ _ _ _ _ _ _ _ __
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER

. GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

,(1). REACTOR AVAILABILITY FACTOR "' HOURS IN REPORTING PERIOD X 100

_H_O_U_R_S_G_E_N_E..:...R_A_T_O_R_O_N_L_IN..:...E_ _ X lOO (2) UNIT AVAILABILITY FACTOR HOURS IN REPORTING PERIOD (3) UNfT CAPACITY FACTOR .. NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING l'ERlOIJ (4) UNIT FORCED OUTAGE RATE _FO_R_C_E_D_O_U_T_A__ G_E_H_O_U_R_S_ _ _ _'---------X lOO HOURS GENEl{ATOR ON LINE+ FORCED OUTAGE HOURS

  • .*
  • DOCKET NO.

e 50-280 UNIT Surry_ #1 DATE S~pt. 21 1976 COMPLETED BY E. P. DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH August 1976

  • A VERA GE DAILY POWER LEVEL . AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

. 739.5 17 0 1

739.5 18 0 2

743.5 19 .67 .4 3

721.7. 257.4 4 20 738.4 21 722.5 *.

5

. 7-50. 8 . 22 365.7 6

750.9 23 397.4 7

750.8 24 752.8 8

753.5 751.5 9 25 753.5 26 756.9 10 753.3 27 757.4 11 755. 7 12 28 651 752.8 13 29 14 '. 3.0 719.0 0 31 706.0

  • 15 0

16

  • .:DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unir power ievel in MWe-net for ea*ch day in the reporting month.

Compute to the nearest whole megawatt.

  • These figures: will be *used to plot a graph for each. reporting month. Note that by using rirnximum de-pehdabie capacity .for the net elecfrical rating of. the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level. line). In such. cases, th.e average daily unit po\ver output shee't should b_e footnoted to explain t_he apparent anomaly_. .

DOCKET NO. 50-280 UNIT SHUTDOWNS UNIT NAME Surrl Uni.t #1 DATE Sept.

2, 1976 COMPLETED BY E. P. DeWandel REPORT MONTH August 1976 TYPE METHOD OF F-FORCED DURATION ~HUTTING DOWN

  • NO. DATE s:scHEDULED (HOURS) REASON (1)
  • THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS 76-10 8-13~76 F-Forced 136.0 A 1 Pr'imary to secondary leakage in steatn I generators. Plugged leaking tubes in "~

and "C" S/G's.

76-11 8-19-76 F-Forced 1.1 H 3 Turbine trip on ioss of first stage pres-sure interlock when latching turbine. r '

Repositioned valve. limit.

76-12 8-22-76 F-Forced . 5.4 A 1 Turbine only-had blown rupture discs on the L/P turbine 'casings. Replaced rupture dis.cs *

. (1) REASON * (2) METHOD I A* -EQUIPMENT 1-'AILURE (EXPLAIN) I-MANUAL B-MAINT. OR TEST 2-MANUAL C- REFUELING SCRAM D-REGll LA TORY RESTRICTION 3-AUTOMATlC

. E-OPERATOR TRAINING AND

.e SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

SUMMARY

DOCKET N 0. * --"-5-"-0-_2--"-8-"-0_ __

UNIT SHUTDOWNS ' UNIT NAME Surry Urii't #1 DATE September 2 '* 197 COMPLETED BY E. P. DeWandel REPORT M QNTH -=-=Au=g=u::..:s:....:t:____ _ __

TYPE METHOD OF F*FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS 76~13 8-23-76 F-Forc~d 1.6 H 3 Lo Level in S/G with WW mismatch during startup due to sensiti~ify. of feedwater

  • control _system. Returned level to normal band.

76-14 8~23-76 F-Forced 1.3 H 3 Lo level in S/G with :WW mismatch during startup due to sen.siti:~ily of feedwate:c control system. Returned level to normal

  • band.

76-15 8-23-76 F~Forced 1._5 A 3 Failure of static breaker r~lay in switch yard. Replaced relay.

(1) REASON (2) METHOD A--EQUIPMENT FAILURE (EXPLAIN) I-MANUAL li-MAINT. OR TEST 2-MANUAL C- RffUELING .

  • SCRAM 0-REGLILATORY RESTRICTION 3-AUTOMATIC E-OPERA TOR TRAINING AND SCRAM LICENSE EXAMINATION F-:-ADMINISTRA TI.VE G-OPERATIONAL ERROR (EXPLAIN)

H--OTHER (EXPLAIN)

SUMMARY

U~IT f rry Unit #2 Sept. 2, 1976

. *; **~, *.. DATE

. COMPLETED BY.* E. P. DeWandel

  • DOCKET NO. 50-281

~

OPERATING STATUS

1. REPORTING PERIOD: 0001 760801 THROUGH 2400 760831 HOURS IN REPORTING PERIOD: 7 44
2. . CURRENTLY AUTHORIZED POWER -----------~------------------

LEVEL (MWth) 2441 MAX. pE.PENDABLE CAPACITY (MWe*NET) 7 88

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IFANY) (MWe-NET): _ _ _ _ _ _ _ _ __

. 4. REASONS FOR RESTRICTION (If ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL * . . . . . . * . * . * . 691.8 4133. 3 191762.9

6. REACTOR RESERVE SHUTDOWN HOURS .**..*.* 0 0 0 7.. HOURS GENERATOR ON LINE . * . . * . . . * * * * * . . 690.4 4043. 7 191398.2
  • 8. UNIT RESER VE SHUTDOWN HOURS . . . . * * . * * *
  • 0 0 0
9. GROSS THERMAL ENERGY GENERATEO(MWH) . . . . . * . * * . . . * . . * * * * * .
  • 1,661,570 9,563,524 44,071, 657
10. GROSS ELECTRICAL ENERGY

-GENERA TED (MWH) . . . . . . . . * . . * . ; .**...*. 53.3' 525 3,115,925 14,461,484

11. NET ELECTRICAL ENERGY GENERATED (MWH) . . . . * . * . . . . . . . . . . . * . . . . . : .***.* 505,862 2,22.2,H\6 n,ZQZ,5:Z6
12. REACTOR AVAILABIL)TY FACTOR (1) . . . . , . . .
  • 93.0% 70.6% 67.6%
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . * * * . . . 92. 8% 62.1% 66 I 3°fu
14. UNIT CAPACITY FACTOR (3) . . . . . . . . * . . * * ***. 86. 3%. 64.1% 59.5i lS. UNIT FORCED OUTAGE RATE (4) . . . . . . . . : .. . 7.2% 13.6% 18.8%
16.
  • SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):

None

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATE!) DATE OF STARTUP: _ _N-'-/A_*---'---------
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DA TE FORECAST. ACHIEVED INITIAL CRITICALITY .

INITIAL ELECTRICAL POWER GENERATION

.I ..

. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR A.VAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE (2) UNiT AVAILABILITY FACTOR ------------x HOURS IN REPORTING PERIOD 100 NET ELECTRICAL POWER GENERATED

()) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPOlltlNU l'EiUOl>

(4) UNIT FORCED OUTAGE RATE _FO_R_C_E~~D_*_O_U_T_A__

G_E_ll_O_U_R_*S---~---------~XtOO HOURS GENLltATOR ON LiNE +FORCED OUTAGE HOURS

  • DOCKETN0.~5~0~-2=8=1~~-

UNIT Surry Unit #2 DATE Sept. 2, 1976 COMPLETED BY E. P. DeWandel AVERAGE DAILY UNIT PO.WER LEVEL MONTH August, 1976 AVERAGE DAILY POWER LEVEL AVERA GE DAILY POWER LEVEL

. DAY (MWe-net) . DAY (MWe-net) 0 17 745.6 1

0 18 . 744. 2 2

497.2 742. 7 .

3 19 754.4 750.1 4 20*

751 *. 8 21 750.0 5

748.3 745.0 6 22 746 3 23 740 2 7

. 748.3 24 699.1 8

751.5 25 724.,5 9

752.3 732.5 10 26 746.6 27 734.4 11 738.0. 740.0 12 28.

737.1 29 738.0 13 724.2 r 30 741.0 14 582.8 730.7 15 31 16 740.8 DAILY UNIT POWER LEVEL FORM*INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figure's will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the. net electrical rating of the unit, there may be occasions when the daily average power level exceeds the l 00% line (or the restritted power level line). In such cases, the.

average daily unit power output sheet should be footnoted* to explain the apparent anomaly.

  • DOCKET NO. _5_0_-_2_81_ _ __

UNIT SHUTDOWNS UNIT NAME Surry Unit #2 DATE Sept, 3, 197h COMPLETE.D BY E. P, DeWandel REPORT MONTH August 1976 TYPE METHOD OF F-FORCED DURATION ~HUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTlc:fNS/COMMENTS 76-8 8 76 F-Forced 53.6 A 1 !Excessive .reactor coolant leak. Reactor_.

and unit shutdown on 7-30-76, Tightened9 packing ?nd renewed gaskets on leaking components, Shutdown waiting for repairs to the low pressure letdown relief valve, (RV-2203) .

(l) REASON *(2) METllOD A*-EQUIPMENT rAILURE (EXPLAIN) I-MANUAL B-MAINT. OR TEST 2-MANUAL C- REFUELING SCRAM 0-REGULATOR Y RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE SCRAM e

)-AUTOMATIC G-OPERATIONAL ERROR (EXPLAIN)

H-OTUER (EXPLAIN)

SUMMARY

Surry Unit No. 1 UNIT---------

DATE Apr. *1~ 1976

~O~PLETED BY E.P. DeWandel DOCKET N0 .. _5_0_-_2_8_0_ _ _ __

OPERATING STATUS

l. REPORTING PERIOD:_o_o_o_1_ _ 7_6_0_J_O_l_ _ _ _ _ _ . THRO(jGH _ _2_4_0_0_ _7_6_0_3_3_1_*- - - - -

HOURS IN REPORTl1'G PERIOD: 7 44

2.
  • CTR RE NTL Y AUTHORIZED POW_E_R_L_E_V_E--'L--'(-~-!W_t_h_)_?_4_4_1--~-IA_X_'.-D-E_P_E_N-'D_A_B_L_E_c_*A_P_A_C_l_T_Y_(-~l-\\-.c!-*N-'E_T_)_7..,.....,..8-8.,...- -
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET>:----------"'-
4. . REASONS FOR RESTRICTION (IF A'.'IY):
  • THIS C'JMt:LATIVE

.REPORTING PERIOD YR TO DATE TO D ..\TE S.

  • HOURS REACTOR WAS CRITICAL. . . . . * . * * . * . . 532.3 12972.3 182468.7 6:* .REACTOR RESER.VE SHL1TDOWN HOURS .*..**** *a 0 0
7. HOliRS GE::-IERA TOR ON LINE . . . . . : .**..**.* 520.7 _L_96U. 7 17,305.02

&.

  • L'NIT RESERVE SHL'TDOWN HOURS . . . . . * . . * . . 0 0 0
9. GROSS THERMAL E:--:ERGY GENERATED (MWH) . . . . . * . * . . * . . * . * . * . * . 1,215,803 4,693,124 39,475,812
10. GROSS ELECTRIC".o\L ENERGY GENERA TED (MWl-I) . . . . . . . . . * . . * . * . . . . . * * . 396,325 . l,529, 780 12,981,323 I I. *NET ELECTRICAL ENERGY GENERATED

(~1WH) 376", 648 1.455.226 12,302,106

. 1:?.*. Rl:ACTOR AVAILABILITY FACTOR {I) . . . . . . . . . 71.5% 90.3% 64.3%

13. l:NIT AVAILABILITY FACTOR (2) * * * . . . * * * * *
  • 70.0% 89.8% 62.0%
14. L'NIT CAPACITY l- ,\CTOR (3) ....*********** 64.2% 84.6% 54.4%
15. l'NIT FORCED Ol:TAGE RATE (4) . . . . . . . . . . . . 30.0% 10.3% 23.4%
16. SHl"TDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, D ..\TE, AND DURATION OF EACH):
17. If SHUT DOWN. AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ _ __

.18. L"N!TS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DATE FORECAST . ACHIEVED INITIAL CRITICALITY.

INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I)

  • REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE (2) liNIT AVAILABILITY FACTOR -----~---~~~-XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED .

.(3) UNIT CAPACITY FACTOR MAX. Dl:.PENDABLE CAPACff'i (MWe-NET> x ttOllRS IN R.i:.l'ORllNt.: Ne: mot>

FORC°ED OUTAGE HOURS C4l UNIT FORCED OUTAGE RATE --H-O_U_R_S_G_E_N_E_R_A_T_O_R_,O,..._N-L-IN_E__,....i-_F_O_R_C_E_D_O_L_iT_A_G_.E_~-10-t:-'R-S-X lOO

  • UNIT DATE eSurry Unit No.

5-3-76 COMPLETED BY _E.P. DeWandel DOCKET NO. _ _s_o_-_2_8_0_ _ __

OPERATING STATUS I. REPORT! NG PER IOD: _ _o_o-'-0_1_ _7_6_0_4_0-'-l_.- - - - - Tl! ROUGll _ _2_4_o_o_ _7..,..6_0_4_3_o_ _ _ __

HOURS IN REPORTING PEIUOD: 719


'-=-='-------'----~------~--------

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX .. DEPENDABLE CAPACITY (MWe-:-;ET) 788
3. LOWEST POWER LEVEL TO WlllCH SPECIFICALl..,Y*RESTRICTED (IF ANY) (~!We-NET): _ _ _ _ _ _ _ _ _ __

4.. REASONS F.OR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PER!OD YR TO DATE TO D.-\TE

5. HOURS REACTOR WAS CRITICAL . . . * . . * , **..** *574 2,546.3 19,042 ..__]_

6., REACTOR RESERVE SHUTDOWN HOURS ....*.* 0 . 0 0

7. HOURS GENERATOR ON LINL . . . . . * * * * * * * *
  • 569.7 - 2,530.4
8. UNIT RESER VE SHUTDOWN HOURS ***.. ; .**.* 0 0
9. GROSS lHERMAL ENERGY.

GENERA TED (MWH) . . . . . * . * . * * * . * * * * * * *

  • 1,363,416. §,056,540 40,839,228
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . : * * * . . . * . * * * . *
  • 447,670 1, 977 ,450 13,428,993 1L NFT El.ECfRlCAL E~EilGY GENERATED (M.WH) . . * . * . * . . . * . . * . . . * * * . * * * * * * *
  • 426,326 1,881.552 12,728.432 12, REACTORAVAILABILITYFACTORO) .**.***** 79.olo 87.7% 64. 7%
13. UNIT AVAILABILITY FACTOR (2) . * * * * * * * * * *
  • 79.2% s1.n 62.4%
14. UNIT CAPACITY FACTOR (3) .*....***. , ..*. 75.1% 82.2% 54.9%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 20.3% . 12.8% 23.4%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT6 MONTHS (STATE TYPE, DATE, AND DURATION Of EACH):

Refueling, October 15, 1976; approximately six weeks

17. IF SHUT DOWN ~TEND OF REPORT PERJOD, ESTIMATED DATE OE STARTUP: Hay 2, 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REl'ORTTllE fOLLOWING:

DATE LAST DATE FORECAST* ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL. OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR x 100 HOURS IN.REPORHNG PERIOD HOURS GENERATOR ON LINE (2) UNIT AYAILADILITY FACTOR lO_U_l_lS_l_N_l_lE-,1-'0_R_T_l_N_G_l'_E_R_IO-D--X l OO NFT f.l.EC'TRIC'AL l'O\\'FR GF\'JERATFD

(~) tfNIT C'APACITY FACTOR MAX. Ul,l'ENUABLE CAl'ACITY tMWc-NET) X llOllRS IN RU'ORTINli l'FIUOI>

FORCED.OUTAGE llOURS (4) UNiT FORCED OUTAGE RATE "----*** ~---------'~-~~-x100 HOURS GEN! Ill\ TOil ON. LINE i FOltCF.D OUTAGE llOURS

  • UNIT DATE Surry Unit No. 1 June _1, 197 6 COMl'LETFD UY E. P. DeWaridel DOCKET NO. 50- 80 2 OPERATING STATUS
l. REPORTING PERIOD: 0001 760501 . TH ROUGll -~2~4~0~0.,...._7.._...,_6,.,_0-'-5-'-3....

1 _*- - - - - -

HOURS IN REPORTING PERIOD: 744

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2 441 MAX. DEPENDABLE CAPACITY (MWc-NETJ 7 88
3. LO\\'EST POWER LEVEL TO Wl!ICH SPECIFICALLY RESTRICTED llF ANY) (~!Wc-NFTJ:--__,..----,-----
4. REASONS FOR RESTRICTION (If ANY):

THIS CUMULATIVE REPORTING PERIOD YRTO DATE TO DATE

5. HOURS REACTOR.WAS CRITICAL .***..*******
  • _6_4_7_._6_ __ 3193.9 19,690.3.
6. REACTOR RESERVE SHUTDOWN HOURS . * * * * * * -~0_ _ __ 0 0
7. HOURS GENERATOR ON LINE. ; . . . . . . , * . * * *
  • _6_3~9~*~9_ __ 3170.3 19, 014. 8*
8. 0 0 0 9.

UNIT RESERVE SHUTDOWN !!OURS . . . .* , . . . . . .

GROSS THERMAL ENERGY GENERATED(MWH) . . . . . . . * * * * * * * * * * * * . . 1,504,199 7,560,739' 42' 343 '427

10. GROSS ELECTRICAL ENERGY .

-GENERATED (MWH) . . * . . * . * * . * * . * . . * **.** 490,165 2,467,615 13,919.158

11. NET FJ.F\TRICAL ENERGY GENERATED (MWH) . . * . * * . * . * * * * * * . * * * * * * * * * * * * . ** 465,205 2,346,757 13,193,637
12. REACTOR.AVAILABILITY FACTOR(l) ....***** 87.0% 87 ~6% 65.3%
13. *UNIT A VAILAillLITY FACTOR (2) . . . . . . . . * . . . 86.0% 86
  • 9io 63.0%
14. UNIT CAPACITY FACTOR (3) .' . . * * . . * . * * * * *
  • 79.3% 81.6% 55.5%.
15. UNIT FORCED OUTAGE RATE (4) . . . . . . * . * . . . 14.0% 13.1°/., 23.1%
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):*
  • RefuelinB, October 15, 1976, six weeks * * .* * *
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATI-:-or S T A R T U P : - - - - - - - - - - - -
18. UNITS .IN TEST STATUS (PRIOR T_O COMMERCIAL OPERATION) REPORT"fHE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL P.OWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL X JOO (l) REACfOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD

_H_O_U_R_S_G_E_N_E_.R_.A_T_O~_R_O_N_L_IN_E_ _ X IOO (2) UNIT AVAILABILITY FACTOR HOURS IN REPORTING PERIOD NET EUTTIUC/\L l'OWER GFNERATFD

(:\) tJNl"fCAl'A('ITV FACTOR MAX. Dl:.l'ENl>/\llLE C/\1'1\CITY (MWc-NElJ X 110.URS IN kt*.l'Oll'l'INtl 1'1-.IUlll' 1:0RCED ou1_*A_c_.E_l_IO_U_R_s____________ I 00 (4) UNIT FORCED OUTAGE RATE.

llOURS GI-:Nt:ltATOlt ON l.INE + FOltCED OUTAGE llOUHS X

.e UNIT-~urry Unit //1

.*DATE July 1, 1976 COMPU:TEL> IJY E. P. DeWandel OOCKET No.iQ.-_2_8_0_.,-------'-

OPERATING STATUS I. REPORTING PERIOD: 0001 760601 . T!IROUGH . 2400 7606.J~----

HOURS iN REPORTl~G PERIOD: 720

---'~"----~-------'-----------------

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 -~iAX. DEPENDABLE CAPACITY. lMWc-NETJ 7 88
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ASYJ (l\!Wc-NET): _ _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE

.. REPORTING PERIOD YR TO DATE TO DATE S. HOURS R.EACTOR WAS CRITICAL. . . . . . . . . . . . . 720 _l9Ll_*.2__ 20,410.3

6. REACTOR, RESERVE SHUTDOWN HOURS . . . . . .
  • 0 0 0
7. HOURS GENERATOR ON.LINE . . . . . . . . * . . . . . . 720 3890.*3_ 19)734.8

. 8. UNIT RESERVE SHUTDOWN HOURS . . . . . . . . * .

  • 0 0 0
9. .GROSS THERMAL ENERGY GENERATED(MWH) . . . . . . . . . . * . . -~ . * . . .
  • 1,744,255 ~304, 994 44, 087, 682
10. GROSS ELECTRICAL ENERGY

<;ENERA TED (MW!I) . : . . . * . . . . . . . '. .****** 555,645 310231260 14' 4 7 4' 80 3 .

  • 11. NET Fl.ECTRICAL ENE!'l.GY GENERA TEL> . 1-- l
  • (M\i.'H) **.. *.* . . * . . . . . . . . , * . * . . * . . . * . 527,763 2,874l520 13, 721~400

. 12. REACTOR AVAILABILITY FACTOR(!) .. *.* . . . . . 89.6% 66.lio

13. UNIT A VAILAB!LITY FACTOR (2) . * . * * * * * * * *** 8q 1% 63.9%.
14. UNIT CAPACITY FACTOR (3) . . * . * . * * * * * . ; *. 93.0% *83. 5io 56.4%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . . 0 10.9% 22. 4%
16.
  • SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH);

. Refueling, October 15, 1976, 6 weeks . . * *

17. IF SHUT DOWN AT END Of REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ _ __
18. UN.ITS IN TEST STATUS (PRIOR TO cmlMERCIAL OPERA T!ON) REPORT THE FOLLOWING:

DA TE LAST DA TE FORECAST* AClllEVED

. INITIAL CRITICALITY i" INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION I*

HOURS REACTOR WAS CRITICAL (I) REACTOR AVAILADILITY FACTOR HOURS IN REPORTING PEIUOD x 100 HOURS GENERATOR ON LINE (2) llNIT AVAILABILITY FACTOR. ------------~XIOO HOURS IN REPORTING PERIOD NFT El.f.C'TRlC'AL l'O\\'FR GENERATED (3) UNIT C'ArACnY FACTOR MAX. DU'ENl>AllLJ.. Ct\l'Al'l 1 Y lMWl**NET) X llOllltS IN IU.\'OltTit-a: l'FIUOI>

(4) UNIT FORCED OUTAGE RATE

  • FORCEO OUTAGI:: !IOllRS_'- - - - - - - - - - - - X IOO llOllltS GENEl\ATOlt ON LINE+ l'OltCED OUTAGF llOURS
  • UNI- rry DATE/\uqust Un it lil 2, 1976 COMPLETED BY E. p. DeHandel DOCK ET NO. -"-50~-_2::..8::..0:.__ _ __

OPERATING STATUS

l. REPORTING PERIOD: 0001. 760701 THROUGH 2400 760731 HOURS IN REPORTING PERIOD: 744

~--'--'--'------.,.--------------------~

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 244} MAX. ~E.PE:'IDABLE CAPACITY (~IWe-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF_ANY) (~lWc*NET): _ _ _ _ _ _ _- - ' - -
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

.S. HOURS REACTOR WAS CRITICAL .. * ..*..** *~ *** 568.8 4,482.7 20,979.l

6. .REACTOR RESERVE SHUTDOWN HOURS ******* 0 0 .* 0

. 7. HOURS GENERATOR ON LINE. .*.*.********* 565.1 4,45~.4 ~0.299.9

8.
  • UNIT RESER VE SHUTDOWN HOURS .******.*.* 0 0 0
9. . GROSS THERMAL ENERGY GENERATED(MWH) .....******.********* 1,322,138
  • 10,627 ,132 45,409,820
10. GROSS ELECTRICAL ENERGY

{/ENERA TED (:\t'NH) ......**.*.********** 417,655 3,440,915 14,892,458

11. NET ELECTRICAL ENERGY GE!'./ERATED (MWH) ****.****. , *.***. *, **..* ***** " ** 395,817 3,270,337 14,JJZ.~17
12. REACTOR AVAILABILITY FACTOR (I) . * * * . * * . *
  • 76. 5% 87 .7% 66.3%
13. UNIT AVAILABILITY FACTOR (2) * * * * * * * * * * *
  • 76.0% 87. 2%_ 64.2%
14.
  • UNIT CAPACITY FACTOR (3) * * * * * * * * * * * * * *
  • 67. 5%. 81. 2% 56.6%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * * . . . 24.1% 12.8% . 22. 5%
16. SHUTDO\\'NS SCH.EDU LED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):.

Refuel inq - October 15, 1976 - 6 weeks * "

17. IF SHUT DOWN. AT END OF REPORT PERIOD, ESTIMATED DATE OF ST ARTl!P: ~N-<-/.:..;A__________
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION.

HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR ., X 100 HOURS IN RErORTING PERIOD HOURS GEN.ERA TOR ON LINE (2) UNIT AVAILABILITY FACTOR HOURS IN REPORTING PERIOD x IOO NET ELECTRICAL POWER GE~ERATED (J) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY l~!Wc*NET) X HOURS IN Rt::l'ORT!Nli l'!:.KIOIJ FORCED OIJTAGE llOURS (4) UNIT FORCED OUTAGE RATE *~~--------~---------------XlOO llOURS GENloRATOR ON LINE+ FORCED OUJ'1\GE llOURS

  • UNIT Surry DATE. 5-3-76 Unit No. 2 COMPLETED BY E
  • p
  • DeWandcl DOCKET NO.

- -8 1- - - - -

Z OPERATING STATUS

l. REPORTING PER IOD: _ _._0_0_0_1_ _ 7 _60_4_0_1_ _ _ _ _ THROUGH _ _2_4_0_0_ _7_6_0_L_13;;....0_ _ _ __

HOURS IN REPORTl!':G l'ERIOD: _ _ _7..__l.._9"---'--'-------------------~~-

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (l\\We-NETJ _ _ 7_8_8_
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRlCTED (If ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY);

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

5. HOURS REACTOR WAS CRITICAL. ... : .*.*.**. 505.5 2 2 159.s: 17,789.4
6. REACTOR RESER YE SllUTDOWN HOURS . . * . . . . 0 . 0 0
7. HOURS GENERATOR ON LINE . . . . . . . . * . * * * . . 503.7. 2,146.4 17,500.9_
8. UNITRESER YE SHUTDOWN HOURS . . . . . . . . . . . 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . . . . . . * . * . . * * * * * ' 1, 175, 103 5,052,578 39,560,711
10. GROSS ELECTRIC' AL ENERGY GENERATED (M\VH) . * . . . * . * . . * * * * * ; . * . * *
  • 378,580 1,651,680 1219972239
11. NET I:LEC.'Tn.ICAL

. E!'/ERGY

. GENERATED (MWH) ..*...*....*.*.*.*..***.*.*****

3_58, 361 l,566,l182 12,318,863

12. REACTOR AVAILABILITY FACTOR (I) . . . . . . . .
  • 70. 2.% 74.4% '67. 6i;
13. llNIT AV Al LAB! LITY FACTOR (2) . . . . . . . . * . .
  • 73.9% 66.5%
14. UNIT CAPACITY FACTOR (3) . . . . . . . . . * . . . . . 63.2% 68.5% 59.4%
15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . * . . . 0 20.1% 20.1%
16. SHUT.DOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION or EACH):
17. IF SHUT DOWN AT END Of REPORT PERIOD, ESTIMATED DATE OF STARTUP: M3y 22, 1976.
18. UNITS IN TEST STATUS (PRIOR TO CO!-.IMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE-LAST DATE FORECAST ACHIEVED INITIAL C.RITICALITY INITIAL ELECTRICAL POWER GENERAJ"ION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR HOURS IN REPORTING PERIOD.

x 100 HOURS GJ:c:NERATOR ON LINE (2) UNIT AVAILABILITY FACTOR _H_O_U_R_S_l_N_R_E-PO-RT_l_N_G_P_E-.-R-lO_,.D--X.1 OO NFT Fl.FCTRIC'AL POWFR (:FN_l_*:I_tA_T_F_.n_ _ _ _ _ _ _ _- - : - - - - -

(3) UNI'(CArACITY FACTOR MAX. l)El'ENDAULE CAPACITY (MWc-NET) X llOllltS IN lll*.l'Ult:l INl; l'l-:IWJI>

FORCED OUTAGE llOURS (4) UNIT FORCED OUTAGE RATE llOU!tS GENLRATOlt ON LIN!~+ l'ORC:ED OUTAGE IIOURS x 100

  • UNIT e

DATE June Surry Unit No. 2 1, 1976 COMP1.ETED llY E. P. DeWandel DOCKET NO. _5_0_-_*-'-2_8_1_ _ __

OPERATING STATUS I. REPORTING PERIOD: 0001 760501 TH ROUGll _ __.2-..::4:r.i.0.u0.t_~7u6.il0.1....'5J_3.._11--_ __

HOURS IN REPORTING PERIOD: 744


..,~.,--------""'---~---~------~

2. CURRENTLY AUTllOR_IZED POWER LEVEL (MWth) 2441 ~!AX. DEPENDABLE CAPACITY l~!Wdfff) 788
3. LOWEST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (MWc-NET):_*----------
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMllLATIVF.

REPORTl:-IG PERIOD YR TO DATE TO DAH:

S. HOURS REACTOR WAS CRITICAL . . . . . . . * . . . . . 0 2159 .* 8 17,789.4

6. REACTOR RESER VE SHUTDOWN HOURS . ; ...** 0 0 0
7. HOURS GENERATOR ON LINE . . . . . . . . * . . . * . . 0 2146.4 Jl ,,500. 9
8. UNIT RESER \'E Sil UTDOWN llOURS . . . . * . . . . .
  • 0 0 0

. 9. GROSS THERMAL ENERGY GENERATED (MWH) ; . . . . . . * . . * *.*.**.** *'* 0 5,052,578 39, 560, 711

10. GROSS ELECTRIC' AL ENERGY GENERATED (MWH) . . . . . . . . . * . . . * * . * . * *
  • 0 1,651,680

. 11. i-iET ELl:CTRICAL ENERGY GENERATED (MWH) 0 __L266,482 12,318~863

12. REACTOR AVAILABILITY FACTOR (1) * * * * * * * .
  • 0 59.2% 65.8%
13. UNIT AVAILABILITY FACTOR (2) * * * . * . * * . * *
  • 58 .. 9°/,, M.n
14. UNITCAPACITY FACTOR (3) . ; . . * . * * * * * . * *
  • 0 54.5% 57.8%
15. UNIT FORCED OUTAGE RATE (4) . * . * * * * * * . . . 0 20.1% 20.,1%
16. SHUTDOWNS SCHEDU.LED TO BEGIN IN. NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION Of- EACII):.
17. IFSHUTDOWNATENDOfREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: June 1, 1976
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DA TE FORECAST. ACI II EVED INITIAL CRITICALITY

.r INITIAL ELECTRICAL POWER GENERATION

. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILADILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR, ON LINE (2) UNIT AVAILABILITY FACTOR . - -H'-0-U_R_S_.-l~-R-lcl-'0_R_T..::...l.:....N_G_P_E_.R_l_O_D_ _. X IOO NF.T El.FCTRICAL POWER GENERATED

{3) UNl1' C-Al'ACITY l'ACfOR MAX. DEl'ENl>AIJLECAl'ACITY (M\Yc-NET) X llOUHS IN Rl*.l'ORTINl; l'Fl\100 FORCED OUTAGE l!OLIRS (4) UNIT FORCED OllTAGE RATE -*

llOUllS GENl-.RA~*oR. ON LINE -t-.FORCED OUTAGE llOURS


x 100

  • UNIT DATE e Surry Unit July 1, 1976 112 COMPLETED BY E. P. DeWnndel DOCKET NO. 50-281 OPERATING STATUS .*
l. REPORTING PERIOD: 0001 760601 Tll ROU Gil --=2'--'4""'0"""0'--_ _...7_,.,6'-"'0'-"6""'3'"""'0'---~--

HOURS IN REPORTING PERIOD:--'7_2_0_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWc-NETl ~7~8~8'---

3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NETl:--~--------
4. REASONS FO.R RESTRICTION (IF ANY):

THIS CU~IULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL *.**.******** 576.5 2736.3 18,365.9

6. . REACTOR RESER VE SHUTDOWN HOURS ..*.*** 0 Q Q
7. HOURS GENERA TOR ON LINE . . * . . * . * * * . * * *
  • 502.6 2649.0 ~003.5
8. UNIT RE~ERVE SHUTDOWN HOURS . . * * . * * . : ** 0 0 0
9. GROSS THERMAL ENERGY GENERA TED (MWH) ..*.*.*************** 1,138,081 6,190,659 40, 698, 792
10. GROSS ELECTRICAL ENERGY

-GENERA TED (MWH) ..*.*.*.***.***.****** 374,915 2,026,595 13, 372, 154

11. NF.T F.LECTRICAL ENERGY GENERATED (MWll) ***.*******.***************** 355,272 1,921,754 12, Q7 l1, 1_J5
12. REACTOR AVAILABILITY FACTOR(!) **..**** : 80 o 1°/o 62.6% 66_J%
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . . * * . .
69. 8/*. . 60. 7% 64. 8%
14. UNIT CAPACITY FACTOR (3) .....*.********

62.6% 55.8% 57

  • 9/o
15. UNIT FORCED OUTAGE RA"(E.(4) ********* : .*
  • 8% 17.1% 19.7%
16. SHUTDOWNS SCHEDULED TO B.EGIN IN NEXT 6 MONIBS (STATE TYPE, DATE, AND DURATION OF EACH):.
17. IF SHUT DOWN AT END or: REPORT PERIOD, ESTIMATED DATE Of STARTUP:-------------
18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELELIRICAL POWER GENERATION COMMERCIAL OPERA TlON HOURS REACTOR WAS CRITICAL (I) *REACTOR AVAILABILITY FACTOR

  • HOLIRS IN REPORTING PERIOD x 100 (2) UNIT AVAILABILITY FACTOR

_11_o_u_R_S_G_E_:N_r_:R_A_T_O_R_O_N_l_.I_N_E_ _ x i 00 llOU!lS IN REl'ORTING l'ERIOO NF.T ELF.CTR IC Al. POWFR GFNF.RATF.O (3) Ul'HTCAPACITY FACTOR.

MAX. DEl'FNLMBLE CAPACITY (MWc*NET) X llOllRS IN IUJ'OlrJ'INC; l;l'f1101>

FORCED OUTAGE llOURS (4) UNIT FORCED OUTAGE RATE llOU!tS GEN i: ll A TO_ll_O_N_L_IN-1-~*-+-.F._O_ll_C_F._D_O_L_F_rA-G-.E-,_ll_O_U_lt-S-x I 00

.

  • e UNIT Surry Unit DATE Au~ust 2, 1976 n

COMPLETED.BY E. P. DeWandel DOCKET NO. 50-281 OPERATING STATUS

1. REPORTING PERIOD: _ _ _0_0_0_1_7_6_0_7_0_1_ _ _ _ _ THROUGH ~---*2_4_0_0__ 7_6_0_7_31_ _ _ __

HOURS IN REPORTlt"G PERIOD: _ _ ___;7_4_4___________________......,.,..,..---

2. CURRENTL Y AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPE~DABLE CAPACITY !MWc-NET) 788
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (!F ANY) (~!We-NET): _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTING PERIOD. YR TO DATE TO DATE

s. HOURS REACTOR WAS CRITICAL *.*..******** 705.2 3,441.5 !9.,071.1
6. REACTOR RESERVE SHUTDOWN HOURS **.****.* 0 0
7. HOURS GENERA TOR ON LINE ...*.***** ; **** 704.3 32353.3 10~707.b
8. UNIT RESERVE SHUTDOWN HOURS *********.* 0 0 0
9. GROSS THERMAL ENERGY GENERATED(MWH) **...*******.******** l, 711, 295 7,901,954 4.2 ,410 ,087
10. GROSS ELECTRICAL ENERGY

{;ENE RA TED (MWH) .***.....*.********** 555,805 2l582l400 13~927 2959

11. . NET.ELECTRICAL ENERGY GENERATED (MWH) *.* ****** **************** * *****

527,570 *224~92324 132201~70fi

12. REACTOR AVAILABl.LITY FACTOR (1) *.* ******* ~~~ 67.3% 66.9%
13. UNIT AVAILABILITY FACTOR (2) * * * * * * * * * * *
  • 65.63 65. 6%
14. UNIT CAPACITY FACTOR (3) . . . . * * * * * * . . * *
  • 90
  • 0% 60.8% 58.8%
15. UNIT FORCED OUTAGE RATE (4) . . . * * . * * * . * * . . _ _ _ 5-'-._3'-%__ 14. 8% 19.2%
16. SHUTDO.WNS SCHEDUl,.l:D TO BEGIN IN NEXT 6 MONTHS (STATE 1YPE, DATE, AND DURATION OF EACH):

None *

17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: Auqus t 2' .1976
18. UNiTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:.

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY lNlTIAL ELECTRICAL

  • POWER GENERATION COMr..1ERCIAL OPERATION HOURS REACTOR WAS CRITICAL (l) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) UNIT AVAILABILllY FACTOR --~-~~-~-~-~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GE!'IERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDAULi~ CAPACITY <MWe*NET) X HOUllS IN IU*.l'UltTIN(; l'l*RIOl.Y FORCED OUTAGE llOL_IR_S_ _ _ _ _ _ _ _ _ _---'--X lOO (4) UNIT FORCED OUTAGE RATE llOURS GENLRATUll ON LINE+ FORCED OUTAGE llOUltS