VIRGINIA ELECTRIC AND RIOHMOND, VIRGINIA 232.61 September 13, 1976 Mr. William McDonald, Director Office of Management Information and
- program Control
- u. s *. Nuclear. Regulatory Cormnission Washington, D. c.
20555
Dear Mr. McDonald:
Serial No. 182/021974 PO&M/ALH:jlf Docket Nos. 50~280 50-281 License Nos. DPR-32 DPR-37 Operating information for Surry for the month of August 1976 is attached.
through July 1976 on Unit No. 1 and April also.attached.*
Power Station, Unit Noso 1 and 2, Corrected copies of data for March through July 1976 on Unit No,. 2 are Very truly yours,
- ~.>>!.~~
- c. M. Stallings Vice.President-Power Supply and Production Operations
e UNIT Surry Unit #1
. DATE September 2, *1976 COMPLETED BY E. P. DeWandel DOCKET NO. -"-5-'-0_-.;;:.2..;;.8..;;.0 _ _._ __ _
OPERATING STATUS
- 1.
REPORTING PERIOD: __
o_o_o_1 __
7_6_0_8_0_1 ______ THROUGH -*-=2'-"'4"°"0_,.Q _ __._7.,,_6_-=0=83:;.a.1 ___..___
HOURS IN REPORTING PERIOD:--.. _ _.;_7_4....;.4 ___
....,...,. ______ ~-------------
- 2.
CURRDITLY AUTHORIZED POWER LEVEL (MWth) 2441
- MAX. pEPENDABLE CAPACITY(MWe*NETl...:J~8~8 __
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL......*.***..
607.4
- 6.
REACTOR RESERVE SHUTDOWN HOURS *..*..*
0
- 7.
HOURS GENERATOR ON LINE.*. ~.....**.**.
597.1
- 8.
UNIT RESER VE SHUTDOWN HOURS..****...**
0
~
GROSSTHERMALENERGY GENERATED (MWH)....,.................
1,364,191
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED (MWH).*.*.**...**.*...**.*
439,365
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH) 416, 802 1i:
REACTORAVAILABILITY.FACTOR(l).*.*.***.
81.6%
- 13.
UNIT.AVAlLABILITYFACTOR(2) ***....**. ~ **
- 14.
UNIT CAPACITY FACTOR (3) ***...* ; **.**..
71.1%
- 15.
UNIT FORCED OUTAGE RATE (4).*.*..***..*
19.7%
CUMULATIVE YR TO DATE TO DATE.
5090.1 21,586.5 0
0 5052L2_
20,897.0 0
0 11,991,323 46, 774, 011 3 2 8802 280 15 2-3312 823 3,687,139 14,534,019 86.9%
66.7%
86
- 3°/.
69:. 5°!.
79.9%
57.0%
13!7%
. 22!4%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT-6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling - October 15,.1976 - six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __
N~/_A _________ _
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST FORECAST DATE ACHIEVED HOURS REACTOR WAS CRITICAL
,(1).
REACTOR AVAILABILITY FACTOR "' HOURS IN REPORTING PERIOD X 100 (2)
UNIT AVAILABILITY FACTOR (3)
UNfT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE
_H_O_U_R_S_G_E_N_E..:...R_A_T_O_R_O_N_L_IN..:...E __
X lOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING l'ERlOIJ
_FO_R_C_E_D_O_U_T_A __
G_E_H_O_U_R_S ____ '---------X lOO HOURS GENEl{ATOR ON LINE+ FORCED OUTAGE HOURS
e DOCKET NO.
50-280 UNIT Surry_ #1 DATE S~pt. 21 1976 COMPLETED BY E. P. DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH August 1976
- A VERA GE DAILY POWER LEVEL DAY (MWe-net)
. AVERAGE DAILY POWER LEVEL DAY (MWe-net) 1
. 739.5 17 0
2 739.5 18 0
3 743.5 19
.67.4 4
20 257.4 721.7.
5 738.4 21 722.5 *.
6
. 7-50. 8.
22 365.7 7
750.9 23 397.4 8
750.8 24 752.8 9
25 751.5 753.5 10 753.5 26 756.9 11 753.3 27 757.4 12 28 755. 7 13 29 752.8 651 14 3.0 719.0
- 15 0
31 706.0 16 0
- .:DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unir power ievel in MWe-net for ea*ch day in the reporting month.
Compute to the nearest whole megawatt.
These figures: will be *used to plot a graph for each. reporting month. Note that by using rirnximum de-pehdabie capacity.for the net elecfrical rating of. the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level. line). In such. cases, th.e average daily unit po\\ver output shee't should b_e footnoted to explain t_he apparent anomaly_.
NO.
DATE TYPE F-FORCED s:scHEDULED 76-10 8-13~76 F-Forced 76-11 8-19-76 F-Forced 76-12 8-22-76 F-Forced.
SUMMARY
DURATION (HOURS) 136.0 1.1 5.4 UNIT SHUTDOWNS REPORT MONTH August 1976 REASON (1)
- A H
A METHOD OF
~HUTTING DOWN
- THE REACTOR (2) 1 3
1 DOCKET NO.
50-280 UNIT NAME Surrl Uni.t #1 DATE Sept. 2, 1976 COMPLETED BY E. P. DeWandel CORRECTIVE ACTIONS/COMMENTS Pr'imary to secondary leakage in steatn I
generators.
Plugged leaking tubes in "~
and "C" S/G's.
Turbine trip on ioss of first stage pres-sure interlock when latching turbine.
r Repositioned valve. limit.
Turbine only-had blown rupture discs on the L/P turbine 'casings.
Replaced rupture dis.cs *
. (1) REASON A* -EQUIPMENT 1-'AILURE (EXPLAIN)
B-MAINT. OR TEST C-REFUELING D-REGll LA TORY RESTRICTION
. E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-*OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
- (2) METHOD I
I-MANUAL 2-MANUAL SCRAM 3-AUTOMATlC SCRAM.e
UNIT SHUTDOWNS '
DOCKET N 0. * --"-5-"-0-_2--"-8-"-0 __
UNIT NAME Surry Urii't #1 DATE COMPLETED BY September 2 '* 197 E. P. DeWandel REPORT M QNTH -=-=Au=g=u::..:s:....:t:___ ___ _
TYPE F*FORCED DURATION NO.
DATE S-SCHEDULED (HOURS)
REASON (1) 76~13 8-23-76 F-Forc~d 1.6 H
76-14 8~23-76 F-Forced 1.3 H
76-15 8-23-76 F~Forced 1._5 A
SUMMARY
METHOD OF SHUTTING DOWN THE REACTOR (2) 3 3
3 CORRECTIVE ACTIONS/COMMENTS Lo Level in S/G with WW mismatch during startup due to sensiti~ify. of feedwater
- control _system.
Returned level to normal band.
Lo level in S/G with :WW mismatch during startup due to sen.siti:~ily of feedwate:c control system.
Returned level to normal
- band.
Failure of static breaker r~lay in switch yard.
Replaced relay.
(1) REASON A--EQUIPMENT FAILURE (EXPLAIN) li-MAINT. OR TEST C-RffUELING 0-REGLILATORY RESTRICTION E-OPERA TOR TRAINING AND LICENSE EXAMINATION F-:-ADMINISTRA TI.VE G-OPERATIONAL ERROR (EXPLAIN)
H--OTHER (EXPLAIN)
(2) METHOD I-MANUAL 2-MANUAL
.
. *; **~, *..
U~IT f rry Unit #2 DATE Sept. 2, 1976
. COMPLETED BY.* E. P. DeWandel
- DOCKET NO. 50-281
~
OPERATING STATUS
- 1.
REPORTING PERIOD:
0001 760801 THROUGH 2400 760831 HOURS IN REPORTING PERIOD:
7 44
~------------------
- 2.. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pE.PENDABLE CAPACITY (MWe*NET) 7 88
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IFANY) (MWe-NET): _________
. 4.
REASONS FOR RESTRICTION (If ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL *......*.*.*.
- 6.
REACTOR RESERVE SHUTDOWN HOURS.**..*.*
7.. HOURS GENERATOR ON LINE.*..*...*****..
- 8.
UNIT RESER VE SHUTDOWN HOURS....**.****
- 9.
GROSS THERMAL ENERGY 691.8 0
690.4 0
GENERATEO(MWH).....*.**...*..*****.* 1,661,570
- 10.
GROSS ELECTRICAL ENERGY
-GENERA TED (MWH)........*..*. ;.**...*.
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH)....*.*...........*..... :.***.*
- 12.
REACTOR AVAILABIL)TY FACTOR (1)....,...*
- 13.
UNIT AVAILABILITY FACTOR (2).......***...
- 14.
UNIT CAPACITY FACTOR (3)........*..* * ***.
lS.
UNIT FORCED OUTAGE RATE (4)........ :...
53.3' 525 505,862 93.0%
- 92. 8%
- 86. 3%.
7.2%
CUMULATIVE YR TO DATE TO DATE 4133. 3 191762.9 0
0 4043. 7 191398.2 0
0 9,563,524 44,071, 657 3,115,925 14,461,484 2,22.2,H\\6 n,ZQZ,5:Z6 70.6%
67.6%
62.1%
66 I 3°fu 64.1%
59.5i 13.6%
18.8%
- 16.
- SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):
None
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATE!) DATE OF STARTUP: __ N-'-/ A_*---'---------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR A.VAILABILITY FACTOR (2)
UNiT AVAILABILITY FACTOR
())
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE
.I..
INITIAL CRITICALITY.
INITIAL ELECTRICAL POWER GENERATION
. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
x 100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DA TE FORECAST.
ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPOlltlNU l'EiUOl>
_FO_R_C_E~~D_*_O_U_T_A __
G_E_ll_O_U_R_*S---~---------~XtOO HOURS GENLltATOR ON LiNE +FORCED OUTAGE HOURS
DOCKETN0.~5~0~-2=8=1~~-
UNIT Surry Unit #2 DATE Sept. 2, 1976 COMPLETED BY E. P. DeWandel AVERAGE DAILY UNIT PO.WER LEVEL MONTH August, 1976 AVERAGE DAILY POWER LEVEL
. DAY (MWe-net)
A VERA GE DAILY POWER LEVEL DAY (MWe-net) 1 0
17 745.6 2
0 18
. 744. 2 3
497.2 19 742. 7.
4 754.4 20*
750.1 5
751 *. 8 21 750.0 6
748.3 22 745.0 7
746 3 23 740 2 8
. 748.3 24 699.1 9
751.5 25 724.,5 10 752.3 26 732.5 11 746.6 27 734.4 12 738.0.
- 28.
740.0 13 737.1 29 738.0 14 724.2 r
30 741.0 15 582.8 31 730.7 16 740.8 DAILY UNIT POWER LEVEL FORM*INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figure's will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the. net electrical rating of the unit, there may be occasions when the daily average power level exceeds the l 00% line (or the restritted power level line). In such cases, the.
average daily unit power output sheet should be footnoted* to explain the apparent anomaly.
NO.
DATE 76-8 8-1-76
SUMMARY
TYPE F-FORCED S-SCHEDULED F-Forced DURATION (HOURS) 53.6 UNIT SHUTDOWNS REPORT MONTH August 1976 REASON (1)
A METHOD OF
~HUTTING DOWN THE REACTOR (2) 1 DOCKET NO. _5_0_-_2_81 ___
UNIT NAME Surry Unit #2 DATE Sept, 3, 197h COMPLETE.D BY E. P, DeWandel CORRECTIVE ACTlc:fNS/COMMENTS
!Excessive.reactor coolant leak. Reactor_.
and unit shutdown on 7-30-76, Tightened9 packing ?nd renewed gaskets on leaking components, Shutdown waiting for repairs to the low pressure letdown relief valve, (RV-2203)
(l) REASON A*-EQUIPMENT rAILURE (EXPLAIN)
B-MAINT. OR TEST C-REFUELING 0-REGULATOR Y RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
H-OTUER (EXPLAIN)
- (2) METllOD I-MANUAL 2-MANUAL SCRAM
)-AUTOMATIC SCRAM e
OPERATING STATUS Surry Unit No. 1 UNIT---------
DATE Apr. *1~ 1976
~O~PLETED BY E.P. DeWandel DOCKET N0.. _5_0_-_2_8_0 ____ _
- l.
REPORTING PERIOD:_o_o_o_1 __
7_6_0_J_O_l ______. THRO(jGH __
2_4_0_0 __
7_6_0_3_3_1_* -----
HOURS IN REPORTl1'G PERIOD:
7 44
- 2.
- CTR RE NTL Y AUTHORIZED POW_E_R_L_E_V_E--'L--'(-~-!W_t_h_) _?_4_4_1--~-IA_X_'.-D-E_P_E_N-'D_A_B_L_E_c_* A_P_A_C_l_T_Y_(-~l-\\\\-.c!-*N-'E_T_) _7..,.....,..8-8.,... --
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET>:----------"'-
- 4.. REASONS FOR RESTRICTION (IF A'.'IY):
- THIS
.REPORTING PERIOD S.
- HOURS REACTOR WAS CRITICAL.....*.**.*..
6:*
.REACTOR RESER.VE SHL1TDOWN HOURS.*..****
- 7.
HOliRS GE::-IERA TOR ON LINE..... :.**..**.*
&.
- L'NIT RESERVE SHL'TDOWN HOURS.....*..*..
- 9.
GROSS THERMAL E:--:ERGY GENERATED (MWH).....*.*..*..*.*.*.*.
- 10.
GROSS ELECTRIC".o\\L ENERGY GENERA TED (MWl-I).........*..*.*.....**.
I I. *NET ELECTRICAL ENERGY GENERATED
(~1WH)
. 1:?.*. Rl:ACTOR AVAILABILITY FACTOR {I).........
l:NIT AVAILABILITY FACTOR (2) ***...******
L'NIT CAPACITY l-,\\CTOR (3)....***********
l'NIT FORCED Ol:TAGE RATE (4)............
532.3
- a 520.7 0
1,215,803 396,325 376", 648 71.5%
70.0%
64.2%
30.0%
C'JMt:LATIVE YR TO DATE TO D..\\TE 12972.3 182468.7 0
0
_L_96U. 7 17,305.02 0
0 4,693,124 39,475,812
. l,529, 780 12,981,323 1.455.226 12,302,106 90.3%
64.3%
89.8%
62.0%
84.6%
54.4%
10.3%
23.4%
- 13.
- 14.
- 15.
- 16.
SHl"TDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, D..\\TE, AND DURATION OF EACH):
- 17.
If SHUT DOWN. AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ____________ _
.18.
L"N!TS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
- REACTOR AVAILABILITY FACTOR (2) liNIT AVAILABILITY FACTOR
. (3)
UNIT CAPACITY FACTOR C4l UNIT FORCED OUTAGE RATE INITIAL CRITICALITY.
INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
~---~~~-XIOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED.
. ACHIEVED MAX. Dl:.PENDABLE CAPACff'i (MWe-NET> x ttOllRS IN R.i:.l'ORllNt.: Ne: mot>
FORC°ED OUTAGE HOURS
--H-O_U_R_S_G_E_N_E_R_A_T_O_R_,O,..._ N-L-IN_E
__,....i-_F_O_R_C_E_D_O_L_iT_A_G_.E_~-10-t:-'R-S-X lOO
e UNIT Surry Unit No.
DATE 5-3-76 COMPLETED BY _E.P. DeWandel DOCKET NO. __ s_o_-_2_8_0 ___ _
OPERATING STATUS I.
REPORT! NG PER IOD: __
o_o-'-0_1 __
7_6_0_4_0-'-l_. ----- Tl! ROUGll __ 2_4_o_o __
7..,..6_0_4_3_o ____ _
HOURS IN REPORTING PEIUOD:
719
'-=-='-------'----~------~--------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX.. DEPENDABLE CAPACITY (MWe-:-;ET) 7 88
- 3.
LOWEST POWER LEVEL TO WlllCH SPECIFICALl..,Y*RESTRICTED (IF ANY) (~!We-NET): __________ _
4..
REASONS F.OR RESTRICTION (IF ANY):
THIS REPORTING PER!OD
- 5.
HOURS REACTOR WAS CRITICAL...*..*, **..**
6.,
REACTOR RESERVE SHUTDOWN HOURS....*.*
- 7.
HOURS GENERATOR ON LINL.....*********
- 8.
UNIT RESER VE SHUTDOWN HOURS ***.. ;.**.*
- 9.
GROSS lHERMAL ENERGY.
GENERA TED (MWH).....*.*.***.********
- 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH)...... : ***...*.***.**
1 L NFT El.ECfRlCAL E~EilGY GENERATED (M.WH) 12, REACTORAVAILABILITYFACTORO).**.*****
- 13.
UNIT AVAILABILITY FACTOR (2).***********
- 14.
UNIT CAPACITY FACTOR (3).*....***.,..*.
- 15.
UNIT FORCED OUTAGE RATE (4)............
- 574 0.
569.7 0
1,363,416.
447,670 426,326 79.olo 79.2%
75.1%
20.3%
YR TO DATE 2,546.3 0
- 2,530.4 0
§,056,540 1, 977,450 1,881.552 87.7%
s1.n 82.2%
. 12.8%
CUMULATIVE TO D.-\\TE 19,042.. __]_
0 40,839,228 13,428,993 12,728.432
- 64. 7%
62.4%
54.9%
23.4%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT6 MONTHS (STATE TYPE, DATE, AND DURATION Of EACH):
Refueling, October 15, 1976; approximately six weeks
- 17.
IF SHUT DOWN ~TEND OF REPORT PERJOD, ESTIMATED DATE OE STARTUP: Hay 2, 1976
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REl'ORTTllE fOLLOWING:
DATE DATE LAST FORECAST*
ACHIEVED (1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AYAILADILITY FACTOR
(~)
tfNIT C'APACITY FACTOR (4)
UNiT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL. OPERATION HOURS REACTOR WAS CRITICAL HOURS IN.REPORHNG PERIOD x 100 HOURS GENERATOR ON LINE lO_U_l_lS_l_N_l_l E-, 1-'0_R_T_l_N_G_l'_E_R_IO-D--X l OO NFT f.l.EC'TRIC'AL l'O\\\\'FR GF\\'JERATFD MAX. Ul,l'ENUABLE CAl'ACITY tMWc-NET) X llOllRS IN RU'ORTINli l'FIUOI>
FORCED.OUTAGE llOURS
~---------'~-~~-x100 HOURS GEN! Ill\\ TOil ON. LINE i FOltCF.D OUTAGE llOURS
UNIT Surry Unit No. 1 DATE June _ 1, 197 6 COMl'LETFD UY E. P. DeWaridel DOCKET NO. 50-280 OPERATING STATUS
- l.
REPORTING PERIOD: 0001 760501.
TH ROUGll -~2~4~0~0.,.... _7.._...,_6,.,_0-'-5-'-3....
1 _* ------
HOURS IN REPORTING PERIOD:
744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2 441 MAX. DEPENDABLE CAPACITY (MWc-NETJ 7 88
- 3.
LO\\\\'EST POWER LEVEL TO Wl!ICH SPECIFICALLY RESTRICTED llF ANY) (~!Wc-NFTJ:--__,..----,-----
- 4.
REASONS FOR RESTRICTION (If ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR.WAS CRITICAL.***..*******
- _6_4_7_._6 __ _
- 6.
REACTOR RESERVE SHUTDOWN HOURS
-~0 ___ _
- 7.
HOURS GENERATOR ON LINE. ;......, *. * * *
- _6_3~9~*~9 __ _
- 8.
UNIT RESERVE SHUTDOWN !!OURS.... *,......
0
- 9.
GROSS THERMAL ENERGY GENERATED(MWH).......************.. 1,504,199
- 10.
GROSS ELECTRICAL ENERGY.
- 11.
- 12.
-GENERATED (MWH)..*..*.**.**.*.. * **.**
NET FJ.F\\TRICAL ENERGY GENERATED (MWH)..*.**.*.******.************. **
REACTOR.AVAILABILITY FACTOR(l)....*****
- 13.
- UNIT A VAILAillLITY FACTOR (2)........*...
UNIT CAPACITY FACTOR (3)
UNIT FORCED OUTAGE RATE (4)......*.*...
490,165 465,205 87.0%
86.0%
79.3%
14.0%
YRTO DATE 3193.9 0
3170.3 0
7,560,739' 2,467,615 2,346,757 87 ~6%
86
- 9io 81.6%
13.1°/.,
CUMULATIVE TO DATE 19,690.3.
0 19, 014. 8*
0 42' 343 '427 13,919.158 13,193,637 65.3%
63.0%
55.5%.
23.1%
- 14.
- 15.
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):*
- RefuelinB, October 15, 1976, six weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATI-:-or STARTUP:------------
- 18.
UNITS.IN TEST STATUS (PRIOR T_O COMMERCIAL OPERATION) REPORT"fHE FOLLOWING:
(l)
REACfOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR
(:\\)
tJNl"fCAl'A('ITV FACTOR (4)
UNIT FORCED OUTAGE RATE.
INITIAL CRITICALITY INITIAL ELECTRICAL P.OWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL X JOO HOURS IN REPORTING PERIOD
_H_O_U_R_S_G_E_N_E_.R_.A_T_O~_R_O_N_L_I N_E __
X IOO HOURS IN REPORTING PERIOD NET EUTTIUC/\\L l'OWER GFNERATFD DATE LAST DATE FORECAST ACHIEVED MAX. Dl:.l'ENl>/\\llLE C/\\1'1\\CITY (MWc-NElJ X 110.URS IN kt*.l'Oll'l'INtl 1'1-.IUlll' 1:0RCED ou1_*A_c_.E_l_IO_U_R_s____________
I 00 llOURS GI-:Nt:ltATOlt ON l.INE + FOltCED OUTAGE llOUHS X
OPERATING STATUS
.e UNIT-~urry Unit //1
.*DATE July 1, 1976 COMPU:TEL> IJY E. P. DeWandel OOCKET No.iQ.-_2_8_0_.,-------'-
I.
REPORTING PERIOD: 0001 760601
. T!IROUGH. 2400 7606.J~----
HOURS iN REPORTl~G PERIOD: 720
---'~"----~-------'-----------------
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441
-~iAX. DEPENDABLE CAPACITY. lMWc-NETJ 7 88
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ASYJ (l\\!Wc-NET): __________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS
.. REPORTING PERIOD S.
HOURS R.EACTOR WAS CRITICAL.............
- 6.
REACTOR, RESERVE SHUTDOWN HOURS......*
- 7.
HOURS GENERATOR ON.LINE........*......
. 8.
UNIT RESERVE SHUTDOWN HOURS........*.*
- 9.
.GROSS THERMAL ENERGY GENERATED(MWH)..........*.. -~.*...*
- 10.
GROSS ELECTRICAL ENERGY
- 11.
. 12.
- 13.
- 14.
<;ENERA TED (MW!I). :...*....... '..******
NET Fl.ECTRICAL ENE!'l.GY GENERA TEL>
1--
l
- (M\\i.'H)
REACTOR AVAILABILITY FACTOR(!).. *.*.....
UNIT A VAILAB!LITY FACTOR (2).*.******** **
UNIT CAPACITY FACTOR (3)..*.*.*****. ; *.
- 15.
UNIT FORCED OUTAGE RATE (4)............
720 0
720 0
1,744,255 555,645 527,763 93.0%
0 CUMULATIVE YR TO DATE TO DATE
_l9Ll_ *.2__
20,410.3 0
0 3890.*3_
19)734.8 0
0
~304, 994 44, 087, 682 310231260 14' 4 7 4' 80 3.
2,874l520 13, 721~400 89.6%
66.lio 8q 1%
63.9%.
- 83. 5io 56.4%
10.9%
- 22. 4%
- 16.
- SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH);
Refueling, October 15, 1976, 6 weeks
- 17.
IF SHUT DOWN AT END Of REPORT PERIOD, ESTIMATED DATE OF STARTUP: ____________ _
- 18.
UN.ITS IN TEST STATUS (PRIOR TO cmlMERCIAL OPERA T!ON) REPORT THE FOLLOWING:
(I)
REACTOR AVAILADILITY FACTOR (2) llNIT AVAILABILITY FACTOR.
(3)
UNIT C'ArACnY FACTOR (4)
UNIT FORCED OUTAGE RATE *
. INITIAL CRITICALITY i"
INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PEIUOD x 100 HOURS GENERATOR ON LINE
~XIOO HOURS IN REPORTING PERIOD NFT El.f.C'TRlC'AL l'O\\\\'FR GENERATED DA TE LAST DA TE FORECAST*
AClllEVED MAX. DU'ENl>AllLJ.. Ct\\l'Al'l 1 Y lMWl**NET) X llOllltS IN IU.\\'OltTit-a: l'FIUOI>
FORCEO OUTAGI:: !IOllRS_' ------------X IOO llOllltS GENEl\\ATOlt ON LINE+ l'OltCED OUTAGF llOURS I*
UNI-rry Un it lil DATE/\\uqust 2, 1976 COMPLETED BY E. p. DeHandel DOCK ET NO. -"-50~-_2::..8::..0:._ ___ _
OPERATING STATUS
- l.
REPORTING PERIOD:
0001.
760701 THROUGH 2400 760731 HOURS IN REPORTING PERIOD:
7 44
~--'--'--'------.,.--------------------~
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 244}
MAX. ~E.PE:'IDABLE CAPACITY (~IWe-NET) 788
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF_ANY) (~lWc*NET): _______ --'--
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
.S.
HOURS REACTOR WAS CRITICAL.. *..*..**
- ~ ***
- 6.
.REACTOR RESERVE SHUTDOWN HOURS *******
. 7.
HOURS GENERATOR ON LINE..*.*.*********
- 8.
- UNIT RESER VE SHUTDOWN HOURS.******.*.*
- 9.
. GROSS THERMAL ENERGY 568.8 0
565.1 0
GENERATED(MWH).....******.********* 1,322,138
- 10.
GROSS ELECTRICAL ENERGY
{/ENERA TED (:\\t'NH)......**.*.**********
- 11.
NET ELECTRICAL ENERGY GE!'./ERATED (MWH)
- 12.
REACTOR AVAILABILITY FACTOR (I). * **.**.* *
- 13.
UNIT AVAILABILITY FACTOR (2) ************
- 14.
- UNIT CAPACITY FACTOR (3) ***************
- 15.
UNIT FORCED OUTAGE RATE (4).......**...
417,655 395,817
- 76. 5%
76.0%
- 67. 5%.
24.1%
YR TO DATE 4,482.7 0
4,45~.4 0
- 10,627,132 3,440,915 3,270,337 87.7%
- 87. 2%_
- 81. 2%
12.8%
CUMULATIVE TO DATE 20,979.l
.* 0
~0.299.9 0
45,409,820 14,892,458 14,JJZ.~17 66.3%
64.2%
56.6%
. 22. 5%
- 16.
SHUTDO\\\\'NS SCH.EDU LED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):.
Refuel inq - October 15, 1976 - 6 weeks
- 17.
IF SHUT DOWN. AT END OF REPORT PERIOD, ESTIMATED DATE OF ST ARTl!P: ~N-<-/.:..;A _________ _
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION.
DATE LAST FORECAST DATE ACHIEVED HOURS REACTOR WAS CRITICAL REACTOR AVAILABILITY FACTOR.,
X 100 HOURS IN RErORTING PERIOD (1)
(2)
UNIT AVAILABILITY FACTOR (J)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE HOURS GEN.ERA TOR ON LINE HOURS IN REPORTING PERIOD x IOO NET ELECTRICAL POWER GE~ERATED MAX. DEPENDABLE CAPACITY l~!Wc*NET) X HOURS IN Rt::l'ORT!Nli l'!:.KIOIJ FORCED OIJTAGE llOURS
- ~~--------~---------------XlOO llOURS GENloRATOR ON LINE+ FORCED OUJ'1\\GE llOURS
OPERATING STATUS UNIT Surry Unit No. 2 DATE. 5-3-76 COMPLETED BY E
- p
- DeWandcl DOCKET NO. 50-Z81
- l.
REPORTING PER IOD: __
._0_0_0_1 __
7 _60_4_0_1 _____ THROUGH __
2_4_0_0 __
7_6_0_L_13;;....0 ____ _
HOURS IN REPORTl!':G l'ERIOD: ___
7..__l.._9"---'--'-------------------~~-
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (l\\\\We-NETJ __
7_8_8_
- 2.
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRlCTED (If ANY) (MWe-NET): _________ _
- 4.
REASONS FOR RESTRICTION (IF ANY);
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.... :.*.*.**.
505.5
- 6.
REACTOR RESER YE SllUTDOWN HOURS..*....
0.
- 7.
HOURS GENERATOR ON LINE........*.***..
503.7.
- 8.
UNITRESER YE SHUTDOWN HOURS...........
0
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)...........*.*..***** ' 1, 175, 103
- 10.
GROSS ELECTRIC' AL ENERGY GENERATED (M\\VH).*...*.*..***** ;.*.***
378,580
- 11.
NET I:LEC.'Tn.ICAL E!'/ERGY GENERATED (MWH)
- 12.
REACTOR AVAILABILITY FACTOR (I)........*
3_58, 361
- 70. 2.%
- 13.
llNIT AV Al LAB! LITY FACTOR (2)........*..*
- 14.
UNIT CAPACITY FACTOR (3).........*.....
63.2%
- 15.
UNIT FORCED OUTAGE RATE (4)........*...
0 CUMULATIVE YR TO DATE TO DATE 2 2 159.s:
17,789.4 0
0 2,146.4 17,500.9_
0 0
5,052,578 39,560,711 1,651,680 1219972239 l,566,l182 12,318,863 74.4%
'67. 6i; 73.9%
66.5%
68.5%
59.4%
20.1%
20.1%
- 16.
SHUT.DOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION or EACH):
- 17.
IF SHUT DOWN AT END Of REPORT PERIOD, ESTIMATED DATE OF STARTUP:
M3y 22, 1976.
- 18.
UNITS IN TEST STATUS (PRIOR TO CO!-.IMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNI'(CArACITY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL C.RITICALITY INITIAL ELECTRICAL POWER GENERAJ"ION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD.
x 100 HOURS GJ:c:NERATOR ON LINE
_H_O_U_R_S_l_N_R_E-PO-RT_l_N_G_P_E-.-R-lO_,.D--X.1 OO DATE-LAST DATE FORECAST ACHIEVED NFT Fl.FCTRIC'AL POWFR (:FN_l_*:I_tA_T_F_.n ________ --:-----
MAX. l)El'ENDAULE CAPACITY (MWc-NET) X llOllltS IN lll*.l'Ult:l INl; l'l-:IWJI>
FORCED OUTAGE llOURS llOU!tS GENLRATOlt ON LIN!~+ l'ORC:ED OUTAGE IIOURS x 100
e UNIT Surry Unit No. 2 DATE June 1, 1976 COMP1.ETED llY E. P. DeWandel DOCKET NO. _5_0_-_*-'-2_8_1 ___ _
OPERATING STATUS I.
REPORTING PERIOD:
0001 760501 TH R OUGll __
_.2-..::4:r.i.0.u0.t_~7u6.il0.1....'5J_3.._11--__ _
HOURS IN REPORTING PERIOD:
744
..,~.,--------""'---~---~------~
- 2.
CURRENTLY AUTllOR_IZED POWER LEVEL (MWth) 2441
~!AX. DEPENDABLE CAPACITY l~!Wdfff) 788
- 3.
LOWEST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (MWc-NET):_*----------
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTl:-IG PERIOD S.
HOURS REACTOR WAS CRITICAL.......*.....
- 6.
REACTOR RESER VE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE........*...*..
- 8.
UNIT RESER \\'E Sil UTDOWN llOURS....*.....*
. 9.
GROSS THERMAL ENERGY GENERATED (MWH) ;......*..* *.*.**.** *'*
- 10.
GROSS ELECTRIC' AL ENERGY
. 11.
GENERATED (MWH).........*...**.*.***
i-iET ELl:CTRICAL ENERGY GENERATED (MWH)
REACTOR AVAILABILITY FACTOR (1) *******.*
UNIT AVAILABILITY FACTOR (2) ***.*.**.***
UNITCAPACITY FACTOR (3)
UNIT FORCED OUTAGE RATE (4).*.******...
0 0
0 0
0 0
0 0
0 0
YR TO DATE 2159.* 8 0
2146.4 0
5,052,578 1,651,680
__L266,482 59.2%
58.. 9°/,,
54.5%
20.1%
CUMllLATIVF.
TO DAH:
17,789.4 0
Jl,,500. 9 0
39, 560, 711 12,318~863 65.8%
M.n 57.8%
20.,1%
- 12.
- 13.
- 14.
- 15.
- 16.
SHUTDOWNS SCHEDU.LED TO BEGIN IN. NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION Of-EACII):.
- 17.
- 18.
IFSHUTDOWNATENDOfREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
June 1, 1976 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILADILITY FACTOR (2)
UNIT AVAILABILITY FACTOR
{3)
UNl1' C-Al'ACITY l'ACfOR (4)
UNIT FORCED OllTAGE RATE
.r INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
. COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR, ON LINE
-H'-0-U_R_S_. -l~-R-lcl-'0_R_T..::...l.:....N_G_P_E_.R_l_O_D __
. X IOO NF.T El.FCTRICAL POWER GENERATED DA TE LAST DA TE FORECAST.
ACI II EVED MAX. DEl'ENl>AIJLECAl'ACITY (M\\Yc-NET) X llOUHS IN Rl*.l'ORTINl; l'Fl\\100 FORCED OUTAGE l!OLIRS
x 100 llOUllS GENl-.RA~*oR. ON LINE -t-.FORCED OUTAGE llOURS
e UNIT Surry Unit 112 DATE July 1, 1976 COMPLETED BY E. P. DeWnndel DOCKET NO.
50-281 OPERATING STATUS
- l.
REPORTING PERIOD:
0001 760601 Tll ROU Gil --=2'--'4""'0"""0'--_
_...7_,.,6'-"'0'-"6""'3'"""'0'---~--
HOURS IN REPORTING PERIOD:--'7_2_0 __________________________ _
2..
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWc-NETl ~7~8~8'---
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe*NETl:--~--------
- 4.
REASONS FO.R RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL *.**.********
- 6.. REACTOR RESER VE SHUTDOWN HOURS..*.***
- 7.
HOURS GENERA TOR ON LINE..*..*.***.****
- 8.
UNIT RE~ERVE SHUTDOWN HOURS..**.**. : **
- 9.
GROSS THERMAL ENERGY GENERA TED (MWH)..*.*.***************
- 10.
GROSS ELECTRICAL ENERGY
-GENERA TED (MWH)..*.*.*.***.***.******
- 11.
NF.T F.LECTRICAL ENERGY GENERATED (MWll)
- 12.
REACTOR AVAILABILITY FACTOR(!) **..**** :
- 13.
UNIT AVAILABILITY FACTOR (2)........**..
- 14.
UNIT CAPACITY FACTOR (3).....*.********
UNIT FORCED OUTAGE RA"(E.(4) ********* :.*
576.5 0
502.6 0
1,138,081 374,915 355,272 80 o 1°/o
- 69. 8/ *.
62.6%
- 8%
CU~IULATIVE YR TO DATE TO DATE 2736.3 18,365.9 Q
Q 2649.0
~003.5 0
0 6,190,659 40, 698, 792 2,026,595 13, 372, 154 1,921,754 12, Q 7 l1, 1_J5 62.6%
66_J%
. 60. 7%
- 64. 8%
55.8%
57
- 9/o 17.1%
19.7%
- 15.
- 16.
SHUTDOWNS SCHEDULED TO B.EGIN IN NEXT 6 MONIBS (STATE TYPE, DATE, AND DURATION OF EACH):.
- 17.
IF SHUT DOWN AT END or: REPORT PERIOD, ESTIMATED DATE Of STARTUP:-------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
- REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
Ul'HTCAPACITY FACTOR.
(4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELELIRICAL POWER GENERATION COMMERCIAL OPERA TlON HOURS REACTOR WAS CRITICAL
- HOLIRS IN REPORTING PERIOD x 100
_11_o_u_R_S_G_E_:N_r_:R_A_T_O_R_O_N_l_.I_N_E __ x i 00 llOU!lS IN REl'ORTING l'ERIOO NF.T ELF.CTR IC Al. POWFR GFNF.RATF.O DATE LAST FORECAST DATE ACHIEVED MAX. DEl'FNLMBLE CAPACITY (MWc*NET) X llOllRS IN IUJ'OlrJ'INC; l;l'f1101>
FORCED OUTAGE llOURS llOU!tS GEN i: ll A TO_ll_O_N_L_I N-1-~* -+ -.F._O_ll_C_F._D_O_L_F_r A-G-. E-, _ll_O_U_lt-S-x I 00
e UNIT Surry Unit n DATE Au~ust 2, 1976 COMPLETED.BY E. P. DeWandel DOCKET NO. 50-281 OPERATING STATUS
- 1.
- 2.
- 3.
- 4.
- s.
- 6.
- 7.
- 8.
- 9.
REPORTING PERIOD: ___
0_0_0_1_7_6_0_7_0_1 _____ THROUGH ~---*
2_4_0_0 __
7_6_0_7_31 ____ _
HOURS IN REPORTlt"G PERIOD: ___ __;7_4_4 ___________________......,.,..,..---
CURRENTL Y AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPE~DABLE CAPACITY !MWc-NET) 7 88 LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (!F ANY) (~!We-NET): _________ _
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD.
HOURS REACTOR WAS CRITICAL *.*..********
REACTOR RESERVE SHUTDOWN HOURS **.****.
- HOURS GENERA TOR ON LINE...*.***** ; ****
UNIT RESERVE SHUTDOWN HOURS *********.*
GROSS THERMAL ENERGY GENERATED(MWH) **...*******.********
705.2 704.3 0
CUMULATIVE YR TO DATE TO DATE 3,441.5
!9.,071.1 0
0 32353.3 10~707.b 0
0 7,901,954 4.2,410,087
- 10.
GROSS ELECTRICAL ENERGY l, 711, 295 555,805
{;ENE RA TED (MWH).***.....*.**********
- 11.. NET.ELECTRICAL ENERGY GENERATED 2l582l400 13~927 2959 (MWH) 527,570
- 224~92324 132201~70fi
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
67.3%
65.63 60.8%
- 14. 8%
REACTOR AVAILABl.LITY FACTOR (1) *.* ******* ~~~
UNIT AVAILABILITY FACTOR (2) ************
UNIT CAPACITY FACTOR (3) 90
- 0%
UNIT FORCED OUTAGE RATE (4)...**.***.**.. ___
5-'-. _3'-% __
SHUTDO.WNS SCHEDUl,.l:D TO BEGIN IN NEXT 6 MONTHS (STATE 1YPE, DATE, AND DURATION OF EACH):
None IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
Auqus t 2'.1976
- 18.
UNiTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:.
66.9%
- 65. 6%
58.8%
19.2%
DATE LAST DATE (l)
REACTOR AVAILABILITY FACTOR (2)
UNIT A VAILABILllY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL CRITICALITY lNlTIAL ELECTRICAL
- POWER GENERATION COMr..1ERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
--~-~~-~-~-~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GE!'IERATED FORECAST ACHIEVED MAX. DEPENDAULi~ CAPACITY <MWe*NET) X HOUllS IN IU*.l'UltTIN(; l'l*RIOl.Y FORCED OUTAGE llOL_IR_S __________ ---'--X lOO llOURS GENLRATUll ON LINE+ FORCED OUTAGE llOUltS