ML17055B527

From kanterella
Jump to navigation Jump to search
Rev 2 to Administrative Procedure AP-5.0, Procedure for Repair.
ML17055B527
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/13/1986
From: Abbott R, Hansen W, Roman T
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17055B512 List:
References
AP-5.0, NUDOCS 8604280276
Download: ML17055B527 (82)


Text

Encl osure 3.8,....

NINE MILE POINT NUCLEAR STATION ADMINISTRATIVE PROCEDURE PROCEDURE NO. AP-5.0 PROCEDURE FOR REPAIR DATE AND INITIALS APPROVALS SIGNATURES REVISION 2 REVISION 3 REVISION 4 Station Superintende NMPNS Unit 1 T. W. Roman Station Superintendent NMPNS Unit 2 a/i~/m R. B. Abbott Gene impendent G eration erkins Quality Assurance Concu re ce Manager, QA Nuclear W. Hansen Summar of Pa es Revision 2 (Effective 3/1/86 PAGES DATE 1-40 February 1986 This is a general rewrite NIAGARA MOHAWK POWER CORPORATION THIS PROCEDURE NOT TO BE USED AFTER MARCH 1988 SUBJECT TO PERIODIC REVIEW.

PDR 8604280276 860415 PDR, ADOCK 05000410 P

(I SP-S. 0 PROCEDURE FOR REPAIR 1.0 PURPOSE This procedure describes the program for corrective maintenance and repair of structural, mechanical, instrument and electrical equipment at the station (Unit 1 and Unit 2). It includes the procedures for initiation, planning, schedu1ing, documentation, and post-maintenance testing. Additional requirements for the Unit 2 test program are contained in SAP 117.

2.0 REFERENCES

ANSI N 18.7/ANS 3.2 1982 Section 5.2.7 Maintenance and Modifications ANSI/ASME N45.2.1-1980 - Cleaning of Fluid Systems and Associated Components for Nuclear Power Plants Regulatory Guide 1.33, Quality Assurance Program Requirements AP-4.0 Administration of Operate:ons AP-3.3.1 Control of Equipment, Markups for Personnel Safety AP-3.3.2 Control of Equipment, Placement of Jumpers or Blocks or Lifting of Leads AP-8.2 AND AP-8.3 Surveillance and Test and Inspection Programs AP-6.0 - Procedure for Modification and Addition AP-7.0 - Procedure for Control of Material and Services AP-10.1 Management of Station Records AP-5.1 Site Welding Program MI-6.0 ASME Section XZP Maintenance Work Plan 10CFR50.49 - Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.

Generic Letter (GL) 83-28 "Required actions based on Generic Implementation of Salem ATWS Events" July 8, 1983.

ZNPO "Guidance for Conduct of Maintenance at Nuclear Power Stations" October, 1985.

Nine Mile Point Unit 1 Q List Nine Mile Point Unit 2 FSAR Table 3.2-1 Office Instruction OI-21, Work Tracking System 3.0 SCOPE 3.1 Corrective Maintenance Mechanical, electrical, and instrument corrective maintenance are performed generally as the resu1t of unsatisfactory equipment performance or equipment failure. Maintenance or modifications that may affect functioning of safety related structures, systems, or components shall be performed in accordance with approved procedures. Written procedures need not be required for work covering skills normally possessed by qualified maintenance personnel. Quality Assurance procedures QAP-9.0.1, and associated NDEP's, shall be used as a guide to the acceptability of special process procedures. During the Unit 2 test program and prior to receipt of license both the Nuclear Quality Assurance and Construction Quality Assurance Program are in effect providing quality assurance activities and support to Nuclear generation.

AP-5 0 -1 February 1986

3.1 Corrective Maintenance (Cont'd)

The Administrative controls and records required by this procedure shall apply to maintenance work affecting nuclear safety on safety, related systems or components and to all work on major systems and components related to plant reliability. In general, this procedure shall be used when applicable for organizing and documenting the maintenance on other systems and components.

3.2 Post-Maintenance Testin After completion of corrective maintenance on safety related components, the equipment shall have post-maintenance testing performed to verify that components will fulfill their design function when returned to service. The tests performed shall be documented in departmental procedures or on a Post-Maintenance Test Report. The documentation shall include acceptance criteria, verification that the test is completed, and a revie~ that the test passed the acceptance criteria. The tests should be applicable to the degree and type of maintenance performed.

For the purpose of administrative controls the following definitions apply to post-maintenance tests:

(1) Maintenance Tests: Tests usually performed by the post-maintenance tests. These tests are specified in the Maintenance/I6C Procedures and are indicated on line 15 of figure 2.

(2) Post-Maintenance Tests: Tests usually performed by the Operations Department after operations acceptance for post-maintenance testing. These tests as a minimum include Technical Specification requirements and are indicated on line 37 of figure 2.

3.3 Maintenance of E ui ment lified Com onents Where engineering has established corrective maintenance requirements to maintain Equipment Qualification, these requirements shall be implemented into the corrective maintenance performed, as applicable. 'eviations to engineering established corrective maintenance requirements shall be approved by the Nuclear Engineering

& Licensing Department.

3.4 Maintenance of ASME XI Com onents Where corrective maintenance is performed on ASME XI components, a maintenance evaluation report (Figure 4) and Maintenance Work Plan (MI-6.0), if applicable, shall be complete per MI-6.0. Notifications of ISI, who would notify ANII, shall be included in the applicable maintenance procedures or addressed by MI-6.0.

AP-5.0 -2 February 1986

3.5 Maintenance of Securit Com onents The Security Department performs maintenance or security instrumentation using personnel and an administrative system internal to the Security Department. However, any maintenance work performed for Security by other Site depaztments or work performed within the plant facilities by the Security Department shall be managed in accordance with this procedure.

3.6 Cleanness Control of Fluid S stems Durin Corrective Maintenance Cleanness control of fluid systems shall be maintained per ANSI/ASME N45.2.1. Departmental procedures shall establish cleanness control and provide for verification of cleanness prior to closure of a fluid system. This verification shall be provided for safety related fluid systems and non-safety related fluid systems whose fluid interfaces with a safety related system. The cleanness level shall be established by supervisors, assistant supervisors, or engineers in the department assigned to do work.

3.7 Work Trackin S stem (WTS)

The WR is entered in the Work Tracking System as WR is processed in accordance with OI-21. In addition, labor accounting is performed using the Labor Accounting System (LAS).

4.0 REPORT OF SYSTEM OR COMPONENT MALFUNCTION OR DEFICIENCY When anyone in the plant notices a system or component malfunction or deficiency which may affect station reliability, safety, or output, he shall immediately inform his immediate supervisor and the Station Shift Supervisor. The Station Shift Supervisor shall take action in accordance with AP-4.0.

Work Requests noting a system or component malfunction or deficiency, or requesting corrective action, may be originated by the person discovering the trouble, by his immediate chief or supervisor, or by the S.S.S. Approval and receipt of the WR shall be obtained from one of the following or a higher level supervisor relative to the work to be corrected. During off hours, the senior representative of the department to do work may receive a WR.

a. Operations Assistant Supervisor, SSS or ASSS
b. Maintenance Superintendents, Engineers, Supervisors or Assistant Supervisors.
c. Instrument and Control Supezvisoz or Assistants.
d. Chemistry and Radiation Protection Supervisor, Unit Supervisors, or Instrument Support Supervisor AP-5.0 -3 February 1986

e 4.0 (Cont'd)

e. Reactor Analyst Supervisors
f. Technical Support Supervisor or Assistants
g. Senior Security Investigator, Security Investigator, Shift Sergeant, or Security Eng'ineer.
h. Computer Operations and Maintenance Supervisor or Assistants.

i, Supervisor Fire Protection or Assistant Supervisor Fire Protection.

Superintendent ISI or Unit ISI Supervisors.

k. Test Group Managers, Leads, or Supervisors (During Unit 2 Test Program Only).

5.0 WORK RE VEST FORM (WR)

The Work Request Form is used for ordering, scheduling, dispatching, and recording the results of corrective maintenance work and associated post-maintenance tests at the station. Prenumbered blank forms are retained by Station Supervisors for originating work assignments. (See Figure 2 and 3)

A computerized system known as the Work Tracking System (WTS) parallels the Work Request and may later take the place of the WR when sufficient experience is accuiulated. Blocks are provided on selected lines of WR form for clerks to initial when the data is entered into the WTS system. This later sytem will expedite the scheduling of maintenance and the accumulation, of a rapidly searchable equipment maintenance history data base.

5.1 Duties of Ori inator 5.1.2.1 Enter Issue Date (line 1). Determine the lead (L) Department to Do Work (line 3).

5.1.2.2 Select the priority of work in accordance with the following guidelines (line 4) 5.1.2.2.1 NonWutage Work:

Priority 1 Emergency, limits station operation. Top priority work for the day.

necessary.

Provide special coverage, if Priority 2 Urgent, hinders station operation. Schedule within 24 hours.

AP-5.0 -4 February 1986

5.1.2.2.1 (Cont'd)

Priority 3 Necessary, has potential to degrade or hinder station operation. Schedule within seven days.

Priority 4 - As time permits.

5.1.2.2.2 Outage work:

Priority 5 - Next unit outage Priority 6 Next refueling outage 5.1.2.3 Indicate the Unit (line 5), the System Code (line 6), Component Number (line 7) and Equipment Title (line 9). For system codes, see Appendix A for Unit 1 or Appendix B for Unit 2. Equipment name and number should be that given on the P&I diagram or on an approved issued by authority of the Station Superintendent.

list Valves or instruments may be described by their function with the associated equipment when not otherwise named. During the Unit 2 test program, the BIP number should also be listed (line 8).

5.1.2.4 In the case of equipment failure or malfunction, give a concise description (line 10). In addition, describe the equipment location (line 10). Enter the NPRDS Symptom Code (Appendix C, line 11). An abridged version of Appendix C is preprinted on the back of the WR forms'.1.2.5 Sign and date the WR (line 12) and deliver to the person authorized to approve the WR for action.

5.2 Duties of the Person A rovin the WR 5.2.1 Check that the correct equipment name and number is entered on the WR form (lines 6, 7, and 9). Assure lines 3 and 4 are complete and correct.

5.2.2 If the cause of equipment failure or malfunction can be determined at this time, give a concise description in line 29 and 30.

5.2.3 If the post~intenance tests are known, these may be indicated on line 37. If the post~intenance tests are not known, initiate post maintenance test report (fig. 5) with the appropriate department supervisor and indicate on line 37.

5.2.4 Sign and date the WR in the space marked "Approved" (line 13) and deliver the WR to a person authorized to receive the WR. During the Unit 2 test program and prior to operations acceptance of the system; and, if the Test Engineer is not the originator of the WR, concurrence from the Test Engineer shall be obtained prior to work proceeding.

5.2.5 Deliver the green copy to the WR books in the SSS office and send the remaining copies to the department designated to do the work.

AP-5.0 -5 February 1986

5.2. 6 Where emergency action is required (Priority 1), the person approving the WR personally delivers the WR to the person responsible for the work and verbally addresses the nature of the emergency. During non-scheduled working hours, the S.S.S. or his representative will contact appropriate personnel to deal with the emergency.

5.3 Duties of the Person Receivin the Work Re uest 5.3.1 Sign and date Work Request received, line 14. Zf WR is voided, notify approver and notify the S.S.S. or Security to remove the green copy from the WR brook in the S.S.S. office. During the Unit 2 test program and prior to Operations acceptance of the system, Test Engineer concurrence should be obtained for voided WR's.

5.3.2 Where a procedure is required, list the number of the approved procedure or procedures (line IS). The procedure numbers listed shall include department procedures which perform the applicable maintenance tests.

Certain activities within the normal ability of the individal do not xequire a written procedure to perform.

By checking the "Not required" box in line 15, the supervisor is indicating that the, work can be considered an established routine within the capabilities of a journeyman maintenance person.

5.3.3 Zf the work requires emergency maintenance during non-scheduled working hours, immediately contact the on duty or on call QA representative for review. Mce required entries on line 16 of the Work Request.

NOTE: Work may not start on safety related equipment until the conclusion of QA review unless immediate action is required to eliminate an unsafe condition as determined by the SSS.

5.3.4 Enter the account number (line 17).

5.3.5 Indicate the Safety Class (line 18) for the component. Indicate if the component is Equipment Qualified (line 19) or an ASME component (line 20). An approved list issued by authority of the Station Superintendent should be referenced for this information.

5.3.6 Enter the cleanness class (line q21).

5.3.7 Zndicate any support departments req'uired (line 3).

5.3.8 Zf the work requires a station outage, check that this is marked at the top of the form along with the appropriate priority (line 4, px'iority 5 and 6).

5.3.9- Zf the work requires emergency maintenance (Priority 1), hand deliver yellow, blue, white and pink copies of the WR to Quality Assurance and WTS Clerk. Otherwise, deliver the WR to QA for review on a normal schedule.

AP 5 ' W February 1986

5.4 ualit Assurance Review 5.4.1 Upon receipt of the WR from the person responsible for implementing the gob, the Quality Assurance representative will examine the scope of the project to determine the inspection and quality requirements.

The QA department shall verify the component's Safety Class (line 18), Equipment Qualification requirements (line 19), and ASME III Component requirements (line 20) and the referenced lead department procedures (line 15). The QA department shall indicate if inspections are required (line 23).

5.4.1.1 If QC notifications or further to QA review are determined be performed, lines to be not 26 and 35 may be applicable to the maintenance initialed and marked N/A.

5.4. 2 Following QA review, the yellow, blue, white, and pink copies of the Work Request are delivered to the WTS Clerk for initial entry into the WTS program.

5.5 Res onsibilit of WTS Coordinator 5.5.1 The request portion (lines 1 through 23) of each work request should be entered into the WTS as soon as practical after generation of the WR. WTS Clerk retains the pink copy of the M. and returns the yellow and blue copies to the lead department to do work. The white copy (Figure 3) or copies of the white copy are forwarded to the support departments indicated in line 3. A copy of the Work Request is forwarded to the ALARA Coordinator who determines whether an ALARA review is required. A copy of the Work Request is forward to ISI and Planning.

5.5.2 If the work requires emergency or urgent maintenance (Priority 1 and 2), the Planning (Scheduling) Department should schedule the work for that day.

5.5.3 The Planning Department should receive information required to schedule all work requests not to be immediately implemented. This information should be obtained after the WR is staged by the lead or support departments (lead department, line 24; support department, line D). Based on this information and similiar input from other activities, an integrated schedule of deferred work requests, surveillance tests, inspections, modification operations, and preventive maintenance activities may be produced and published on a regular basis. Schedules should be dynamically adjusted to account for scheduled work which was displaced by immediate action requirements.

5.5.4 All outstanding Work Requests items and other activities which do not require a station outage for implementation shall be pro)ected on a schedule which should always be at least one month in advance of the current date. Schedules should be issued to the department to do work and coordinated where support departments are required.

AP-5. 0 -7 February 1986

5.6 Duties of the Su ervisor Receivin the Work Re uest from WTS Coordinator 5.6.1 Following receipt of the WR from QA or after verbal consultation with the QA supervisor, the work may be assigned for action.

5.6.2 For support departments, the supervisor shall sign that the data sheet (figure 3) is received (line A) and complete the procedure number (line B) and applicable account number (line C). This data is entered in the WTS system.

5.6.3 If the MR is not to be implemented during the week of receipt, the supervisor should assign the WR to be staged (lead department, line 24; support department, line D).

NOTE: The following data is entered by the departments in the WTS fields and not entered on the WR form. The data is used by the Planning (Scheduling) department to develop intergrated schedules.

5.6.3.1 If the WR is on hold, the reason should be entered in the MTS system.

5.6.3.2 If the WR is on hold due to parts, purchase requisition numbers should be indicated in the WTS system. Where parts are reserved, the reservation number may be entered in the WTS system.

5.6.3.3 After staging, enter the manhours and duration estimated to complete the maintenance.

5.6.3.4 Where the maintenance is minor or routine, staging may be not applicable. If the maintenance is of emergency or urgent nature (Priority 1 or 2), staging is not applicable.

5.7 Duties of the Person Assi ed the Work Re uest for Action 5.7.1 Before commencing any maintenance affecting station output, safety, or reliability, the Station Shift Supervisor must be informed when the work commences in accordance with the approved maintenance procedure. When required, Quality Assurance must also be notified (lead department, line 26; support department, line F). The appropriate entries should be made daily into the WTS and computerized Labor Accounting System (LAS) record to reflect the starting time of each gob, the total labor, hours, and materials consumed and a narrative of the work completed.

For security hardware (I&C and computer only), the SSS shall be notified for hardware located only within plant facilities. In addition, the SSS shall be notified when the work is completed. Mark line 26 with the time notified or "No", as appropriate.

5.7.2 Upon completing the gob, enter a brief description of the work under Corrective Action (line 27) of the MR and include. appropriate summary remarks in the WTS record. Enter the NPRDS Corrective Action Code (Appendix C, line 28). An abridge version of Appendix C is preprinted on the back of the WR form.

AP-5.0 -8 February 1986

5.7.3 If the cause of equipment failure or malfunction was not determined at step 5.2.2 of this procedure, the person completing the work or his supervisor enters a description (line 29). Eater the NPRDS Failure Code (Appendix C, line 30).

for safety related and "Q" class components must be 5 ~ 7,4 Work Requests accompanied by copies of or must make reference to material issues and/or completed purchase orders sufficient to pzovide quality traceability for all materials used. In addition, documentation must be attached to the WR providing traceability to the required certifications for all welding, nondestructive examinations and tests pertaining to the quality of the work. Check to indicate that materials issue, inspection zeports, and procedure check lists are attached (lead department, line 31; support department, line H).

Copies of procedures referenced need not be attached. References should also be incorporated into the WTS record.

5.7.5 Man hour data as called for in the WR form will be available from the and wiU. be transferred to the WTS as part of the data base

'AS management. A printed transcript should be attached to the WR (lead department, line 31; support department, line H).

5.7.6 Quality Control inspectors shs11 furnish copies of aU. quality inspection reports for inclusion in the records. Attach inspection reports to the work request (line 31).

5.7.7 For work pertaining to safety related systems, the serial numbers of all mark-upsy RWP's, QCIR's, and NCR No's shall be entered (lead department, line 32; support department, line J).

5.7.8 The completed WR is signed off (lead department, line 33; support department, line K) by the person completing the gob. This shall indicate that aL1 work, including QC inspections and maintenance tests, called for in the maintenance procedure has been completed and that the maintenance tests are completed and. passed the acceptance criteria. Documentation must show that inspections and tests required to satisfy Appendix B to 10 CFR 50 have been completed by persons independent of those comple'ting the work.

5.8 Duties of Persons Verif in Work and Acce tance for 0 eration 5.8.1 The signature of the supervisor responsible for the maintenance shall be entered as soon as practical after completion of the job indicating his verification and acceptance (lead department, line 34; support department, line K). This is to verify that all work including the items in 5.7.4 have been completed. The Department clerk shaU. enter this signoff into the WTS system after supervisor h&s signed and dated and sends to QA for verification.

5.8.1.1 If line 35 has been checked "NA" by a QA department representative, of the WR is delivered by the person the yeU.ow and blue copies signing off in line 34, or his representative, to the Station Shift Supervisor. The lead department, in this case, sha11 attach support department copies (white copy) of the WR.

AP-5.0 -9 February 1986

If the component is a ASME Section XI component, the WR is forwarded to the ISI department. The ISI department will complete NIS-2 and ASME Section XI Abstract Forms per the applicable ISI departmental procedure. After completion of the forms, the ISI department forwards the WR to the QA department.

If the component is security hardware located outside the is forwarded to the plant facilities (l&C and computer only), the WR Security Shift Supervisor. The Security Shift Supervisor sha11 signify acceptances by completing lines 36 and 39 of the WR and checking the "Supv" block. Lines 37 and 38 are not applicable. The WR shall not be forwarded to the QA department and Operations department for final acceptance. The blue copy of the WR is retained by the Security department, or a representative. The completed yeU.ow copy of. the WR is forwarded to the WTS clerk for closeout per 5.8.6.

The Quality Assurance department shall enter the final verification signature in line 35. This signature indicates that Quality Assurance Operations certifies that maintenance and associated maintenance tests has met the Quality Assurance requirements and the equipment is acceptable for operation pending any postmaintenance tests indicated on line 37.

The Quality Assurance department shall verify that documentation is received from both the lead departments (yellow copy) and support departments (white copies) indicated on line 3. The QA. department shall attach support department copies (white) to the WR.

The QA clerk enters the QA login date on WTS and, after verification by QA, enters name and date of the QA representative doing verification prior to delivering the yellow and blue copies of the WR to S.S.S.

The SSS/ASSS shall review, verify, and correct, as necessary, what post-maintenance test shall be performed for safety related equipment by the Operations Department prior to making the equipment "operable" as defined in Technical Specifications. The ASSS/SSS shall indicate the tests on line 37 and sign line 36. Where a specific test is not written to complete the applicable post~intenance testing, a PostWaintenance Test Report (Figure 5) shall be prepared and attached. During the Unit 2 test program and prior to Operations acceptance of the system, any subsequent retest required will be performed by the test engineer; and thus, lines 37 and 38 are not applicable. The Operations department clerk should enter the applicable tests in the Work Tracking System.

When the post maintenance tests on line 37 are completed, the person verifying completion shall sign line 38 and forward the WR to the SSS.

For all work other than that noted in 5.8.1.3, the signature of the Station Shift Supervisor is required on line 39 prior to making the equipment "operable" as defined in Technical Specifications. This signature ingicates that the SSS is satisfied that the equipment is ready for service. In no case shall safety related equipment be made "operable" prior to acceptance by the Station Shift Supervisor.

AP-5.0 -10 February 1986

5.8.5.1 The blue copies of completed work requests originating in the Station Shift Supervisor's Office may be retained by the SSS at this time.

Blue copies of other work requests should be returned to the person originating the work request. The green copy of the WR should be removed from the WR Book in the SSS office. During the Unit 2 test program and prior to Operations acceptance of the system, the blue and green copies are forwarded to the Test Engineer. After S.S.S.

approval on line 39, department clerk enters S.S.S. Logout date on WTS prior to delivering the WR to WTS clerk.

5.8.5.2 If protective mark ups are cleared/surrendered by the maintenance organization and the equipment does not qualify for operation according to Technical Specifications, the SSS is responsible that a mark up or yellow hold out tag is retained on the equipment until final acceptance for operation is documented. (See AP-3.3.1) 5.8.5.3 If the Station Shift Supervisor does not find the equipment satisfactory upon turn over by Quality Assurance and/or Maintenance, he shall mark "No" on line 39 of the work request and originate a new work request. Mark the new work request number on the closed out form as: "See W.R. No. 8384".

5.8.6 Following all sign~ffs, the completed yelLow copy and attachments of the work request are returned to WTS clerk for close-out and to verify the WTS equipment history record is a true summery and/or key to the WR information delivered .to the Equipment History File.

5.8.7 Following WR close-out, the WTS clerk the delivers completed WR to Rx. Physics Department, where the NPRD section is completed (line 40). For Unit 2, NPRD's tracking is not required until fuel load.

The WR is then returned to the WTS clerk. Completed WR's along with all attachments are then delivered to Document Control for filming (line 41). After filming, the documents are returned to the central files.

6.0 POST MAINTENANCE TEST REGISTER The TechnicaL Support Department will maintain a register of recommended maintenance tests and post~intenance tests. The register will be administered in accordance with a Technical Support departmental procedure. The register will generically list the type of component, type of maintenance performed, and type of test required. The register will be used to 'insure appropriate tests are performed and for development of departmental procedures and interfaces between departments.

7.0 CORRECTIVE MAINT1MQlCE REVIEW The Maintenance Review Program consists of regularly scheduled annual reviews of all Corrective Maintenance actions involving safety related structures, systems and components and those whose loss limits or prevents power production.

AP-5 0 -11 February 1986

7.1 Annual Reviews Electrical and Mechanical Maintenance Superintendents, Instrument and Control Supervisor, Chemistry and Radiation Protection Supervisor, and the Reactor Analyst Supervisor shall annually review the log of aU. Work Requests issued to their departments involving safety-related structures, systems, or components and those whose loss limits or prevents power production. The review may consist of, but not be limited to, the following:

ao A review of the Work Request Log, paying particular attention to the number of Work Requests issued for each item and each group of similar items.

b, For those items which, based upon the frequency and type of operation and age of the item, exhibit a high incidence of failure. A review of the completed Work Requests or equipment histories wi11 be made in an effort to determine the cause of the failures.

Co A written, signed statement shall be prepared stating that the annual review has been conducted and summarizing significant findings and recommendations. (See Figure 1 attached).

The originaL of this statement shall be sent to the Station Superintendent for review and action. After Station Superintendent review, the Corrective Maintenance Review Statement shall be sent to the Technical Superintendent and an analysis performed per 8.0.

7.2 Perodic Re orts The ISI Superintendent, or designee, shall provide periodic reports of corrective maintenance on ASME XI components to the Station Superintendent. These reports shall summerize corrective maintenance and 'associated failures. One report shall be completed after a refueling outage or an extended outage.

8.0 PERFORMANCE ANALYSIS The Technical Superintendent will review the department Corrective Maintenance Review Reports in con)unction with the results of the Test and Inspection Program. He will make recommendations for improvements in the T & I Program and/or equipment based upon equipment failure rates, trends in equipment performance, and analysis of the causes of equipment malfunction and failure. These recommendations shall be presented to the Operations Assessment Committee for review and assignment.

AP-5.0 -12 February 1986

9.0 ATTACHMENTS 9.1 Figure 1 Corrective Maintenance Review Statements 9.2 Figure 2 Work Request 9.3 Figure 3 - Work Request - Support Department 9.4 Figure 4 Maintenance Eva1uation Report 9.5 Figure 5 Post Maintenance Test Report 9.6 Appendix A System Codes, Unit 1 9.7 Appendix B << System Codes, Unit 2 9.8 Appendix C NPRDS Codes AP-5. 0 -13 February 1986

FIGURE I CORRECTIVE MAINTENANCE REVIEW STATEMENT I hereby certify that I have performed I

the required review of corrective have the following comments:

maintenance assigned to my department and Signatur e/Date Department Station Superintendent Date Technical Superintendent/Date OEA Committee Chairmen Date AP-5.0 -14 February 1986

I FIGURE 2

'r MlAGAMA Ni~E M~LE 1. DATE U MOHAWK po I NT

3. DEPARTMENT TO DO WORK 4. PRIORITY OF WORK UNIT: 0 1 0 2 0 SITE QE Qs ELECTRICAL MAINTENANCE Ql EMERGENCY 6. SYSTEM CODE Pi Ps MECHANICALMAINTENANCE QI URGENT (<1 DAY) 7. COMPONENT NUMBER Q< Qs INSTRUMENTATION E, CONTROL QI NECESSARY ((7 DAYS) 8. BIP NUMBER Qi Qs COMPUTER Qi Qs ISI Ql AS TIME PERMITS (>7 DAYS) 18. SAFETY CLASS OSR O 0 O NSR Qi Qs SECURITY I EI C Qi Qs FIRE METER ET TEST QI NEXT UNIT OUTAGE NEXT REFUELING OUTAGE'. 19. EQ O YES O NO Qi Qs Qs 20. ASME COMPONENT O YES O NO Qi Qs OTHER 21. CLEANNESS CLASS
9. EQUIPMENT TITLE:
10. FAILURE DESCRIPTION AND LOCATION I 11. NPRDS. SYMPTOM CODE C3 DESCRIPTION
12. ORIGINATOR
13. APPROVED
14. W.R. RECEIVED
15. PROCEDURE NOS.

16.,0 QA NOTIFIED BY SUPV.

17. ACCOUNT

/

"I: Jl RJ'ATEDATE I

/

1'h

/

II 1':

TIME I I Nlk I DATE QA NAME I

DATE I KNI

/

/

~

/

/

':N

/

0 P/A hIOT REQUIRED

~

22. QA REVIEW QA DATE / / 23. INSPECTION REQUIRED 0 YES 0 NO

. STAGED BY DATE / / OPARTS OPROCEDURE ODRWG OMARKUP ORWP ONA~

25. 'ASSIGNED TO DATE / /
26. NOTIFICATIONS: QC DATE / / TIME 0 NA PA'/NIT, SSS DATE / /" TIME
27. CORRECTIVE ACTION 28, NPRDS CORRECTIVE ACTION CODE CG DESCRIPTION
29. CAUSE OF FAILURE 30. NPRDS FAILURE CODECZI DESCRIPTION
31. ATTACHMENTS 0 MATERIALISSUES 0 PROCEDURE CHECKLISTS 0 INSPECTION REPORTS O LAS O 32, MARK UP ND'3 / / RWP ND'3 / / QCIR ND'3
33. CORRECTIVE ACTION COMPLETED BY DATE /
34. SUPERVISOR REVIEW BY DATE / /
35. WORK ACCEPTED BY OA 0 NA DATE / /

PMT REVIEW BY O ASSS/SSS 0 SUPV, DATE

. PMT PROCEDURE NO'S / 0 PMT TEST REPORT 0 NQT REQUIRED

38. PMT COMPLETE VERIFIED BY 0 NA DATE / /

39, ACCEPTED BY 0 SSS 0 SUPV. DATE / /

AP-5 ' -l~ FebruarY 9 IMIT 4A NIJAflC Pl hill E MIA+r ~ ~ / PAPRC IA ~ I& ~ ~

I

'7 NIAGARA NINE MILE ~ I 1. OATE U MOHAWK POINT / iOOOOO'." '.

. DEPARTMENT TO OO WORK 4. PRIORITY OF WORK UNIT: Q1 Q2 QSITE ElECTRICAl MAINTENANCE QI EMERGENCY 6. SYSTEM CODE Qi Qs URGENT ((1 DAY) 7. COMPONENT NUMBER Qi Qs MECHANICALMAINTENANCE QE INSTRUMENTATION h CONTROL QE NECESSARY( 7 DAYS) B. BIP NUMBER Qs Qs COMPUTER Qi Qs ISI Ql AS TIME PERMITS I>7 DAYS) 18. SAFETYCLASS QSR QQ QNSR Qi Qs SECURITY I I, C QE Qs FIRE C" NEXT UNIT OUTAGE 19. EQ QYES QNO Qi Qs METER II TEST L<l NEXT REFUELING OUTAGE 20. ASME COMPONENT Q YES Q NO Qi's OTHER 21. CLEANNESS CLASS 9, EQUIPMENT TITLE:

10. FAILURE DESCRIPTION AND LOCATION '1. NPROS. SYMPTOM CODE 0 DESCRIPTION
12. ORIGINATOR DATE / /
13. APPROVED DATE / /

14, W.FL RECEIVED DATE / /

NOT

, 15. PROCEDURE NOS. / / / 0 REOUIRED

16. 0 QA NOTIFIED BY SUPV. DATE / / TIME OA NAME
17. ACCOUNT I'I O' S O': I NIL I
22. QA REVIEW QA DATE / / 23. INSPECTION REQUIRED 0 YES 0 NO

~ ~ 0'

26. NOTIFICATIONS: QC DATE / / TIME EINA 0 NI A. DATA SHEET RECEIVED NOT

B. PROCEDURE

NO'S. / / 0 REOVIREO C. ACCOUNT I

' S'lk

~

I I DATE . / QPARTS QPROCEDURE QDRWG QMARKUP Q RWP QNA D. STAGED BY E. ASSIGNED TO DATE / /

F. NOTIFICATIONS,'C DATE / / TIME SSS DATE TIME G. SUPPORT DEPARTMENT WORK COMPLETED H. ATTACHMENTS 0 MATERIALISSUES. 0 PROCEDURE CHECKLISTS Q LAS Q J. MARK UP ND'S. / / RWP ND'S / /

K. SUPPORT DEPARTMENT WORK CQMPLETFD BY DAT L SUPERVISOR REVIEW BY DATE / /

35. WORK ACCEPTED BY QA D NA DATE /

AP-5.0 -16 February 1986

FIGURE 4 MAINTENANCEEVALUATIONREPORT INITIALDETERMINATION Inspection of ASME Section XI component indicates that only minor repairs as specified in Step 311. are required to effect the .

necessary restoration. GYes 0 No If NO, answer Questions 1 thru 6.

MAINTENANCEEVALUATION

1. Was component/item damaged as a result of foreign particle inclusion? {weld slag, debris, etc.) Cl Yes 0 No
2. Is component/)tern damage a result of normal erosion, corrosion, use? 0 Yes Cl No
3. Was component/item damaged during the disassembly activity? 0 Yes CI No
4. Does damaged component/item require welding, grinding, or machining on a pressure boundary surface? {Except as allowed during normal maintenance by existing procedure or manufacturer's instructions.) CI Yes' No
5. Does inspection (visual, NDE, other) indicate that stress cracks or other design deficiencies exist? 0 Yes* 0 No
6. Engineering evaluation is requested to determine cause of failure and/or repair techniques.

(Check YES if YES is checked in Questions 4 and/or 5, or if further evaluation is desired.) OYes 0 No Submitted:

Maintenance Supervisor Date Concurrence:

Maintenance Engineer Date EVALUATIONREPORT DISPOSITION (Required only if box for statement 6 is checked YES.).

Transmitted to Engineering:

Name Date V

Returned to Maintenance Supervisor.

Name -.- Date

FIGURE 5 POST MAINTENANCE TEST REPORT

1. Tes t Acceptance Criteria Test Complete oSat aUnsat Verified By Date
2. Test Acceptance Criteria Test Complete oSat oUnsat Verified By Date
3. Test Acceptance Criteria Test Complete QSat aUnsat Verified By Date
4. Test Acceptance Criteria Test Complete oSat oUnsat Verified By Date Tests and Acceptance Criteria:

Prepared By Date Reviewed by ASSS Date Approved by SSS Date Test Completion:

Reviewed by ASSS Approved by SSS Date AP-5.0 -18 February 1986

APPENDIX A.

SYSTEM CODES UNIT 1 SYSTEM CODE ZZELE 01 Eatn Steam (Reactor Outlet to Ezternal Zaolatlon Valve Outlet) 02 'Main Steam (External Isolation Valve Outlet to Turbine Inlet) 03 Turbine By-Pass Valve System 04 Spar 05 Emergency Condenser Vent to Main Steam Line 06 Steam Supply to Air Effector 06.1 Steam Supply to Mixing Jet and Off Gas preheaters after pressure reducing vlv 07 H.P. Steam Supply to Seal Regulator 08 H.P. Steam Supply to 2nd Reheater 09 2nd Stage Reheater Drains & Vents 10 Hot Reheat Steam to L.P. Turb. (From Moisture Separator Outlet to L.P. Turbine 11 Spare 12 Cold Reheat Steam to Reheater (From H.P. Turb. to Moisture Separator) 13 Extraction Steam to 1st Reheater 14 Extraction Steam to 5th Feedwater Heater Extraction Steam to 4th Feedwater Heater 16 Extraction Steam to 3rd Feedwater Heater 17 Extraction Steam to 2nd Feedwater Heater 18 Extraction Steam to 1st Feedwater Heater 19 Spare 20 Turbine Steam Seal Regulator (Low Pressure System) 21 Leakmff From Steam Seal Regulator to 1st Extraction Line &

Relief Valve Discharge Line to Condenser 22 Gland Seal Exhaust From Turbine to Gland Seal Condenser 23 Misc. Steam Line Drains 24 Moisture Separator Drains & Vents (to 4th Heater & Condenser) 25 1st Stage Reheater Drains & Vents 26 Feedwater Heater Drains 27 Reactor Head Spray 28 Control Rod Drive Hydraulic Pump to Strainer 29 High Pressure Reactor Feedwater (From Reactor F. W. Pumps to 5th Ext. F. W. Heater Stop Valve 30 High Pressure Reactor Feedwater (5th Heater to Ext. Isol. Valve) 31 High Pressure Reactor F.W. From Ext. Isolation Valve to Reactor Inlet (Nuclear Reactor Code Section) 32 Reactor Recirculating 33 Reactor Cleanup (Reactor to PCV & CU Recirc. Pumps to Reactor) 33.1 Reactor Cleanup (Reactor to 'PCV & CU Recirc. Pumps to Reactor) 34 Head Spray 35 Reactor Cleanup (PCV to Pumps) 36 Reactor Instrumentation (Press, Level, etc. Controls) 37 Reactor Misc. Connections (Reactor Vent & Drain to Last Isolation Valve-Reactor Water Sample) 38 Reactor Shutdown Cooling (350'fter Ext. Isolation Valve) 39 Emergency Condenser Steam Supply & Condensate Return AP-5.0 -19 February 1986

APPENDIX A (CONT'D)

SYSTEM CODES UNIT 1 SYSTEM CODE TITLE 40 Reactor Core Spray (Ert. Iaolatloc Valve to Reactor) 41 Liquid Poison From Tank to Positive Displacement Pumps & From Relief Valve Discharge to Tank 42 Liquid Poison From Pumps to Outlet External Isolation Valve 42.1 Liquid Poison From Reactor to External Isolation Valve 43 Resin Transfer 44 Control Rod Drive Hydraulic After Strainer 44.1 Control Rod Drive Hydraulic Isolaton to Reactor 45 Radioactive Waste Disposal (Corrosive Service) 45.1 Radioactive Liquid Waste Disposal Corrosive Service 45.2 Radioactive Liquid Waste Disposal Corrosive Service 46 Sulphuric Acid Transfer Storage Tank to Mixing Tee 46.1 Sulphuric Acid Transfer 46.2 Sulphuric Acid Transfer 46.3 Sulphuric Acid Transfer 47 High Pressure N2 For Drywell & Torus (From Tank to P.S.V.)

(Not Used) 48 Control Rod Drive N2 Gas 49 Condensate Pumps Inlet, Spray System & Misc. Condenser Piping 50 Condensate Pump Discharge to Reactor F.W. Booster Pump Inlet &

to Condensate Storage Tanks 51 Reactor F.W. (Booster Pumps Disch. to F.W. Pumps Inlet) 51.1 Reactor F.W. Booster Pump Discharge for Moist. Sep. Cooling 52 H.P. Hydro Pump Discharge 53 Condensate Normal Supply to Control Rod Drive Pumps 54 Fuel Pool Cooling Filtration & Drains 55 Demineralized Make-Up Water 55.1 Demineralizer Drains 56 Spare 57 Condensate Storage & Transfer 57.1 Condensate Storage & Transfer 58 Condensate Make-Up to Torus (From Condensate Transfer Sys. BV) 58.1 Condensate Hake-Up to Torus (Torus to 1st B.V.)

59 Condensate Hake-Up to Main Condenser (From Storage Surge Tanks) 60 Emergency Condenser Make-Up 60.1 Emergency Condenser Shell Vent, Drain & Overflow

60. 2 Emergency Condenser Overflow 61 Spare 63 Reactor Clean-Up Sys, Safety Valve Discharge (to Check Valves at Torus) 63.1 Reactor Clean-Up Safety Valve Discharge (Torus to Check Valve) 64 Feedwater Heater & Line Vents to Condenser 65 Feedwater Safety Valve Discharge 66 Hain Steam Line Power Operated Relief Valve Discharge 67 Misc. Contaminated Vents Drawing & Leak-Offs 68 Drywell & Torus Vacuum Relief (Vessel to 1st B.V.)

69 Misc. (not Contaminated) Vents Drains & Leak-Offs AP-5.0 -20 February 1986

APPENDIX A (CONT'D)

SYSTEM CODES UNIT 1 SYSTEM CODE TZ1'Lg 70 Reactor Bldg. d Waste Bldg. Closed Zaop Coolitg (Decorated Demineralized water) 70.1 Waste Bldg. Closed Loop Cooling 71 Turbine Bldg. - Closed Loop Cooling (Deaerated Demineralized Water) 72 Service Water 72.1 Lawn Sprinkling System

72. 2 Lawn Sprinkling System 73 Screen Washing 74 Main Condenser Circ. Water 75 Main Condenser Circ. Water Box Vents 76 Main Condenser Air Removal 77 Condenser Off Gas From Jet Air Ejectors 77.1 Condenser Off Gas (Recombiner Inlet to Recombiner Condenser Inlet) 77.2 Condenser Off Gas (Recombiner Outlet to existing Connection at.

Chimney) 77.3 Condenser Off Gas (Inlet to Vacuum Pumps to Outlet of the Off-Gas Moisture Separator) 77.4 Condenser Off Gas (Mixing Jet Inlet to Recombiner Inlet) 77.5 Condenser Off Gas (Chillers to deicing water buffer tank, tank outlet) 78 Turbine Gland Seal Exhaust 79 Diesel Generator Cooling Water 80 Containment Sprays Outside Drywell 80.1 Containment Spray Inside Drywell 81 Reactor Core Spray 81.1 Reactor Core Spray After Topping Pump 82 Fuel Oil Handling 6 .,Storage 83 Drywell Pump Discharge Piping (Outside 1st External Isolation Valve) 83.1 Drywell Sump Piping (Drywell Sump to Extra I.V.)

84 Reactor Building Sump Discharge Piping 85 Radioactive Waste Disposal (Non-Corrosive) 86 Mis. Building Sump Discharge Piping 87 Caustic Soda Transfer 88 Misc. Line Drains in Drywell After Last Valve 89 Misc. Line Drains in Reactor Bldg. After Last Valve (Piping Upstream of Last Valve to be Same as Principle Line or Source) 90 Misc. Line Drains in Reactor Bldg. After Last Valve (Piping Ustream of Last Valve to be Same as Principle Line or Source) 91 Sealing Water (Condensate or Filtered) 92 Incore Monitoring 93 Containment Spray Cooling Raw Water 94 Instrument Air-Atmos. to Dryer 95 House Service Air 96 Diesel Generator Starting Air AP-5 ' -21 February 1986

APPENDIX A (CONT'D)

SYSTEM CODES UNIT 1 SYSTEM CODE TZTZZ 97 Turbine Oil Storage g Purification 97.1 Turbine Oil Vents 98 Electric Steam Boiler 811 98.1 Electric Steam Boiler 812 (Condensate Return) 98.2 Electric Steam Boiler 812 (Saturated Steam) 98.3 Liquid Waste System Cleaning (Hot mixture of Condensate & Steam) 99 C02 (Fire Protection & Generator Purging) 100 Fire Protection - Water &'Foam 101 Transformer Fire. Protection 102 Spare 103 City Water (Cold) 103.1 City Water (Hot) 104 Roof & Floor Drains (Non-Radioactive) 105 (Gravity Flow Drains) Equipment Drains 106 Sanitary Sewerage 107 L.P. Inst.

108 H.P. Inst.

109 Misc. Inst.

U.O Samples 111 Hydrogen (H2) Supply for Generator 111.1 Hydrogen (H2) Vent & Drain 112 Condenser Off Gas & Stack Gas Samples 113 Instrument Air (After Dryer) 114 Breathing Air (After Filter) 115 Yard Drainage 116 Low Pressure Air 117 Laboratory Drains 117.1 Laboratory Drains Where Noted 118 Gas Supply to Lab 119 Laboratory Vac. Sys.

190 Freon Refrigeration System for Off Gas Chillers 201 Reactor Containment Cooling, Air Purge 201.1 Drywell Vent & Purge Air & N2 (Drywe11 to 1st I.V.)

201.2 Reactor Containment N2 Purge & Fi11 201.3 Truck Fill Conn. to N2 Vaporizer 201.4 Reactor Cont. N2 Purge & Fill Where Specified 201.5 Leak Rate Monitoring Inside Drywell Vessel 201.6 Leak Rate Monitoring Outside Drywell to & Including Auto Isolation Valve AP"5.0 -22 February 1986

APPENDIX A (CONT'D)

SYSTEM CODES UNIT 1 SYSTEM CODE TZTIZ 201.7 Coatainaent Radiation Monitoting 201.8 Reactor Containment (Drywell & Torus) Inert Gas (N2) Supply 812 201.9 Reactor Containment (Drywell & Torus) Inert Gas (N2) Supply 811 201.11 Reactor Containment (Drywell & Torus) Inert Gas (N2) Supply dU.

(Between Sys. 201.9 & 201.2) 202 Reactor Bldg. Ventilation Exhaust System 202.1 Misc. Equipment Vents Connected to Bldg. Ventilation Duct 203 Turbine Building Ventilation Exhaust System 204 Waste Disposal Building Ventilation Equipment 206 Sewerage Treatment & Equipment (Outside of Plant) 208 Reheater Drying System Equipment (Downstream of Last Blocking Valve) 209 Miscellaneous 210 Control Room Heating, Vent & Air Conditioning 211 Add. Building Air Conditioning, Heating & Ventilating System The above system numbers reflect mechanicl piping numbers to designate the electrical portion of these systems, place a capital "E" after the number. For example, 34E would concern itself with some electrical apparatus in the head spray sys.

AP-S.O -23 February 1986

APPENDIX A (CONT'D)

SYSTEM CODES UNIT 1 SYSTEM CODE TBTBB ADM Adnandsczacdcn Bni1ding Mdsc.

ANN Annunciator AMPM Area Monitors-Process Monitors BB Battery Board COMP Computer CONT Control Room Miscellaneous DG Diesel Generators DWMI Drywell Misce11aneous ELM Electrical Monitors FBF Flat Bed Filter FP Fire Protection FWC Feedwater Controls GEN Generator Miscellaneous INSTs Instrument Miscel1aneous LAB Laboratory Miscellaneous NEU Nuetron Monitors (SRM's, IRM's, LPRM's)

PAGE Paging System PWRB Power Boards Performance Calculation RFBR Refuel Bridge RSD Reheat Steam Drains RST Reactor Servicing Tools RXVE Reactor Vessel RXVI Reactor Vessel Instrumentation RXBM Reactor Building Miscellaneous SB Station Batteries SEC Security SHM Screen House Miscellaneous SEOI Seal Oil STWT Stator Water SWYD Switchyards TIP Transverse Incore Probe TRNA Transformers TSI Turbine Supervisory Instruments TBM Turbine Building Miscellaneous WBM Waste Building MisceU.aneous WI Wind Instruments WS Weather Station YDS Yards AP-5.0 -24 February 1986

APPENDIX B SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION 20 BREATHING AIR 48 AUXILIARYBOILER-BLOWDOWN 48 AUXILIARY BOILER-FEEDWATER AND CONDENSATE ABH 48 AUXILIARY BOILER-CHEMICAL FEED 48 AUXILIARY BOILER-STEAM ABS 20 AUXILIARY BOILER - SYSTEM ADS 34 AUTOMATIC DEPRES SURI ZATION-SYSTEM AIR REMOVAL-MAIN CONDENSER ASR 40 AUXILIARYSTEAM-RADWASTE ASS AUXILIARY STEAM-NUCLEAR-STEAM 71 TRANSFORMER, AUX PWR INCLUDING AUXILIARIES BWS 92 BATTERY-24V-STATION BYS 73,74 BATTERY-125V-STATION CCP 11,13 COMPONENT COOLING-REACTOR CCS 14 COMPONENT COOLING-TURBINE PLANT CEC 103 COMMON ELECT EQUIP-CONTROL RM COMPLEX CES 31 COMMON ELECT-SYSTEM CMS 82 CONTAINMENT ATMOSPHERE MONITORING-SYSTEM CONDENSATE-AUXILIARY CONDENSATE CONDENSATE-DEMINERAIJ ZER CONDENSATE-MAIN COND~TE CONDENSATE-PUMP LUBE OIL SYSTEM CONDENSATE-MA1KUP, DRAWOFF COJ 76 COMMUNICATIONS (MAINTENANCE)

AP-5.0 -25 February 1986

APPENDIX B (Cont.)

SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION COP 76 COMMUNICTIONS (PAGING)

COS 76 COMMUNICATIONS (SOUND POWERED)

CPS 61 REACTOR CONTAINMENT (PURGE)

COLD REHEAT-SYSTEM CSH 33 CORE SPRAY-HIGH PRESSURE CSL 32 CORE SPRAY-LOW PRESSURE 10A CIRCULATING WATER 102 DECONLQGNATZON-SYSTEM 63,67 DRAINS-REACTOR BLDG EQUIP 64 DRAINS-TURBINE BLDG EQUIP DFD 66 DRAINS, FLOOR-DIESEL GEN BLDG DFE 66 DRAINS, FLOOR-SERVICE AREA 66 DRAINS, FLOOR-MISC BLDGS 63>67 DRAINS, FLOOR-REACTOR PLANT DFT 64 DRAINS, FLOOR-TURBINE PLANT 65 DRAINS, FLOOR-RADWASTE BLDG DMS 35, 74 MOTOR CONTROL CENTER DC-SYSTEM 60 DRYWELL COOLING-SYSTEM DSM 2 DRAINS MOISTURE SEPARATOR DSR 2 DRAINS-MOISTURE SEPARATOR REHEATER 66 DRAINS-TURBINE PLANT MISCELLANEOUS DWS 50 DOMESTI C WATER-SYSTEM 100A,100B GENERATOR, EMER-AZR COMPR-DIESEL STARTING AZR EGF 100A,100B GENERATOR, EMER-FUEL SYSTEM AP"5.0 -26 February 1986

APPENDIX B (Cont.)

SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION 100A,100B GENERATOR, STBY LUBE OIL SYSTEM EGP 100A,100B GENERATOR, EMER-PROTECTION (INCLUDE ACB & INST)

EGS 100A,100B GENERATOR, EMER-SYSTEM EGT 100A,100B GENERATOR, STANDBY, TEMPERATURE 23 ELECTRO HYDRAULIC CONTROL EHS 72 MOTOR CONTROL CENTER-EMERGENCY-SYSTEM 72 UNIT SUBSTATION-EMERGENCY-AC CONT & HTR SUPPLY 72 UNIT SUBSTATION-EMERGENCY-SYSTEM 72 SWGR, EMER, 4160V-SYSTEM EPS 29 SWGR, STBY, 13. SKV SYSTEM 40 EMERGENCY RESPONSE FACILITY ERS 90 EARTHQUAKE RECORDING SYSTEM ESS EXTRACTION-SYSTEM 68 EXCITATION-MAINGENERATOR-SYSTEM (COOLING)

EXS 68 EXCITATION-MAINGENERATOR-SYSTEM (POWER CKT'S) 39 FUEL-NUCLEAR - REPtKLING 39 FUEL HANDLING-SYSTEM FOF 43 FUELWIL - ENGINE DRIVEN FIRE PUMP FPF 44 FIRE PROTECTION - FOAM SYSTEM 46 FIRE PROTECTION HALON FPL 45 FIRE PROTECTION LOW PRESSURE C02 FPM 47 FIRE PROTECTION SUPERVISION SYSTEM FPW 43 FIRE PROTECTION WATER FEEDWATER - PUMP & MOTOR OIL SYSTEMS AP-5.0 -27 February 1986

APPENDIX B (Cont.)

SYSTEM CODES UNIT 2 SYSTZM CODE BIP NUMBER SYSTEM DESCRIPTION FEEDWATER & CONDENSATE PUMP-SEALS & LEAKOFF FEEDWATER RECIRCULATION FWS 6I 7 FZEDWATER SYSTEM GMC 26 GENERATOR, MAIN-STATOR COOLING 27 GENERATOR, MAIN-HYDROGEN & C02 24 GENERATOR, MAIN-LEADS GENERATOR, MAIN-SEAL OIL

~

68 GENERATOR, MAIN-SYSTEM GSN 88 GAS-NITROGEN SYSTEM 61 GAS TREATMENT, STANDBY-SYSTEM HCS 62 HYDROGEN RECOMBINER SYSTEM (POST DBA)

HEATER DRAINS HIGH PRESSURE HEATER DRAINS - LOW PRESSURE HOT REHEAT SYSTEM HTS 40,41,82 HEAT TRACING-SYSTEM 53,54,59A AIR COND. CONTROL BLDG OR AREA 59C VENTILATION SERVICE BLDG 49 GLYCOL KEATING SYSTEM 49 HOT WATER HEATING SYSTEM 59C VENTILATION AUX BOILER ROOM CHILLED WATER CONTROL BLDG 59B AZR CONDITIONING SERVICE BLDG 54 CHILLED WATER - VENTILATION VENTILATION - DIESEL GZN BLDG AP-5.0 -28 February 1986

APPENDIX B (Coat.)

SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION VENTILATION - REACTOR PLANT VENTILATION - TURBINE PLANT 56 VENTILATION - RADWASTE BLDG 58,59C VENTILATION YARD STRUCTURES 19,34 INSTRUMENT AIR SYSTEM ICS 35 REACTOR CORE ISOLATION COOLING - SYSTEM 103 INFORMATION HANDLING - ANNUNCIATOR 91,103 INFORMATION HANDLING - COMPUTER ZHS 40 INFORMATION HANDLING SECURITY ISC 28 INSTRUMENTATZON SYSTEM - NUCLEAR BOILER ISG 77 GROUNDING SYSTEM 75 LIGHTING, AC-CONTROL ROOM (MAIN) 75 LIGHTING, AC-DIESEL GENERATOR ROOM 75 LIGHTING, AC-COOLING TOWER 6 POND AREA 75 LIGHTING, AC-MISC BLDGS 75 LIGHTING, AC-RADWASTE BLDG 75 LIGHTING, AC-REACTOR BLDG LIGHTING, AC-SYSTEM (SUPPLY) 75 LIGHTING, AC-TURBINE AREA 75 LIGHTING, AC-SCREENWPZJ AND PUMPHOUSE 75 LIGHTING, AC-AUXIZZARY BOILER ROOM 75 LIGHTING, AC-SWYD OR SUBSTA (INCLUDING CONT HSE) 75 LIGHTING, AC-SERVICE BLDG LMS 81 LEAKAGE MONITORING SYSTEM AP-5.0 -29 Pebruary 1986

APPENDIX B (Cont.)

SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION LOS 22B LUBE OIL (TREATMENT AND STORAGE ONLY) SYSTEM 86 LOOSE PARTS MONITORING - SYS.

LWS 40 LIQUID WASTE (RADIOACTIVE) - SYSTEM 101 MOTOR OPERATED DOORS SYSTEM 101 MAT HANDLING (CRANES, HOISTS, ETC) - MISC BLDGS 101 MATERIAL HANDLING RADWASTE BLDG 84 MAT HANDLING(CRANES, HOISTS, ETC)-

REAC BLDG(CONTNMT)

MHS 101 MAT. HANDLING (CRANES, HOIST) SYSTEM 101 MAT. HANDLING (CRANES, HOISTS, ETC)-TURBINE AREA 101 MAT HANDLING(CRANES, HOISTS, ETC)-

SCREENWELL 6 PP HSE 108 METROLOGICAL MONITORING SYSTEM MSS 1,21,85 MAIN STEAM SYSTEM 69 MN TRANS INCL AUXZLLQtZES (COOLERS, LTC, ALARMS, ETC) 16 MAKEUP WATER SYSTEM (RAW WATER)

NHS MOTOR CONTROL CENTER, NORMAL - SYSTEM NJS 71A,71B UNIT SUBSTATION SYSTEM 92 NEUTRON MONITORING SYSTEM 92 NEUTRON MONITORING SYSTEM (INTERMEDIATE) 92 NEUTRON MONITORING SYSTEM (POWER) 94 NEUTRON MONITORING (TRAVERSE ENCORE PROBE) 92 NEUTRON MONITORING (SOURCE) 71A SWGR, NORMAL, 4160V-SYSTEM AP-5.0 -30 February 1986

APPENDIX B (Cont.)

SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION NPS SWGR, NORMAL, 13.8KV-SYSTEM OFG 42 OFF GAS PBS 51 SANITARY SEWERAGE FACILITIES - SYSTEM PCS 77 PROTECTION, CATHODIC-SYSTEM RCS 29,71A REACTOR RECIRCULATION 18 ROOF DRAINS (HANGERS) 30 REACTOR ROD DRIVE - SYSTEM 31 RESIDUAL HEAT REMOVAL - SYSTEM RMS 79580 RADIATION MONITORING SYSTEM REACTOR PROTECTION SYSTEM ~ SET RPS 97 REACTOR PROTECTION - SYSTEM 106 REDUNDANT REACTIVITY SYSTEM RSS 78 REMOTE SHUTDOWN SYSTEM 70 RES STA SERV TRAN INCL AUXZIZARZES SAS 19 SERVICE AIR SYSTEM 71 STA, CONT BUS (NONVITAL)-AC SUPPLY INCL TFMR 6 TRANS SWITCH STA, CONT BUS (NONVITAL)-INDICATION SCM 72 STATION CONTROL MONITORING (VITAL) INDICATION 72 STA CONT BUS (VITAL)-AC SUPPLY SFC 38 SPENT FUEL-FUEL POOL CLG 6 CLZANlP (ZNC. POOL 6 AUX)

SLS 36 STANDBY LIQUID CONTROL (POISONING) SYSTEM SPF 70 RESERVE STA SERVICE LINE SPG 68 STATION PROTECTION GENERATOR SPI 70 STATION PROTECTION GEN, MN TFMR, STA SER BUS AP-S.O February 1986

APPENDIX B (Cont.)

SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION SPM 69 STATION PROTECTION - MAIN TRANSFORMER SPR 70 STATION PROTECTION RES STA SERV TRANS SPS 70 STATION PROTECTION STA SERV TRANS SPU 68 STATION PROTECTION - UNIT SPX STATION PROTECTION - AUX PWR TRANS SRH 21 TURBINE REHEAT (HANGERS) 18 STORM SEWER - ROOF DRAINAGE SSP 17 SAMPLING SYSTEM - POST ACCIDENT SSR 17 SAMPLING SYSTEM REACTOR PLANT SST 17 SAMPLING SYSTEM - TURBINE PLANT (NUCLZAR)

SSW 17 SAMPLING SYSTEM - RADWASTE BLDG STX 70 STA SERV TRANS NORMAL INCL AUXZILARZES STEAM VENTS - FEEDWATER HEATER RELIEF VENT & DRAINS STEAM VENTS SAFETY VALVES SERVICE WATER - SYSTEM SERVICE WATER - SYSTEM (HANGERS) 40 SEEL WATER - RADWASTE 12 SERVICE WATER - TRAVELING SCREENS-WASH & DISPOSAL SXS 105 STARTUP TEST INSTRUMENTATZON - SYS SYD 100A SYNCHRONIZING - DIESEL GENERATOR 68 SYNCHRONIZERG - MAIN GENERATOR SYS SYNCHRONIZING - STATION SERVICE 21 TURBINE, MAIN-ALARMS AND TRIPS 23 TURBINE, MAIN-CONTROL (EHC) 25 TURBINE, MAINLAND SEAL & EXHAUST STEAM AP-5. 0 -32 February 1986

APPENDIX B (Coat.)

SYSTEM CODES UNIT 2 SYSTEM CODE BIP NUMBER SYSTEM DESCRIPTION MAIN-TURNING GEAR 21 TURBINE, MAIN-SUPERVISORY INSTRUMENTATION TURBINE, MAIN-LUBE OIL 21 TURBINE, MAIN-SYSTEM 18 ROOF DRAINS (HANGERS)

VBA 72 VITAL BUS - AC SUPPLY (TO BUS)

VBB 71B,75 VITAL BUS - DC SUPPLY (TO INVERTER)

VBS 72 VITAL BUS-SYSTEM(INCOMING SUPPLY FROM ZNVERTER) lt 26,22A VENTS, TURBINE PLANT EQPT WCS 37 REACTOR WATER CLEANUP SYSTEM 22C WASTE OIL DISPOSAL - SYSTEM 71B WELDING POWER-SYSTEM WSS 41 SOLID WASTE (RADIOACTIVE) - SYSTEM 10B WATER TREATING - ACID TR1UZMENT 10C 'ATER TREATING - HYPOCHLORZTE 10A,15 WATER TREATING - SYSTEM 70 115KV SWYD/SUB STA-BUS DIFF/PT's 70 115KV SWYD/SUBSTA 69 345KV SWYD/SUBSTA AP-5.0 -33 February 19S6

APPENDIX C NPRDS CODES NPRDS FAILURE SYMPTOM CODE The code indicating the first effect of the failure observed when the failure was discovered. Choose one of the following:

A - Physical Fault- A failure is characterized by a changed physical condit1on, physical configuration, fracture or damage, often resulting in a loss of integrity or ability to hold a contained fluid or electrical cu'rrent. This category includes blocked or stopped flow, cracks, fractures or breaks, collapses, physical distort1on or displacement, electrical arcing, open circuit, shorts, or degraded 1nsulation. Leaks are considered a special category (E or F below) due to the number of reported items.

B Out of Spec1fication A failure is characterized by operation outside the permissible range of expected output or response. This category inc1udes out of limits, low or high output or flow, erratic output, premature response, off frequency, off voltage, intermittent operation or failure to synchronize or control.

C - Demand Fault failure 1s characterized by the responsible system or component failure to actuate, move, or change operating mode upon request, either operator-init1ated or from an automatic signal.

This category includes failure to stop, close, open, release, run, start/move, operate per demand, respond, record, or instances of no output when an input of some sort demands one D Abnormal Character1st1c- A failure is characterized by a type of response or an operating characteristic not considered normal or expected. This category inc1udes such attributes as overheating, unusual noise or vibration, chatter, corrosion, discoloration, and false response (such as non-zero output with zero input).

AP-5.0 -34 February 1986

APPENDIX C NPRDS CODES NPRDS FAILURE SYMPTOM CODES (Cont.d)

E - Released Leakage - A failure is indicated by external leakage of a process fluid from within its normal pressure boundary. This includes leaks to the environment caused by faulty packing glands, mechanical seals, or gasketed joints. Also included in this category are relief valve leakage and heat exchanger tube leaks.

F Contained Leakage - A failure is characterized by leakage of the process fluid through a closed isolation device (e.g., a valve) and along a normal flow path. This inc1udes internal flow leaks such as across valve seats. Not included (see code E) are relief valve leaks and heat exchanger tube leaks.

I AP-5.0 -35 February 1986

APPENDIX C NPRDS CODES NPRDS CORRECTIVE ACTION CODE The following is a listing of the codes used for corrective action taken to remedy a failure, along with a definition and an example for each of the codes.

Recalibrate/Adjust To reset a device mechanically or electrically to a prescribed valve or position. An example of this is to calibrate an instrument string.

Specifically it would read something like, "Reset outputs of the flow transmitter on the shaft driven feed water pump flow instrument loop". Some keywords to look for: calibrate, recalibrate, ad)ust, readjust, set, reset.

AC Temporary Measures Actions taken to bypass maintain oz p restore a system or component to operation for an interim period. An example of this is to replace a defective part with another component until either conditions permit a proper replacement, or a similar component can be purchased. For example, "Added temporary pressure gauge on feedwater heater high level trip column, until.

next outage when a proper gauge can be installed". The Key word here is:

Temporary.

Repair Component/Part To refurbish and/or reinstall a component, including such actions as cleaning and or polishing. An example of this would read something like, "Fixed circuit breaker coil and cleaned contacts for diesel generator air start compzessor motor starter." Keywords:

Repair, fix, refurbish, clean, reinstall, rebuild, reset.

AP-5.0 -36 February 1986

e APPENDIX C NPRDS CODES NPRDS CORRECTIVE ACTION CODE (Cont.d)

Replace Parts A piece component or part is removed and a similar or identical part is put in its place. An example of this is "Installed new valve stem and seat in accordance to original specifications."

Key words: Replace, install, repair, fix, rebuild, added, refurbish.

Replace Component To replace the entire component with a similar or identical component. For example, "Replaced defective Rosemonnt Pressure Transmitter on Feed water line with an identical unit." Keywords:

Replace, install, repair, fix, rebuild, added, refurbish.

AP-5.0'37 February 1986

APPENDIX C NPRDS CODES NPRDS CAUSE OF FAILURE CODE MECHANICAL CAUS ES Foreign/Incorrect Material Material not as spec1fied or internal environment containing an unanticipated material (e.g., water).

Particulate Contamination - Gas or fluid contents, including unexpected buildup of suspended solids.

Normal/Abnormal Wear - Loss of function due to a gradual loss of configuration or material.

Lubrication Problem Frictional failure directly attributable to lack of proper lubrication.

Weld Related Weld fracture, crack, or heat-affected zone failure attr1butable to the fielding process.

AG Abnormal Stress Material stress attributable to abnormal load, vibration, temperature, pressure or flow.

AV Connection Defective/Loose Parts - Loose mechanical parts or fasteners.

Material Defect Material type as specified, but with integrity compromised due to a flaw or leak.

BB Mechanical Damage/Binding Loss of proper mechanical configuration due to excessive forces.

BC Out of Mechanical Adjustment - Loss of proper mechanical al1gnment, movement limits, or conf1guration not due to damage. Loose setscrews, locknuts, mechanical stops, and setpoints of adjustable fixtures are included.

BD Aging/Cycl1c Fatigue - Time-related degradation of mechanical properties without significant loss of material (as through wear).

Includes radiation damage, embrittlement, and fatigue cracking of mater1al subjected to stress reversals.

BE Dirty Loss of function due to deposition of extraneous material on operating surfaces such as circuit breaker moving parts, pilot valve seats, etc.

BF Blocked/Obstructed - Loss of flow function due to lodged objects or solids. May also be loss of movement due to mechanical interference other than binding.

BG Corrosion Failure attributable to loss of material or buildup of chemical reaction products from electro-chemical or stress-aided corrosion.

AP-5.0 -38 February 1986

APPENDIX C NPRDS CODES NPRDS CAUSE OF FAILURE CODE (Cont.d)

ELECTRICAL/ELECTRONIC CAUSES AG Abnormal Stress - Loss of function due to stress-related causes attributable to voltage spikes, oscillations, etc.

Insulation Breakdown Loss of electrical circuit integrity, including shorts, arcs, burned windings, etc., attributable to failure of the insulation itself.

Short/Grounded - Loss of electxical circuit integrity due to a shorted or gxounded circuit.

AT Open Circuit Inopexability of electrical circuit due to a break in conductor or contacts not made up.

AU Contacts Burned/Pitted/Corroded - Inoperability of electrical circuit due to degradation of electrical contacts.

AV Connection Defective/Loose Parts << Electrical terminal connection loose, intermittent, or containing high electrical resistance.

Circuit Defective Electrical or electronic circuit fault not attributable to any one subcomponent, component, or part, including unknown electronic faults or failuzes not reproducible.

Burned/Burned Out Loss of e1ectrical cizcuit integrity, including insulation breakdown due to local combustion, overload, and/or electrical fire.

Electrical Overload - Loss of function specifically attributable to unanticipated high electrical curxent.

Material Defect - Material type as specified but with integrity compxomised by a flaw.

BE Dirty Loss of function due to deposition of extraneous material on opezating suzfaces such as electrical contacts.

Corrosion Failure attributable to loss of material or buildup of chemical reaction products from electxo-chemical corrosion.

AP-5.0 -39 February 1986

APPENDIX C NPRDS CODES NPRDS CAUSE OF FAILURE CODE {Cont.d)

ADJUSTMENT/HUMAN-RELATED Foreign/Wrong Part - Part does not belong in responsible component or system. This includes poor designs and misapplications.

Setpoint Drift - Electronic drift attributable to poor control setpoint stability. Relief valve setpoint changes during operation due to pilot valve seat bleed rate changes may be included but not changes due to previous repair or mechanical adjustment.

Previous Repair/Installation Status Inadequate repair condition resulting from lack of proper previous maintenance, installation, or restoration to operational status, Incorrect Procedure - Failure directly attributable to an inadequate or improper instruction or approved procedure.

BC Out of MechanicaL Ad)ustment - Loss of proper mechanical alignment, movement limits, or configuration not due to damage. Loose setscrews, locknuts, mechanical stops, and settings of adjustable fiztures are included.

BH Out of Calibration - Electrical/mechanical setpoint or= response settings (lead, lag, or reset) not in the specified position or range.

Incorrect Action Loss of proper function directly due to human error.

AP-5.0 &0 February 1986