Rev 0 to Technical Dept Procedure TDP-8, Post-Maint Testing Criteria
ML17055B538
Person / Time
Site: Nine Mile Point 
Issue date: 02/28/1986
From: Drews W, Randall R, Spadafore J
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17055B512 List:
References
TDP-8, NUDOCS 8604280286
Download: ML17055B538 (30)


Text

Enclosure

¹13 NINE MILE POINT NUCLEAR STATION TECHNICAL DEPARTMENT PROCEDURE PROCEDURE NO. TDP-8 POST MAINTENANCE TESTING CRITERIA APPROVALS SIGNATURES Technical Superintendent W.

C. Drews Technical Se~+

6~ntendent J.

R.

Sp fohh~g~

Supe kk echnical S

p ort R.

G.

dell DATE AND INITIALS REVISION 0 REVISION 1 REVISION 2 j-<cQ n~ ~-)4+

Summer of Pa es Revision 0

(Effective 2/28/86

)

~Pa es 1-14 Date February 1986 NIAGARA MOHAWK POWER CORPORATION THIS PROCEDURE NOT TO BE USED AFTER FEBRUARY 1990 SUBJECT TO PERIODIC REVIEW.

8bQ428028b 8b0415 PDR ADOCK 05000410 P

PDR

PUP-S POST MAINTENANCE TESTING CRITERIA 1.0 PURPOSE The purpose of this procedure is to provide the criteria which establishes the extent of testing required following a maintenance activity.

2.0 DEFINITION Post Maintenance Testing (PMT) as used in this procedure means component or system operability testing to assure that the maintenance

activity, be it preventative, predictive, or corrective maintenance, did not adversely affect performance of the component or
system, regardless of who performed the work.

3.0 REFERENCES

3.1 3.2 3.4 Generic Letter 83-28 Information Notice 85-71 ASME B6PV Code, section 11 AP-5, "Procedure for Repair" 4.0 PROCEDURE 4.1 The attachment to this procedure lists, by component, the maintenance activities that might be performed and the testing required following that activity.

The supervisor who approved the WR is normally the PMT specifier.

4.2 It is the responsibility of the PMT specifier to define the testing requirements for cases not contained in the attachment, and to notify the Supervisor, Technical Support for required revision to this document.

4.3 The PMT specifier shall assure that the PMT include a test specific to the corrective maintenance performed, as well as tests to assure the proper functioning of the component and/or system.

TDP-8

-1 February 1986

4.4 When maintenance is performed on a

component that is part of an auxilliary system of a large component, the larger component does not necessarily need to be tested.

For

example, maintenance on the prelubrication pump of a diesel generator does not require a

load test for any diesel maintenance.

What is required i'n this case is a pressure/flow test of the prelubrication pump.

4.5 When more than one PMT is specified, the test must be done in a

logical order, such that adjustments made during the test (tightening of valve

packing, for example) do not invalidate a

previously performed test (stroke timing).

TDP-8

<<2 February 1986

POST MAINTENANCE TESTING COMPONENT LIST MFCIIANICAL COMPONENT air locks MAINTENANCE ACTIVITY any affecting seal POST MAINTENANCE TEST RE UIREMENTS Primary Containment:

LLRT Secondary Containment:

Local peak Test opening Pzimary Containment airlock LLRT c ompressozs containment:

any insezvice test primary secondary any any CILRT or LLRT Reactor Building leakage test ox local leakage test control room boundary any local leakage test or control room pressure/flow test coolers cranes damper s any actuator xepair or replacement see heat exchangers or fxeon units load test stroke test damage repair or replacement stzoke test; fox Reactox Building oz Control Room isolation

dampezs, a

system pressure/flow test diesels doors any seal work, replacement load test leakage test for fixe rated or pzessure boundazy doozs fans any head/capacity (pressure/flow) test TDP-8

-3 February 1986

POST MAINTENANCE TESTING COMPONENT LIST (Cont'd)

MErllANTCALCOMPONENT filters (air)

MAINTENANCE ACTIVITY housing maintenance media replacement POST MAINTENANCE TEST RE UIREMENTS leakage test; fox SGTS oz Control Room Emergency Ventilation, chemical absoxption test(s)

flow, delta
pressure, and chemical absorption test(s) filters (fluid) flanges freon units (chillersl gates gears hatches h eat exchangezs intake area smoke chemical
release, or painting housing maintenance media replacement gasket replacement any any any any opening of containment hatches tube plugging chemical absorption test(s)

ISI, hydro flow, delta pzessuxe leakage

check, system flow test insezvice test exercise test (raise/lower) inservice test (ST foz driven device) leakage test (LLRT for Containment)

LLRT tube leakage test; LLRT for Unit l Containment Spray llX's; verification of heat exchange capability, either by test ox analysis hydxa<<lic units piping any weld repair inservice test (ST for dxiven device)

ISI; hydro TDP-8

-4 February 1986

POST MAINTENANCE TESTING COMPONENT LIST (Cont'd)

MECIIANICALCOMPONENT MAINTENANCE ACTIVITY POST MAINTENANCE TEST RE UIREMENTS penetzations:

non-containment repair, replacement leakage test fox fixe rated oz pressure boundxy containment pumps any opening packing/mechanical seal ad)ustment oz replacement check fox gxoss leakage; adequate seal cooling overhaul head/capacity test; vibxation; bearing temperatures racks zod drives/NCU's casing xepaix any any any affecting coupling integrity ISI; hydxo inservice test exercise test; scram time test coupling integxity test snubbers any operability test strainexs pressure boundary repaiz ISI; hydro tanks traveling screens turbines any other pressure boundary repair any any insezvice flow test ISI; hydxo insezvice test ST fox driven component valves:

TDP-8

-5 February 1986

POST MAINTENANCETESTING COMPONENT LIST (Cont'd)

MECUANICAL COMPONENT MAINTENANCE ACTIVITY Non-CIV packing replacement ox adjustment POST MAINTENANCE TEST RE UIREMENTS stroke timing CIV packing replacement or adjustment pxe-maintenance LLRT; post main/@nance LLRT; stroke timing limit switch replacement or adjustment (stem mounted ox internal) stroke; verify limit switch actuation of controlled device including any inter-locks torque switch replacement or adjustment motor operator replacement air opexator replacement controller replacement pzessuze boundary repaix MOVATS stroke timing; MOVATS; verify limit switch actuation of controlled device including any intexlocks stroke timing; vexify limit switch actuation of controlled

device, inc1uding any interlocks; snoop air connections insexvice test ISI; hydro valve intexnals zepaix:

Pressure Isolation valves seat leakage test (Unit 1 T S

3 2

7 1, Unit 2 T.ST 3 4.3.2 d)

CIV's LLRT Vacuum Breakers:

Torus to Drywell Pressure decay rate test (Unit 1 only),

Force test pex T.ST 4.3.6.b.l (Unit 1)

TDP-8

-6 Febzuary 1986

POST MAINTENANCE TESTING COMPONENT LIST (Cont'd)

MECIIANTCALCOMPONENT MATNTFNANGE ACTIVITY POST MAINTENANCE TEST RE UIREMENTS Rx Bldg to Tozus Accumulator Check valves replacement:

safety valve Force test per T.S. 4.3.6.b.l (Unit 1) leakage check per T S 4.1 3 5 b 2 pressure lift test prior to installation inservice flange leakage test SRV Pressure Isolation valves Unit 1:

flow test per T S. 4.l 5.a seat leakage test (Unit 1 T S

3 2.7.1, Unit 2 T.S. 3.4.3-2.d)

CIV's LLRT Vacuum Breakers:

Torus to Drywell Rx Bld to Torus Acciimulator Gheck valves Pressure decay rate test (Unit 1 only),

Force test per T.S. 4.3.6.b.l (Unit 1)

Fozce test per T.S. 4.3.6.b.l (Unit 1) leakage check per T.S.

4 1 3.5.b.2 TDP-8

-7 February 1986

POST MAINTENANCE TESTING COMPONENT LIST ELECTRICAL COMPONENT MAINTENANCE ACTIVITY POST MAINTENANCE TEST RE UIREMENTS annunciators batteries any cell replacement insexvice tes t cell voltage; cell specific gravity; bank voltage breakers (switchgeaz) bank zeplacement any battery discharge test trip and closure tests; ST for effected component generators (emergency) any load test heaters heat tzace hoists lighting (emergency) limit switches limitozques M-G sets:

any any any any adjustment ox replacement any xated power test insexvice test load test inservice test vexify actuation of controlled device including any intexlocks see valves; MOVATS zecixculation UPS meters any any any insezvice test load test inservice test motors any insexvlce test; bearing tempezatuxes; ST fox driven device TDP-8

-8 Febr>>ary 1986

POST MAINTENANCE TESTING COMPONENT LIST (Cont'd)

FLFCTRTCAL COMPONENT MCC's (load centers)

MATNTFNANCF ACTIVITY any POST MAINTENANCETEST RF UIREMENTS ST foz effected components penetratiorls electrical repair any other meggez test see penetrations, mechanical refuel platfozm relays RPIS solenoids squibs any replacement adjustment any any squib replacement ST pze or post xeplacement inservice test post adjustment calibration inservice test cycle; ST for actuated device test fixe replaced squibs; fire one from new batch transformers volatage regulator any any inservice test inser vice test; ST fox emergency generators TDP-8

-9 February 1986

POST MAINTENANCE TESTING COMPONENT LIST T&C COMPONENT accelerometezs amplifiers CAM's chart recorders communication equipment MAINTENANCE ACTIVITY any any any any any POST MAINTENANCE TEST RE UIREMENTS insezvice tes t inservice test insezvice test calibration, insezvice test insezvice test Gaitronics speaker repaiz, replacement audibility ST c ontrollezs any insezvice test Detectors:

fire radiation EPR gas analyzer indicators LVDTs MPR meteorological instruments any any any any any any any any inservice test inservice test insezvice test inservice test inservice test inservice test insezvice test insezvice test meters any inservice test TDP-8

-10 February 1986

POST MAINTENANCE TESTING COMPONENT LIST (Cont'd)

I&C COMPONENT MAINTENANCEACTIVITY POST MAINTENANCETEST RE UIREMENTS neutxon instrumentation:

SRM IRM APRM LPRM RBM PINGS positioners refueling grapple relays RPIS any any any any any any any any any any inservice test insexvice test inservice test insexvice test inservice test inservice test insexvice test insexvice test inservice test inservice test Rod Worth Minimizer Rod Sequence Contxol any any ST ST RTDs seismometezs synchroslsexvos switches:

limit any any any replacement or ad)ustment insexvice test inservice test insexvice test verify limit switch actuation of controlled device TDP-8 -ll February 3.986

POST MAINTENANCETESTING COMPONENT LIST (Cont'd)

T&C COMPONENT MAINTENANCE ACTIVITY POST MAINTENANCETEST RE UIREMENTS flow level pressure/DP radiation temperature any any any any any insexvice test insezvice test insezvice test insezvice test insezvice test SQUIBS SQUIB Replacement Test Fire Replace SQUIBS; Fire One From New Batch TIP system thezmocouples txansducers tzansmittezs any any any normalization of output prior to use inservice test insezvice test conductivity flow humidity pressuze/DP zadiation temperature trip units tachometexs any any any any any any any any insexvice test inservice test inservice test inservice test inservice test insezvice test insezvice test inservice test TDP-8

-12 February 1986

POST MAINTENANCE TESTINC COMPONENT LIST (Cont'd )

IaC COMPONENT t imers valves MAINTENANCEACTIVITY any replacement POST MAINTENANCETEST RE UIREMENTS inservice test pressure test of fittings; flow tes t for excess flow check valves vibrometers

'video equipment any any inservice test inservice test TDP-8

-13 Pebr<<ary 1986

DEFINITIONS:

ANY:

any maintenance activity that could effect the proper functioning of the component.

Includes:

any dissassembly of the component or power supply.

Does not include removal of inspection covers on non pressure retaining components.

Does not include non intrusive maintenance, such as a visual inspection or surface cleaning.

CIIRT:

Appendix J to 10CFR50 Containment Integrated Leak Rate test INSERVICE TEST:

observation of correct operaion of the component after being placed in service.

This should be accomplished by comparison with redundant equipment or with previously known performance characteristics.

This may need to be accomplished with one or more of the following Technical Specifications tests:

Surveillance tests (ST)

Channel Calibration Sensor Check/Channel Check Instrument Channel test/Channel Functional test Source Check Non destructive examination as required by ASME B&PV code section XI.

LOCAL LEAKAGE TEST:

a test for leakage at the point of maintenance, such as a Downy Wand test.

LLRT:

Appendix J to 10CFR50 Local Leak Rate Test.

LOAD TEST:

a test

.designed to assure that the component is capable of carrying its required load.

PRESSURE/FLOW TEST:

a test designed to assure that a

fan or pump is operating on its head/capacity

curve, or a

test designed to show that a

pressure boundary is sufficiently leak tight.

STROKE TEST:

movement of a valve or damper through a sufficient portion of its travel to assure freedom of movement.

STROKE TIMING TEST:

timing of the movement of a valve or damper through a

sufficient portion of its travel'o assure that the travel time is correct.

This test usually requires full travel unless partial travel times are previously documented.