Submit Operating Report for the Month of April 1976
ML19095A330
Person / Time
Site: Surry  
Issue date: 05/12/1976
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Mcdonald W
Office of Nuclear Reactor Regulation
References
Serial No. 976/021974
Download: ML19095A330 (7)


Text

Mr. William McDonald, Direc Office of Management Infor Program Control U.S. Nuclear Regulatory Co Washington, D. C.

20555

Dear Mr. McDonald:

Docket Nos. 50-280 50-281 License Nos. DPR~32 DPR-37 Operating information for Surry Power Station, Unit Nos. 1 and 2, for the month of April 1976 is attached.

Attachment cc:

Mr. Norman C. Moseley Very truly yours,

~)I)//. ~d??~p/

C. M. Stallings Vice President-Power'supply and Production Operations

DOCKET NO. 50-280 UNIT Surry Unit No. 1 DATE 5-3-76 COMPLETED BY E.P. DeWandel AVERAGE DAILY UNITPOWER LEVEL MONTH APRIL AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 0 767.2*

1 17 2

  • O 18 767.5 3

0 19 765.0 4

697.0 20 762.4 5

758.5 21 766.4 6

757.7 22 754.2

,7 754.2 23 723.1 8

756.9 24 737.6 9

760.0 25 752.0 10 760.3 26 753;3 11 750.5 27 415:5 12 761.4 28 0

13 760.3 29 0

14 756.6 30 0

15 761.1 31 16 764.4 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

  • Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the I 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

  • 1;

OPERATING STATUS UNIT Surry Unit No. l DATE 5-3-76 COMPLETED BY E

  • p. DeWandel 50-280 DOCKET NO. ________ _

REPORTING PERIOD: __ o_o_o_1 __

7_6_0..,.40,...l __________ THROUGH __

2_4_o_o __

7_6_0_43_o ____ _

HOURS IN REPORTING PERIOD: ____

7_2_0 ____ ~----'-----'------"---------

l.
2.
3.
4.

CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788 LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _

REASONS FOR RESTRICTION (IF ANY):

THIS REPORTING PERIOD

5.

HOURS REACTOR WAS CRITICAL.............

6.

REACTOR RESERVE SHUTDOWN HOURS.......

7.

HOURS GENERA TOR ON LINE..... ;.........

8.

UNIT RESER VE SHUTDOWN HOURS...........

9.

GROSS THERMAL ENERGY GENERATED(MWH)..............,......

10.

GROSS ELECTRICAL ENERGY.

<GENERATED (MWH)...........'..........

11.

NET ELECTR!CAL ENERGY GENERATED (MWH).............................

12.

REACTOR AVAILABILITY FACTOR (l).........

13.

UNIT AVAILABILITY FACTOR (2)............

14.

UNIT CAPACITY FACTOR (3)...............

15.

UNIT FORCED OUTAGE RATE (4)............

574 0

568.1 0

1,363,416 447,670 426,326 79.7%

78.9%

75.1%

21.1%

CUMULATIVE YR TO DATE TO DATE 2,546.3 19,042.6 0

Q 2,528,6 18,313.l 0

0 6,056,540 40,839,228 1, 977,450 13,428,993 Ll81.551 12, 728-UZ 87.n 64.7%

_§1...,.ll.__

62.4%__

82.2%

54.9%

11. 7%

23.3%

16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

RefueJ.ing, October 15, 1976, approximately six weeks

17.

IF SHUT DOWN AT END OF*REPORT PERIOD, ESTIMATED DATE OF STARTUP:~ 2, 1976

18.

UN!TS IN TEST STA i:*us (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

(!)

REACTOR AVAILABILITY FACTOR (2)

Ur-TIT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR (4)

UNIT FORCED OUTAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE


XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST FORECAST DATE

. ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS, IN REPORT!Nc.; PERIOD FORCED OUTAGE HOURS


=---=--.:....::..C'-'-------------~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

/

DOCKET NO. _s_o_-_2_8_0 __ -.__,

UNIT SHUTOOWNS UNIT NAME Surry Unit No. 1 DATE _s_-_3_-_7_6 ___ _

COMPLETED BY E.P. DeWandel REPORT MONTH __

AP_R_IL ____ _

TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMl\\llENTS 76-4 040176 F

115. 25 A

1 Primary-to-secondary steam generator tube leak.

Plugged leaking tubes.

76-5 040376 F

3.12 H

3 Low. level steam generator due to feed control system sensitivity.

Corrected levels.

76-6 042776 F

80.29 A

1 Primary-to-secondary steam generator tube leak.

Unit still out at the end of this report per.iod.

(1) REASON (2) METHOD A*-EQUIPMENT FAILURE (EXPLAIN).

I-MANUAL B--MAINT. OR TEST 2-MANUAL C-RErUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC

£-OPERATOR TRAINING ANO SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*OPERA TIONAL ERROR

  • .~*

(EXPLAIN)

H-OTHER (EXPLAIN)

I I

SUMMARY

DOCKET NO.

50-281 UNIT Surry Unit No. 2 DATE 5-3-76 COMPLETED BY E.P. DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH~_A_P_R_IL~~~~~~-

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 743.l

17.

731.1 2

744.3 18 733.6 3

720. l 19 679.3 4

735.7 20 469.9 5

737.8 21 547.4 6

736.9 22 1.9 7

736.8 23 0

8 738.1 24-0 9

738.8 25 0

10 738.3 26 0

11 736.8 27 o*

12 735.8 28 0

13 733. 9 29 14 730.6 30 15 730.8 31 16 730.5 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the I 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

e*

UNIT Surry Unit No. 2 DATE_5-_3_-_7_6 __ -'---

COMPLETED BY E.P. De-Wandel DOCKET NO. 50-281 OPERATING STATUS REPORTING PERIOD: __

o_o_o_1 ___

7~6_0_4_0_1 _____ THROUGH __

2_4_0_0 __

7_6_0_.c..4::..30.;__ ___

HOURS IN REPORTING PERIOD: ___

7_2_0 ________________________ _

l.
2.

CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________

4.

REASONS FOR RESTRICTION (IF ANY):

THIS REPORTING PERIOD

5.

HOURS REACTOR WAS CRITICAL.............

505.5

6.

REACTOR RESER VE SHUTDOWN HOURS...*...

7.

HOURS GENERATOR ON LINE............*..

0 504.7

8.

UNIT RESER VE SHUTDOWN HOURS...*.......

0

9.

GROSS THERMAL ENERGY GENERATED (MWH)...... *... *... * * *...

  • 1, 175,103
10.

GROSS ELECTRICAL ENERGY

~ GENERATED (MWH)....................*

378,580

11.

NET ELECTRICAL ENERGY GENERATED

. (MWH).........................*...

12.

REACTOR AVAILABILITY FACTOR (1).........

.13.

UNIT AVAILABILITY FACTOR (2)...........*

I4.

UNIT CAPACITY FACTOR (3)...............

15.

UNIT FORCED OUTAGE RATE (4)......*.....

358,361 70.2%

70.1%

63.2%

0 CUMULATIVE YR TO DATE TO DATE 2 2159. 5.

172789.1 0

0 22147.4 17 '501. 9 0

0 5,052,578 39.560,711 1,651,680 13202.72239 1,566,482

. 12,318,863 74.4%

67.6%

73.9%

66.5%

68. 5~~

59.li%

20.1%

20.1%

I6.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

I7.

  • IFSHUTDOWNATENDOF 0

REPORTPERIOD,ESTIMATEDDATEOFSTARTUP:

May 222 1976

18.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

{l)

REACTOR AVAILABILITY FACTOR (2)

UNIT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR (4)

UNIT FORCED OUTAGE RA TE INITIAL CRITICALITY INiTIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE


x 100 HOURS IN REPO\\lTING PERIOD NET ELECTRICAL POWER GENERATED DA TE LAST DA TE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS


XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

/

UNIT SHUTDOWNS REPORT MONTH APRIL TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACT.OR (2) 76-5 042276 s

215.20 c

1

SUMMARY

DOCKETNO. ~5_0_-_28_1~~~-*

UNIT NAME Surry. Unit No. 2 DATE 5-3-76 COMPLETED BY E.P. DeWandel CORRECTIVE ACTIONS/COMMENTS R.efueling (1) REASON (2) METHOD A*-EQUIPMENT FAILURE (EXPLAIN)

  • I-MANUAL B-MAINT. OR TEST 2-MANUAL C-REf-UELING SCRAM D-REGULATORY RESTRICTION

~-AUTOMATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*OPERA TIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

  • .