ML17345A236

From kanterella
Jump to navigation Jump to search
Forwards 6-month Rept of Integrated Schedule for Plant. Schedule Reflects Info as of 880520 Issuance Date.Changes to Schedules Reviewed W/Nrc Per Integrated Schedule Plan
ML17345A236
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/08/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-144, NUDOCS 8806160023
Download: ML17345A236 (45)


Text

S ACCELERATED DISTRIBUTION DEMONSTRO1ON SYSTEM S

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806160023 DOC.DATE: 88/06/08 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards 6 month rept of integrated schedule for plant.

DISTRIBUTION CODE: BOOID COPIES RECEIVED:LTR TITLE: OR Submittal: General Distribution g ENCL Q SIZE:

NOTES iRECIQIENT,'

~ ID'CODE/NAME COPIES RECIPIENT, '~'v','OPIES LTTR ENCL ID 'CODE/NAME LTTR 'ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 1' EDISON,G 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/MTB 9H NRR/DOEA/TSB NUDOCS-ABSTRACT ll 1 1

1 1

1 1

NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC 15-B-18 1

1 1

1 1

0 i-RES EILEEN 01 1 1 RES/DE/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 N

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 19

y v

P. OX 14000, JUNO BEACH, FL 33408.0420 4@

+em+

~JUbS 8 1988 L-88-144 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inte rated Schedule 6-Month Re ort Attached is the 6-Month Report of the Integrated Schedule for Turkey Point Plant. The schedule discussed in this report reflects information as of the issuance date of May 20, 1988. Updated information will be provided in subsequent reports. The changes to the schedules discussed in this summary have been reviewed with members of the NRC Staff in accordance with the Integrated Schedule Plan. In accordance with the Turkey Point Facility Licenses, the next Integrated Schedule (I/S) Regulatory Report will be issued in November 1988.

Very truly yours, W. . Co ay Senior Vice President-Nuclear WFC/RG/gp Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant RG/020.ISM 8806i60023 SS0608 PDR ADOCK 05000250 an FPL Group company R DCD

I IP

ATTACHMENT 1 6 MONTH

SUMMARY

REPORT

MOD STATUS REPORT NOV-MAY UPDATE M A Y l 6p l 9 8 8 MODIFICATIONS ADDED SINCE NOVEMBER ISSUE LIC, I/S 5 DESCRIPTION CAT ~

776 3 CHARGING PUMP VENTS FPL 793 3 CORROSION OF 480V AC MCC 3E FPL 794 4 CORROSION OF 480V AC MCC 4E FPL 852 3 INSTL MANIPULATOR CRANE AZR COMPR FPL 853 4 ZNSTL MANZPUKATOR CRANE AZR COMPR FPL 855 S EVAL DES.BASIS ACCIDENT HT LD REM FPL 869 4 RELOCATE FM-113 MAG FLOW CONVERTR FPl 889 C PLANT LIGHTING UPGRADE PH I 4 ZZ FPL 975 3 MODIFICATION TO $ 3 GAS STRIPPER FPL 1001 C EXISTING "B" EDG IDLE START/STOP NRR loao 3 MSR INSTRUMENTATION FPf 1013 4 MODIFICATION TO 44 QAS STRIPPER FPL 1053 S METEOROLOGICAL SYSTEMS EVALUATION FPl 1058 3 INSTALL SFP STORAGE BOXES FPL ao6o 4 INSTALL SFP STORAGE BOXES FPL 1069 3 REACTOR HEAD LIFT RZG LOAD CELL NRR 1070 4 REACTOR HEAD LIFT RZG f OAD CELL NRR 1073 4 REACTOR CAVITY SEAL RING FPL 1082 4,RX MANIP CRANE LOAD TEST DEVICE FPL 1105 C AFW PUMPS"QOVRNR VLV STEM GUARDS FPL 1113 4 CONNECT GAMMAMETRICS TO NIS RCRDR FPL 1114 S STUDY FAILURE MODE/GE AUX RELAYS FPL 1129 3 REPL PRMS R-ll/R-12 OUTPUT RELAYS FPL 1130 4 REPL PRMS R-11/R-12 OUTPUT RELAYS FPf 1165 C "S" EDG STARTNG AIR TK PZ ZSO VLV . FPL 1202 C CHEMICAL STORAGE BZDG CENTRAL A/C FPL 1203 4 CHARGING PUMP VENTS FPL 1207 3 REPLACE G o E. CRl20BD AUX RELAYS FPL 1208 4 REPLACE Q.E. CR120BD AUX RElAYS FPL 1209 3 CONTAINMENT TENDON SURVEILLANCE REG 1210 4 CONTAINMENT TENDON SURVEZLLANCE REG

,1213 C LIVE LOADING OF VALVE PACKING FPL 1217 C PLANT OUTFALL INVESTIGATION-PTN FPL 1219 3 S.A.S. AS BUILT DRAWINGS FPL 1220 4 S.*.S. AS BUILT DRAWINGS FPL 1235 3 CONNECT GAb9&IETRZCS TO NZS RECRDR FPL 1236 C EDQ CLG WTR DZSCH TEKRMOMETER FPL 1237 4 TURBINE BLADE RING EROSZON FPL 1244 4 4160 V SWGR CNTRL MOD - 14 DIODES FPL 1245 3 TURB RUNBACK SELECTOR SWITCH REPL FPL 1246 4 TURB RUNBACK SELECTOR SWITCH REPL FPL

1249 MOV THERMAI OVERLOAD HTR SELECTN Z&E 1252 REDUCTiON ZN 4KV BKR VOlTAGE DROP NRR 1253 REDUCTION ZN 4KV BKR VOf TAGE DROP NRR 1254 ADD FUSE SPEC TO BKR LIST & PWGS NRR 1255 CHARG PUMP SUCTN QUICK DISCONNECT FP4 1263 CHARGING PVMP CHECK VALVE EVAf "N FPL 1264 CHARGING PUMP CHECK VALVE EVAL"N FPL 1267 REPL REGEN HX/PZR RLF LN SNUBBERS FPL 1268 SOER 86-3 CK VIV APPLZCATZON RVW ORA MODIFICATIONS COMPLETED SZNCE NOVEMBER ISSUE LZC.

I/S DESCRIPTION CAT.

'W 'W W 11 C CABLE TRAY MODIFICATIONS Z&E 66 3 REPLACE LOW PRESSURE ROTORS FPL 104 C SECURITY LIGHTING UPGRADE FPL 114 3 CNTMT TEMP & NIS FLUX LVL RECQRDR FPL 130 3 PRMS DRAWERS REPLACEMENT FPl 214 PST3 PEP"PlT REF SIMULATOR CFQ 246 3 AFW STOP CHECK VALVE FAILURE FPL 272 P1T4 PEP-PHASE ZV SITE FAC UPGRD CFO 332 S HGA RELAY - PART 21 REPf ACEMENT Z&E 338 S POTABLE 'WATER CONCEPT DES. STDY FPL 346 3 HZ RNG GAMMA RAD ANN. AIARM CHECK FPL 347 4 HI RNG GAMMA RAD ANN. ALARM CHECK FPL 358 S REPL OBSOLETE ASCO SOLENOID VLVS FPL 402 3 ICW CHECK VLV REPL/PERM FIX i&E 403 4 ICW CHECK VLV REPL/PERM FIX I&E 407 S STATION BATTERY IOADZNG EVAf ORA 412 C REPL 14" GATE VLV 6 RAW H20 TANK FPL 416 C DIESEL OIL TANK SAMPLING Pf ATFQRM FPL 453 3 G.E. PK-2 TEST BLOCKS FPL 459 S VTZ PWR INVTR OPERATING CONCERNS FPL 493 S RESPONSE TO BROKEN PUMP SHAFT FPL 500 S EDG LOADING (EP-33) FPL 520 3 RHR PUMP RECIRCULATION FLOW FPL 530 S BORIC ACID STOR TK ZVf XMTR CALIB FPL 551 S PWR SOURCE TQ WIDE RNG RAD MONTR FPL 566 4 RHR PUMP RECIRCULATION FLOW FPI 581 4 CNTMT TEMP & NZS FLUX LVL RECORDR FPL 621 S CCW/TPCW/EDG CHROMATE REMOVAL Z&E 633 S GUYON ALLOYS 10CFR PART 21 FPf 647 S 125V DC POWER PARTIAL LOSS I&E 649 C UPG PAX PHONE & SYS 85 MODULES ORA 651 S CNTMT BLDG PROT COATZNGS TESTING FPL 710 S EVAIUATE EDG EQUIPMENT MODS I&E 721 S INTAKE BUB BUSTER&WATER LVL MEANS FPL 746 S TECHNICAL SPECIFICATION IMPLEMENT I&E 800 S TECH SPEC TEST REQUIREMENT FPL 803 S PROC TP221 FQR Q&M OF STA BATTERY I&E 804 S REV FSAR TO ZNCL GOULDS GNB BATT i&E

I~

II P

~

,'I I

805 S EXCESS AC/OC CNTf CKT VOLT DROP ORA 806 S STA BATT OPER & ACCEPT CRITERIA FPf 811 S EVAL CURRENT OPER OF CCW PUMPS I&E 8'2 S 3C CCW PUMP SHAFT SEAL LEAKAGE I &E 813 $ EHERG CTHT COOLERS OPERAS EVAf FPL 814 5 HTR SHAFT BRG FZT ACCEPT CRIT/CCW Z&E 815 S PROVIDE RWST .EMPERATURE ZNDZCA FPf 816 S RHR VLV OPERABILITY (605 & 758) Z&E 817 S DECAY HEAT REHOVAL REPORT FPL 825 S OPER PRCDR 4704.6 ECC ACCEP CRIT Z&E 836 S MSI VALVE OPEN"G PROBLEM SOfUTZQN Z&E 837 S MSI VERIFY STROKE LENGTH Z&E 838 S MSI REVIEW MAINTENANCE HISTORY FPL 839 S MSI REVISE MAINTENANCE PROCEDURES I&E 841 S HSIV ZE REPORT RVW EWQ Q/M 7206 FPL 904 C REPL WRONG SIZE EXP JNT/ICW PMP FPL 905 C REPLACE ICW PUMP MOTOR COUPLINGS FPL 911 S ZCW SYS TEST EVAL & RECQMHENDT"N FPL 913 $ INSTR AIR REGULATOR DRAIN LINES FPL 920 S REVISE IA SYSTEMS DESCRIPTIONS FPL 923 S DEVELOP AIR LEAK ZNSP PROGRAM FPL 926 S EVAI EDG OPER&HZGHR THAN BASE CAP FPL 929 S REM BAT RM CHILLERS FOR EDG LDS FPL 931 S ADD QP GUIDANCE TO EDQ INST METER FPL 932 S REV OPS & ELIM UNNEC ACCPT CRIT FPf 933 S CNFIRM 200KW ZS SINGLE LARGEST LD FPL 940 S REV HIGH TEMP INSUL CONCERN FPL 944 S U3 MSIV LINE PIN DAMAGE CAUSE FPL 1149 C REPL AUTO-XFR SWITCH DP312A & 412A FPL 1181 C NEW EDQ"S CONCEPTUAL DESIGN FPL 8965 P4T11.17 U3 SAF ENGR GRP FINAL RPT CFO 8967 P4Tll ~ 18 U3 DRAWING FOLfOWUP CFO 8977 P3T7 PEP-IMPL PHASE 4 PRCDR REVIS"N CFO MODIFICATIONS DELETED SINCE NOVEMBER ISSUE LZC, I/S 4 DESCRIPTION CAT.

52 C DRY STORAGE WAREHOUSE - PHASE II FPL 94 C NEAR SITE fIQBTED HELZ-PORT FPL 222 C AFW PMP/TURB AREA VITAL BARR. UPQ I&E 273 C ACCESS & DRESS FACILITY EXTENSION FPL 329 C CTR RM DOORSET/REPAIR FPL 421 C HAZARDOUS WASTE STORAGE BLDG FPI 543 S AFW RELIABILITY/FOLZOW-ONEFFORT FPL 558 S INADVERT GEN ENERGIZATION PROTECT FPL 559 3 REMOVE LOAD FREQUENCY & CNTf SYS FPL 604 C INST CARD READERS ZN NEW VTL AREA FPL 631 S EMERG OPERATING PROCEDURE REVIEW FPZ 648 C 480V LOAD CNTR VOLTAGE INDICATORS FPL 656 C PIRE EQUIPMENT STORAGE FACILITY 663 3 METERING X-DUCERS FOR WATT & VARS

664 4 METERING X-DUCERS FOR WATT 6 VARS FPL 669 3 INSTL RCDT DZCITAf GAGE READOUT FPL 670 4 ZNSTL RCDT DIGITAL GAGE READOUT FPl 684 C PURCHASE WASTE BAG MONITOR EQUIPT FPL 686 C RADIOACTIVE MATL SFGREGT"N TABZE Fpr 690 4 PRESSURIZER TEMP SENSOR REPZMNT FPL 691 3 PRESSURIZER TEMP SENSOR REPLMNT FPL 702 S SPARE PARTS HARDCARD EVALUATION FPf, 726 S FLAG 1 LINE BKUP RELAY PROT ADDN FPL 731 S ENGR SUPPT FOR 10CFR 50+59 EVAL"N FPL 732 S ENGINEER SUPPORT FOR NRC AUDIT FPl 733 S ENGINEERING EVAL OF NRC ISSUES FPf.

734 S ENGINEERING EVAZ OF NRC NOTICES FPL 737 S ENGZNEERING SITE MAINT SUPPORT FPl 738 S ENGINEERING SITE OUTAGE COORD"N FPL 739 S ENGINEER"G EVAL SPARE PARTS SPECS FPL 743 C SECURITY OFFICE 4 CONTRACT FACILITY FPL 757 C CNTL RM LINE REPEATR PNL REMOVAL FPf 760 C TEDB SITE CONTRACTOR ENGR SUPPORT FPE 847 S RMS LICENSING ti MAINTENANCE PRCDR CHANGE FPf 856 C CHEMICAL STORAGE a DZSTRZBUTZON AREA FPL 954 C REPL EDG IDLE GEAR STUB SHAFT FPL 965 S PERFORM HPE REVIEW ON PCM IMPLMNTN ) 9/85 FPL 966 S DEVELOP HFE MANUAL FOR FUTURE PCM FPl 972 3 CONTAINMENT PAINTING FPL 1014 3 ADD DPI TO SFP EXHST HEPA FILTRS FPL 1015 4 ADD DPI TO SFP EXHST HEPA FILTRS FPL 1084 C WTP ACID/CAUSTIC UNLOAD X-FER STA FPL 1085 3 REPl, PNLS WITH DRS ON QR81 0 QR82 FPL 1086 4 REPL PNLS WITH DRS ON pR81 4I QR82 FPL 1089 S WALKWAY BETWEEN NABrMB 4 TURBINE DECK FPL 1123 3 REFUEZING TOOL STORAGE RACKS FPL 1124 4 REFUELING TOOL STORAGE RACKS FPf 1141 3 EDG TRAIN A TEMP MODIFICATIONS FPL 1151 3 ZNSTALL IN-LINE N84 ANALYZERS FPL 1152 4 INSTALL ZN-LINE NH4 ANALYZERS FPf 1179 EDG TRAIN B TEMP MODIFICATIONS FPL 1187 C OPERATING ENGR Bf DG RELOCATION FPL 1188 C MACHINE SHOP FACILITY FPf 1189 C CONTRACTOR ENTRY BLDG SO OF NAB FPL 1191 C DRAINAGE SYS AT NAB NMB tc HP BLDG FPL 1195 C WALKWAY BETWEEN NAB AND NMB FPL 1196 C NEW BRIDGE OVER LAKE WARREN FPl 1197 C BACKFZT CONSTRUCTION OFFICE FPL

MODIFICATIONS <OMBZNED SINCE NOVEMBER ISSUE LICE DESCRIPTION CAT.

1) MOD MOO 1149 1149 (U3) 4 1150 (U4) WERE COMBINED INTO'PI C REPL AUTO-XFR SMITCH DP312A 5 412A
2) MOD 1222 - C SELECT SAFETY SYS DESIGN VER - ORI 15 SYS CFO IS A COMBINATION OF THE FOLLOWING NODS; 981 C AFW SEL SYS ~DESIGN VERIFICATION 982 C MS ISOL SEL SYS DSN VERIFZCATION 983 C CTMT ZSOL SEL SYS DSN VERIFZCAT"N 984 C CTMT SPRAY SEL SYS DSN VERIFICATN 985 C ECC SEL SYS DESIGN VERIFICATION 986 C EC FILTER SEL SYS DSN VERIFICAT"N 987 C CCW SEL SYS DESIGN VERIFICATION 988 C ZCW SEL SYS DESIGN VERZF CATION 989 C ZA SEL SYS DESIGN VERIFICATION 990 C SI SEL SYS DESIGN VERIFICATION 991 C RHR SEL SYS DESIGN VERIFICATION 992 C EMERQ AC PWR SEL SYS DESIGN VERIF 993 C VTL AC/DC PWR SEL SYS DSN VKRIF 994 C CHEM/VOL CNTL SEL SYS DSN VERIF 1198 S RPS SEL SYS DESIGN VERIFICATION MOD 1 223 - C SEL SAFETY SYS DESIGN VKRIF-ARMS/PRMS/NCC CFO IS A COMBZNATION OF THE FOLIOWING MODZFZCATZONSg 1199 S ARMS SEL SYS DESIGN VERIFICATION 1200 S PRMS SEL SYS DESIGN VERIFICATION 1201 S NORM CNTMT CLRS SEL SYS DSN VERIF MOD 1 224 - C ON-GOING DESIG BASIS ENHANCEMENT-ORI 15 SYS FPL IS A COMBINATION OF THE FOLLOWING MODIFICATIONS; 1022 S AFW SYS ONGO"G DES BAS ENHANCEMNT FPL 1023 S SI SYS ONGO"G DES BAS ENHANCEMENT 1024 S CTMT SPRAY ONGO"G DES BAS ENHANCE 1025 S CTMT ISO ONGO"G DES BAS ENHANCEMT 1026 S EMERG AC PWR ONGQ"G DES BAS ENHAN 1027 S VTL DC PWR QNGO"G DES BAS ENHANCE 1028 S MSIV SYS ONGO"G DES BAS ENHANCEMT 1029 S EMERG CLRS QNGO"G DES BAS ENHANCE 1030 S EMERG FZTRS ONGO"G DES BAS ENHANC 1031 S ZA SYS ONGO"G DES BAS ENHANCEMENT 1032 S RX PROT ONGO"G DES BAS ENHANCEMNT 1033 S CHEM S( VOL CNTL DES BAS ENHANCEMT 1034 S CCW SYS ONGOING DES BAS ENHANCEMT 1035 S ICW SYS ONGO"G DES BAS ENHANCEMT 1036 S RHR SYS ONGO"G DES BAS ENHANCEMT
5) MOD 5 09 - C ADDITION OF EDG HIGH TURBO CHARGER FPL IS A COMBINATION OF THE FOLLOWING MODIFICATIONS MOD 9 54 - C REPL EDG IDLE GEAR STUB SHAFT

E h gq k

ya 4

.4 0 ~

4"

NRC MODIFICATIONS WITH DATE CHANGES SCHEDULE A COMPLETION DATE CHANGES MOD 14 CONTROL ROOM HABITILITYHVAC This project requires both units to be operating and stabilized at power for 30 days prior to implementing a one time Technical Specification (TS) change that allows a 45 day Limiting Condition for Operation (LCO). During this LCO the HVAC modification will be completed. The NRC commitment date was January 14, 1988 and has been moved to June 17, 1988 based upon a 45 day LCO commencing on the projected permanent HVAC OOS date of May 4, 1988. This date change is in accordance with the NRC approved TS change.

MOD 25 UNIT 3 ALTERNATE SHUTDOWN A meeting was held on December 3, 1987 to develop a plan and schedule for the completion of training and procedures for Mod

25. Based on input from that meeting, the expected completion is now July 6, 1988. May 1988 was the previous completion date for procedures.

MOD 214 P5T3 PEP-PLT REF SIMULATOR The NRC commitment date was changed from March 1, 1988 to June 1, 1988 for completion of simulator acceptance testing with concurrence from Region II.

MOD 272 PEP PROJECT 1 TASK 4 - PHASE IV SITE FACILITY UPGRADE The NRC commitment date of February 29, 1988 was not met for the relocation of personnel into the new maintenance facility. FPL considers this PEP task to be completed as of March 31, 1988.

MOD 0250 Unit 3 AFW FLOW TRANSMITTER REPLACEMENT The remaining work is delayed pending a Technical Department test which cannot be performed until a safety evaluation is complete.

In addition, a review of this modification is on-going to determine if this is an NRC committed modification.

MOD 227 C AFW PMP/TURB GOV BLEEDDOWN DEVICE This MOD is currently pending deletion/closeout based on the results of an engineering study (JPT-PTPO-87-2726) which concludes that no modifications are to be performed.

SCHEDULE B COMPLETION DATE CHANGES MOD 820 C RHR VALVE OPERABILITY 864 & OTHER VALVES The schedule was revised based on priority in accordance with the I/S Program. This MOD was originally scheduled for completion June 14, 1988 and has moved to February 28, 1989.

MOD 836 MSIV Opening Problem Solution This completion date has moved from October 30, 1988 to January 11, 1989 because of the change in the Unit 4 refueling date, now scheduled to begin September 1988.

MOD 958/959 Units 3/4 PROJECT "V" GUARD FOR MG-6 SAFEGUARDS This project is the installation of guard rails around the MG-6 Safeguard Rack. The completion of these mods slipped due to the change in the Unit 3 outage window and Unit 4 outage resource limits. The completion date has been moved from the Unit 4 refueling outage (December 16, 1988) to Unit 3 refueling outage (September 22, 1989).

ATTACHMENT 2 MAY 1988 INTEGRATED SCHEDULE

liYTE SATED )YED LF 8ZSQZA M8'P'EWAN'P SAP',S8

PAOIICI AINICAI'I IUEKEI tOINI NJCEEAC tlANI IAACEI SCNIIANE 44 ~ SN IISSAlll ll OI SISIIIAAIIO SCINOSA I IIII IAAC I INISN III PIOE PACE O'IAAI

~

CIO

~lIII ll

~

~

I ~ ~ OAIOA Mel ~ ~I SS'AS ~ CO lent

~ Ns ~ ~ PAI SOII OAEAAS

~ rSAASSS OCCOIS CW IAIC NAIA OAI ~

If SIINCII I'llsl\II PIOIIC

\LMOUI~

~ IAE NAA ENAAI I INISSI llls444$ lllsl OAIAA ON WC CCNWIISNNI CAIEGCNIIS OAIA OAII SNAIIC I INE ~ EEAA CW CIO SUQ'SMIIN 1988 1989 1990 199 'I 1992 CFO POST TMI C CONTROL ROOM HABITABILITYHVAC CFO MOD 0014 CONFIRMATOAY ~ ~ THE REVISED CQ4llTMENT WAS PREDICATED ON '1 7JUNBS MOO IF I CAT "N THE PERMANENT HVAC OOS ON 04 MAY 88 BE BACK IN SEAVICE BY 17 JUN 8$ . 2JAN$ 5 SJUNSS 310EC90 3 AREA RADIATION MONIT"G SYST REPL CFO MOO 0341 21DECSS 20NOVB9 I 31DEC90 4 AAEA RADIATION MONIT"G SYST AEPL CFO MOO 0342 7FEB89 20NOV90 REMAINING I JUNSS P.E.P. COMPLETION OF PEPISS TASK CFO SLMlARY IAUG84 I JUN89 SUB TASKS 29FEBSB I PIT4 PEP-PHASE IV SITE FAC UPGAO CFO MOO 0272 24JANSd J 30MARSS 1APRBS P3T7 PEP IMPL PHASE 4 PRCOR REVIS"N CFO MOO 8977 170CT85 J IAPASS 2MAYSB PST3 PEP.PLT REF SIMULATOR CFO MOO 0214 20DECBB Q 2MAYSS

~l PITS PEP.PHASE V IMPLEMENT"N SITE CFO MOO 8972 IAUG84 ~ I ~

I JULSB I JULSS 19JAN$ 9 P4T11 ~ 21 U4 SAF ENGR GRP FINAL RPT CFO MOD 89$ $ 17SEPSS [J 19JAN89 I ~l 19MAA89 P4T11 22 U4 DRAWING FOLLOWIB

~ CFO MOO 89dd 17SEPSS 19MAR89 I I IAPA89 PST24 PEP-EISIANCE MATLS MGMNT SYST CFO MOO 8993 170EC85 IAPRBS I I SMAY89 C SEL SYS DESIGN VEAIF-ORIG 15 SYS CFO MOD 1222 30NOV87 SMAY89 I I ISMAY89 C SEL SYS WALKDOWN PSIID NCRS CFO MOO 1098 4JANSS ISMAY89 l ~l I JLN89 C SEL SYS DESGN VERIF-AAMSIPRMSINCC CFO MOO 1223 14NQVS8 'I JUN89 P04-T11. 20 U4 SEL SYS Q 19NOVBS MOOS I RE PA I RS 4 INSTALL WYE STRAINEAS ON lh SYST CFO MOO 1047 23JAN$ 7 13MAYBS I 19NOVB8 C IDENT EXTRANEOUS IA X-CONNECTIONS CFO MOO 05'll 18JULSS 19SEPBB I 24DECBB 4 INSTALL CCWITPCW AMERTAP SYSTEM CFO MOD 0588 I SAPA$ 7 110CTBB I I SNOVBS 4 DELETE CROM CLR FANS AUTOSTAAT CFO MDO 0355 dAPA87 190CTBS I 19NOVS8 4 PZR HEATEA AC POWEA CDNTAOL CFO MOO 0428 21APR87 210CTBB I I SNOVS8 4 REPLACE RPS TEST SELECTOR SWITCH CFO MOD 1048 4MAY87 210CTBS DATA DATE NOTES: 0 INDICATES NON-OUTAGE N.R.C. COMMITMENT DATE INDICATES OUTAGE RELATED N.R.C. COMMTTI4FNT TIATF

ppoacl ALwcAIT IDPII ~ POINI NCLLM PIMI IMCII SCNLLTAI IP PLOI CIO LNILCAAILDSCNLOLA I NON 1211 IAPC I ~ NIW 21OLCT ~ PAOJLC122 PIAI PACI I ANI ~ I I ~~ OAIOA TOAI ~ AAAI I ICNI CO ~ NIIAPAl ~ TLAAI'll ~ AAO NAIA DAIL I' IAMI TLTN LAN I OM CNAA I SIMI I ~ IOPL IA ~ Cl I SCNIOUL COOL ~ I LAIS OCODLS P CDO LI I INISN IINOPIS ~ INL OLLAC ON NAC CONIILaNI CAILCOOIIS NAIA OAII lNATP ~ ~ IIN OPIAC ON CIO SLN STSIIN 19SS 1989 1990 1991 1992 CFO P04- T11. 20 U4 SEL SYS ~

~ 19NQvsa

~

MOOS I REPAIRS 4 S. I. MINI RECIAC. VALVE REPLACE CFO MQD 0385 2\MARBS 14NOVBB

~l 19NQVSS

~~

C EOG AIR START MOTORS UPGRADE CFO MOO 0578 )83ULSS 14NQvss

~l 19NQVBS 4 MSIV AIR OPERATOR BACKUP N2 SYST CFO MQD 0288 19SEPSS 17NOVSS

~l 19NQVBB 4 RIEI- INSTL UPGRADED 10 GLOBE VLV CFO MQO 0585 5FEBSB 19NOVSB POST PEP Q 19NQVSS 3 INSTALL WYE STRAINERS ON IA SYS CFO MOO 0513 15APABS Q 13MAYSS I+ SAUGSS C P&ID OC WKOWN{ARM PRM NCC) OICTMT CFO MOD 1041 sMAYSS U sAUGSS 31OCTSS S ISSUE DRAFT DESIGN BASIS FOR ARMS CFO MQO 1037 4APRSB 31OCTSB 9NOVSS S ISSUE DRAFT DESIGN BASIS FOR PRMS CFO MQD 1038 4APRSS 9NQVSS 9NQVSS S ISSUE DRAFT DESIGN BASIS FOR NCC CFO MOO 1039 4APRSS 9NOVSS IsNQvaa 4 P&ID VER IF WOIAAM PRM NCC) I ICTMT CFO MQD 1040 23SEPSS 'IBNQVSS I g! 19NQVBS 4 SM PP WD- I IC FUNC"N ARM PRM NCC CFO MQD 1043 23SEPSS g 18NQVSS

~l C SM PP WO FNCT OIC(AAM PRM SL NCC) CFO MQD 1044 ....., 22JULSB I

I

~ I 28FEB89 28FEB89 20NQV89 3 R)%- INSTL UPGRADED 10" GLOBE VLV CFO MQD 0519 1SEPBB 27OCT89 I I 20NQV89 3 P&ID OC WKOWNIARM PAM NCC) I ICTMT CFO MOD 1042 18SEPSB 20NQV89 3 SM PP WD FNCT I IC )ARM PRM NCC) CFO MOD 1045 I

25SEP89 I g 20NQV89 20NQVS9 DATA DATE NOTES: V INDICATES NON-OUTAGE N.R.C. COKIITHENT DATE

~ INDICATES OUTAGE RELATED N.R.C. CONNTVNF-Nv nave

~ IOI(CT A(INCA\1 TIOA(e POINT IACI(AA PI ANT RIOT AIO INI(OIAIIOSCNIOIA( NIO( I (I I tile IINee ~ e I~ I2 PAO( I 'INI ~ I ~ OAIOA POetS PAOIICI (1 ~ 'IAI

~ ~ Ai(2 ~ ICNT CO. INI~ APAI ~ el Ae I 'I ~

STAOT II( ~1~ TAOOI 'I SCN(OUI ( TAAC(T SCN(IAO( 1~

Nl Iee ~ NAA CeiAA ~

~ IN ISO 1lleOee'I ~ ~ le( Ol(A( ON NAC COIOIITINNT CAT(OOAI($ TAAO 1 INISN 1IO(CD 1 OATA OAI( laeee ~ SPAT oe(Ats ocoo(s ~ COO (1 TAAC OATA OAT( TPIANII 1888 1989 1990 1991 1992 REG 8JUL88 3 ALT SHUTDN CAPABILITY APPENDIX R REG MOO 0025 2OEC85 8JUL88 3 CONTAII4lENT TENDON SURVEILLANCE REG MQO 1209 I

~ ~ IMPL SCHED TO COMPLETE BY CONJITMENT DATE.

DEMOB ANO ENGR EVAL OF FINAL TEST RESUI.TS 30JUN88 NOT PART OF THE NRC COLBIITMENT. 27OCT87 18JUL88 4 CONTAlfklENT TENDON SIÃIVEILLANCE REG MQO 1210 I

~o IMPL SCHEO TO COMPLETE BY COIISIITMENT DATE.

DEMOB AM) ENGR EVAL OF FINAL TEST RESULTS NQT PART OF THE NRC COIBIITMENT. 270CT87 20NQV91 3 ATWS MQOIF ICATIONS REG MQO 0088 2DEC85 20NQV91 I I I 2DEC92 4 ATWS MOOIF ICATIONS REG MOO 0587 3JUN87 2DEC92 DATA DATE NOTES: V INDICATES NON-OUTAGE N.R.C. CONNIVENT DATE

~ INDICATES OUTAGE RFI.ATFD N R r rnuwv~a-~n no~(2

rEOIICf Al INCAE ~ IINSIT tOINI UICIIAA rIANI rs OI NB ~ INIICAAII0 SCHIZO 1 NOCE I1~ I rsollcl 12 CHANDI

~ 'IAE

~ ACI ~ SIN 9 I ~ ~~ 08 I OA rOBE ~ AFSB ~ I TOI ~ CO IN I ~ ~ VAB ~ TSAAI'81 'BSHE IAA I NAA S TAO I 931484 AOO ~ ~ SCNE OUI IAOCI I SCNIOUI1 14 I I NISH I 2 HOSS 9 ~ INI ~ SIAA ON NAC CTOOIIIBNNI CAIECOOBIS IAAI ~ I NISH IIOECSO NAIA OAIE INATSO SOOT ~ 4(AES KOOSS '

CUO ~I IAAC NAIA OAII I 4 SANO I 1988 1989 1990 I99 I 1992 3 SFP COO!.ING SYS SEISMIC MOD NRR MOD 0118 4 ~ THE CQ4IITMENT FOR THIS MOO HAS BEEN MET.

BALANcE oF WoRK BEYOND THE 18 OEC 87 NRc CQslITMENT DATE IS FOR ISSUANCE OF FINAL 14AUG85 STRESS CALCULATIONS, WHICH WAS NOT REDO To 19MAY88 MEET THIS COLSJITMENT.

I

~ $ 25JUL88 4 INSTL IST GUAGE FOR SFP CLG PMPS NRR MOO 0888 9JUN87 24MAY88

~

I tI 310 EC88 C EXISTING A" EDG IDLE STARTISTOP NRR MOD 0132 SIIATBII IBOCTBS I $ I sNovsa 4 SFP COOLING SYS SEISMIC MOO NRR MOO Od03 IOECSI 210CTBS l ls Novae

~~~

C EXISTING "B" EDG IDLE STARTISTOP NRR MOD 1001 'IMAY87 31OCT88 4 REDUCTION IN 4KV BKR VOLTAGE DROP IdIR Moo 1253 I 19NOV88

~ 4 THIS Moo IS THE RESULT OF MOO 805 STUDY.

I JUN87 8NOV88 I I Q 7APR89 C INSTALL BARRIERS IN HVAC DUCTS NRR MOO 0787 BCIOBST IFE889 I I Q 28SEP89

~

4 REACTOR HEAD t.lFT RIG LOAD CELI. NRR Moo 1070 23NOV88 29JUN89 I I P 7ocTas 3 REACTOR HEAD LIFT RIG LOAD CELL NRR MOO 1089 19OEC88 25JUL89 I I 1 JAN90 C SECURITY PLANT ENTRANCE FACILITY NRR MOD 1 lad 280CTSS IIOIISB 3 REDUCTION IN 4KV BKR VOLTAGE DROP NRR Moo 1252 I I I 20NOV91 4 ~ THIS Moo IS THE RESULT OF MOD 805 STUDY.

C ADO FUSE SPEC C SECIÃIITY PERIMETER LTG To BKR LIST 81 81 CCTV OWGS NRR MOD NRR MOO 1182 1254 25APR88 I

24MAY89 I

~ IV 13FE890 I

13DEC89 ltl I IMAY90 1MAR90 tl I lMAY90 C PERIMETER FENC"G 81 INTRUS"N OET"N NRR MOD 1183 25APR88 I Q 10JUN90 C SECURITY ACCESS CNTLICARD READER NRR MOO 1184 2 I OCT88 30MAR90 I I I Q 9JUL90 C VITAL AREA BARRIERS NRR Moo 0700 BFE888 1MAY90 I I I 19JAN9 I C SECURITY COMPUTER SYSTEM NRR Moo 1185 21OCT88 19JAN91 I I I

    • INCLUDES INTEGRATED PREOPERATION STARTUP AND TURNOVER OF NEW SECURITY ACCESS SCHEME.

DATA DATE NOTES: T INDICATES NON-OUTAGE N.R.C. COMMITMENT DATE

~ INDICATES OUTAGE RELATED N.R.C. COMMITMFNT DATF.

PAOWCI M NICAIS IINAIP POINT WCIIAA PIANI PIOI I AI INI SCIATIC SCNITAA 1 NXN ITS I PA 0 IIC I T I

~ ACI ~ SINI I ~ ~ ~ OAIOA POPIA AIII ~ ICNI CO INI~ APAI ~ TIAIISI SI MIANI NAA CNAA ~

SIAAI II~ ~ I ~ 'IAAC ~ I SCN ~ OV ~ TAACTI SCNIWNS 1O I I NISN 1 INOT TS I IIN OITAA ON NAC CIINIIININICAIICOAIIS TAAC I INISN 1 IOICIP NAIA OAT I INAPT ~ SOS I NAIAAS WNNS CNA II IAAC NAIA OAII ISIANII 1988 1959 1990 1991 1992 IhE $ MARae S TECHNICAL SPECIF ICATION IMPLEMENT Ihf MOO 074d 2JAN87 eJANaa lp 14JUNea S PROC TP221 FOR OhM OF STA BATTERY lhE MOD 0803 7JANSS p 17MARaa

$ MAvas S REV FSAR TO INCL GOUI.DS GNB BATT IhE MOD 0804 28JANas 0 17MARea I Q 3OCT88 C CABLE TRAY MOOIF I CAT IONS IhE MOO 0011 7JANSS 21MAR55 I P 2DEC88 S 125V DC POWER PARTIAL LOSS Ihf MOO Od47 IDEC85 21MAR88 8MAvs8 S EVAL CI9IRENT OPER OF CCW PIAIPS ~

Ihf MOO 0811 IFEB$ 8 Q 2IMARaa lP 22MAY88 S 3C CCW PI94P SHAFT SEAL LEAKAGE l&E MOO 0812 18JAN88 Q 21MAR88 lg 'I IJUN88 S MSI VERIFY STROKE LENGTH IhE MOO 0837 11JAN88 Q 21MAR88 I Q 15JUL8$

S MSI REVISE MAINTENANCE PROCEDURES IhE MOO 0839 23%)V$ 7 2 I MAR88 I P sNovea S EVALUATE EDG EQUIPMENT MOOS lhE MOO 0710 SDEc87 IAPR55 I P 28OCT88 4 STUD h BOLT THREAD ENGAGEMENT Ihf MOD 0999 14JUL87 4MAY88 S REV T. SPEC TO CNTMT ISOL VLV Ihf MOO 0525 9MAR88 0 I f dJuLsa 5MAvas I $ 15JUL88 S PENETR <<18 ELIM ONE VALVE AS CIV IhE MOO 0829 5MAY58 I g eJULsa S PENETR 27 ADO RV-5223hSGWL AS CIV Ihf MOO 0830 2MAR8 7 eMAvss I $ dJUL88 S PENETR 24 CK VLV VS. ISI PROGRAM IhE MOD 0831 2MAR 57 dMAY88 I $ eJULsa S PENETR 530 CV-dld5 REO INSTR AIR IhE MOO 0832 2MAR 87 eMAY88 I P 9JULsa S RHR TECH SPEC REVISIONS Ihf MOD 0819 9 MAR 88 Q sMAvas S TEMP SETPOINT FOR H2 ANALYZER IhE MOO 0833 9MAR88 Q I f 10JUL88 10MAY88 I Q 1$ JUL88 S CLOSEOUT If INFO NOTICE 84-da lhf MOO 0398 SJAN$ 7 18MAY88 I $ 27JUL88 S LK RATE SPEC ELEC PENET RCP 4150V IhE MOO 0834 9MAR88 Q 27MAves I $ 31JUL88 S ECF DRAIN LOOP SEALS EVAPORATION Ihf MOO 0801 9 MAR 88 Q 31MAY88 DATA DATf NOTESI f INDICATES NON-OUTAGE N.R.C. COMHI~NT DATE

~ INDICATES OUTAGE RELATED N.R.C, COMMITMENT DATE

lit k(

~ SOI(CT AIINCASS TIN((T tOINT IAI(I(A( tlANT

~ IOI Ill IN'i(COAIIO SCNIAA I IKQE I(IT ~ IOIICTI2 l(AI

~ ~

STMI I ~llII(O(lI I(OS(CA PC&IS AMl i I~1 CO INI(SFAI I TASC(l SCNI(AN(

S(AS2$ 2 Il

'b4AI(kAI OAS CNASI IINISN 2FNOVSS I IN( Ol(AA ON NSC COWIIFNNT CA(IGNI($ IMC IINISN ) NNCSI NAIA OAII QIAISI ZMI OIIMS O(OOI'I $ Cuh II IAAC NAIA OAII ISIANII 1988 1989 1990 199'I 1992 I&E SFEsas S MOV THERMAL OVERLOAD HTA SEI.ECTN I&E MOO 1249 190CT87 7JUNSB I Q IOAUGSS S PROVIDE NPSH INFO ON RHR PIS S l&E MOO OS18 19APABB Q 10JUNBS I Q 70CTSB S CNTMT ISOI. SYS STROKE TIME - MOV I&E LKIO 0827 SQARSS '24JUNBB I I I JAN90 C SEL SYS PAIMAAY DOCIAIENT UPGRADE I&E MOO 1095 17SEP87 17AUGBB I ISNOVSS 4 MOV FAIL OUE TO IMPAOPER SW SET"G I&E MOO 1110 15JAN87 SNOVBB I 19NOvaa C EDG STAAT"G AIR SYSIADO AIR DRYER l&E MOO 0810 18JULBS ldNOVBB

~~

~

I I Q 28FES89 S RHR VALVc OPEAASILITY aei & OTHER l&E aeo os2o ISEPBB 280ECBS I I Q 20NOV89 3 PAOTECT"V GUARD FOR MG-d SAFEGRDS l&E MOD OSSB 7APRaa I Q 20NOV89 C EF FLOW SWITCH OPEN ON LOSS POWER l&E MOO 0843 ISEPBB IIOCTFI I I  ! SAPR91 C IMPAOVE PA SYSTEM AUDIBILITY l&E MOO 0711 Ill(Ill 2 SMAA90 I I I I $ 20NOV90 4 PROTECT"V GUAAD FOR MG-8 SAFEGRDS I&E MOO 095S 7APASS 24SEP90 I I I I 20NOV90 4 INST CTMT PHYS SARRIPREV PEAS ACC I&E MOO Oadl 7APRBB 30CT90 I I I I I 20NOV90 4 API INVEATER REPLACEMENT l&E MOO 07dd 17FESBS 220CTSO I I I I 20NOV91 3 INST CTMT PHYS SAAAIPAEV PEAS ACC I&E MOO dado 7APABB 30CT91 I 20NOV91 3 RPI INVERTER REPLACEMENT l&E MOO 042d 24MAY89 220CT91 DATA DATE NOTES: 1 INDICATES NON"OUTAGE N.R.C. CPHHZ~NT DATE

~ INDICATES OUTAGE RELATED N-R.C. CPNNyMFNT DATF

~ IOJICT Al IN CA I \ TUSIIT TOINT IACITAS OBANT TSOI OAA INIICSAIIO SCNlOSAS IKOC IffI ~ BOJSCITI SSAI

~ 800 I BUSS I I ~ ~ OASOA POetS 0903 I SCNS CO. ~ NTSSVAS ~ VIA09$9

$ SM OUS I NAN CSSAS ~

CIAIT III~ I~ TAOCT I CONT OUI TAACTT CCSCCOSAI $0 I IN 9 $N TINOVSS I ISO 00 ~ AA ON NSC COSNBSIKNI CATICOOIIC IAAC I SNSBN SlaCI ~

OAIA OAII NBA9 ~ I $ 00I OSIA0$ OCSN3IS CUS If IASC OAfA OA ~ \ ISIAISII 1988 1989 1990 1991 1992 S PWR PLT FLOOD"G FROM IN'OURCES ORA MOO 0334 SJAN88 9MAYSS S LOSS OF RHR SOER IRHR 00031 ORA MOD 0518 30SEP87 'I9MAYSS I I 4 EXTRACTION STEAM DRAIN LINES ORA MOO 0574 2SEP88 900280 4 LOAD CENTERS X-FORMER REPLACEMENT ORA MOD 1081 4 GENERATOR H2 MONITORING SYSTEM ORA MOO 0582 1 JAN84 2000280 ~

~

I I

I SSOOTSS I

~

9NOVBS I I I C GAS ANALYZER SYSTEM MOO OAA MOO 003d SSSSSVSS 22NSIISI I I I C WASTE NEUTA et WTP SYSTEM MOO ORA IEX3 0042 SJSNSS 23NOVBB S AEVW NON EMER TRIPS SER 25-85 ORA MOD 0508 1SEPSS I

~ I 28DECSS I

I

~ I I

~

S ISJREG 0737 1 FEED WATER ORA MOD 0751 15Epea 280ECSS I I I S SOER 88 3 CK VLV APPLICATION RVW ORA MDD 1258 SNOVSS 15JUN89 I I I

~

3 EXTRACTION STEAM DRAIN LINES ORA MOO 0554 dJANSS 40CTSS I I I 3 GENERATOR H2 MONITORING SYSTEM ORA MOD 0557 I I I 0 WTR TRMT PLT IN LINE CHEM MONITOR ORA MOO 07d7 .... 290IOSS SOJANIS I I 3 SECONDAAY CHEM INLINE IKNITORS ORA MOO 0102 25JUL89 20NOV91 I I I 4 SECOIKAAY CHEM INL INE MONITORS ORA MOO 0103 21SEP89 20NOV92 DATA DATE

rIOIICI Al NICALS TLNLIV rOINI IWCLIAA rIANf

~ IOI Irl INILCAAILO 5CNIOLAL NlOi ~ fl I rIOILC IT I

~ ACL ~ LNI I I I ~ ~ OAIOA rOVI ~ ANS I ICNI CO. IVII~ VAI ~ VLAAILI 'ILNLIAA\ NAA CNAA I 5IAS I Ifl~ I~ ~ AAOI I SCNL OU ~ I f TAACI SCNI ON f I~

I INILN 1 INOVI'I I LNI ALIAS foal NAC CIVOILININI CAIICCAILS IAAO IINILN TIOICSL NAIA NATL INAVLS SOLI OIIALS OCLSNS CLO ~ I IAAO NAIA OAII ISIANII f989 1989 1990 1991 1992 FPL S EDG PARALLELING OFF-SITE POWER FPL MOO 0472 15JANBB Q 25MARBB I I S REM 8AT RM CHILLERS FOR EDG LDS FPL MOO 0929 22DEC87 1APRBB I I S ADO OP GUIDANCE TO EDG INST METER FPL MOO 0931 18JANBB D IAPRBB I I S REV OPS BL ELIM I90IEC ACCPT CRIT FPL MOO 0932 1 2JANBB Q IAPRBB I I C REPLACE ICW PUAP MOTOR COUPLINGS FPL MOD 0905 16APR87 4APRBB I I S ACCEPTABILITY OF DC EQUIP RATINGS FPL 1K'404 11JANBB 21APRBB

~

I I 3 REPLACE LOW PRESSURE ROTORS FPL le 00dd 31OCT84 2MAYBB I I S TECH SPEC TEST REQUIREMENT FPL MOO 0800 25JANBB CI 2MAYBB I I S INSTR AIR REGULATOR DRAIN LINES FPL MOO 0913 21 JANBB Cl 2MAYBB I I S REVISE IA SYSTEMS DESCRIPTIONS FPL IKX) 0920 I I JANBB D I 2MAYBB I

S PWR SOURCE TO WIDE RNG RAD MDNTR FPL lO 056'I 22DEcae 3MAYBB 1 I S STA BATT OPER BL ACCEPT CRITERIA FPL MOO 0808 30JAN87 3MAYBB I I 3 MSR 1KNERNIZATION REPLACEMENT FPL MOO 0050 2OEC85 10MAYBB I I 4 REPAIR INTAKE STRUCTURE EOUIPT FPL MOO 00d2 IBFE888 I dMAYBB I I C REMAINING SITE PREP WORK FPL MOO 1090 19NOV87 I dMAYBB l I C HALON SUPPRESSION SYSTEM FPL MOO 0279 'I7OEC85 23MAYBB I I S CONTROL RM EMERGENCY LIGHTING FPL MOO 0491 11APRad 31MAYBB I I 3 FIX LEAKING VALVE MOV-3 '32 FPL MOO 0492 22AUGBB BJUNBB I I C INSTALL IAICLEAR DATA ACCOUNTG SYS FPL MOO 0229 1MAY84 9JUNBB I I 3 REM ITIC RAO AIR MONICNTRL ROOM FPL MOO 0350 17DEC85 9JUNBB I

S EVAL LEAKING CTMT ISOLATION VLVS FPL MOD 0597 18JULad 28JUNBB DATA DATE

ttOIICI AIINCAI' fottlt tolNI PEICIIAA tlANI PIOI I tt INIICAAIIOSCIPtltat NEOI ItlI ~ 442 ~ CI 1 1 SIAI

~ ACI ~ SPN I ~ ~ ~ OAIOA POet ~ APEI ~ ICNI EO ~ Nlleett ~ '2 I At 2 4 I IENEEAA ~ NAA ENAAI S I At I I I I ~ I~ IAICII SCNIEAN I 14

~ I N I IN IINOPI' I INI ~ IIAA ON NIC CENOIIINENI CAIECOoltS IAIC I INIIIE IIENCII NAIA OAIt NIAII~ Soal SttAES SCOOtS 4 CEN IS IAEC NAIA OAIE I~ IANII 1908 1989 1990 1991 1992 FPL S IDENT 125VIVITAL INSTR BUS LKCS FPL MOD 0488 15JUI.SS 30JUN88 I I C ADO"L EMERG LIGHTING FOR APP ~ R FPL MOD 0592 12JUNSS 1JULSS 3 MOV FAIL DUE TO IMPROPER SW SET"G FPL MOO 052d BAI.ANCE OF MOD IS NOT !SEE.CATEGORY CHANGFO I TO FPL AFTER ORIGINAL CDLSIITMENT COMPLETED. 10APRSS 5 JUL SS.

I I 3 MSR INSTRISIENTAT ION FPL MOO 1010 2dJUN87 SJULSS I I 4 400V LOAD CENTER COOLING FACILITY FPL MOD 0085 I IFEBSS 19JULSS S STA BATT LD TST REO-PROP T. SPEC FPL MOO 0809

~ ~ BALANCE OF WORK IS NOT PAAT OF ISIE COLSIIT- I I MENT. CONllTMENT MET PER JPE 80 1474. 10APR87 20JUI.SS 5 REVIEW WEJ- IT EXPANSION ANCHNIS C WHOLE BODY COUNTR PERMANENT INSTL FPL MOO 0077 FPL MOO 0500 4MAYS7 28 JUL 07

~I I

I 27JUI.88 I

3AUGSS 3 INSTALL CCWITPCW ALIEATAP SYSTEM FPL MOD 0531 I I e ~ BALANCE OF MOD IS NOT COFO.TPCW WORK TO GO.

1 5 MAY80 I 2AUG8 0 l I C ON. GOING DES BAS EISI-ORIG 15 SYS FPL LOO 1224 ISDEC87 15AUGSS I I S EVAL DES.BASIS ACCIDENT HT LD REM FPL S BOUNDARIES FOR VISUAL LEAK INSP 3 DEL LEAOILAG MODULE LOW PZR LOOPS FPL MOO 1003 MOO 0855 FPL MOO 0390 10NOV87 10JAN87 I JUL 87

~I I

19AUGSS I

23AUGSS I

29AUGSS I I 4 OEL LEAOILAG LKXXILEILOWPZR LOOPS FPL MOO 1004 I JUL 07 29AUGSS I I C CONTROL BLDG ROOF HANDRAIL INSTL FPL MOD 0703 300CTS7 ISEPSS I I 4 PERM SFP LEVEL MEASURING SCALE FPL MOO 1132 15MARSS ISEP08

~

I I C BAEATHING AIR CDMPR WTR SOFTENER FPL MOO 0501 13JAN80 23EEPEI

~

I I 4 GEN DISCONN LINK INSPN WINDOWS FPL MOO 1107 I JAN84 22EEPIE I I 4 RX CAVITY SEAL RING LAYDOWN FPL MOO 1212 I JAN84 22EEPEE l I C BREATHING AIR COMPAESSOR FPL MOO 0087 20JANSS 20SEPSS DATA DATE

I, *I PAOSICI ASNSCASS IUSSSV POINT IACIIAS PS ANT PSOI In INIICSAIIO SCNEOull NCOE III I PS 0 IIC II I ~ SAS INRUSH I

~ ACS SHI ~ I ~ ~ OSIOA POPE ~ ASSI I ICHI CO INII~ VAS I VSASESI ssulilul 8 OAA Cutull SIASI IIIOOE IAAC I SCNIOU

~ ~ I VAACEI SCNEIAkl 30 I IINOVSS E INE OSIAS ON NEC CCSOSIIINNI CAIICOOIIS IASC I INISN S ICE C I~

NAIA OAEE INAV~ 8 SOSI ~ 8 ~ ASS OCOOES '8 CUS EI IASC NAIA OATS I8 SANS I 1988 1989 1990 1991 1992 FPL 4 OPEN h CLOSE IA PPG FOR QC INSP FPL MOD 1093 25SEPBO 28SEPSS I I 3 480V LOAD CENTER COOLING FACILITY FPL MOO 0085 10JANSd 27IEPSS I I C W. T.P. FLOW METERS UPGRADE FPL MOO 0151 'I 1F EBSO 278EPSS 4 G.E. PK-2 TEST BLOCKS FPL MOO 0577

~ 0 NO BASIS FOR IhE CONITMENT CATEGORY I I CHANGED TO FPL ON 2I IOISO. 30JANSO 28SEPSS

~

I 1 4 CADM DUCTWORK QUICK OISCONN CLAMP FPI. MOO 1229 1 JANS4 28SEPSS I I 4 BACKUP INSTR. AIA COMPAESSOR FPL MOO 0291 4APRSd 28SEPSS I I 3 METEAING X DUCERS FOR WATT h VAAS FPL MOO 0553 7MARBd 30CT88 l

4 AEPL*CE FAAR IS RELIEF VALVESICCW FPL MOO 0415 2SEPSB 40CTSB l l 4 REPLACE VELAN CHECK VALVE DISK FPL MOO 0420 19MAY87 OOCTSS I I 4 ADO h AELOCATE AFW N2 SUPPLY FPL MOD 0215 2DECOO TCCTSS I I C CABLE SPREAD RIAL DRAINS FPL MOO 0392 12JAN87 TCCTSS I I 4 REPLACE BASKET STAAINER CCW 4B FPL MOD 0274 14JUL87 lCCCTSS I I 4 MAIN STM SAFFTY LIFTING LEVERS FPL MOD 0423 220ECSO lICCTII 0 F IRE PLBOI DIESEL ENGINE UPGRADE FPL MOO 0191 FPL MOO 0479 220ECSO 4MAYBB ~

I I

I 110CTBB I

l200TSS 4 INST FLGS ON RCP SEAL LINES

~

I I 4 MODIFICATION TO 84 GAS STRIPPER FPL MOD 1013 1 JAN84 130CT88 I I 4 REPL CNTMT DOME LIGHTS U 4 FPL MOO OOS3 1 JAN84 7800788 I I 0 HYDROGEN LINE MOOIF ICATION FPL MOO 0077 20EC85 150CT BS I I 4 EIBLANCEO ACP OIL COLL SYS FPL MOD 0713 18NOVSO ISCCTIS I I 4 REPL. BASKET STRAINEA TPCW 4A h B FPL MOD 0277 14JUL87 I TCCTSS I I C AFW PUAPS GOVRNA VLV STEM GUARDS FPL MOD 1105 BJAN87 170CTSS DATA DATE

TAOItCT AIINCAIS TNtlfT AOINT IACICAA TIASST

~ IOI I fa INIICAAIIOSCNIOSNI INOI l f1 I TAOllalfl SIAA

~ 'Aaf s asN Is ~ ~ OASOA AOSSN ANs ~ SCNI CO. INII~ IIAI ~ TIAAsal aasNQUs ~ NAA aNAA ~

STAAI 1st ~ ft 1ANCTT SCOT OV f ~ ~ AACTT SCSNINAC Tt

~ INISN 1 INON IS I last ~ IIAA ON IIAC CIINIITNtssf CAIICOAIIS IAAC 1 INISN 1 IOICTI OAIA OAlt lNA'Sat soal sttAAS occots \ COO tf IAAC OAIA OAlt 1 ~ SANA I 1988 1989 1990 1991 1992 FPL 4 TURB RUNBACK SELECTOR SWITCH REPL FPL MOO 1246 I JAN84 170CTBS I I 4 CNTRL SW FOR CV3722 SI CV2913 FPL MOO 03SB 4FEB87 210CTSB I I 4 MAIN FEED CV 2011 CLOSING TIME FPL MOD 1102 9LIAA88 210CTSB 4 REPLACE G.ED CR120BD AUX RELAYS FPL LAO 1208 I I POTENTIAL SIKXIT NOTICE OUTAGE WORK.

I OAUG87 210CTSS l I C COMPUTER ROOM FIRE DETECTION FPL MOO 0069 3DECS5 240CTSS I I C PLANT LIGHTING UPGRADE PH I St I I FPL MOO 0889 4MAYS8 240CTSS I I 4 REWIRE LIMIT SW FOR IKIV 750, 751 FPL MOO 0390 22DEC86 250CT88 C EDG ENGINE CNTL PNL LIGHT UPGRADE FPL MDD 0451 I I

~ o POTENTIAL SISXIT NOTICE OUTAGE WORK.

IBJULBS 260CTSS I I 4 RHR PIAIPS SEAL UPGRADE FPL MOO 1173 3AUG87 260CTSS I

4 CRCM CLA FANS DAMPER POWER FPL MOO 0475 20MARSS 270CTSS I I 4 INSTL MANIPUI.ATDA CRANE AIR COMPA FPL MQO 0853 19FEB87 270CTSS I I C NEW EDG PAOJ Sl'TE PREPAAATION FPL MOO 1137 15JUN87 270CTSS I I 4 INSTL MN LUBE OIL VAPOR EXTRACTOR FPL MOO 1251 1 JANS4 270CTSS I I 4 ISO SV 20 OPC TURBINE PAOT"N SYS FPL MOO 0564 3NDVSS 280CTSS I I 3 SFP DELIIN RESIN FLUSH UPGRADE FPL MOO 0956 SOCT87 280CTSB I I 4 SFP OEMIN RESIN FLUSH UPGRADE FPL LKG 1155 190CTS7 280CT88 I I 4 REPLACE AEACTOR CAVITY LIGHT FPL MOO 0357 4MARS7 290CTSS I I C EDG HC TURBOIIOLE GEAR STUB SHAFT FPL MOO 0509 16MAA87 3NOVSS I I 4 RX MANIP CRANE LOAD TEST DEVICE FPL MOD 1082 10NOV87 3NOVSS I I S ICW DEMAND FLOW ANALYSIS FPL MOO 0111 2DEC85 4NQVSS DATA DATE

g ~

IIOJICI AIINCASD 11Nalv 042NI SAJCIIAA NIANI NIOI las INIIICEAIIOSCNIINAI aaOOI I lI I ~ AOJICI11 IIAI I'ACC ~ NNS I~ 5 ~ IONIOA NOela Baca 5 ~ IJI ~ CO. I Nl I a'VAI ~ 'I ~ Aa I 'I ~ 'ICNIOUS ~ NAN CNAN ~

S IAAI Iflail IANOI I SCNI OUI E IACCCI SCINOUEE 10 I SNISIB IJNOVS\ I ask ~ EIAC ON BBEC CINOII IINNI CAIIOONBIS IAAO 5 BNI See Iaoac\0 OAIA OAII INAV~ 0 SON I ~ Ef ASS OC DOE S ~ Ceaa lf IANC OAIA OAIf I 1 4AN0 I 14988 1989 1990 I&91 1992 FPL 3 AOO

~~

SI RELOCATE AFW N2 SUPPLY BALANCE OF MOO WORK BEYOM) THE COLSIITMENT DATE OF 2d JAN 8$ IS NOT COFO. REPLACE REPLACE AUPTURE DISCS WITH RELIEF VALVES.

FPL MOO 02 IS 20ECSS ~

~ INOVSS 4 INSPIAEPR EO RAYCHEM SPLICESIO&M 4 SGWL CNTMT 3 MSIV

~~

ISOL. VLV REPLACEMENT AIR OPERATOR BACKUP N2 SYST BALANCE OF MOO IS NOT COFO.

CHANGES ARE PER FPL.

FPL MOO 074&

FPL MOO 0257 FPL MQO 02d7 I IINNST JNUIBS 2DECSS

~

~

I I

I I

5Novea TNOllsa IIIOVSS I

I I I I 4 CRDM MTA GEN SET VBRTN MONTRG SYS FPL MOO 0093 22NOV85 1&NOVSS S LIMITING CONDITION 4 REACTOR CAVITY SEAL RING CVT OPERATION FPL MOO 0344 FPL MOD 1073 290ECSd 44UO87 ~

~

I I

I I

ISNOVSS I TNOVSS I

I 4 REPLACE LOW PRESSURE ROTORS 3 CHARG PIMP SUCTN QUICK DISCONNECT FPL MOD 0431 FPL MOO 0087 310CTS ~

Eaoacas ~

~

I I

I I

I I

2103285 a novas I

I I

~~

4 SFP AIR INLET DAMPER REPLACEMENT FPL MOD 0353 4NAV57 70ECSB I l - I 4 HEATER DAAIN TANK SAMPLE SYSTELI FPL MOO 1050 &OCT&7 8DEC&8 I I I

~

4 INST. CTMT SIMP LVL. PNEU. INDIC. FPL MOO Od52 IJAN24 13DECSS l I I 4 TURB LUBE OIL BOWSER LVL CNTAL FPL MOD 077$ 4LIAYSS ISDEC8$

I I I C UPGRADE PH MONITORING SYS AT WWTF FPL MOO 0413 TNAVSB Ieclcss S CBIFUSE IMPACT ON VOC PANELS FPL MOD 0533 ISEPSS I

~ I 2&DEC&8 I

S AFW PIMP TURBINE LUBE OIL SETPTS. FPL MOO 0544 1SEPSB l

~ I 280ECSS I

S PRA ADVISABILITYSTUDY FPL MOO Od72 ISEP&8 I

~ I 2SDEC&8 I

S FLAG 1 LINE BKUP RELAY PROT ADON FPL MOO 0728 ISEPSS I

~ I 2&DEC&8 1

S SIU MTR DISC SWIINT-LCK A CTL RFM FPI. MOO 0741 1SEPSS I

~ I 2&DEC&8 I

S SYNC CK RECLOSESaSUPV BAK CNTL ADO FPL MOO 0742 'ISEPSB ~ I 28DECSS I

DATA DATE

I'al V

I

tlOJICI AINECA'I' fulfiltOINI IACESAA tlAN'I ~ EAE IINAVIE tIOI I tl INIICOAIIO SCIEIOull NEIN 1/I I ~ EOIIC ~ fl CSAE

~ ACI ~ SEEE II ~ IEENIOA ttvll ANI I ICVI CO ENIISVAE I VEAAEEI SEEAEAAE NAA CEEAAE S'IAE I IIEOEE I A ~ CI I SCNE OU ~ I IAICS f SCNE CIAE lt I IN ISA IINOVEE ~ INI Glfll ON NEC CEVOEIfENNE CAIECOOIES IAAG ~ INISN I IENCSI GAIA OAII INAVE~ SOAf ~ EEAAE OCOOES ~ Cul II IAAC GAIA GaIt IIIANOI 1988 1989 1990 1991 1992 FPL S POST TMI SOURCE TERMS EVALUATION FPL MDD 0799 ISEP&8 2&DEC88 I I I S RIEL MDV 744 A & B FPL MOO 0822 ISEP88 2&DEC&8 I I I S LONG TERM ECC FAN TEST FPL MDO 0823 ISEP&8 2&DEC88 I I I S OPERABILITY REOM"TS ECCS EOUIP FPL MOD 0844 ISEP88 28DEC&8 I I I S EVAL CCW HX BSKT STRNR NOZZLE LDS FPL MOO 0908 ISEP&8 2&DEC88 I I I S AMEND FSARIICW MAX INLT TEMP FPL MOO 0909 ISEP&8 28DEC88 t I I S TPCW WALKDOWN &I LOAD STIXIY FPL MOO 0910 ISEP&8 2&DEC88 I I I S FEASIBILITY STOY CAB REARR FOR IA FPL MOD 0912 ISEP&8 2&DEC&8 I I I S EVAL 2 FULL CAP DIESEL GEN FOR IA FPL MOO 0915 ISEP&8 2&DEC&8 I I I S IAIEVAL SFTY FUNCT"NS EFFECTED ED FPL MOO 0917 'ISEP&8 2&DEC&8 l I I S IAIREGULATOR I 0 LK&WIER FPL LKXL 0918 ISEP&8 2&DEC&8 I I I S REVIEW COMPRESSOR SERVICE LIFE FPL MDO 0919 ISEP88 28OEC&8 I I I S REVISE FSAR ON INSTRI&IENT AIR FPL MOO 0921 1SEP&8 2&DEC&8 I I I S REVIEW IXWPRESSOR LOADING FOR IA FPL MDO 0922 1SEP&8 2&DEC&8 S FSAR&. 2 1&AI INCORP AIR REG SET PT FPL LKX) 0927 ISEP&8 I

~ I 2&DEC&8 I

S PROV ACCEPT CRIT FOR OIL XFR PMPS FPL MOD 0928 ISEP&8 I

~ I 2aDEC&a I

S INC AMB TEMP EFF ICLG SYS ACC CRIT FPL INO 0930 1SEP&8 I

I

~ I I

28DEC&8 I

I S EVAL PROB RISK ASSMT STOY FOR EDG FPL MDO 0937 1SEP88 28DEC88 S FUEL STORAGE, IK)LG &E WTR REMOVAL FPL LNO 0939 1SEP88 I

I

~ I I

2&DEcaa I

I S ADD PRESSURE GAUGES TO PENETS FPL MDD 0948 1SEP&8 2&DEC&8 I I I S EVAL NEW CONN FOR TESTING PENFT FPL MDO 0947 ISEP&8 2&DEC&8 DATA DATE

~ lOJIC'I AIINCASE IOAEIT tOINI EEJCEEAS tlANI tiol Ill BNIICAAIIO SCNIOIN l NCOI ~ TI 5 tEOJICTTT SIAE tACI I Sasll I IIOAIOA RONSN AFEI ~ ICNI CO. INIINtal ~ tlAEISI 5CNI CIA I OAN CIIAE ~

5'lail IITlll ~ 0 ~ c ~ I sess l 0893 5 IAACTT SCNI ESNE I~

~ IN BIN 1 ISONSS ~ Isk OEIAA ON SFRC CCSOBI TINNI C*IICOOIIS I IANI I NISN I IOIC$ $

NAIA OAT E INATSS $ 051 OEEARS SCONES COA IS 'IARC DATa Call TBSANSI reae 1989 1990 I991 1992 FPL C MODIFY Sl Pled'PARE MOTOR FPL MOD 012d 230ECBII 29DEC&8 l I I S EVAL NEW VLVS FOR TESTING PENET FPL MOD 0945 lsEpae 2&DEC&a 3 AFW FLOW TRANSMITTER REPLACEMENT FPL MOD 0250

~ ~ PER RUSS GOULOY &I DAVE OVORAK THERE WAS NO BASIS FOR THIS I&BE CONllTMENT. REVISEO CONllTMENT TO FPL PER THEIR DIRECTION. 3JINBS 3&DEC&8 3 POST ACCIDENT H2 MONITORS UPGRD FPL MOD 0383 120CT87 4JAN&9 I I 4 POST ACCIDENT H2 QONITORS UPGRD FPL MOO 03d4 15JANBS 4JAN&9 l I

~

S O.C. SWGR CRITERIA PER TS 3.7-8 FPL MOO 0528 1SEP&8 I 2JAN89 S ACCI94ULATDR 8 PRESS XMTR REPL FPL MOO 0590 1SEP&8 I

I

~ I 20JAN&9 I

~~

I I 3 "C" BUS SWGR ENCL hlC 18305 FPL MOO 0070 ISCCTSS 23JANBS I I I 4 "C" BUS SWGR ENCL AIC I&3OS FPL MOO 0071 3DEC&5 23JAN&9 l l l 3 BORIC ACID EVAP PMP UPGRADE FPL MOO 0237 IIIOVSB 23JANES S REV RM VNT&ICOMBS"N AIR INL CONCRN FPL I%0 0938 1SEP&8 I

~ l 24JAN&9 l

~~~

I I I S POTENTIAL FOR HIGH CTMT TEMP FPL MOD 0810 15Epae 3FEB&9 I I I S EVAL EDG EXCEEDING FRED LIMIT FPL IUD 0454 15DEC&8 D 1&FEB&9 I I I S ECCS HEAT SINK UPDATE FPL MOO 0382 SINTST ITFE889 I I I 4 SFP BRIDGE CRANE REPLACEMENT FPL IOD 0744 IIAFRBB 2IFEBBS I I I S FSAR START TIME DESCRPIDATA VERIF FPL MOO 0497 ISEP&8 27FEB&9 S TECH SPEC REV GL-84-15 (EP-00171 FPL MOD 0498 1SEP88 I

~ I 27FE889 I

~

~~

I I I S ANNJNCIATOR SYS REPL STUDY FPL QOD 1011 ISEP&8 27FEB&9 S METEOROLOGICAL SYSTEMS EVALUATION FPL MOD C NEAR SITE LIGHTED HELI PORT 1053 FPL MOO 0094 IJANSS 1SEP&8 I

I

~ I l

27FEB&9 ESFSBSS I

I I I I C "8" EDG STARTNG AIR TK PI ISO VLV FPL MOD I id& ISEP&8 1MAR&9 DATA OATE

tlOILCI ALLNCASS LLJLSLV tOINI ICCLLAC tlANI nol 5 tl INllCCALLO SCNLLSAS NLOL 1 I1 ~ tLOILCLf S SSAL

~ ACI ~ SNI ~ I ~ fIOAIOA tOVLC ANI I ICNI CO, I Nl I AvAI ~ Vl AL I S I KNIOIA~ CAA CNAA ~

S IA$ 1 I II~ $ $ I ACC ~ I SCNL Oul f LAACL~ SCNLCNLS 1$

f INILN LIIVOVSL lIIN CLLJA ON NLC CONIIINLNL CALLLOCILS lAIC I INISN 'LLOLCL~

NAIA CAIL LNAVL~ SOA ~ CLLALS CCIVNS ~ CIN ~ f LALC NAIA CAIL LLIAI3$3 1988 1989 1990 1991 1992 FPL S ISI CODE BOUNDARY OWG UPDATE FPL MOO 0755 8Novaa 8MAR8 9 I I I S C-BUS RELAY PROTECT"N MFW EVALNN FPL MOO 0519 9Novaa 9MAR89 I I I S 0-L ISTITEOB PLANT EOUIP TAG SYST FPL MOO 0545 $ Novaa 9LIAR8 9 I I I S POLAR CRANE CNTLS ENGINEER"G STDY FPL MOD 0723 9NOV88 9MAR89 I I I S EVAL 2 PULI. CAP DIESEL CCMPR - IA FPL L0 0914 9NOV88 9MAR89 I I I 3 REPL CCW HX THERMOMETERS WIRTD"S FPL MOD 04'l7 30LIAR87 10MAR89 I I I S EVAL SEQ EVNTS RCDR 85 STA Atda ADO FPL MOD 073d 10NOV88 10MAR89 I I I S ECC EXTEND LOC LILIIT FPL MOD 0824 ... ... .... 3 locTaa 13MAR8$

I I C WTR TREATMT PLT PRETREAT SYS REPL FPL MOO 0084 ~ CIVIL 14MAR89 I I S EVAL EGUIPT AGING REPLACEMENT RAL FPL L83D 070d 9NOV88 14MAR89 I I S EVAL CNOSR BOOT SEAL REPLACEMENT FPL MOO 04d2 19OEC88 I

HI 14APR89 I

S 0-L ISTITEDB ACTIVE PCM BACKF IT FPL MOO 0543 29DEC88 Cl 24APR89 I I I S RESOLVE CNTMT PURG FSAR DISCREP FPL MOO 0828 2$ DEC88 C3 24APR89 I l C PLANT OUTFALL INVESTIGATION PTN FPL MOO 1217 1SEP88 IMAY89 I I I 4 SPENT FUEL POOL RERACKING FPL LOO 1190 I IJULII 3MAY89 I I I 5 O-LISTITEOB DRAWING MODIFICATIONS FPL MOD 0544 29DEC88 8MAY89 I I I S CNTMT PURGE SYS LEAKAGE RESOLUT FPL MOO 0835 25JAN89 17MAY89 I I l S STUDY FAILURE MODEIGE AUX RELAYS FPL MOD 1114 9NOV88 18MAY89 I I I C COMPUTERIZED DATA LINKS FPL MOO 1097 17NOV88 25MAY89 I I I 4 REPL CCW HX THERMOMETERS WIRTD"S FPI. MOO 0418 15APR87 SJUN89 I I I C COLD LAB CHEMICAL EQUIPMENT FPL MOO 0145 IIAPRII 8JUN89 DATA DATE

~ 80JIGI Alda CA 8 8 Esssacv rosssB Iacslas rssssE

~ IOI Irl INIICSAIIO SCNIOLAI aooc I ls I raoslclll BBAA

~ ACI ~ assi I~ ~ ~ IONIDA Pool ~ AJCJ I ICNI CO. I N I I ~ vAl ~ vs AE I S I ssasl Dsa ~ asa Cdssa ~

Slaal llloll I A ~ D I 'I 'S C O 1 O la ~ 1 IASCC1 SCNIEBAC SO I IN I SJI 1118DVSB lido oalaa sod Issc ccaoIIIIC11 callcoalcs ~ AAC BIOIBN 1IDICS ~

all cUA ~ r I

~~

OAIA OAES Sasvsl Cool AaS OCIOIS IAAC OAIA DAIS 1 8 Jassa TSSS 1989 1990 1991 1992 FPL C WALKDOWN INSTRISIENT C CHEMICAL STORAGE BLDG CENTRAL AIA SYSTEM FPL MOD 0924 AIC FPL MOO 1202 22PEBSI 9NOVSS I

~I 18JUNS9 I

2731NBB I I I FPL MOO 0190

~

S CHILLER UNIT ENGINEEAING STUDY SNDVSS 30JUNSS C MASTER DRAWING 3 PEAM SFP LEVEL MEASURING SCALE LIST MODIF ICATION FPL LGD 1098 FPL MOO 0874

.............. 29DECSS ISEPSS I

~

~

I I

I SJUL89 I

IJULBI C EDG CI.G WTR DISCH THERMOMETER C UPGRADE AIR START WYE STRAINER FPL MOO 1238 FPL LGO 0950 ISEPSS ISEPII I

~

~

I I

I 7JUL89 I

ISJULI9 C RELAY MALFISICT"N AIA DUAL EOG RM C GAS BINDING OF CCP"S S INADVERT GEN ENERGIZATION PROTECT FPL LGO 0558 FPL MOO 0955 FPL LGD 0495 ISEPSS ISEPSS I

I I

17FE889

~~ I I

I I

ISJULI9 I

19JULB9 I

19JUL89

~

I I I 3 RHR PLSIP ANCHORS FPL MOO 0521 ldJUN89 g 21JUL89 I I I 3 CONNECT GALWlETRICS TO NIS AECADR FPL IGD 1235 BISNSS JAUGSI I I I

~

3 SFP BAIOGE CRANE AEPLACEMENT FPL MOO 0745 I I

~ I

~

S CONTAIIAIENT SPRAY PMP SUCT PRESS FPL MOO 0802 17APRSS SAUG89 I I I

~

C ISOL VLV ON LUBE OIL CLR MANIFOLD FPL MOO 0953 ISEPIS IISUGSI I I I 3 TERM MOOULEIFOXBORO SPEC 200 INST FPL LGO 0879 IIEPBS IdSUGSI I I I 4 TERLI LGDULEIFOXBORO SPEC 200 INST FPL MOO 0880 ISEPSS Idslols S O-LIST TEDB CLASSIF ICATION OF SYS FPL LGO Od42 I

SMAYBS I

~ I 28AUG89 S LOAD FLOW ANO VOLTAGE DROP STUDY FPL MOO 0585 I

2MAY89 I

~ I 29AUG89 S STIX)YIMOV FAIL"R DUE TO INLSIEAING FPL MOD 4 CONNECT GALSLAMETRICS TO NIS RCRDA FPL MOO 1113 0897 1

7NGVSS I

~

9LIAY89 I

I

~ I 30AUGSS I

IIAUGII9 DATA OATE

c PP

~ l

~ AOIICT AIWCASS IINAIT TOINI IAICIIAA tIANI TIOI Itl INIIOAAIIOSCNICMI NCOC I2II tAOIIC III TIAC tACI I 'hATII 14 ~ ~ OAIOA tOAI4 AAO ~ ICN ~ CO. I NI I A SAT I 'IIAAISI 44AI IAA~ NM CNAA I S IMI IIICI~ IAACI I SCNI OUI I IAACII SCNI ISA I 14 I INIIN TINOVSS I INI ~ IIAA ON NAC CAOIITNINT CAIICOAIIS IAAO I INISN TIOIC ~ I NAIA OA'I ~ NTAI~ I SOAI ~ AIAAS OCCOIS ~ COA II IAAO NAIA OAII I\ IANAI 1588 1989 1990 1991 1992 FPL 4 INSTALL SFP STORAGE BOXES FPL MOD 1080 9NOV88 dSEP89 I I C NEW EDG BLDGS SECURITY SYSTEM FPL MOO 1177 I ISEP89 I

C NEW EDG FIRE PROTECTION FPL MOO 117d 4MAY88 14SEP89 I

C REL INV XFR LN TO CVT WIOSPDS PNL FPL MOO 0925 9NOV88 15SEP89 I I 3 NORMAL CNTMT COOLER AIR BAL dl CTL FPL MOO Od92 8NOV88 22SEP89 I I I 3 RX CAVITY SEAL RING LAYOOWN FPL MQO 1211 I JAN84 24SEP89 I I I 3 REACTOR CAVITY FILTER LEAD SHIELD FPL MOO 023d 1MAY84 25SEP89 I I I 3 BACKUP INSTR. AIR CCNPRESSOR FPL MQO 0290 1APRad 2esEp89 C LIVE LOADING OF VALVE PACKING FPL MQO 1213 I I

~ 4 THIS IS A SA18'LE MOO FOR 15 VALVES ONLY.

9NOV88 25SEP89 I I 3 CROM DUCTWORK QUICK OISCONN CLAMP FPL MOO 1228 1 JAN84 28SEP89 I I 1 3 REPLACE FARRIS RELIEF VALVESICCW FPL MOO 0414 22DEcae 3OCT89 I I C WASTE GAS SYS UPGRADE PROGRAM FPL MOD 07da 9Novaa 30CT89 I I 3 INSTALL SFP STORAGE BOXES FPL MOO 1058 8NQV88 30CT89 I I 3 REPLACE VELAN CHECK VALVE DISK FPL MQO 0419 22DECed 5QCT89 I I I C NEW EDG BLDGS LTG FIRE CQal HVAC FPL MOO 1175 21MAY87 eDCT89 I I.

c sUOTIDN GUAGEs FQR IsT plaals FPL MOO 013d ............. 29DEC88 9OCT89 I I 3 REPLACE REACTOR CAVITY LIGHT FPL MOO 0355 27DEC85 10OCT89 I I I 3 MAIN STM SAFETY LIFTING LEVERS FPL MOO 0422 17APRad 100CT89 I I C EDG ENGINE CNTL PANEL MOOS FPL MQD 0450 9NQV88 12OCT89 I I 3 IST GUAGE INSTLN FOR ICW PIMPS FPL MOO 0108 19MAR85 140CT89 I I I 3 ENHANCED RCP OIL COLL SYS FPL MQO 0120 20MAYad 14OCT89 DATA DATE

~ AOIEC'I fualtf roINI IACIEAO rlANI riot INIICAAIIOEEIHOENE

~ 'ACE ~ I ~ oaloA root ~ Ivcl I IIIII co.

NODE ~ 1~

I NII AVAI I

I VIAEIEI

~ EOIECI ll CEAl SIAAE Iftoll I A ~ Ol I SCHE OUI fAOCEI SCNEOIOE 1~

EEIHIAAI OAA CHAEI f IRISH 1 INOVIE I INE ~ IIAE ON NEC CINOIIIIHN'I CAItCOOIIS IAEO I INISH 1IOECll NAIA OAII ENAVE f SOAI OAIAAS OCOOES COO If IAEO OAIA OAIt I~ IHO I 1988 1989 1990 1991 1992 FPL 3 MODIFICATION TO 83 GAS STRIPPER FPL MOO 0975 1 JAN84 150CT89 I I 3 TURB RUNBACK SELECTOR SWITCH REPL FPL MOO 1245 I JAN84 170CT89 I I 3 INSPECT TURB PLT NSR PIPE SUPPRTS FPL MOO 0410 22DECdd 190CT89 I I 3 REPL. BASKET STRAINER TPCW 3A dt B FPL MOO 0275 14JUL87 200CT89 I I 3 SGWL CNTMT ISOLAT N VLV REPLACEMT FPL MOD 0293 200CT59 I I 3 CNTRL SW FOR CV3722 & CV2913 FPL MOO 0387 IAPR85 200CT89 I I 3 CROM CLR FANS DAMPER POWER FPL MOD 0474 20MAR dd 200CT89 I I 3 EVAL ACCI88ILATOR N2 F ILL LINE FPL MOO 0598 18JUL85 200CT89 I I 3 MAIN FEED CV 2011 CLOSING TIME FPL MOO Od52 9MAR88 200CT89 I I 3 HEATER DRAIN TANK SALIPLE SYSTEM FPL MOO 0072 250CT89 I I 3 RHR PIkdfS SEAL UPGRADE FPL MOD 1172 31AUG87 2dOCT89 I I 3 CORROSION OF 480V AC MCC 3E FPL MOO 0793 1SEP88 270CT89 I I 3 INSTL MANIPULATOR CRANE AIR COMPR FPL MOO 0852 270CT89 I I 3 CHARGING PILIP CHECK VALVE EVAL"N FPL MOD 12d3 18LKIV88 270CT89 I I 3 INSTL MN LUBE OIL VAPOR EXTRACTOR FPL MOO 1250 1JANdi 290CT89 I

3 CHARGING PL85'S VENTS FPL LCO 0775 9NDV88 2NOV89 I I 0 INSTL LIFTING OEVICEIEOG CNTR LN FPL MOO 0951 27DEC88 2NDV59 I I 3 PERM FLOW INSTR . CCW LNS-RHR HX FPL MOO 09d3 .............. 190EC85 3NOV89 I

C EDG DIESELID.O.S.T. BLDG CONST FPL MOO 1174 7AUG87 SNOV89 I I I 3 CROM MTR GEN SET VBRTN MONTRG SYS FPL MOO 0092 3JAN85 13NOV89 I I I S ADD TO BREAKER LIST BKR TRIP SET FPL MOO 0818 11MAY59 )3NOV89 DATA DATE

PBOJEC'I Al NLCA0 ~ ILJBBEV POINI Iv I LAB PLANE PLOT IPL INIECAAIIO DCNIOIAI NIOB ~ II 1 ~ LOIICIIB ~ LAS

~ ACA ~ $ 99ll I ~ I t LOB IOA POPE ~ AJEI ~ ICNI CO, I I tl I ~ VAI ~ VEASLLI BLNIOul I OAB LNAB I SIAN'I LIIOBL I A ~ OE I $ CNI'OLIL IABCLE CCNIIBAE ID IINILN lFNDVSL ~ INC OS(AB ON NBC COSBIIISNNI CAIICOAILC LAAO SINILN 1 ICE CSB NAIA DAIL INAVS~ COB I OBIASS OCDOED CLJB lt ~ ABO OAIA NAIL BBJANBB 1988 1989 1990 1991 1992 FPL.

~

3 REACTOR CAVITY HANDRAIL FPL MOD 0233 2MAR87 I I I I

~

3 HIGH INITIAL RESPONSE EXCITER FPL MQO 0978

~~~

I I I I 3 NORMAL CTMT CLRS CNTRL SWITCHES FPL MOO 0550 290EDSS ISIOVSI I I I 4 NORMAL CTMT CLRS CNTRL SWITCHES FPL MQD 0589 29DEDSS IDBIVSL I I I C SF DEMIN BYPASS RWST RECIRC LINE FPL MOO 0591 LFOVSS 30BDV99 I I I I 3 C SUS XFMR DELUGE SYS ALARM FPL MQO 0854 2JUN89 4DEC89 I I I

~

S EVAL INDEPENDENT SERVICE AIR FPL MOO 091d 28JUL89 4DEC89 l I I

~

3 NEW EDG ELECT SYS INSTALLA'TION FPL MOO 1142 I I I 3 SUPPLY BREATH"G AIRIREGULAT"G VLV FPL MQD 0550 29DEDSS SDECSS 4 SUPPLY BREATH"G AIR REQULAT"G VLV FPL C WTR EQUIPT C UNIT 8L HQTWELL SAIEILE SYST.

AUTONOMOUS P8110 DRAWINGS MOO FPL I%0 0180 FPL IXX) 1094 0575 I

28DEDIS I

SFEISL I

I I

~ I I

I IIDEDIS ISDE099 I

I I

C EDG PROJECT LICENSING SUBMITTALS 3 REMOVABLE ROOF FOR CASK WASH FPL I83D 1144 FPL IOD 019d I

I 29FESSS I

I

~

~

I IJAB90 I

I

~

DOWN I I I 4 PERM SHIELDING IN CASK WASHX7WN FPL MOD 0135 23FEBIS ISJAII99 I I

~~~

I I 3 PERM SHIELDING IN CASK WASINQWN 4 RHl PLNP ANCHORS C NOIHP SHELTER IN AUX BUILDING FPL MQO 0134 FPL IXX) Odd7 FPL MOO 0378 29FEISS 290EDII I

I 14JUN8$

I

~ I I

ISJAB90 22JANSO 2JJAB90 I

I I

~

I I 4 REM MIC RAD AIR MQNICNTRL ROOM FPL IXX'351 29FE899 IFEB90 I I I l 3 SHIPPING CASK CLOSURE HEAD STAN) FPL MOO 0159 2IIIAV99 20FEB90 I I I I 4 A dl B REHTR DRAIN TANK LEVEL CNTL FPL MQQ 0857 SFEBSS 23FEBSI DATA DATE

~ lOIICT AIMCATS TIOCTT POINT IACITAB tlANT I BOA 9 I ~ ~ I Il

~ IOT Stl I NIICCAIIO SCNT INN f NCOT 'TTI 1 Pac J 1 c 1 I 1 ~ IAl

~ ACB I BIZ II I ~ I ~~ OBIOA tati ~ APBI I ICNI CO INIIBYAI I 'IIABISI SCMOLAI OAB CIIABI SIAAI Ill I

~ ~ IAOCI I SCNIOU ~ I TABCTT SCNIINNT 10 I IN I I INI ~ alaa ON Nac CIUMITMNT CATICOBIIS IABC I INISN TIac9 ~

~

BN TFNOUBB OAT* OATT 294AYB ~ saal aalaas OCIUNs 0 CUB II TAAO NAIA OAII IMANBI 1988 I989 1990 1991 1992 FPL 3 A & B REHTR DRAIN TANK LEVEL CNTL FPL MOO 0858 IFIB09 29F9090 4 PROCURE & INSTALL TWO NEW EDG"S 4 REMOVABLE ROOF FOR CASK WASH C INSTRLLIENT AIR COMPRESSOR MOOS FPL MOD 1138 DOWN FPL MOD 0197 FPL MOD 02d1 28FEB87 24MAR85 I

I 8MAY89 I

I

~ I I

I I

2994290 j

I l

I 4 LOW TAVG SET PT. INTERLOCK MOO FPL MOO 0175 24MAY89 IIAPB90 I I I I 4 REI.OCATE FM-113 MAG FLOW CONVERTR FPL MOD 0859 .. ............... 24MAY8$ ZZAPB90 I I I I 4 CHARG PLOP SUCTN QUICK DISCONNECT FPL MOD 1255 14 JUN89 ZZAPIIBI 4 METERING X-OUCERS FOR WATT & VARS C LUBE C REPL OIL MODIFICATIONS ICW PMP COL & OISCH TEE MATL FPL MOO FPL'OO Od84 FPL MOO 0952 090d I

I I

7JUN89 24MAY89 I

I 7JLÃ48$

I I

I

~~ I I

I I

I BAPB 9 24APB90 20APB90 I

I I

I I

C RCP VIBRATION SYSTEM FPL MOO 1087 2JUN89 2IIAYII I I I C CATWALK IN WATER TREATMENT PLANT FPL MOO 1171 19MAY89 ~ IIAY9 I I I I I 4 C BUS XFMR DELUGE SYS ALARM FPL MDO 0553 2JUN89 I IIIAY90 I I I 4 NEW EDG ELECT SYS INSTALLATION FPL MOO 1139 17MAY90 I I I C MONIT"G CIRC WATER TEMP IN DOPS FPL MOO 0391 19MAY89 22IIAY90 I I I I 3 LOW TAVG SET PT. INTERLOCK N30 FPL 18X7 0174 24MAY89 ZJLNII I I I I 3 PERSONNEL & EGMT HATCH SHIELD FPL MOO 1182 24MAY89 IJUL90 I I I I 4 PERSOI81EL & EQMT HATCH SHIELD FPL MOO 1183 24MAY89 IIJUL90 I I I C DOPS AUXILIARY CABINET REMOVAL FPL MOD 0358 27JUL90 I I I 4 lXXIMAL CNTMT COOLER AIR BAL & CTL FPL MOO 0895 24SEP90 I I 4 REACTOR CAVITY HANDRAIL FPL MOO 0080 2MAR87 28SEP90 DATA DATE

toOIICT AI IN OA I I IINAIV tOINI IACIIAA to AIIT ~ OOV 99NAV9$ 99 9$

~

' OI ~ tl IIIIICIAIIOSCINOOAI NON If91 tlOIICITI llAl tAAI ~ VVIII I~ ~ ~ OAIOA tOVI ~ AOV\ ~ ICNI CO- ~ NIIAVAI ~ VIAVIVI VVNVIAA I NA9 CVOAAI STAII Ifllll TA ~ Cl I SCNTONI T IAACTT SCNIOIAC I

1$

I IOIC$$

f INISN 1INOVSV I INC OIIAC ON NIC COVOIIININT CAIICOOIIS IAAO INISN NAIA OAII INAV~ l SOAI OIIIAS OCINNS CIIO lf IAAO NAIA OAII TSIANff 1988 1989 1990 1991 'I 992 FPL 4 REPL. STM FLOW XMTR PROCESS TUBE FPL MOO 03dl 19MAY89 C00990 I I I I 4 POLAR CRANE MOTORS FPL MOO 0477 15JUN89 900990 I I I

~

4 SECONDARY PIPE WALL SIZE EVALIRPR FPL MOD 0892 80CT90 I I 4 INSPECT TURB PLT NSR PIPE SUPPRTS FPL MOO 0411 10JUL89 I 9009 9 I I

4 4150 V SWOR CNTRL 100 - li DIODES FPL MOO 1244 18OCT90 I I I 4 UPGRO RCP OIL LIFT SYSILOWR COOLR FPL MOO 1021 14JUN89 9900990 I I I I 4 CORROSION OF 480V AC MCC 4E FPL MOD 0794 25OCT90 I I I 4 PERM FLOW INSTR - CCW LNS-RIEI HX FPL MOD 0954 2dOCT90 I I 4 CHARGING PI84'HECK VALVE EVAL"N FPL MOD 12d4 25OCT90 I I I 4 CHARGING PLNP VENTS FPL MOO 1203 INOV90 I I I 3 TRANSFER CANAL LEAKAGE PERM FIX FPL MOD 0895 14 J IXI89 VI+VII I i 4 ADO"L CNTMT ELECT PENETRATIONS FPL MOO 0755 'IOJUL89 ION0990 I I 4 HIGH INITIAL RESPONSE EXCITER FPL MOO oa7a 9FEB87 I SI4)V90 I

4 WSTGHSE RTD BYPASS EL IM PROPOSAL FPL MOD 0817 10 JUL 89 I I IOV90 I I I 4 TURBINE BLADE RING EROSION FPL MOO 1237 15JUN89 I I 3 EDG TRAIN A EOPT MOOIF ICATIONS FPL MOO 1180 2DEC87 SDEC90 I I 4 RCP 92 SEAL LEAK-OFF INDICATOR FPL MOO 0017 21AUG88 11DEC90 I I 4 TRANSFER CANAI. LEAKAGE PERM FIX FPL MOO Odad I 5 J UN89 12DEC90 I I I I S UPGRADE Ui INSTR AIR SYSTEM STUDY FPL MOO Oidl 24MAY89 I I I 4 EDG TRAIN A EOPT MODIFICATIONS FPL MOO 1140 18SEP87 20OEC90 4 EDGIREMOVAL OF UNIT 4 MCC "0" TIE FPL MOO 1143 4MAY88 20DEC90 DATA DATE

15 tIOIICI Al Nl CA'I~ TINCT T tOINT IAKIIAAtl ANT tlol ltl INIICAAIIOSCNTOIAC NCOS 'I /I I taOI I C I 2 I

~ ACI I SNlll IS IIOAIOA ttvl~ ANI I ICNI CO. ~ NIIAVAI I VIAAISI

~ SAC STAT I I TINTS TA COT 2 CONT OU ~ TAACT2 SCNIIAAC Il SCNIOIAI NAS CNAA ~

I IN I SN TINOV\S TINT OAIAA ON NAC CNOIITNINT CAIICOAIIT IAAO ~ INISN 2 NN 'I ~

CATA OAII INAVS~ SCAT NIIAAZ OCCOIS '

CIN lt IAAC NAIA OAII C

IlTANTI 1988 1989 1990 1991 1992 FPL 3 EDG TRAIN 8 EDPT MODIFICATIONS FPL IUO 1145 4MAVSS 210EC90 I I 4 EDG TRAIN 8 EDPT MOOIF ICATIONS FPL MOO 1178 18SEP87 28DEC90 I I C EDG - NEW 4 KV "C" BUS TIE FPL MDO 1145 24FE888 30JAN91 3 TUNNEL UNDER CTMT RAMP FPL MDO 1194 SCHEDULE WILL BE REVISED PENDING 0. I. STORY I I I I COMPLETION AIS) AEVIEW. I OCT 87 14MAR91 j I I I 3 S.A.S. AS BUILT DRAWINGS FPL I0 1219 ldJUN89 15 JUL 91 I I I I I 4 S.A.S. AS BUILT DRAWINGS FPL MDO l220 15 JUN89 ISJUL91 I I I I 3 GEN DISCONN LINK INSPN WIISXWS FPL MOD 1ldd 1 JAN84 24SEP91 I I 3 REPL. STM FLOW XMTA PROCESS TUSE FPL MOO 0350 9MAY89 IOCT91 I I 3 POLAR CRANE MOTORS FPL MDO 0475 15 JUN89 SOCT91 I I 3 INST FLGS ON ACP SEAL LINES FPL MOO 0478 I 9MAY89 1 10CT9 I I I 3 UPGRD RCP OIL LIFT SYSILWA COOLER FPL MOD OSSS 24MAYSS 210CT91 3 REPLACE G.E. CR12080 AUX RELAYS FPL MOD 1207

~ ~ POTENTIAL SIKRT NOTICE OUTAGE WORK. I I 1 OAUG87 230CT91 I I 3 ELEC GENERATOR RADIO FRED MONITOR FPL MOO 0382 ldJUN89 290CT91 3 ADO"L CNTMT ELECT PENETRATIONS FPL MOO 0549 10JUL89 14NDV9 I I I 3 REPL REGEN HXIPZR RLF LN SNUBBEAS FPL MOO 1257 21FEB89 15NOV9 I I I 3 WSTGHSE ATO BYPASS ELIM PROPOSAL FPL MOO Odld IOJUL89 18NOV91 4 INTAKE COOL ING WATER REPLACEMENT FPL IKX) 1193

~ SCHEDULE WILL BE REVISEO PE)4)ING Q. I

. STORY I I COMPLETION ANO REVIEW.

10ECSS 13SEP93 3 INTAKE COOLING WATER REPLACEMENT FPL MDO 1192

~ SCHEDULE WILL BE REVISEO PENDING Q.I. STORY COMPLETION AM) AEVIEW. IDEC88 2dNOV93 DATA DATE

0