Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18041A073 | 27 July 1999 | Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2. | Safe Shutdown Weld Overlay Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld Scaffolding Backfit |
ML17059B291 | 4 September 1996 | NMP Nine Mile Point Nuclear Station Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan. | |
ML17059B022 | 15 February 1995 | Rev 0 to UT-NMP-311V0, Procedure for Manual Ultrasonic Exam of Nozzles Inner Radius & Bore. | Nondestructive Examination |
ML17059B020 | 10 February 1995 | Rev 0 to UT-NMP-703V0, Procedure for Geris 2000 Ultrasonic Exam of RPV Nozzle Inner Radius & Bore Regions. | Non-Destructive Examination Nondestructive Examination |
ML17059B021 | 10 February 1995 | Rev 0 to UT-NMP-309V0, Procedure for Manual Ultrasonic Exam of Planar Flaw Sizing for Nozzle Inner Radius & Bore Regions. | |
ML17059A888 | 18 January 1995 | Rev 0 to Field Disposition Instruction 0245-90800, Shroud. | |
ML17059A566 | 9 November 1994 | Rev 2 to Emergency Plan Maint Procedure EPMP-EPP-08, Maint, Testing & Operation of Oswego County Prompt Notification Sys. | Health Physics Network |
ML17059A424 | 6 July 1994 | Rev 14 to Nine Mile Point Nuclear Station Unit 1 Odcm. | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML18040A294 | 17 December 1993 | Rev 13 to Nine Mile Point Nuclear Station Unit 1 Odcm. | Grab sample Offsite Dose Calculation Manual |
ML17059A097 | 25 October 1993 | Rev 4 to NMP2-IST-001,NMP,Nine Mile Point Nuclear Station, Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan. | Stroke time Hydrostatic Squib Cold shutdown justification |
ML20056G669 | 25 February 1993 | Rev 8 to Odcm | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
ML17056C297 | 30 June 1992 | NMPNS - Unit 2 Odcm. | Grab sample Annual Radioactive Effluent Release Report |
ML17056B984 | 26 June 1992 | Rev 9 to Nine Mile Point Nuclear Station Unit 1 Odcm. | Grab sample Annual Radiological Environmental Operating Report |
ML18038A485 | 1 October 1991 | Rev 3 to First 10-Yr ISI Program Plan. W/910930 Ltr | |
ML17058A956 | 2 May 1991 | Rev 5 to Administrative Procedure AP-3.7.1, Unit 2 Radwaste Process Control Program. | Process Control Program |
ML18038A353 | 1 May 1991 | Rev 3 to NMP2-IST-001, Niagara Mohawk Power Corp,Nine Mile Point Nuclear Station Unit 2 - Pump & Valve First Ten Year Inservice Testing Program Plan. W/910501 Ltr | Safe Shutdown Stroke time Squib Power-Operated Valves |
ML20070U362 | 1 April 1991 | Cover Page to Rev 1 to Issue 2 to Nuclear Security Training & Qualification Plan | |
ML17058A954 | 6 March 1991 | Rev 4 to Administrative Procedure AP-3.7.1, Unit 2 Radwaste Process Control Program. | Process Control Program |
ML18038A327 | 30 June 1990 | Rev 3 to Nine Mile Point Requalification Program Action Plan. | |
ML17056B983 | 15 June 1990 | Rev 8 to Nine Mile Point Nuclear Station Unit 1 Odcm. | |
ML17056A967 | 3 April 1990 | Rev 8 to Odcm. | |
ML18038A324 | 28 February 1990 | Rev 5 to Odcm. | |
ML17056A966 | 27 February 1990 | Rev 7 to Odcm. | |
ML18038A292 | 12 September 1989 | Rev 3 to Administrative Procedure AP-3.7.1, Unit 2 Radwaste Process Control Program. | Process Control Program |
ML17055E558 | 2 March 1989 | Rev 1 to Restart Action Plan. | Fire Barrier Nondestructive Examination Scram Discharge Volume Exemption Request |
ML19325C174 | 14 February 1989 | Rev 1 to AP-3.7.1, Process Control Program. | Process Control Program Annual Radiological Effluent Release Report |
ML17055E477 | 16 January 1989 | Second 10-Yr Interval Inservice Testing Program. | Safe Shutdown Reactor Vessel Water Level High Radiation Area Stroke time Squib Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Exemption Request Power Operated Valves |
ML18038A423 | 31 May 1988 | Rev 6 to Offsite Dose Calculation Manual. W/Two Oversize Figures | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML17056A965 | 23 February 1988 | Rev 6 to Odcm. | Grab sample |
ML20059F875 | 5 February 1988 | Rev 4 to Odcm | |
ML20236G816 | 31 July 1987 | Revised Preservice Insp Plan for Nuclear Piping Sys & Reactor Pressure Vessel | |
ML20236G811 | 31 July 1987 | Revised Preservice Insp Plan for Nuclear Piping Sys & Component Supports | Incorporated by reference |
ML18038A272 | 21 May 1987 | Rev 3 to Offsite Dose Calculation Manual. | Grab sample Offsite Dose Calculation Manual |
ML18038A249 | 13 April 1987 | Revised Emergency Procedures,Consisting of Rev 5 to Emergency Action Procedure EAP-1, Activation & Direction of Emergency Plan, & Rev 9 to Emergency Plan Implementing Procedure EPP-20, Emergency Notification. W/870413 Ltr | Safe Shutdown Grab sample Earthquake Siren Overexposure Overdose |
ML20205S231 | 31 March 1987 | Rev 0 to Pump & Valve Inservice Testing Program | Safe Shutdown Reactor Vessel Water Level Stroke time Hydrostatic Squib Scram Discharge Volume Power Operated Valves |
ML18038A422 | 27 February 1987 | Rev 4 to Offsite Dose Calculation Manual. W/Two Oversize Figures | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML20211P450 | 13 December 1986 | Rev 0 to Preoperational Test Procedure N2-POT-1-2, Msivs | |
ML17055D182 | 19 August 1986 | Rev 0 to Administrative Procedure AP-3.7.1, Process Control Program. | Process Control Program |
ML18038A167 | 31 May 1986 | Rev 1 to Offsite Dose Calculation Manual. W/One Oversize Encl | Grab sample Offsite Dose Calculation Manual |
ML17055B533 | 11 April 1986 | Rev 1 to Technical Dept Procedure TDP-5, Administration of Operational Engineering Assessment Items. | |
ML17055B543 | 1 April 1986 | Rev 0 to Maint Instruction Procedure S-MI-GEN-002, Maint Instructions for Writing Procedures. | Fire Barrier Squib |
ML17055B530 | 20 March 1986 | Rev 0 to Site Administrative Procedure AP-6.1, Procedure for Mod & Addition. | |
ML17055B544 | 14 March 1986 | Rev 1 to Nuclear Training Procedure NTP-11, Licensed Operator Retraining. | Fuel cladding |
ML17055B542 | 14 March 1986 | Rev 1 to Nuclear Training Procedure NTP-10, Training of Licensed Operator Candidates. | Fuel cladding Power change |
ML17055B517 | 10 March 1986 | Rev 4 to Administrative Procedure AP-2.0, Production & Control of Procedures. | Fire Protection Program |
ML17055B541 | 10 March 1986 | Rev 3 to Vol IV to SWEC Pp 94, Review of Changes & Effect on Environ/Mechanical/Seismic/Hydrodynamic Qualification of Equipment. | |
ML17055B546 | 2 March 1986 | Rev 2 to Maint Instruction Procedure MI-4.0, Maint Instructions for Review & Implementation of Technical Requirements in Maint Procedures. | |
ML17055B525 | 1 March 1986 | Draft Rev 4 to Administrative Procedure AP-4.0, Administration of Operations. | |
ML17055B538 | 28 February 1986 | Rev 0 to Technical Dept Procedure TDP-8, Post-Maint Testing Criteria. | Squib |