NINE MILE POINT NUCLEAR STATION ADMINISTRATIVE PROCEDURE PROCEDURE NO ~ AP-3 ~ 7. 1 PROCESS CONTROL PROGRAM DATE AND INITIALS APPROVALS SIGNATURES REVISION 0 REVISION 1 REVISION 2 Radwaste Operations Supervisor O. Henderson i-,/,, rr~/e r"~
Chemistry & Radiation Management Superintendent Station Superintendent NMPNS z/efz~
R. B. Abbott General Superinten~~t. 8'(e~>>
Nuclear Generatiog,g ~p T. J. Perkins Quality Assurance Con u re ce Manager, Q.A. Nucl a W. A. Hansen Summer of Pa es
( ective )
~Pa es Date l7ii71 23 August 1986 NIAGARA MOHAWK POWER CORPORATION
'HIS PROCEDURE NOT TO BE AUGUST 1988 USPD APTER SUBJECT TO PERIODIC REVIEW .
8709030020 870828 PDR ADOCN, 05000410 R PDR
gh TABLE OP CONTENTS SECTION TIZIZ PAGE 1.0 Purpose 2.0 Technical Specification References 3.0 Regulatory Requirements References 4.0 Other References 5.0 System Description 6.0 Solid Waste Sources 7.0 Prerequisites 8.0 Process Control System Components 8.1 Asphalt Process 8.2 High Integrity Containers.
8.3 Oil Solidification 10 8.4 Temporary Radwaste Processing (Contracted Vendor) 10 8.5 Dry Active Waste (DAW) 10 9.0 Sampling 10.0 Waste Classification 11.0 Administrative Controls 12 11.1 Quality Assurance 12 11.2 Training 12 11.3 Documentation Control and Record Retention 14 11.4 Revision to the PCP 14 11.5 Shipping Manifest 11.6 Temporary Storage 15 AP-3.7. 1 -i- August 1986
TABLE OF CONTENTS SECTION TITIZ PAGE P~iures Process Control Flow Path 16 B System Flow Schematic 17 Operator Worksheet 18 Temperature Profile Log 19 E Barnwell Manifest 21 US Ecology Manifest 22 Procedures Which Implement the PCP 23 AP-3.7. 1 -ii- August 1986
Process Control Procedure AP-3.7.1 1.0 PURPOSE 1.1 The NMP2 Process Control Program (PCP) describes the guidelines for processing and packaging low-level radioactive waste and provides assurance of complete solidification of various radioactive "wet wastes" in accordance with the applicable portions of NRC regulations and guidance.
This document satisfies the Nuclear Regulatory Commission's Low-Level Waste and Uranium Recovery Projects Branch (WMLU) requirement and establishes process parameters within which the Werner 6 Pfleiderer Corporation Volume Reduction System (WPC-VRS) must be operated to ensure complete solidification. Conformance with WMLU requirements provides assurance that the requirements identified in 10CFR61, which state that Class A waste shall be a free standing monolith with less than 0.5/
latent water, will be met.
2.0 TECHNICAL SPECIFICATIONS REFERENCES
- 2. 1 Semi Annual Radiological Effluent Release Report, Section 6.9.1.8.
2.2 Nine Mile Point Unit 2 Technical Specifications, Section 3/4 11.3 (Specifications for Solid Waste Handling and Disposal).
3.0 REGULATORY REQUIREMENTS REFERENCES 3.1 Refer to 10CFR61 sub part D technical requirements for land disposal facilities and final waste classification and waste form technical.
position papers (an approved process control procedure, Report No. WPC VRS-001, Rev. 1, May 1978).
3.2 Refer to 10CFR71 for NRC requirements (refer to S-RP-6).
3.3 Refer to 49CFR173 for DOT requirements (refer to S-RP-6).
3.4 Refer to burial licenses and,criteria (of Barnwell and Hanford Sites) for applicable requirements. S. C., Department of Health and Environmental Control, Radioactive Material Licensee 097, as amended. , State of Washington Radioactive Material License //WN-1019-2 as amended.
3.5 For disposal of unused or off-standard chemicals. Refer to Requirements Resource Conservation and Recovery Act (RCRA) of 1976 (Ref. Corporate Guide to Hazardous Waste Disposal and Spill Reporting).
3.6 NRC Special Nuclear Material License No. 12-13536-02, as amended, for Barnwell, SC.
3.7 NRC Special Nuclear Material License No. 16-19204-01, as amended, for Richland, Washington AP-3.7.1 -1 August 1986
4.0 OTHER REFERENCES 4.1 Nine Mile Point 2 Waste Handling Procedures 4.2 WPC Topical Report No. WPC-VRS-001, November 1976, Rev. I May 197 8 4.3 Nine Mile Point 2 Quality Assurance. Department Procedures 4.4 Nine Mile Point Nuclear Process Survey Procedure N2-CSP-14, Solid Radioactive Surveillance Chemistry 4.5 Nine Mile Point 2 Nuclear Training Procedure S-NTP-14, Training and Retraining of Radiation Protection Technician 4.6 Nine Mile Point 2 Nuclear Training Procedure S-NTP-1, -Training and Retraining of Chemistry and Radiochemistry Technician 4,7 Nine Mile Point 2 Nuclear Training Procedure S-NTP-13, Radwaste Operator Training 4.8 Nine Mile Point Nuclear Station, Site Radiation Protection Procedure S-RP-6 Packaging and Transportation of Radioactive Material 4,9 NUREG 0123 "Standard Radiological Effluent Technical Specifications for Boiling Water Reactors"
- 4. 10 ANSI/ANS-55. 1/1979, American National S tandard for Solid Radioactive Waste Processing System for Light Water Cooled Reactor Plants
- 4. 11 Regulatory Guide 1.143, Rev. 0, Design Guidance for Radioactive Waste Management System, Structure, and Components Installed in Light-Water-Cooled Nuclear Power Plants 4.12 NUREG-0800, Standard Review Plan Section 11.2 Liquid Wast e Management System
- 4. 13 NUREG-0800, Standard Review Plan Section 11.4 Solid Waste Management System
- 4. 14 QATR-1 QA Program Topical Report.
5.0 SYSTEM DESCRIPTION The Solid Waste Management System (SWMS) collects, reduces the volume, solidifies and packages wet and dry types of radioactive waste in preparation for shipment off site to a licensed burial site. A process control flow path is presented as Figure A, and a system flow schematic diagram of the NMP2 SWMS is presented as Figure B.
AP-3.7.1 -2 August 1986
5.0 SYSTEM DESCRIPTION (Cont'd)
The Solid Waste Management System accepts dry solid trash which is, when physically possible, compacted with a trash compactor. Resin beads or powdered, resins will be dewatered in high integrity containers or will be processed along with evaporator bottoms through the extruder evaporator. When required, NMP2 will also use the services of a vendor to solidify waste.
The extruder/evaporator is a one-step volume reduction and solidification process. Two screws inside the extruder/evaporator convey the waste/asphalt mixture along its length, continually shearing and mixing the waste/asphalt. The screw speed can be regulated to control the evaporating capacity and residence time of the waste. The extruder/evaporator discharges a homogeneous mixture of asphalt and waste containing less than 1X latent water.
The solid radwaste system uses the extruder/evaporator to process waste feed from two inputs: the evaporator bottoms tank or the waste sludge tank. The waste is mixed with asphalt in the extruder. Only one waste feed path can be processed at a time.
The evaporator bottoms tank and lines are electrically heat traced to prevent crystallization of waste salts. The contents of the tank are fed to the extruder/evaporator via a transfer pump that supplies redundant metering pumps. The waste flow rate is controlled manually by adjusting the flow rates on the metering pumps The contents of the waste sludge tank are fed to the extruder/
evaporator by a system similar to, but separate from, the evaporator bottoms feed system. The waste sludge tank is supplied by waste from three sources: the radwaste filters, the floor drain filter and the spent resin tank . The waste sludge tank has the ability for decantation. A decant pump takes a suction off the sludge tank and discharges to the spent resin tank.
The contents of the asphalt tank is fed to the extruder/evaporator via redundant recirculation pumps, strainers and metering pumps.
The asphalt flow rate is automatically adjusted to yield the proper ratio of asphalt to solids. The asphalt tank and lines are contin-uously steam heated to keep the asphalt in a liquid state for ease of pumping.
As the waste/asphalt mixture moves through the extruder/evaporator, it is heated by boiler is skid steam from the electric radwaste boiler.
mounted boiler system which utilizes electricity This a
for steam production. It is a closed system, thus most of the water used for steam is returned to the boiler as condensate via the boiler feedwater system. The boiler vessel is capable of supplying 14001>/hr of steam at 233 psig and 400 P. The steam applied to the extruder is utilized in six separate heating zones for moisture evaporation. Each zone has its own temperature controller for optimum operating conditions.
AP-3.7. 1 -3 August 1986
5.0 SYSTEM DESCRIPTION (Cont'd)
Three devolatization ports along the extruder allow for water vapor to separate from the product and enter the three steam domes. A predetermined amount (4 gal.) of demineralized water is used, which ~
dissolves and boils out any salt sediment at the devolatization port. The vapors are condensed in the steam domes using turbine building closed loop cooling and drained to the distillate collection system.
The distillate collection system is a recirculating system used to continuously filter and cool the condensate from the extruder/evaporator steam domes. The condensate is recirculated from the distillate collection tank through the distillate pumps>
roughing filter and the distillate cooler, then routed back to the collection tank. The level controller maintains collection tank level and system flow.
A forced circulation ventilation system is incorporated into this system, consisting of a vent hood over the extruder/ evaporator turntable, a fan which draws air from the plant ventilation system across the extruder/evaporator turntable, and liner cool down areas.
The extruder/evaporator product empties into 50 cubic feet liners.
The liners are placed on the fill station turntable. The operator indexes (turns) the turntable, via a control switch, placing a liner under the discharge chute of the extruder/evaporator. This turntable holds three liners. When the liner level reaches a predetermined level, a high level alarm sounds to inform the operator it is time to index the container. Liners are indexed without shutting down the extruder/evaporator. Using control switches, the operator, via a pneumatic carrier, extends a drip pan under the extruder/evaporator discharge chute. The operator then indexes the turntable. Once the new liner is in place under the extruder/evaporator discharge chute, the pneumatically operated carrier is withdrawn. During this withdrawal operation, the drip pan is removed from the carrier by a stationary arm as the carrier retracts past the arm and drops the drip pan into the new liner.
Full liners are removed from the turntable to the cooldown area via a radio controlled/ operated crane. The liners remain in the cooldown area for approximately 52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br />. After the cooldown is completed the liners are capped. They are then moved by crane to the storage area using a ceiling grid coordinate system for placement of the liner.
Operation of the extruder evaporator is detailed in operating procedure 2WSS-OP-41.
6.0 SOLID WASTE SOURCES A description of each solid waste source is provided below:
Radwaste Filters these mechanical filters filter resin and crud (backwash material) from the waste collector sub-system. When a AP-3.7.1 -4 August 1986
6.0 SOLID WASTE SOURCES (Cont'd) filter reaches a pre-determined differential pressure, it backwashes the material into the backwash tank, which is then pumped to the spent resin tank.
Radwaste Demineralizers these demineralizers are used as an ionic exchange media for processing high quality water from the waste collector tanks. When determined that the resin can no longer be regenerated, the depleted resin is pumped to the spent resin tank, Condensate Demineralizer - these demineralizers remove soluble and insoluble impurities from the condensate water to maintain reactor feedwater purity. After the it is determined that these resins can no resins are pumped to the spent longer be regenerated, depleted resin tank.
Floor Drain Filter contributes to solid waste because it uses diatomaceous earth to process liquid waste of low quality. Input to the filter is from the floor drain system and the regeneration waste tank. When the filter reaches a predetermined pressure drop it backwashes to the waste sludge tank for processing through the extruder evaporator.
Spent Fuel Phase Separator these tanks receive the exhausted powdered filter (ecodex) coating from the fuel pool clean up system which is subsequently pumped to the spent resin tank.
RHCU Phase Separator these separator tanks receive exhausted ecodex or powdered resin from the reactor water clean up system which is subsequently pumped to the spent resin tank.
Contaminated Oil oil from sources within the unit that become contaminated will be stored in containers to be solidified .by a vendor with an approved procedure.
Compactible Solids compactible low level trash will be processed and compacted in a hydraulic-operated box compactor. Shoe covers, trash, contaminated paper from the chem lab, and similar materials are included in this category.
Filters and Miscellaneous Items Solid items with higher dose rates than those above will be handled on a case-by-case basis, being disposed of by methods acceptable to the burial site. They will, for example, be placed in a suitable cask prior to shipment to the burial site.
Waste Evaporator the waste evaporator processes low quality waste the floor drain collector system and, as an option, waste from 'rom the waste discharge tanks. The waste evaporator is designed to concentrate to a 25X solid concentration. The concentrates are then discharged to the evaporator bottoms tank for processing through the extruder evaporator.
AP-3.7.1 -5 August 1986
6.0 SOLID WASTE SOURCES (Cont'd)
Regenerant Evaporator the regenerant waste evaporator receives regeneration solutions from the condensate,demineralizer system and radwaste demineralizer resin regeneration system as well as the.
radwaste regeneration sump. The regenerative waste evaporator is designed to concentrate to a 25K by weight solid concentration of sodium sulfate. The concentrates are then discharged to the evaporator bottoms tank to be processed thru the extruder evaporator.
Spent Resin Storage Tank exhausted resin from the condensate demineralizer, the radwaste demineralizer, RWCU phase separator, the spent fuel pool phase separator and the radwaste filter backwash tanks are sluiced to the spent resin storage tank. The waste from the spent resin tank is pumped to the waste sludge tank for processing thorough the extruder evaporator.
7.0 PREREQUISITES 7.1 Adhere to Station Radiation Protection Procedures 7.2 Assure proper asphalt input per ASTM-D-312-71 and N2-CSP-14.
7.3 Assure that NMPC Safety Procedures are adhered to.
7.4 Assure adequate recirculation of waste to be solidified (per 2WSS-OP41-Asphalt Operating Procedure).
7.5 Assure proper ventilation (radwaste ventilation).
8.0 PROCESS CONTROL SYSTEM COMPONENTS 8.1 Asphalt Volume Reduction System Variables Influencing End Product Pro erties This section identifies and defines the process variables of the WPC-VRS System. These process variables have a direct bearing on the properties of the final waste product and relate only to the ability to form a free standing monolith with essentially no free-standing water. Additional process variables, such as pH, must be controlled to minimize corrosion within the system.
However, because these variables do not affect the ability of the waste product to form a monolithic solid upon cooling, they will not be discussed below.
The following variables influence the properties and consistency of the final solid product:
A. Asphalt type; AP-3.7.1 -6 August 1986
As halt Volume Reduction S stem (Cont'd)
B. Waste chemical species being incorporated into the asphalt matrix, water content; C. Ratio of waste-to-asphalt; and D. Process temperature.
A detailed discussion of the effect and limitations placed on each of the foregoing items follows:
As halt T e NMP2 will use an oxidized petroleum-based asphalt, conforming to ASTM-D-312-71, Type III requirements. This grade of asphalt has a low residual volatile content, and a high molecular weight. At room temperature, and at all normal ambient conditions, this material is a freestanding monolith. Unit 2 will specify Witco Pioneer 221, or an equivalent. This is one of the means by which process control for asphalt quality is achieved. Werner &
Pfleiderer Corporation will be consulted if use of an alternate asphalt material is planned. A chemical analysis will be performed on each batch of asphalt received at the site. Verification of the asphalt type will be done per N2-CSP-14; Waste Chemical S ecies Testing will be done to determine the oil content and physical properties of the waste to be solidified per N2-CSP-14. The type and relative quantity (waste-to-asphalt ratio) of waste chemicals being incorporated in the asphalt matrix has a direct influence on the properties of the final product. Encapsulation of inorganic salts and solids typically "stiffen" and harden the waste product; whereas organic liquids have the opposite effect. When the proper ratio of waste-to-asphalt is maintained, final product properties relative to solidification, for all practical purposes, are independent of the waste type.
Werner 6 Pfleiderer Corporation places a limit of 1.0% oil and organic contaminants in the waste feed stream for process controI, and Unit 2 adheres to these guidelines.
Waste-to-As halt Ratio in the Product The ratio of waste-to-asphalt contained in the end product has the most bearing on the viscosity and physical consistency of the product during processing. The recommended weight ratios of waste-to-asphalt for each waste feed is as follows:
AP-3.7.1 -7 August 1986
Waste-to-As halt Ratio in the Product (Cont'd)
Ratio of Waste-to-Asphalt Feed in the End Product
- 1. Evaporator Concentrates 40/60 to 50/50*
- 2. Spent Resins 45/55 to 50/50*
- 3. Filter Sludge 40/60 to 50/50*
- Optimum value depends on type and quantity of contaminants present.
Should the ratio of waste-to-asphalt be increased above the range specified in the foregoing table, the end product viscosity will increase and may exhibit a grainy texture. This could lead to "pyramiding" of the product in the container, thereby decreasing the container filling efficiency. In all cases, the product will cool to form a freestanding monolith. If lower than specified waste loadings are realized, the end properties will approach that of pure asphalt.
Proper waste-to-asphalt ratios in the product are automatically maintained by a coordinated proportioning feed system to the extruder/evaporator. Operator involvement is limited to setting the initial proportion of waste-to-asphalt flow. To'o this, the chemistry department will determine, by sampling, the solids content of the waste feed. After the sample analysis, the chemistry department will determine the proper feed control settings. See N2-CSP-14 for flow rate calculations. The operator must visually confirm that the proper ratios are being maintained.
A CCTV camera can be used to "view" the discharge from the extruder/evaporator, and the TV monitor located in the control room allows the operator to observe the physical consistency of the product as it is discharged into the container. Flow rates will be calculated based on the information supplied in Topical Report No.
HPC-VRS.001, Rev. 1, May 1978 Appendix B Solid Contents.
Process Tem erature A proper temperature profile along the length of the extruder/evaporator is required to provide adequate evaporative (process) capacity, and to ensure that free water is not discharged from the machine. The process temperature profiles for all typical Nine Mile Point waste types are as follows:
Waste Type Process Temperature* ( F)
Zones: 1 2 3 4 5/6 7 Evaporator Concentrates 165 265 300 330 375 350 Spent Resins, Filter 165 265 285 300 285 230 Sludge
- Temperatures are approximate.
AP-3.7.1 -8 August 1986
Process Temperature Low temperature alarms are provided to alert the operator to a low temperature off~ormal,condition which could potentially lead to the discharge of .free water. These alarms are based on a percent (X) deviation from set point, typically + 10 F. The percent deviation permitted can be adjusted in the field up to + or 25%%d
(+ or 75 F) of the instruments range.
If off~ormal conditions persist for two minutes, the extruder/evaporator is automatically tripped to prevent free water from being discharged into the container. Free water cannot be discharged in the interim, because the residual heat of the extruder/evaporator itself is sufficient to effect evaporation.
The foregoing controls/interlocks are provided to prevent the discharge of, free water to the container. The temperature profiles specified above have been proven by experiment to'ield residual total moisture content in the product of 1X by weight for waste concentrates (inorganic salts) and 10% by weight for bead resins.
This margin provides assurance that free water cannot be discharged under normal circumstances. Under upset or off~ormal conditions, discharge of free water is prevented by the low temperature process interlocks.
Temperature profiles will be logged every two hours of equipment operating run time. See Figure "D".
Minimum Functional Com onents In support of maintaining the four major process parameters; Process Temperature Asphalt, Type Mixture Ratio Oil Content and, to assure a stable waste form consistent with the guidance of the PCP, operators will ensure that the following list of equipment is available, as a minimum, prior beginning to processing:
closed circuit television system at the asphalt loading stations; all temperature profile monitoring instrumentation with calibration; the asphalt and waste metering equipment are operational; and all radwaste sampling stations.
Wastes will not be processed through the extruder/evaporator, when any of the above equipment is inoperative.
AP-3.7.1 -9 August 1986
8.2 Hi h Inte rit Containers NMP2 will also use a high integrity container (HIC) for dewatering to satisfy the stability requirements. Each HIC used will have a certificate of com liance available and dewatering procedures based on an NRC a roved vendor rocess control ro ram or "Topical Report will be a part of N2-WHP-4 Cask Loading procedures.
Documentation of adherence to these procedures shall be kept as records.
8.3 Oil Solidification Contaminated oils will be stored in containers at designated areas within the plant. A vendor with an approved process control program that is acceptable at the burial sites will be used to solidify the oil. An operating procedure for the portable oil solidification system will be established as N2-WHP-10A. A sample production level process control program will be established as N2-WHP-10B.
8.4 Tem orar Radwaste Processin (Contracted Vendor)
In the event NMP2 requires the services of a contracted vendor to temporarily process and package radwaste on site, NMPC will obtain the services of an NRC approved vendor demonstrating their commitment to 10CFR61 stability requirements. The vendor must demonstrate that the have completed Class B and C testin or provide a schedule of com letion. Vendor must have an ap roved procedure to rocess Class "A waste.
After fuel load an engineering review, per 10 CFR50.59 of the subject topical report procedure or program will be performed to assure that vendor operational requirements are compatible with NMPC system and licensing commitments.
All vendor procedures will be reviewed and approved as required by Site Administrative Controls. The operating procedure for the vendor solidification will be approved. A production sample level process control procedure shall be implemented. The vendor shall be provided samples per 2WSSWP-41 and N2-CSP-14.
8.5 DRY ACTIVE WASTE (DAW)
NMPNS Procedure No. N2-WHP-12, "Solid Dry Waste Collection and Compaction", describes the proper and safe steps required to collect and prepare low specific activity DAW for offsite shipment. Procedure No. N2-WHP-11, "Process Control DAW", assures the process control of Dry Waste Collection and Compaction by identifying those items which most directly influence the quality of the end product. All dry active waste is examined before AP-3.7.1 -10 August 1986
8.5 DRY ACTIVE WASTE (DAW) (Cont'd) compaction, and any liquids or items found that would compromise the integrity of the package or violate the burial site license and/or criteria are removed and separated as specified in this procedure. Dry active waste is shipped in containers that meet'the transport requirements of 49CFR173.425. At times, radiation .limits preclude disposing of DAW in LSA boxes or drums, and this waste is disposed of in liners per Procedure No. N2-WHP-4.
9.0 SAMPLING All the various sources of. wastes are directed to one of two final tanks. These tanks are the evaporator bottoms tank (Tk10) and'he waste sludge tank (Tk8). When ready to process waste from one or the other of the above sources, the tank's contents are 'isolated from further input, recirculated and Tk8 agitated to ensure a homogeneous mixture. Once these tanks are isolated, no further waste is added and a batch number will be assigned per the operator work sheet. Figure "C" Before processing, a sample of each batch is obtained from the tank in accordance with Operating Procedures N2-IOP-41 Asphalt Solidification Operating Procedure and N2-CSP-14 Solid Radwaste Surveillance. The s'amples are analyzed and the sample data form in N2-CSP-14 is completed. Chemistry personnel will determine the chemical and radionuclide content of each sample in accordance with the procedures as listed. After the sample is analyzed, the operator will complete the "Operator Work Sheet" per instructions and complete the "Temp Profile Log" (Figure "D") during processing. After collecting the feed rate data from the chemistry department, the operator will sel'ect the given feed rates for introduction into the extruder/evaporator.
Should circumstances result in interruption of a batch, the source tank will be isolated and remain so until processing can resume.
10.0 WASTE CLASSIFICATION The minimum waste characteristic requirements identified in 10CFR61.56(a) shall be satisfied via implementation of Procedure S-RP-6.
The NMP2 PCP assures that wastes determined acceptable for near surface disposal are properly classified for the purpose of segregation at the disposal site. Waste classification is performed consistent with the guidance provided in the Branch Technical position pertaining to Waste Classification and is based upon the concentration of certain radionuclides in the waste form as given in 10CFR parts 61.55 and 61.56.
AP-3-7.1 -11 August 1986
WASTE CLASSIFICATION (Cont'd)
The methods utilized by NMP2, and the frequency for determining the radionuclide concentration of the final waste form is conducted in accordance with NMP2 Procedure For Solid Radwaste Sampling,
~
N2-CSP-14. Classification will be. performed in accordance with S-RP-6, Packaging and Transportation of Radioactive Material.
Chemistry and Rad Protection assume these responsibilities.
ADMINISTRATIVE CONTROLS This section of the NMPC PCP describes administrative controls as they relate to quality assurance, training, documentation, and record keeping programs implemented by the PCP.
Administrative controls are utilized to ensu're that all processing is performed in accordance with the guidelines set forth in the PCP. Management-controls are established for the safe operation of NMP 2.
Qualit Assurance Implementation of the Operational QA program is assured by ongoing review, monitoring and audit functions in accordance with the Applicable NMPC Quality Assurance Department Procedures.
The administrative controls designed to prevent solidified waste forms from being released for shipment prior to test sample verification of acceptability require QA to verify that a sample record sheet has been properly executed for each waste batch prior to processing.
The Manager Nuclear QA, operations has the authority to stop work when significant conditions adverse to quality require action.
The Nuclear QA program assures compliance with the waste classification and characterization requirements of 10CFR61.55 and 10CFR61.56.
With respect to waste characterization, the requirements of 10CFR 61.56 are intended to provide stability of the waste. Stability is intended to ensure that waste does not structurally degrade and affect overall stability of the waste disposal site. The auditing function of the Nuclear QA program assures that stability requirements are achieved in accordance with 10CFR61.
In the event a vendor is contracted to perform temporary radwaste services, the Nuclear QA program requires management review of the ven'dor procedure. The purpose of this review is to assure that vendor operation and requirements are compatible with responsibilities and operation of NMP2.
AP-3.7.1 -12 August 1986
11.2 ~1rainfn A 'raining program is being implemented for personnel having responsibilities related to waste processing operations. The results of this, training program shall ensure that waste processing is performed within the specific requirements of the PCP. To
'accomplish this objective and to provide the necessary control of the solid waste processing the following training programs will be implemented.
11.2.1 Radwaste 0 erations Unit 2 Plant Trainin Pro ram A. These programs are designed to provide competent, trained personnel. During classroom instruction, each operator must qualify by completion of the described course with an average grade of 80 or above. On-the-job training, in conjunction with classroom instructions, will ensure that each radwaste operator maintains an acceptable level of skill and familiarity associated with radwaste controls and operational procedures.
Due to the involvement of radwaste operators in the start-up of NMP2 radwaste systems, the experience gained will suffice for the on-the-job training requirement. The training procedures are detailed in the Nuclear Department Training Manual.
(N2-NTP-13)
This training includes familiarity with the following radwaste components or related systems.
LIQUID Drains, collection tanks with sub systems, waste and regeneration evaporators, seal water SOLID - Extruder-evaporator and associated support systems LWS Computer operation and interfaces Waste handling procedures for packaging and shipping of radioactive material Condensate demineralizer system Spent fuel and phase separators subsystem Steam supplies 11.2.1.1 Chemistry and Radio Chemistry Technicians will be trained per S-NTP-1 (Training and Retraining of Chemistry Radio Chemistry/Technician).
11.2.1.2 Rad Protection Technicians will be trained per S-NTP-14 (Training and Retraining of Radiation Protection Techs).
AP-3.7.1"- -13 August 1986
11.2.2 Trainin Schedule The formal classroom Radwaste training program is scheduled for approximately twelve weeks. Depending on the needs of the plant staffing, this program could cover a continuous twelve week cycle or become part of the NMP2 normal rotating shift schedule which would cover one full year.
11.2.3 Personnel Retrainin Personnel will be retrained on an annual basis to identify individual needs for retraining. Personnel demonstrating a significant deficiency in a given area of knowledge and proficiency may be placed into a remedial training program. This program is specifically structured to upgrade knowledge and skills identified as deficiencies. Successful completion of the accelerated training program is evaluated by a written and/or oral examination.
The Requalification Training Program will cover fundamental review of system modifications, revisions of procedures, and changes or experiences in the nuclear industry.
11.2.4 Training Records The training records shall be maintained for audi.t and inspection purposes. These records are considered permanent records and shall meet the applicable requirements of "Requirements for Quality Assurance Records for Nuclear Power Plants" and AP 9.0 (Administration of Training).'1.3 Documentation Control and Record Retention QA program audits of waste classification records are performed on a periodic basis. Management evaluation of such audits shall be performed and as such satisfy the requirements of 10CPR20.311 (d)(3).
Audits of the Radwaste operating procedures shall be performed by the Quality Assurance Department at a minimum of once per 24 months. Changes to operating procedures shall be reviewed on an as required basis by Nuclear QA in parallel with the NMPC Operations Review.
All Waste Management Records shall be maintained per Administrative Procedures.
11.4 REVISION TO THE PCP Proposed revisions to the NMP2 PCP will receive approval. These revisions and requirements, The PCP,
~
may be betterment if initiated as initiatives, a result of proposed plant operations system design changes, concerns or temporary vendor interfaces.
revised, shall be submitted to maintenance the NRC.
AP-3.7.1 -14 August 1986
Shi in Manifest (See Pigures E and F )
All shipping manifests will be completed and tracked to satisfy the requirements in 10CPR20.311 per Waste Handling Procedures.
Radwaste Management .will monitor the status of Manifest per N2-WHP-2, Section 6.'9.
Temporar Store e Any solid radwaste material that is to be temporarily stored while awaiting shipment in an area other than one in which such material is designated to be stored will be done in accordance with AP-7.2.
AP-3.7.1 -15 August 1986
PROCESS CONTROL FLOW PhTH (FIGURE h)
Pre-Req Asphalt Sampled Isolate and Mix Sample Waste Farm Chemical Analysis NZ-WHP-LOB
-41 NZ-WPZ-9 NZ-WHP-9X NZ-WHP-9B Process N2-WHPM Waste Form NZ-WHP-I.2 N2-WHP-4 Ta Scorage P.T ar sh'- for Classify, Label and disaosal NZ-WHP-9 Store Waste Form
".2-4'HP-2 S-RP-6 Prepare .'!anifesc iV2-WHP -2 Nocificatian for Shipping co Disposal Site C:ose iV2-WHP-2 F'le on S-RP-6 SHIP te N2-WHP-Waste Form Fc m Close Waste File on YES Received Investigate Waste At Disposal N2-WHP-2 Disposal Site Form Site (If needed to N.R.C j folio~ thru AP-3.7.1 -16 <<g<<t 1986
Reactor Water Clean Up Phase Separator pent Fuel Phase Separator Condensate Radwasce Demineralizers Radwasce Dem~neralizers IE Radwasce floor Drain ~
Filters Filter SWHS FLOW SCIIEHATIC pent csin ank Waste Sludge ce
'ank ap.
I Spent Resin Pump To Floor en Waste Drain ap, Evap. Sludge Bottoms Hetering Pump Steam FLT Tank Waste u a Pum Domes tank Cooler .
ra Distillate 'ap Bottoms G Collection Evaporator Hetering a B Bottoms Pump Oil Pump Lube r 0 en Pumps X EXTRUDER/EVAPORATOR Cool Cooler Down brea Asphalt Tank Lube Oil Fill Tank Filter Scacion 0 D.A.W. Solid Waste torage Storage 0 Asphalc DNA.W.
S Hecering Compactor L S To Aapha 1 c Pump Pump gurial FLOW SCIIEHATLC (I'igure Si te B)
Ap 3 7 l l7 August l 986
Figure C
- 10. 2 Operator Worksheet 10.2.1 Batch Number Date A batch is considered (1) a sampled Sludge TK, or (2) a sampled EVAP bottoms tank with no waste being added to the tank during the processing of that batch.
NOTE: Batch number will consist of; BA (Batch Asphalt), year, and a four digit successive number> (beginning with 001) .
Ex. BA 84 001 Unit Year Batch Number 10.2.2 Type of Waste Resin/Filter Media Concentrate Waste A) Waste Temperature OF B) Rad Level C) Specific Gravity D) pH E) X Oil F) X Solid G) Activity nCi/ml
- 10. 2.3 Feed Flow Settings 10.2.3.1 Asphalt Feed Flow Settings 10.2.3.2 Waste Feed Flow Settings 10.2.4 Radioactive materials classification A) Radioactive materials LSA B) Other 10.2.4.1 Waste container labeled in respect to S-RP-6.
NOTE: Labels with the appropriate data will be supplied to the Radwaste Operator by the Radiation Protection Department/Chemistry Department. The operator must label container.
10.2.5 Radioactive waste classification A) Class A Waste B) Class B Waste C) Class C Waste 10.2.5.1 Waste container labeled in respect to S-RP-6.
NOTE: The radwaste operator will receive labels and marking from the Radiation Protection Department. The radwaste operator will label containers.
AP-3.7.1 -18 August 1986
Figure D 10.3. 1 Temperature Profile Log Record of Temperature in Degree oF every two hours of run time for a particular batch.
TYPE OF WASTE BATCH NUMBER START TIME Batch 8 1 2 3 4 5 6 7 Initials/Time Normal Temp. Sludge 165 265 300 330 375 375 350 Normal Temp. Conc. Waste 165 265 385 300 285 285 230 After 2 Hours After 4 Hours After 6 Hours After 8 Hours After 10 Hours After 12 Hours After 14 Hours After 16 Hours After 18 Hours After 20 Hours After 22 Hours After 24 Hours 10.3.2 Did temperature profile remain within limitsP NOTE: The temperature profile should be monitored constantly but must be logged every two hours.
AP-3.7. 1 -19 August 1986
OAIINWLLLWRL~IL MRNAIIIMLNI TAIiILIIT USE llllS NUMBIllUN VOLUME A(EOCAINN NO Operaled by; CHEM NUCI.EAR SYSTEMS. INC. AIL CONIINUATIONPAGES GENERATOR NAME
.-CONTINUATION SHEET- .: tAQ( Of lib (III lit) I)O) ilI) It)i l)ll I)li l)ll (tll (tn ()I) ltl) IRO ilii lu) ill) IN)
ÃI" RADIO t(RC( NI Oi AC(IVI(1 tlIISICAL CIO LRCAI acASI( WAS(L SIASIIili St(CIAI 5OURCL (RSIOSARI( WSIO (AIR( CWITAW(R RAWA(IWC CWI I AQRCA I IWI 44 l TISSR( LAMLSI IIO HUCI IC( ACT(I)1 9 (ACII I OR)( IORU AND NSCRitIARC IORII (RAIS IS II IRI(I(AR @AT(RW CWITANCR COKTAWM TTt( CWCI AIR( I II CWI I ARI(4 SUO lltS CLASS LIARUROS EACH (AC(I CWIIAUI(il IIAU( 5 o Ol CI AS5 IIAI(RIAL Itcacodc) RC(CHT UOLIRAC SURf AC( I Q( I IR SURIAC( (Al. At. USCO CWITAURR ROC(IN. QnCo) Cn(l AlRcO (Ac iocc) (c rls II coRIUR IOtliII OOcodl LSI. a(c I ACIR'I O ~ ail/IIR Ocia Cacocoa 4Ooac Aoo I
coo Roooaclao 4cioacioo 4ooaclac-Roooac iaca Radoac lao 4ooac ovo-PAGE IOTA(S fwin No CNS 20(
(9.83)
OISPOSAL SITE COPY FIGURE AP 3.7 1 gust y986 ~ .
Oiutae loss Mal+
AOCNI la .
P 0 US ECOL, lNG.
EXECUTIVE OFFICE: (402) 424-lf40 BOX 7264 ~ LOUISVILLEIFKENTUCKY4P207 0 OO~ aoa~
Neereei
~111 %II A
WA au~
/+A U olsaa CCHIACI AOOKM alar& + Isnv as It ¹ Oo or Oll LJ~
EILI C&eIACI hOret AOIH14NOKSA LM 1st StaPukHI ~
CAHQfll Rlvpsvo oA'Ia wt ol~ u~s lo Cele CCwIKI Sleri CNWQI CtA ~ 4 NXNfl4
~
NISI sr laoslalHI ~ NIALCAl4lAhlhkI ~ un stela lr hsoHE ule SIAIS cr Loam's a~use st~a Nsao ~~ seaw casa nea CASE SEAIACt aliPORJC MIS IOIM IOA fetus Cs ASS PAOPEA SHIPPNG NAME 6 NAZAAO CLASS SINPMENT TOTALS IOO Nol WRITE IH SNAOEO AAEASI
)PEA lS CFA 172 101)
~ Or NXVQC 'lolAI. ~ OF SouACE Call lCKXCJVI lillirull OACXACaIS gu al pAcxAoca NARAw. Qyg $ 84 hNOWSi Olll Radioiclho Llatortal cha Radloaalvo Lti 14a14 n o a. - Radioactive Materi ~I UN2916 e,
Asdhadtvs MS4rW. hw -
lh sclhl . n o a. Aadhaclivo Material UN2912 ACT IVllYTOTALS:
ACTIVITY Asdhacllvo -
Ma4rtal n o s. Radhactivo Mater fat UN29$ 2 Oc w elle asi C.ll eca isa AIL ISOYOPf4 Aadkealve Radhadive Radhacths LlatarW Nmltod uanta, n o a.
Maladal.
Tlsollum Nitrate - Rodhoctho Malarial Uran Aceta4 AO-6000I2270 -
~
Radioaclho Matorhl 41 foan. n o s. Radhactivo Malorht MS4IW. hubumenU and arlk4s - Aadhaclho Malar tat UN2910 UN297a UN29 ta UN2976 sos IH %le cootlol wQ IOCFIQO1 I I
~
o Io ERRfvw ewe oe IcwNAAI4DlaEIQhALS Nlt tlcvclhe clLw4cD DAcAotD oemcameeararaeinos¹oheseoulaaaaasllrorieaa ewl Oe ~
IMa4Ksrar& Kt&&4I0%4 SALMIwlLAooos oe ccwsAN os swsKwar sal K ~4&tl JtILKARS aI lie IxsLSNAo ocpIKIL ose Ice¹ wlsw¹s
~
w INA4o ~Ma II>>
IJJElm wcl c4mems ¹D cmcwm N Kccso¹ca mss w es ~
eeo N cawls~cE sess Aadhacllve Malarial NA9160 Uran I Nitrate solid AO.50000270 - Radioactive Malarial UN2961 IlIll w salle AKKlvcracaslswar ecwsIKkteac~~4w eyeesoah i ~
wyeaoss oai aa¹yiw ol Iv osoasal w ee Ua lseNOI w oi seas 4sa w see¹
~s¹cawe,a~~~~~oe4 saasiece oeeeseee oe w o\NAoeel er lswoaeeew a@esse se&o Io4eeaao Heaa erose
~ aw~~o i sees>>as ~
w ssydwrg ovso ase, w Io ao Has u esca eou o&e¹ww sosese oooo ~ac%ac ew ~o ow¹ soaus ee 4 o eae aei aaeaaas la ae e~~e~~eo Ilslll c~
raoyeaa AHO se CIIHIHIKll4 I sos eosa4ee
~ aaaw4aaes Qsele
~ ee ~~
A4 wwyoi Hwss aoo oe coward w 4 ae4 lo l4 lsag Iew,aAL~ w w 4algie%4 haÃly lease solaeolaoaaleeeawalss~ateasNaooasowta4oeso44aesaae~oNreeoaeweewoNwl&4~s FOA US ECOLOGT'S USE OHLT Pr&E OF OHTAINEA COHIASNE VCk Ulled CU Fle
~
I%0$
OF CU Fl PEA COHIASNEA M% O~o o,e' 0 ~aesoosayooewoea 0~I+co Ca 0 eev~o OAO ~VM IIAI SON aeaeeaoae<<eao w~~s~
Oo ~~
CWCaeSS SWIaaeae SOIMSOAD CKSCAK SaaCKOuCCINGharlea SICS Oe QS~~
Q~w¹'aa~
0o N
a LJ,UIU eCaaeaoeae~ueewI 04lleoAOa1 Isle+a~ I Va ~at~aswtsAW l
¹I weoaeygw4 Oesay eeH eahse oa Ecoaoo~ srvcHcs s tm acotocn cualolmA ~
~
9++I 'owns)
'A Auaoo al
'4 1
i'-7)j;
+yOI Oil saa%~otts Hseeaaioeocao aivwri~eseau aiiai~Tlo aoaas i ~
M Ecolooe otvocc os%
~
olt l%!
OIHIA Isa SSIE o¹crsaeAHOC cooarAt.".
LLjLLj So Sslf
~ llufrsa Ossa Oapooe4 BATES a e
4'WPllEHl Ieoeco Ho Il lee swor& ruach NceeoW 0 the ewe W eol 4apaoel
~
ol le oscoaovas ~ levee CONSIGNEE OIIIGINALCOtY g~~t&!SCBQO at~ ~ts OIQlto Wllllla ISIIIST ACCOSEPANT WASTE Ol TRAI44A)
FIGURE F Ap-3 . 7 . 1 -2 1 Augus< 1 986
PROCEDURES WHICH IMPLEMENT THE PCP Waste Handlin Procedure's (WHP's)
N2-WHP-1 "Required Documentation Concerning Packaging and Shipping of Radioactive Wastes" N2-WHP-2 "Paperwork for Radioactive Waste Shipments" N2-WHP-3 "Cask Handling Procedure" N2-WHP-4 "Cask Loading Procedure" (Liners for Dewatering)
N2-WHP-6 "Van Handling Procedure" N2-WHP-7 "Van Loading Procedure" N2-WHP-9 "Process Control for Asphalt Systems" N2-WHP-9A "Operating Procedure Vendor Solidification" N2-WHP-9B "Process Control (Sample Production) Vendor Solidification" N2-WHP-10B "Operating Procedure Oil Solidification" N2-WHP-11 "Process Control DAW" N2-WHP-12 "Solid Dry Waste Collection and Compaction" N2-WHP-8A "Flat Bed Handling Procedure" N2-WHP-8B "Flat Bed Loading Procedure" NOTE: Procedures N2-WHP-8A & N2-WHP-8B shall be used for Dewatering and Solidification in large liners unless dose rates dictate that cask will be used.
Radiation Protection Procedures (RP's)
S-RP-1 "Access and Radiological Control" S-RP-2 "Radiation Work Permit Procedure" S-RP-3 "Performance of Radiological Surveys" S-RP-4 "Picking Up, Receiving and Opening Packages Containing Radioactive Materials" S-RP-5 "Radiation and Radioactive Contamination Control" S-RP-6 "The Packaging and Transportation of Radioactive Material" Chemistry Procedures N2-CSP-14 "Solid Radwaste Surveillance" AP-3.7.1 -22 August 1986
FIGURE G PROCEDURES WHICH IMPLEMENT THE PCP Qualit Assurance Procedures (QAPs)
QAP-10.03 "Quality Assurance Department Surveillance Activities for Operations" QAP-10.30 "Quality Assurance Department Inspection Activity" QAP-18.10 "Quality Assurance Department Activity" Operating Procedures 2WSSWP-41 "Asphalt Solidification Operating Procedure" 2LWS-OP-40 "Liquid Radwaste Operating Procedures" Site Administrative Procedure AP-10. 1 "Management of Station Records" AP-3.7.1 -23 August 1986